Loading...
Project 133 - Proposal - Hamers - 1994-07-19 J) ROBIN B. HAMERS 234E 17TH ST SUITE 205 S. ASSOCIATES, INC. COSTA MESA,CA 92627 CIVIL ENGINEERS PLANNERS SURVEYORS (714?54B-1192 July 19 1994 Board of Directors Costa Mesa Sanitary District P 0 Box 1200 Costa Mesa CA 92628 RE PROPOSAL TO PROVIDE INSPECTION SERVICES PROJECT 1112100-133 PUMP STATION MAINTENANCE Gentlemen The following proposal is submitted to provide the necessary engineering services during the construction phase of said project Construction is scheduled to be completed within a 9 week period beginning in September 1994 The necessary services to oversee the project are engineering drafting and inspection and the estimated maximum number of hours and proposed rate for each are as follows Engineering 40 hrs @ $59 00/hr = $ 2 360 00 Drafting 4 hrs @ $47 00/hr = 188 00 Inspection 150 hrs @ $42 00/hr = 6 300 00 TOTAL $ 8 848 00 The above are maximums and billing will be only for actual time worked Sincerely R Robin B Hamers RBH/jp/proposal cms to Printed on Recycled Paper