S-84-11.1W r Y� EST /MATE OF QUANT/ T /ES IVs I TEM UN IT QUANT. l 24" I D. VCR SEWER L.F. 307.7 2 24 I.D. D.I.P. SEWER WITH CONC. ENCASEMENT L.F. 12.5 3 2 I.D. V.C.P. SEWER L.F. 1t302.4 4 18" I D. V• C.P. SEWER L.F. 7.5 5 15'v ID. V. C.P. SEWER L.F 5 6 60" I.D. M.H. EA. 5 7 BOX M.H. EA. / 8 RECONST. EXIST. M.H. BASE EA. 2 9 REMOVE EX /ST. SEWER PIPE L.F 156 l0 REMOVE EX /ST. M.H. AND BASE EA. 2 l/ 601" ID P.V.C. LINED M.H. EA. / /3. Sewer manhole frame and cover shall be Alhambra Foul dry A -1270, or approved equal Cover to be stamped SEWER' COSTA MESA SANITARY-DIS PROJECT Ns / / /2 /Ob -B/ PLAN AND PROF / L E FOR THE CONS TRUC T / ON OF -X- R- V /NE LOWER ".ST A 14 Sewer main shall be balled after al/ manhole frames and covers have been raised to grade. --€V- /6 Contractor shall be responsible for maintaining warning devices, flashing arrow boards, -- lights and flagmen in accordance with "KWK AREA TRAFFIC' CONTROL HANDBOOK 'v published by Building News, Inc., /982. 17 trench backfill material shall be crushed aggregate base and shall be installed per CCM Std. 801 Bedding and trench resurfacing shall be per CCM Std. 801. A permit shall be obtained from CCM prior to commencing work. All manhole excavations shall be backfil/ed with 1 -112 sack sand - cement slurry. UTILIT /ES CALL N° L • 04ess Consa darsd WM63 14200 Underground Ser"te Alert Pacific Te /ephons 633.0811 481rs. prior to arcovating Southern Calif. Ed/son 973 - 549 1 for avdergroubd locating. Soath4in Collf. lras 634,3//7 1-800-422-4133 " . FL OWER STREET SEER j BENCH MARKt IN _ O. C. S, Benchmark N.B.G.-17-70 Disc stalWed NBG-17 -70 northwest corner- of intersect/an 19th and Irvine Avenue, north curb - AVENUE :.. -FROM 19TH ST., TO FL OWER, ST. _ - �� of 191h Street, 43'' west of center line Irvine Avenue, southwest corner of :catch basin. - -- IN - - - Elevation= 79.863 " REET,1 _- FROM -XRV /NE _AVE. TO TUSTIN - --AVE. � v " Zi 1 COSTA MESA STREET � LU ` V - QWW z Q TH STREET Q • Q . O 3 Q FLOWER Z AfEw SEWER ° ' v v Z BROADWAY " - NOT / CE TO CON TRAC TORS All contractors and subcontractors performing ivor� shown on or related to these plans shall conduct their operations so that all persons are provided a safe place to work and the public- is protected. All contractors and subcontractors shall comp /y, with the State of California Department' of Industrial Relations, Division of Industrial Safety and Health, "CONSTRUCTION SAFETY ORDERS." The District Engineer shall not be responsible in any woy for the contractors and subcontracts s compliance , with these orders. s Contractor further agrees that he shall assume sole and complete responsibility for job site conditions during the course df conslructiian of this project, including safety of al/ persons and property; Mat this requirement shall apply continuously and not be limited to- normal working hours; and that the contractor shall defend, Andemnify, and hold the Costa Mesa Sanitary District and the ` District Engineer harm less from any and a// liability),* real or alleged, in connection with the performance of work on this projeq excepting for liability arising from the sole negligence of the Costa Mesa Sanitary District, or the District Engineer. The existence, approximate location and extent of any underground " utilities or structures shown hereon have been obtained by a search of the available records. ' The contractor is required to take due precautionary measures to protect the utility lines shown and any other lines not of record or not shown. K the contractor, while LOCA r ION MAP 'A4- performing the contract, discovers utility facilities not shown hereon, BUILT' he shall immediately notify the District Englneer in writing. SCALE l'- 200' t� MT. w . Mal _ Project V 1112100- 81 Pans comply. wirh City of Costa.Mesa standards.for . ENGINEER SHEET street reconstruction and are approved for issuance COSTA MESA SANITARY DIST. of Public Right- of- Way Excavation and Construction FLOWER STREET. SEWER permit. Approved OF Bruce D. Mottern City Engineer R.CE.19388 Date Robin B. Homers R.C.E. 3172-0 Date GENERAL NO TES 1. The sewer system shall conform to the standards of the Costa Mesa $an/tary District. P. Contractor shall request inspection from the office of the District Engineer 46 hours prior to commencement of work. Tel (71V 631 -173L 3 Any work performed without inspection from the District shall be considered unacceptable. 