Loading...
S-83-4.2, 7m NORM. a4 AT' OF THE VII y I I CH 41EEL PLI All WHEN I I) [w I I C. PATCH PER I r 'I ` ONTRACTOR bN LONTRACTOR TD VERITY EIEV. 0 LE55 THAN 1' y NO TO CBN4TRUCTILIN h PROVIDED AP L� OPEN TRENCL to �'aN p OMSTRUCTION 71 In t Pm EXISTING OINNND RMU HE AREA OWN THE AREA EXIST. O' V.C.P. E� � f 2 "� l P TIC Epi1ATI0N CowSE I" CIIAONLL r1K 1T' VIP. ,rd's' Lj I I I EXISL �1' M.II 111 iiy AG ll ii I RETAIL I • EXIST. MANHOLE 4CA1E 4h": V is C WHIM FOR OPEN CLITi IN IRVINE AVENUE CONST. CONIBOL PANEL PER 411E 4. L% XI t GUY P e BURNG • (4EE bP .) • D " Cl: Pax. PER MR 3 IIIH 4NT S. 1ST. W. TUBE IEPLACED TO THE THFACTION OF E.MA. INSPE IDETAKS 3.40' 91] #AID' 0 I X5:0, PHST. PUMP STATION i VALVE VAULT 4HT4. 11157. &i' A.C. AA.H.W.D. WATER MAIN I PROTECT IN PLACE 1 EXMT.: 3" GAS MAIN (PROTECT IN PIACEI 1 on• W (0.00 ti X6T. &A . (PROTEG. N FL as fYKT B" CD (PROTECT IN PUCE OR RERACE' _ flail i J"w - LIMITS OF A.C. 'CAP N 39.48' LtillttVEy Cl. i i as su,ts- •L A. INSPELTOR. EXKT. B SEWER MAIN (PROTECT IN PLACE) EXKT:' W A.C. NEWPORT BEACH WATER W MAIN IRRY BALKFILL SHALL BE USED IN ALL OPEN CUTS AND SHALL BE PLACED WITHIN 24 NOUR5 AFTER t WHIM FOR OPEN CLITi IN IRVINE AVENUE 111 URRRLIL CUU11URRI Ii REPLACEMENT OF EXKTIMC 67REET IMPROVEMENTS TO BE MADE UNDER THE DIRECTION OF i TO THE EY OF NEWPORT BEACH { [ i N 39.48' EXSTING TRACTOR •L A. INSPELTOR. ELECT EBIDPMENT. ETC... AND RETURN TO THE UM. II11LPILRATION YARD, PLACENTIA AVE.*. AND W9111I EYMT. WITH SAND OR SWRRY: AND REPLACE 711 111 W 5FAC110N OF 0PECTNU IRRY BALKFILL SHALL BE USED IN ALL OPEN CUTS AND SHALL BE PLACED WITHIN 24 NOUR5 AFTER EXIST. 10" C.IP. H SNALL BE OF HIGH HUALITY AND TO THE TOTAL SA1IhFACT10N OF THE E.M.A. INSPECTOR. HALL BE ON THE JOB KITE BEFORE THE IRENCNINS BEG1N5..PLATIS (WALL BE PINNED OR MATERIAL SHALL BE W51ALLED TO FINVA GRADE AND TD THE SATIhTACTIDN OF THE E.M.A. 4MITH•BLAIR TYPE 411 COUPUNG THAN TWO WOR)UNG DAYS AFTER THE SLURRY BACKFIIL HAS BEEN PLACED. R15PON5151E FOR ADJUSTING ThMA GRADE OF AE. PATCH DUE TO SLITLEMENT COMMENCINH KING DANS AND COMPLETING NO LATER IRAN 20 WORRING DAYS AFTER A.C. PATCH INSTAUNIHiN LL WORK SHALL BE DONE TO TAE SATISFACTION OF THE E.M.A. 114PECTOR. SE COVERED BY 5P.M. EALH DAY. •LASED SUCH THAT THERE Will DE NO MORE THAN 1 OPEN TRENCH IN IRVINE OR IhEM W ANY TIME. CON51. 