Loading...
Proposal - Project 342 Headquarters Sewer Water - 2023-05-18May 2, 2023 P342 HQ Sewer and Water Modifications ReBid BID FORM Company Name: ______________________________ Address: ______________________________ Phone #: ______________________________ Base Bid (And basis of Award): Provide HQ Property Serwer and Water modifications per Plans, Specifications, and Standard Drawings that generally consist of installing a new 4” private sewer lateral with cleanout(s), installation of new cleanout on existing sewer lateral, install a new 2” copper waterline, install new 2” RP Backflow device, and new 1” copper waterline with appurtenance. Task Description Cost Basis 1. Move-on and overhead Lump Sum 2. Install new 4” sewer lateral with Single and Double Cleanout(s)Lump Sum 3. Install new CMSD S-107A Double Cleanout on existing sewer Lump Sum 4. Install new 2” copper potable water line with RP Backflow Device Lump Sum 5. Install new 1” copper potable water line with hose bibbs Lump Sum 6. Move-off and close-out Lump Sum PROJECT Base Bid TOTAL (Numbers):$ _____________________________Total Base Bid Price (in Words): The Base Bid will be used to award a contract and the basis of award to the lowest responsive and responsible bidder. Price(s) given above are consultant for 60 days after date of bid opening. May2, 2023 Page | 2 Alternate Bid Price (District may consider a substitution for Bid Line #5): Not Bases for Award A1 Lump Sum Install new 1” HDPE potable water line with copper hose bibbs risers instead of 1” copper (alternate for Bid Item #5, above). Lump Sum $ A2 Not Used Lump Sum $ 0.00 TOTAL AMOUNT OF ITEMS A1 THROUGH A2 $________________ Addendum(s) No(s). ____,____,____, and ____ has/have been received and is/are included in this bid. Contractor License: _________________________________ Bidder Signature: _________________________________ Print Name & Title: _________________________________ Date: _________________________________ Email: _________________________________