XIV - PRODUCTIVITY OF CMSD SEWER CREWCosta Mesa Sanitary District Sewer Maintenance Division Item XIV Measure Objective FY2012 -13 Measure Estimate 2012 -13 Measure Actual Workload Indicators 1. Average linear feet of sewer mainline cleaned annually 700,000 2. Number of pump stations inspected annually 5,200 3. Number of manhole covers replaced without vent holes 200 4. Number of pump station wet wells cleaned 37 5. Total cleaning frequencies for hotspots 139 6. Number of before and after videos inspected for Sewer Lateral Assistance Program* 314 7. Number of tailgate safety meetings 12 8. Number of pump station work orders completed 9. Total annual hours spent responding to after hour emergencies 88 10. Total annual hours spent testing emergency equipment 138 Efficiency Indicators 11. Cost per linear feet of sewer mainline cleaned ** $0.25 12. Cost per pump station maintained ** 13.Avera e time to clean a hots of 1 hour 14. Average time to clean 2,000 feet of sewer mainline Effectiveness Indicators 15. Number of public sanitary sewer overflows 0 16. Number of pump station failures not caused by Southern California Edison 0 17. Percentage of repair work orders completed within two days 90% 18. Percentage responding to emergencies within one hour 90% 19. Number of workplace related injuries 0 20. Percentage of rain ingress 52% 21. Number of hotspots <40 22. Cost per linear feet of sewer mainline cleaned is less than or equal to private contractor cost to cleaning sewer mainline <_$ 23. Number of days hydrogen sulfide levels are 1 PPM at Elden and South Coast Plaza Pump Stations 365 24. Number of emergency equipment failed or malfunctioned 0 Item XIV 1. Developing five quadrants, combining' /2 biennials + triennials to create annual and biennial cleaning totals average required cleaning per year 703,400 2. 20 PS inspected once a day five times a week = 100 a week times 52 weeks = 5,200 inspections 3. Goal is to plug and seal 1,008 out of 4,705 manholes. Currently 802 manholes are plugged and sealed. 4. Elden, Harbor and Irvine pump stations cleaned once a year. All other pump stations cleaned twice a year. 5. 58 hotspot locations that had cleaning frequencies raging from twice a year to four times a year. 6. The average SLAP applications approved in five years (2007 -2012) is 157 x 2 = 314 7. One tailgate meeting a month. 8. 9. Total hours include the entire maintenance division (4 employees). Actual hours from FY11 -12. 10. 1.5 hours to test each equipment (4 generators and 3 by pas pumps) per month = 10.5 hours x 12 = 126 hours. One hour to test each trash pump (2 4" trash pumps) six times a year = 12 hours 126 +12 =138 hours * *Cost efficiencies for maintaining sewer mainline and pump station do not include contractor costs. Objective costs are strictly staff driven.