S-83-4.1 (2)I
F
4
r.
t.
t
N°
ITEM
UNIT
OUANT.
l
PUMP STATION a VALVE VAULT COMPLETE
L. S.
performing the contract, discovers utility facilities not shown hereon,
2
15" V. C.P. SEWER
L. F.
98
3
/0" DIP FORCE MAIN
L.F
l0/
Mesa Sanitary District.
15. PVC pipe may be used only with prior approval from the District SCALE 1"- -400'
2
Contractor shall request inspection from the office of the District
Engineer.
Engineer 48 hours prior to commencement of work. Tel (714) 6.3/ -1731
Y"
3
Any work performed without inspection from the District shall
be considered unacceptable.
"=
4.
Contractor shall obtain C.M.S.D. sewer permit prior to construction
CONTROL HANDBOOK" published by Building News, Inc., 1982, 8
from the Department of Streets and Sanitation, City of Costa
Mesa, 77 Fair Drive. Tel (714) 754 -5323.
5
Contractor shall obtain a// necessary permits that may be required
x .
-
by the local governing agency.
6.
Contractor to have a- copy of approved sewer plan and CMS.D.
Standard Plans and Specifications on job site at all times.
* .F
y^
GENERAL NOTES-
4 m
, r
x
14 Sewer main shall be balled after all manhole frames and covers
performing the contract, discovers utility facilities not shown hereon,
zN
%
The sewer system shall conform to the standards of the Costa
r n
Mesa Sanitary District.
15. PVC pipe may be used only with prior approval from the District SCALE 1"- -400'
2
Contractor shall request inspection from the office of the District
Engineer.
Engineer 48 hours prior to commencement of work. Tel (714) 6.3/ -1731
Y"
3
Any work performed without inspection from the District shall
be considered unacceptable.
"=
4.
Contractor shall obtain C.M.S.D. sewer permit prior to construction
CONTROL HANDBOOK" published by Building News, Inc., 1982, 8
from the Department of Streets and Sanitation, City of Costa
Mesa, 77 Fair Drive. Tel (714) 754 -5323.
5
Contractor shall obtain a// necessary permits that may be required
x .
-
by the local governing agency.
6.
Contractor to have a- copy of approved sewer plan and CMS.D.
Standard Plans and Specifications on job site at all times.
* .F
7
Clay pipe, joints shall be Type "G " mechanical compression joints
..'
Project N° 1112100 -7,
for main line sewer. Type "D" joints, Band -Seal or approved
equal, are approved for laterals and repair work only.
f
8.
laterals shall be constructed from the sewer main to every lot.
y,
}
9
'All laterals shall be placed prior to surfacing of streets.
,p
(0.
Stamp "S" on curb at sewer lateral locations.
CALL
1I.
Sewer main shall be air or water tested meeting District
Description
Engineer s approval,
H
12.
Prior to asphalt concrete paving, manhole frames and covers shall
be left 6" below finish grade. After street surfacing is completed..
frames and covers shall be raised to grade per Std. Dwg. N° S -105.
Underground Service Alert
l3.
Sewer manhole frame and cover shall be Alhombra Foundry A -1270,
I t V O.C.S. Benchmark C. M. 20 -70
In the southeast part of the intersection of Tustin Avenue
THE/ A / �� p C c/� � / O A / O� and -Mesa Drive; 59 feet southeast of the centerline_ of
!7 V TER SEC C l� Y Tustin Avenue; 38 feet southwest of the centerline of Mesa
Drive; 0.7 feet northeast of the southwest end of a concrete
MESADRIVE ^ A,D / p ' / I A' c ^ VE I c retaining wall, level with the sidewalk.
f-1 H' V L� V ! Y C f-1 C/ Y G
1976 a %v 25.871
NOTICE TO CON TRAC TORS
All contractors and subcontractors performing work shown on or
related to these plans shall conduct their operations so that al/
persons are provided a safe place to work and the public is
protected. All contractors and subcontractors shall comply with
the State of California Department of Industrial Relations,
Division of Industrial Safety and Health, .itCONSTRUCTION
SAFETY ORDERS. The District Engineer shall not be responsible
in any way for the contractor's and subcontractor's compliance
with these orders.
• _ Contractor further agrees that he shall assume sole and complete
responsibility for job site conditions during the course of construction
of this project, including safety of all persons and property;
that this requirement shall apply continuously and not be limited
to normal working hours; and that the contractor shall defend,
indemnify, and hold the Costa Mesa Sanitary District and the
District Engineer harmless from any and all liability, real or
alleged, in connection with the performance of work on this project,
excepting for liability arising from the sole negligence of the
Costa Mesa Sanitary District, or the District Engineer.
The existence, approximate location and extent of any underground
utilities or structures shown hereon have been obtained by a search
of the available records. The contractor is required to take due
precautionary measures to protect the utility lines shown and any
if t h l
or approved equal. Cover to be stamped SEWER .
other Imes not of record or not shown. the con ractor, w i e
x
14 Sewer main shall be balled after all manhole frames and covers
performing the contract, discovers utility facilities not shown hereon,
have been raised to grade. LOCATION MAP
he shall immediately notify the District Engineer in writing.
15. PVC pipe may be used only with prior approval from the District SCALE 1"- -400'
Engineer.
16 Contractor shall be responsible for maintaining warning devices, .
lights and f/ogmen in accordance with "WORK AREA TRAFFIC
CONTROL HANDBOOK" published by Building News, Inc., 1982, 8
"MANUAL OF WARNING SIGNS, LIGHTS, AND DEVICES FOR
`
USE IN PERFORMANCE OF WORK UPON HIGHWAYS " issued by
-
the State of California, Department of Public Works, latest edition.
'AS - BUILT" 7 -5 -83
Project N° 1112100 -7,
Re visions
ENGINEER:
SHEE:
UTILITIES
CALL
N°
Date
Description
COSTA MESA SANITARY DIST.
TUSTIN PUMPING STATION
Southern Cal. Edison 714- 835 -3833
Underground Service Alert
I
Southern Cal Gas 714- 634:3117
48 hrs. prior to excavating
Approved
OF
"
Pacific Telephone 7/4- 633 -08 /l
far underground locating.
RELOCATION 8 REMODEL
Santa Ana Heights Water 714-545-1060
1-800-422-.4133
Robin B. Homers R.C.E. 3/720 Date
S
Newport Beach Utilities 714- 640 -2221
5- 3 -4,