Loading...
Minutes - Board - 1980-03-1340 MINUTES OF THE REGULAR MEETING BOARD OF DIRECTORS COSTA MESA SANITARY DISTRICT March 13, 1980 Roll Call Present: Directors - Glockner, Hutchison, Crank, Wahner, Hanson Absent: Directors - None Officials Present: Manager Mattern, Finance Director Oman, Attorney June, Engineer Stevens, Assis- tant Secretary Reichle. Minutes Director Glockner requested minutes of February 14, Correction 1980, be amended as follows: Director Hutchison questioned the time frame for construction projects. Director Glockner asked if there was a possibility that prelimi- nary design of proposed projects could be started in anticipation of the approval of the budget for the coming year. Manager Mattern said he would look into the possibility. Upon motion by Director Wahner, seconded by Director Crank, and unanimously carried, the Construction Status Report from Engineer Stevens was received and filed. Minutes of Upon motion by Director Hutchison, seconded by February 14, Director Crank, and unanimously carried, the 1980 minutes of February 14, 1980, were approved as amended. Written Manager Mattern reported two written communications: Communications (1) Letter from Thomas F. Riley, Supervisor, Fifth District, (2) Letter from David A. Sills, Mayor, City of Irvine. On motion by Director Wahner, seconded by Director Crank, and unanimously carried, the written communi- cations were received and filed. Occupancy Manager Mattern read a communication requesting an Report addition of 9.5 units to the Occupancy Count. It was moved by Director Hanson, seconded by Director Hutchison, and unanimously carried, that 9.5 units be added to the Occupancy Count making a total of 21,522.34 as of March 1, 1980. 3 -13 -80 4 2. Make arrangements for and coordination of surveys, legal descriptions and soils investigations. 3. Prepare engineering data for regulatory permit application that may be required by the city and /or state. 4. Prepare preliminary engineering studies and design for review and approval. 5. Prepare plans and specifications. 6. Prepare estimates of quantities and costs. 7. Deliver copies of the plans and specifications for the District's use in distribution to prospective bidders. 8. Assist the District or its agent in securing bids, tabulation and analysis of bid results, and in letting of the contract. 10 9. Check shop and work drawings as may be submitted by the contractor. - 2 - Financial Upon motion by Director Crank, seconded by Director Report Hanson, and unanimously carried, the Financial Report for the month of February was approved as submitted. Gann Finance Director Oman reported on the possible affect Initiative of the passing of the Jarvis II Amendment. The funds which the District receives are not subject to appropriation. However, once given to the City for operating the District's business, it is possible that funds could be subject to appropriation. He asked Attorney June for an opinion on this. Construction Upon motion by Director Wahner, seconded by Director Status Report Hanson, and unanimously carried, the Construction Status Report from Engineer Stevens was received and filed. Engineer's Engineer Stevens submitted to the District his proposal Proposal for for engineering work and services to meet the needs of Sewer Main in the District for the Construction of a Sanitary Sewer Santa Ana Avenue Main in Santa Ana Avenue from Del Mar to Mesa Drive from Del Mar to as follows: Mesa Drive 1. Hold conferences with representatives of the District, or its agents, property owners or lessees involved, interested cities and other public agencies and others, to review and discuss all aspects of the project. 2. Make arrangements for and coordination of surveys, legal descriptions and soils investigations. 3. Prepare engineering data for regulatory permit application that may be required by the city and /or state. 4. Prepare preliminary engineering studies and design for review and approval. 5. Prepare plans and specifications. 6. Prepare estimates of quantities and costs. 7. Deliver copies of the plans and specifications for the District's use in distribution to prospective bidders. 8. Assist the District or its agent in securing bids, tabulation and analysis of bid results, and in letting of the contract. 10 9. Check shop and work drawings as may be submitted by the contractor. - 2 - 1P 3 -13 -80 Engineer's 10. Furnish consultation and advice to the Proposal for District or its agent during construction. Main in Santa Ana Avenue 11. Review laboratory reports on material tests (Continued) and inspections and correlate such reports with the intention of the plans and specifi- cations. 