S-83-4.1EST /MATE OF OUANT/ T /ES
Ns
ITEM
UNIT
0UANT.
I
PUMP STATION 8 VALVE VAULT COMPLETE
L.S.
f. .
2
/5' V- CP SEWER
L. F.
98
3
4
L.F
l0/
EST /MATE OF OUANT/ T /ES
Ns
ITEM
UNIT
0UANT.
I
PUMP STATION 8 VALVE VAULT COMPLETE
L.S.
2
/5' V- CP SEWER
L. F.
98
3
/0" D.l.P FORCE MAIN
L.F
l0/
GENERAL NO TES '
L The sewer system shall conform to the standards of the Costa
Mesa Sanitary District.
2 Contractor shall request inspection from the office of the DiWr/ct
Engineer 48 hours prior to commencement of work. Tel (714► 631- 1731.
3 Any work performed without inspection from the District shall
I* eonsidemd unacceptable.
Contractor shall obtain C.M.SD, sewer permit prior to construction
from the Department of Streets and Sanitation, City of Cos
Mesa, 77 Fdr Drive. Te% (714) 754 -5323.
5 Contractor shall obtain all necessary permits that may be required
by the loco/ governing agency.
6 Contractor to have o- copy of approved sewer plan and C.AtS.D.
Standard Plans and Specifications on job site at all times.
7 Clay pipe joOfs shall be Type "G" mechanical compression joints
for main line sewer. Type "D" joints, Band -Seal or approved
equal, are approved for laterals and repair work only.
B." laterals shall be constructed from the sewer main to every lot.
9 All laterals shall be placed prior to surfacing of streets.
10. Stapp "S "on exurb at sewer- lateral locations.
It Sewer main shall be air or water tested meeting District
Engineers approvoL
12. Prior to asphalt concrete paving, manhole frames and covers shall
be left 6" below finish grade. After street surfacing is completed,
frames and covers shall be raised to grade per Std Dwg. III° S -105.
13. Sewer manhole frame and cover shall be Alhambra Foundry A -1270,
or approved equal. Cover to be stamped 'SEWER'.
14 Sewer main shall be balled after all manhole frames and covers
have been raised to grade.
15. PVC pipe may be used oa& with prior approval ftom the District
Engineer. .
1 16. Contractor shall be responsible for maintaining warning devices,
lights and f/ogmen in accordance with "WARK AREA TRAFFIC'
CONTROL HANDBOOK " published by Building News, Inc., 19W, 8
"MANUAL OF WARNING SIGNS, LIGHTS, AND DEVICES FOR
L/SE IN PERFORMANCE OF WORK UPON HIGHWAYS 'v issued by
AW State of California, Department of Public Works, latest edition.
F
TU lL /T /E$: p CALL Awq
Southern Cal. Edison 7/4 -835 -3833 [knabrVarnd Servke Alert
Southern Cal. Gas 714- 634 -3117 ,6� prior to innovating
Padfk Tel*bone 714- 633 -0811 la, &;dvQ.ound locating.
Santa Ana Heights Water 714-545-1060 1-800-422-4133
Newport Beach Utilities 714- 640 -2221
PLAN AND PROF ! L E FOR
1 iricrv—i�
THE CONS
TUS T / N AVENUE PUMP / NG
/N
__. .THE /NTERSECTION OF
MESA DR /
TRUC TI ON OF -
,S TA TI O K• MA R
DC.S. Benchmark C.M. 20-70
In the southeast part of the intersection of Tustin Averve
and Mesa Drive; 59 feet southeast of the centerline of
Tustin Avenue; 36 feet southwest of the centerline of Mesa
Drive; 0.7 feet northeast of the southwest end of a concrete
VE _.�A ND_ l.R V 1 _NE A VENUE retaining wall., level with the sidewa /k.
a
} 1976 a %v 25.871
4
PROJECT SITE
Santa Ana Country Club
City
- of
wI
County of ' Orange
_ 'Q DRIVE
Costa Mesa
a
_ � d
MAR
L OCA T/ ON MAP
SCALE /' =400'
NOTICE TO CON TRAC TORS
All contractors and subcontractors performing work shown on or
related to these plans shall conduct their operations so that all
persons are provided a safe place to work and the public is
protected. All contractors and subcontractors shall comply with
the State of California Department of Industrial Relations,
Division of Industrial Safety and Health, . "CONSTRUCTION
SAFETY ORDERS." The District Engineer shall not be responsible
in any way for the contractor's and subcontractor's compliance
with these orders.
Contractor further agrees that he shall assume sole and complete
responsibility for job site conditions during the course of constructiv
of this project, including safety of a// persons and property;
Nut this requirement shall apply continuously and not be limited
to normal working hogs; and that the contractor shall defend,
indemnify, and hold the Costa Mesa Sanitary District and the
District Engineer harm less from any and a// liability, real or
eolleged, in connection with the performance of work on this prgec{
*=opting for liability arising from the sole negligence of the
Casio Mesa Sanitary District, or the District Engineer.
The existence, approximate location and extent of any underground
utilities or structures shown hereon have been obtained by a search
of the available records. The contractor is required to take due
precautionary measures to protect the utility lines shown and al
other lines not of record or not shown. K the contractor, while
performing the contract, discovers utility facilities not shown hereon,
he shall immediately notify the District Engineer in writing.
_ t
"AS - BULT" 7 -5 -83
Project NO 1112100 -74
ENGINEER: _ SHEET
1 COSTA MESA SANITARY D /ST. TUST /N PUMPING STATION
Approved: OF
at RELOCAT /ON $REMODEL
. 5
Robin B. Homers R.C.E. 3/720 Date