4. Contractor shall obtain C.M.,SD. sewer permit prior to construction from the Department of Streets and Sanitation, City of Costa "Mesa, 77 Farr Drive. Tel (714) 754 -5323. 5 Contractor shall obtain al/ necessary permits that may be required by the loco/ governing agency. 6 Contractor to have a' copy of approved sewer plan and CRUD, Standard Plans and Specifications on job site of all limes. 7 Cloy ppe joints shall be Type aG a mechanical compression joints for main line sewer. Type "D" joints, Bond -Seal or approved equal, are approved for laterals and repair work only. .a . a a ' 0& somilp ! 1. Sewer main shall be air or water tested meeting District Engineers approval 12. Prior to asphalt concrete paving, manhole frames and covers shall be left 6" below finish grade. After street surfacing is completed, frames and covers shall be raised to grade per Std Dwg. N4 S -105. r /3. Sewer manhole frame and cover shall be Alhambra Foul dry A -1270, or approved equal Cover to be stamped SEWER' 14 Sewer main shall be balled after al/ manhole frames and covers have been raised to grade. --€V- /6 Contractor shall be responsible for maintaining warning devices, flashing arrow boards, -- lights and flagmen in accordance with "KWK AREA TRAFFIC' CONTROL HANDBOOK 'v published by Building News, Inc., /982. 17 trench backfill material shall be crushed aggregate base and shall be installed per CCM Std. 801 Bedding and trench resurfacing shall be per CCM Std. 801. A permit shall be obtained from CCM prior to commencing work. All manhole excavations shall be backfil/ed with 1 -112 sack sand - cement slurry. UTILIT /ES CALL N° L • 04ess Consa darsd WM63 14200 Underground Ser"te Alert Pacific Te /ephons 633.0811 481rs. prior to arcovating Southern Calif. Ed/son 973 - 549 1 for avdergroubd locating. Soath4in Collf. lras 634,3//7 1-800-422-4133 " . FL OWER STREET SEER j BENCH MARKt IN _ O. C. S, Benchmark N.B.G.-17-70 Disc stalWed NBG-17 -70 northwest corner- of intersect/an 19th and Irvine Avenue, north curb - AVENUE :.. -FROM 19TH ST., TO FL OWER, ST. _ - �� of 191h Street, 43'' west of center line Irvine Avenue, southwest corner of :catch basin. - -- IN - - - Elevation= 79.863 " REET,1 _- FROM -XRV /NE _AVE. TO TUSTIN - --AVE. � v " Zi 1 COSTA MESA STREET � LU ` V - QWW z Q TH STREET Q • Q . O 3 Q FLOWER Z AfEw SEWER ° ' v v Z BROADWAY " - NOT / CE TO CON TRAC TORS All contractors and subcontractors performing ivor� shown on or related to these plans shall conduct their operations so that all persons are provided a safe place to work and the public- is protected. All contractors and subcontractors shall comp /y, with the State of California Department' of Industrial Relations, Division of Industrial Safety and Health, "CONSTRUCTION SAFETY ORDERS." The District Engineer shall not be responsible in any woy for the contractors and subcontracts s compliance , with these orders. s Contractor further agrees that he shall assume sole and complete responsibility for job site conditions during the course df conslructiian of this project, including safety of al/ persons and property; Mat this requirement shall apply continuously and not be limited to- normal working hours; and that the contractor shall defend, Andemnify, and hold the Costa Mesa Sanitary District and the ` District Engineer harm less from any and a// liability),* real or alleged, in connection with the performance of work on this projeq excepting for liability arising from the sole negligence of the Costa Mesa Sanitary District, or the District Engineer. The existence, approximate location and extent of any underground " utilities or structures shown hereon have been obtained by a search of the available records. ' The contractor is required to take due precautionary measures to protect the utility lines shown and any other lines not of record or not shown. K the contractor, while LOCA r ION MAP 'A4- performing the contract, discovers utility facilities not shown hereon, BUILT' he shall immediately notify the District Englneer in writing. SCALE l'- 200' t� MT. w . Mal _ Project V 1112100- 81 Pans comply. wirh City of Costa.Mesa standards.for . ENGINEER SHEET street reconstruction and are approved for issuance COSTA MESA SANITARY DIST. of Public Right- of- Way Excavation and Construction FLOWER STREET. SEWER permit. Approved OF Bruce D. Mottern City Engineer R.CE.19388 Date Robin B. Homers R.C.E. 3172-0 Date