12. Furnish periodic observations of construction work in progress and provide appropriate reports to the District or its agent. 13. Furnish a final inspection and report of the complete project with a representative of the District or its agent. 14. Prepare and record drawings "as completed" when the construction work has been completed and accepted by the District or its agent. This shall mean the original tracings of the plans will be modified, if necessary, because of deviations from the original work. Engineer Stevens stated that he would perform the work listed in Items 1 through 14 for the sum of $4,950.00. Any additional work ordered by the • District will be billed at the following per diem rates: CLASSIFICATION RATE PER HOUR Engineer, d Draftsman Calculator Inspection 3 man field 2 man field asigner, etc. $44.00 36.00 36.00 27.50 crew 97.00 crew 84.00 After discussion, Director Wahner made a motion that Engineer Stevens' proposal be approved. Motion was seconded by Director Crank, and carried by the following roll call vote: AYES: Directors - Glockner, Hutchison, Crank Wahner, Hanson. NOES: Directors - None ABSENT: Directors - None -3- 3 -13 -80 Engineer's Engineer Stevens submitted to the District his Proposal for proposal for engineering work and services to Sewage Pumping meet the needs of the District for the Construc- Station in tion of a Sewage Pumping Station in Mendoza Mendoza Street Street south of Baker Street as follows: south of Baker Street 1. Hold conferences with representatives of the District, or its agents, property owners or lessees involved, interested cities and other public agencies and others, to review and discuss all aspects of the project. 2. Make arrangements for and coordination of surveys, legal descriptions and soils investigations. 3. Prepare engineering data for regulatory permit application that may be required by the city and /or state. 4. Prepare preliminary engineering studies and design for review and approval. 5. Prepare plans and specifications. 6. Prepare estimates of quantities and costs. • 7. Deliver copies of the plans and specifications for the District's use in distribution to prospective bidders. 8. Assist the District or its agent in securing bids, tabulation and analysis of bid results, and in letting of the contract. 9. Check shop and work drawings as may be sub- mitted by the contractor. 10. Furnish consultation and advice to the District or its agent during construction. 11. Review laboratory reports on material tests and inspections and correlate such reports with the intention of the plans and specifi- cations. 12. Furnish periodic observations of construction work in progress and provide appropriate reports to the District or its agent. 13. Furnish a final inspection and report of the complete project with a representative of the District or its agent. -4- 9 3 -13 -80 Engineer's 14. Prepare and record drawings "as completed" Proposal for when the construction work has been completed Sewage Pumping and accepted by the District or its agent. Station in This shall mean the original tracings of the Mendoza Street plans will be modified, if necessary, because (Continued) of deviations from the original work. Engineer Stevens stated that he would perform the work listed in Items 1 through 14 for the sum of $6,900.00. Any additional work ordered by the District will be billed at the following per diem rates: CLASSIFICATION Engineer, d Draftsman Calculator Inspector 3 man field 2 man field RATE PER HOUR asigner, etc. $44.00 36.00 36.00 27.50 crew 97.00 crew 84.00 After discussion, Director Wahner made a motion that Engineer Stevens' proposal be approved. Motion was seconded by Director Hutchison, and carried by the following roll call vote: AYES: Directors - Glockner, Hutchison, Crank, Wahner, Hanson NOES: Directors - None ABSENT: Directors - None James Riley Mr. Riley is developing two parcels on Elden Street Elden Mesa and wishes to treat them as one when finished, Townhomes with one sewer lateral serving both parcels. At the meeting in Feburary, he asked the Board to consider waiving the regulation which requires a separate sewer lateral for each parcel. The Board requested Attorney June draw up a Variance Procedure for projects of this type. After reviewing the Ordinance Attorney June presented, the Board concurred that future prob- lems could be encountered by the passing of this Ordinance and handling requests of this type