Loading...
Contract - Orange Coast Electric - 2012-12-16 i �-P�;, g_i CosJ MESA sA.��?,� y DIS C71 �, ra'" e a $ RECEIVED Addendum No. 1 to DEC 1 9 2012 MIA iVita\SAFlllARY OiSIRILI LETTER AGREEMENT FOR.ELECTRICAL ENCLOSURE REPLACEMENT FOR HARBOR PUMPING STATION AND SEA BLUFF PUMPING STATION In addition to the work described in the Letter Agreement between the Costa Mesa Sanitary District (District) and Orange Coast Electric (Contractor) dated June 2, 2012, District desires Contractor to install District-provided new stainless steel electrical enclosures at the District's Santa Ana Pumping Station and at the Victoria Pumping Station. Contractor agrees to install the Santa Ana enclosure for$5,925 and the Victoria enclosure for$5,785 as shown on Contractor's proposals attached hereto and made a part hereof. As stated in Contractor's proposals, Contractor shall provide the manufacturer of the stainless steel enclosures with the correct dimensions for the fabrication of the enclosures. Aside from the changes made by this Addendum No. 1, all terms and conditions of the original agreement shall remain in full force and effect. Date: December 16, 2012 District Contractor Approved by: Reviewed and Accepted by: d 0 V i l? General Manager Name and Title Approved as to form: cProtecting our community's health 6y providing solid waste Associate District Counsel and sewer cottection services. www.cmsdca.gov