Loading...
S-83-4.1EST /MATE OF OUANT/ T /ES Ns ITEM UNIT 0UANT. I PUMP STATION 8 VALVE VAULT COMPLETE L.S. f. . 2 /5' V- CP SEWER L. F. 98 3 4 L.F l0/ EST /MATE OF OUANT/ T /ES Ns ITEM UNIT 0UANT. I PUMP STATION 8 VALVE VAULT COMPLETE L.S. 2 /5' V- CP SEWER L. F. 98 3 /0" D.l.P FORCE MAIN L.F l0/ GENERAL NO TES ' L The sewer system shall conform to the standards of the Costa Mesa Sanitary District. 2 Contractor shall request inspection from the office of the DiWr/ct Engineer 48 hours prior to commencement of work. Tel (714► 631- 1731. 3 Any work performed without inspection from the District shall I* eonsidemd unacceptable. Contractor shall obtain C.M.SD, sewer permit prior to construction from the Department of Streets and Sanitation, City of Cos Mesa, 77 Fdr Drive. Te% (714) 754 -5323. 5 Contractor shall obtain all necessary permits that may be required by the loco/ governing agency. 6 Contractor to have o- copy of approved sewer plan and C.AtS.D. Standard Plans and Specifications on job site at all times. 7 Clay pipe joOfs shall be Type "G" mechanical compression joints for main line sewer. Type "D" joints, Band -Seal or approved equal, are approved for laterals and repair work only. B." laterals shall be constructed from the sewer main to every lot. 9 All laterals shall be placed prior to surfacing of streets. 10. Stapp "S "on exurb at sewer- lateral locations. It Sewer main shall be air or water tested meeting District Engineers approvoL 12. Prior to asphalt concrete paving, manhole frames and covers shall be left 6" below finish grade. After street surfacing is completed, frames and covers shall be raised to grade per Std Dwg. III° S -105. 13. Sewer manhole frame and cover shall be Alhambra Foundry A -1270, or approved equal. Cover to be stamped 'SEWER'. 14 Sewer main shall be balled after all manhole frames and covers have been raised to grade. 15. PVC pipe may be used oa& with prior approval ftom the District Engineer. . 1 16. Contractor shall be responsible for maintaining warning devices, lights and f/ogmen in accordance with "WARK AREA TRAFFIC' CONTROL HANDBOOK " published by Building News, Inc., 19W, 8 "MANUAL OF WARNING SIGNS, LIGHTS, AND DEVICES FOR L/SE IN PERFORMANCE OF WORK UPON HIGHWAYS 'v issued by AW State of California, Department of Public Works, latest edition. F TU lL /T /E$: p CALL Awq Southern Cal. Edison 7/4 -835 -3833 [knabrVarnd Servke Alert Southern Cal. Gas 714- 634 -3117 ,6� prior to innovating Padfk Tel*bone 714- 633 -0811 la, &;dvQ.ound locating. Santa Ana Heights Water 714-545-1060 1-800-422-4133 Newport Beach Utilities 714- 640 -2221 PLAN AND PROF ! L E FOR 1 iricrv—i� THE CONS TUS T / N AVENUE PUMP / NG /N __. .THE /NTERSECTION OF MESA DR / TRUC TI ON OF - ,S TA TI O K• MA R DC.S. Benchmark C.M. 20-70 In the southeast part of the intersection of Tustin Averve and Mesa Drive; 59 feet southeast of the centerline of Tustin Avenue; 36 feet southwest of the centerline of Mesa Drive; 0.7 feet northeast of the southwest end of a concrete VE _.�A ND_ l.R V 1 _NE A VENUE retaining wall., level with the sidewa /k. a } 1976 a %v 25.871 4 PROJECT SITE Santa Ana Country Club City - of wI County of ' Orange _ 'Q DRIVE Costa Mesa a _ � d MAR L OCA T/ ON MAP SCALE /' =400' NOTICE TO CON TRAC TORS All contractors and subcontractors performing work shown on or related to these plans shall conduct their operations so that all persons are provided a safe place to work and the public is protected. All contractors and subcontractors shall comply with the State of California Department of Industrial Relations, Division of Industrial Safety and Health, . "CONSTRUCTION SAFETY ORDERS." The District Engineer shall not be responsible in any way for the contractor's and subcontractor's compliance with these orders. Contractor further agrees that he shall assume sole and complete responsibility for job site conditions during the course of constructiv of this project, including safety of a// persons and property; Nut this requirement shall apply continuously and not be limited to normal working hogs; and that the contractor shall defend, indemnify, and hold the Costa Mesa Sanitary District and the District Engineer harm less from any and a// liability, real or eolleged, in connection with the performance of work on this prgec{ *=opting for liability arising from the sole negligence of the Casio Mesa Sanitary District, or the District Engineer. The existence, approximate location and extent of any underground utilities or structures shown hereon have been obtained by a search of the available records. The contractor is required to take due precautionary measures to protect the utility lines shown and al other lines not of record or not shown. K the contractor, while performing the contract, discovers utility facilities not shown hereon, he shall immediately notify the District Engineer in writing. _ t "AS - BULT" 7 -5 -83 Project NO 1112100 -74 ENGINEER: _ SHEET 1 COSTA MESA SANITARY D /ST. TUST /N PUMPING STATION Approved: OF at RELOCAT /ON $REMODEL . 5 Robin B. Homers R.C.E. 3/720 Date