under the present regulation might be in the best interest of the District. Director Hanson made a motion, seconded by Director Wahner to reject the Ordinance as written. This motion was carried by the following roll call vote: -5- 3 -13 -80 Elden Mesa AYES: Directors - Glockner, Hutchison, Crank, Townhouses Wahner, Hanson (Continued) NOES: Directors - None ABSENT: Directors - None Director Hutchison made a motion, seconded by Director Hanson to deny Mr. Riley's request for one sewer lateral in keeping with existing Policy and Procedure Statements. Motion was carried by the following roll call vote: AYES: Directors - Glockner, Hutchison, Crank, Wahner, Hanson NOES: Directors - None ABSENT: Directors - None 1980 -81 Manager Mattern presented the City /District City Contract Contract Proposal for 1980 -81. Finance Director Proposal Oman indicated it was acceptable to the City for the District to accept the contract proposal on a preaudit basis. This would provide for an adjustment to the contract based on final operating costs if the actual costs are higher, then the • District will reimburse the City. If the actual costs are less than the contract proposal, the City will reimburse the District. This document was presented to the Board for study and will be dis- cussed in detail at an adjourned meeting on Tuesday, March 18, 1980, at 7:30 p.m. in the First Floor Conference Room at 77 Fair Drive, Costa Mesa, California. Agreement for The Board of Directors of County Sanitation District Collection of No. 6 has determined that implementation of a Fees - sewer connection charge is necessary to provide the District 6 long range funding necessary to enable construction of needed District sewerage facilities. Manager Mattern presented an Agreement which provides for the collection of connection charges and for retention of 5% of the fees collected to defray any administrative costs. He said he had requested a change in the wording of a paragraph in the Agreement. It is in the process of being corrected and will be presented for signatures at the April meeting. He asked for approval in concept as the new Fees Schedule is to go into effect on March 14. It was moved by Director Wahner, and seconded by Dirctor Crank, to approve the Agreement with District No. 6 for collection of Fees, as amended. Motion was carried by the following roll call vote: e 3 -13 -80 Agreement for AYES: Directors - Glockner, Hutchison, Crank, Collection Wahner, Hanson of Fees (Continued) NOES: Directors - None ABSENT: Directors - None Prevailing Manager Mattern reported it is no longer necessary Wage Schedule to publish annually the prevailing wage schedule, but it must be kept on file in the Sanitary District Office. Warrant Director Wahner made a motion, seconded by Director No. 79 -14 Hanson, to authorize the President and Secretary to sign Report No. 79 -14, instructing the County Auditor to draw a warrant from the Costa Mesa Sanitary District General Fund in the amount of $95,877.54. Motion was carried by the following roll call vote: AYES: Directors - Glockner, Hutchison, Crank, Wahner, Hanson NOES: Directors - None ABSENT: Directors - None Warrant Director Wahner made a motion, seconded by Director No. 79 -15 Hanson, to authorize the President and Secretary to sign Report No. 79 -15, instructing the County Auditor to draw a warrant from the Facilities Revolving Fund in the amount of $30. Motion was carried by the following roll call vote: AYES: Directors - Glockner, Hutchison, Crank, Wahner, Hanson NOES: Directors - None ABSENT: Directors - None Alternate Director Hanson asked Assistant Secretary Reichle Representative to write a letter to County Sanitation Board County Districts stating that the Board was verbally polled and 1 and 6 he was appointed as alternate representative for Districts 1 and 6 for the meeting of March 12, 1980. Business Cards Director Hanson asked the status of the business cards he had requested. Assistant Secretary Reichle reported the cards have been designed and should be printed by the next regular Board Meeting in April. -7- V. 3 -13 -80 4. Recycling Director Hanson reported that the Recycling Committee Committee is in the process of printing a book Report showing the proposed program for the Recycling Committee. Adjournment Upon motion by Director Hanson, seconded by Director Crank, and unanimously carried, the meeting adjourned at 9:55 p.m. to Tuesday, March 18, 1980, at 7:30 p.m. in the City Hall, First Floor Conference Room, 77 Fair Drive, Costa Mesa, California. President Secretary It 11:1Z