Loading...
S-80-9.1-9.23 i n VICINITY MAP NO SCALE r I CALL UNDERGROUND SERVICE ALERT 48 HRS. BEFORE YOU DIG FOR UNDERGROUND LOCATING 1- 800- 422 - 4133 i site coedit ur�trtg the course of construction _ . ~_ __- .. _ __ ........_._ _-.__. _ • _ .. -. MESA CONSOLIDATED WATER DIST. COSTA MESA SANITARY . DIET. that he shall a�tmte rote seta eotbptete respahsibt'ltY for job nstructionof this Project ,including safety o all ° 1965 PLACENTIA AVE. r ,> and property; that this requirement shall apply continuously and not be lim- ! E , lx. COSTA MESA CALIF. 92627 (714) 631 -1200 M.C. 539 tted to normal working hours; and that the Contractor shall defend, indemnify and ! ;r g APPROVED BY :���� � DATE: • ,hold the Owner and the Engineer harmless from any and all liability, real or alleged, ,�(� in connection with the performance of work on this Project, excepting for liability j APPROVED BY: l \a. ^�Z- DATE: 27 FEg'80 arising from the sole negligence of the Owner or the Engineer. 0 I" r KARL KEMP /ASST" GEN. MANAGER REVISIONS BENCH MARK: SEWER & WATER PLANS FOR DESIGNED BY SHEET SNEET% NO. DATE DESCRIPTION APP. Tr6.4. / q• or G. ALUMINUM CAP STAMPED "CM 12 -70" IN THE NORTHWEST PART OF THE INTERSECTION OF MONROY2A CIVIL ENGINEERING/ PLANNING DRAWN BY' WHITTIER AVENUE AVENUE AND 18TH STREET; 45.5' NORTH QF THE CENTERLINE OF 18TH 21' WEST OF THE CENTER 17922 SKYPARK CR. SUITE N IBA" OF LINE OF MONROVIA, 2' SOUTHEAST OF A TELEPHONE POLE NUMBER 749611H AT THE NORTHWEST IRVINE, CALIFORNIA 92714 CHECKED BY: srs FROM 33.0.03 FEET TO G(D_DCoFEET S/0 18TH ST. PLAN NO CURB RETURN, IN THE TOP OF A CONCRETE POST, LEVEL WITH THE TOP OF CURB. G��OoG�C�O 714 - 957 -1384 ./H rif ��nn ���nn� ��pp FIELD 900 �D''03 CITY OF COSTA MESA ELEVATION: 103.52 I�IJV(mI1V� mma /oF.taAis7E ec� zoiB� DEPARTMENT OF ENGINEERING SERVICES G ` SEWER NOTES , 1 CONTRACTOR SHALL OBTAIN A PERMIT AND REQUEST INSPECTION FROM CITE' ENGINEERING DEPARTMENT TO BE MADE 48 HOURS IN ADVANCE OF PERFORMING ANY WORK. THELPHONE NO. 714- 754 -5323. 2 THE SEWER SYSTEM SHALL CONFORM TO THE STANDARDS OF THE COSTA MESA SANITARY DISTRICT. I 3 ALL SEWER STATIONING IS ALONG THE CENTERLINE OF THE SEWER. 4 MANHOLES SHALL BE LEFT CLEAN. 5 THE DEVELOPER SHALT FURNISH THE "SEWER CONTRACTOR WITH`A PLOT PLAN INDICATING THE RECOMMENDED LOCATION OF THE HOUSE CONNECTION FOR EACH LOT PRIOR TO SEWER MAIN CONSTRUCTION. 6 ALL SEWER LATERALS SHALL BE STAKED BY A SURVEYOR BEFORE TRENCHING. 7 ALL $EWER CONNECTIONS SHALL BE PLACED PRIOR TO SURFACING OF STREETS. 8 CLAY PIPE JOINT COMPOUND SHALL BE CPI -2; JC -60 MECHANICAL COMPRESSION JOINTS SHALL BE WEDGE -LOCK SPEED SEAL MATNLINE; OR APPROVED EQUAL. IN NO CASE WILL JOINT MATERIAL USING NEAT PORTLAND CEMENT MORTAR OR GROUT BE PERMITTED. 9 STAMP "S" ON CURB AT ALL SEWER LATERAL LOCATION. 10 CONTRACTOR SHALL REQUEST INSPECTION FROM THE OFFICE OF THE SANITARY DISTRICT ENGINEER 24 HOURS PRIOR TO COMMENCE OF WD1RK.r�t;au . TELEPHONE: 714- 754 -5100 11 MANHOLES SHALL BE PRECAST CONCRETE AS MANUFACTURED BY ASSOCIATED CONCRETE PRODUCTS, INC:, OR APPROVED EQUAL 12 SEWER MANHOLE FRAMES AND`COVERS'SHALL BE LEFT 6- INCHES BELOW FINISHED GRADE. THE SEWER CONTRACTOR SHALL RAISE THE •MA*WE± FRAMES AND COVERS TO FINISHED GRADE AFTER STREET SURFACING IS COMPLETED. 13 SEWER MANHOLES AND COVERS SHALL'SE ALHAMBRA FOUNDRY A -1270, OR APPROVED EQUAL, UNLESS NOTED. 14 SIX -INCH VCP LATERALS SHALL BE CONSTRUCTED FROM THE SEWER MAIN TO THE PROPERTY LINE FOR EACH LOT. 15 WORK NOT PERFORMED IN THE PRESENCE OF THE DISTRICT ENGINEER ANDjOR INSPECTOR IS SUBJECT TO REJECTION. 16 PERMITS REQUIRED FOR SEWER CONSTRUCTION SHALL BE OBTAINED FROM THE STREET DEPARTMENT, CITY OF COSTA MEST, 77 I•AIR DRIVE, TELEPHONE NO. 714- 754 -5307 17 AFTER THE PAVEMENT BASE HAS UttR YLAGED, ALt SEWERS "SHALL BE TESTED FOR LEAKAGE TO THE SATISFACTION OF THE 'COSTA MESA a i SANITARY DISTRICT. , k WATER NOTES 1 MATER MAINS TO BE INSTALLED ACCORDING TO THE 1974 STANDARDS AND SPECIFICATIONS OF THE MESA CON`SOLIbATED itA'tk DISYRrCI �t' ' 2 CONTRACTOR TO HAVE ON THE JOB SITE A COPY OF THE 1974 STANDARD SPECIFICATIONS AT ALT TIMES. al 3 tm CONTRACTOR TO NOTIFY MESA CONSOLIDATED WATER DISTRICT 48 HOOKS PRIOR TO CONSTRUCTION. TELEPHONE 714 - 632 -1200 09 754- Ei39Ii 4 ALL PLAN CHECK, INSPECTION AND ENGINEERING DEPOSITS BILL BE MADE PRIOR TO SIGNATURE OF ASST. GENERAL ]MANAGER. 5 A BOND WILL BE POSTED AT THE COMPLETION OF THE PROJECT FOR 10 PERCENT OF ACTUAL COST AND WILL BEHELD FOR ONE YEAR..;^ 6 REQUIRED SEPARATION BETWEEN SANITARY SEWER AND WATER MAINS WILt'BE 10 FEET HORIZONTAL - 3 FEET VERTICAL 7 , w.rx SERVICE LATERALS SHALL BE SET TO GRADE BY CONTRACTOR PRIOR TO THE INSTALLATION Of WATER METER$; AND 'BOXES' 8 . 1 5 � PROTECT ALL EXISTING UTILITrES IN PLACE. "^:� i 9 ALL WATER MAINS SHALL NAVE 3- F007,_b = • 1 C]