Loading...
Contract - Pacific Data Electric - 2012-11-16 RECEIVED DEC 1 12012 FIRST AMENDMENT TO AGREEMENT uuolit Inuit an tivyDISI R FOR CONSULTING SERVICES Pacific Data Electric This First Amendment ("FIRST AMENDMENT") to the April 13, 2012 Agreement between the Costa Mesa Sanitary District and Pacific Data Electric for preparing architectural design development and construction drawings along with structural engineering plans for above ground generators at critical pumping stations ("AGREEMENT") is made and entered into this /t, ■ day of N6UJJVtZV 2012, by and between the Costa Mesa Sanitary District, hereinafter referred to as DISTRICT, and Pacific Data Electric., hereinafter referred to as CONSULTANT. Recitals WHEREAS, on April 13, 2012 the DISTRICT and CONSULTANT entered into AGREEMENT for preparing architectural design development and construction drawings along with structural engineering plans for above ground generators at critical pumping stations; and WHEREAS, the property owner at Back Bay Center is requesting alternative locations to place a generator for the Irvine Pumping Station; and WHEREAS, the CONSULTANT has. submitted -a proposal 'to prepare renderings that will illustrate the generator at alternative locations; and WHEREAS, the DISTRICT and CONSULTANT now desire to amend the AGREEMENT to change the scope of work and increase CONSULTANT'S compensation for services rendered. NOW, THEREFORE, the parties hereto agree as follows: 1. Section 2 in the AGREEMENT shall be amended to extend the tasks completed by June 30, 2013. 2. Section 5 in the AGREEMENT shall be amended by adding the following subsection: "(a) DISTRICT agrees to pay CONSULTANT the sum of $3,887.00 for the services described in Exhibit "B", attached to the FIRST AMENDMENT. 3. The 'term of this FIRST AMENDMENT shall become effective upon. its adoption. • 4. Except as specifically amended by the terms of this FIRST AMENDMENT, all provisions of the AGREEMENT shall remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have caused this FIRST AMENDMENT to be executed this day and year first above written. COSTA MESA SANITARY DISTRICT PACIFIC DATA ELECTRIC 4111b- WPC General Manager Signature jhcllcy Typed Name Name Title APPROVED TO FORM: District Counsel • EXHIBIT A EXHIBIT B PDE Total energy Solutions CA LIC#C10-620473 11/15/12 Scott Carroll General Manager Costa Mesa Sanitary District 628 W. 19th St, Costa Mesa CA 92627 Reference: RE: Proposal for Architectural Services — Costa Mesa Pump Station Generator Renderings — PS13 2672 Irvine Ave., Costa Mesa 92660 Dear Scott, Pacific Data Electric, PDE is pleased to submit a proposal for the above referenced project. Our proposal is based on the following scope of work: Provide renderings to show the proposed locations of the proposed generator to support the Pump Station. SCDS will include proposed rendering of two locations. PDE and CMSD agree to the following terms: 1. Scope of work for PDE a. Meetings with client and PDE to determine design and program requirements. (Limited to 1 working meetings) b. Review existing plans and existing site as-built status. Conduct field investigation and record existing conditions. Convert existing site plan to CAD as required. c. Prepare design development drawings for owners review and approval Payment terms net 30 days Total: $3,887.00 Dan Cohee Project Manager PDE Total Energy Solutions Inc.