10" I.D. DI.B �, DRIVE TO BE COLD PLANED NEXT TO GLITTER t CAP wnk O.1' A.E.. THEN FOG SEAL 1 RE17RIFE G" BRONZE WIC% MWUUG ED 0R THE, PIFW5.0NADED AREA BELOW FLANGED DNE END s' Li O OO G " DEZURIR ECCEIITRIC 11.1111 1MVE _ IO" 45• ELBOW � °— Ills 10.6 TEE O CLA55 B CONCRETE THIN BLOCK G" 90' BIKE ELBOW 4 i2ST. BEARING AREA ON 4011 1 CE1N5T. I O" I.D. O.I.P. I I m FLANGED ONE END C.I. PIPE STAND BOLTED 70 FLOOR OF VALVE VAULT I BASE IF ELBOW W/ 4 • -SW Y01i5. VATION9 TO BE 1AMFUIED WITH TW0 SACK UMY EXKT. 10" LIP., PLUG i AMNDON N PLACE SECTION A •A - BYPASS CONNECTION ' 5EE SHEET 4 iME 1 ": V DETAIL 2 • TIE INTO EXKT. MAIN i LO 4CALE 'k; V NOTE g E.I. PIPE r FILL ED {CAPPED tl AT TIME OF TIE'IN 14" PWG VALVE IN ELDEN W /GONC..1.0' j STATION VALVE VAULT MUST BE C105ED. BACK OF FACE OF CURB. I ' PC.C.51DEWAI% ti a - r 10' —,0 20' LO PUMP STATION OR ci 1 VALVE VAULT I W I .rl4i: _ .2•x2•xV CONC. BLOCK POURED ACAIMT � COMPACTED FILL. II EXKT, • 16 RCP . 7 EXKTP.P TRAFFIC GONT00L UNIT 1 La ffiq ° ca ccw �Sr MI TRAFFIC 4M �o r ' r DETAIL 3 • BARRIERS :U%1[NG C.MkD. PUMP STATION CONTROL BOX �- i VENT PIPE. (TO BE REMOVED t RETURNED BY CONTRACTOR TO CCYL t11{PORATIH11 YARD. 21100 RMITIA AVE) �,ITE PLAN hCALE r : 113' LIImR 111 URRRLIL CUU11URRI 31 "E 1D BL. C.MAD, PUMP STATION TO RE ADANDONED - TO',REMUVE All MR,COVERS. VALYES. EY OF NEWPORT BEACH { [ i N 39.48' EXSTING TRACTOR : ITTIN65, -•• UL ERUIPMENT 2500 4TR11CTURE -� t3' 21.48 IRVINE AYE, HAM U'[U].00 MESA DRI% ELECT EBIDPMENT. ETC... AND RETURN TO THE UM. II11LPILRATION YARD, PLACENTIA AVE.*. AND W9111I EYMT. WITH SAND OR SWRRY: AND REPLACE 711 111 W 5FAC110N OF 0PECTNU BAFFIC CUNTRUL NOTE51 1. CONTRACTOR TO SUBMIT AN ACCEPTABLE TRAFFIC CONTROL PLAN TO THE COUNTY OF ORANGE PRIOR TD BEGINNING CONTT. It. CONTRACTOR TO MAINTAIN 1 LANE OF TRAFFIC IN BOTH DIRECTIONS ` ALONG IRVINE AVENUE AT ALL TIME4 ( MAINTAIN 2 LANES OF TRAFFIC IN EACH DIRECTION DURING PEAK TRAFFIC MUM. e' I PEAK HOUR5 11A1 BE 7AM TO 9AM AND 3 PM TO W 311 PM � �,MONDAY THR101E19 TRIOAY ULESS OTWIWME DETERMINED By SINE COUNTY INSPECTOR - 711' , • • wamu IS" Wa-4 i • • OKCNARCE M• 11.0" a 11.0" WELL DETAIL 4 • ANCHOR 811114 NOT TO SCALE *IEET hEE hNEET ,. TKIN AVENUE PUMP, 4TATION r of 0 A5-BUILT 7.4.153 V RELOCATION I REMODEL a •