15 - CONTRACT ADMINISTRATION & INSPECTION SERVICES PROJECT 192snNrt��` Item 15 f88 COST �IVI�.S �VI�I' �Y X SA �2 (DISTRICT ... an Independent SpeciafDistrict Memorandum To: Board of Directors From: Scott Carroll, General Mana2,e&�- Date: August 20, 2012 Subject: Contract Administration and Inspection Services for Project #192 — System Wide Sewer Reconstruction — Phase II Summary Robin B. Harriers & Associates submitted a proposal to provide contract administration and inspection services for Project #192, System Wide Sewer Reconstruction Project — Phase IL Staff Recommendation That the Board of Directors accepts and files this report. Analysis On August 1, 2012, bids were opened for Project #192 in which Charles King Company is the low bidder and later tonight the Board is considering awarding a contract to Charles King for said services. Robin B. Harriers & Associates (RBH) submitted a proposal to provide contract administration and inspection services for Project #192 for $18,817. RBH performed contract and inspection services for Phase I of the District's System Wide Sewer Reconstruction Project. RBH's cost was $24,000 to administer and inspect the reconstruction of 95 segments, which breaks down to $252.63 per segment. Staff believes RBH's proposal for Phase II is a fair proposal because the cost breakdown to administer and inspect 73 segments is $257.77 per segment. In addition, the proposal does not exceed ten percent of the contract cost. Staff has determined that RBH can perform contract administration and inspection services for this project under his existing contract with the District. Trotecting our community's health and the environment by providing solid waste andsewer collection services. u,ww. crosdca.gav Board of Directors August 20, 2012 Paqe 2 of 2 Strategic Plan Element & Goal This item supports achieving Strategic Element No. 1.0, Sewer Infrastructure and Strategic Goal No 1.4, System wide sewer replacement and repair program. Legal Review Not applicable. Financial Review The total cost for this service will not exceed $18,817. Funding for this service is budgeted in the project's CIP budget. Additional funding will be required and requested for this construction project along with the awarding of the construction contract. Committee Recommendation Not applicable Public Notice Process Copies of this report are on file and will be included with the agenda packet for the August 20, 2012 Board of Directors regular meeting at District Headquarters and on the District's website. Alternative Actions 1. Refer the matter back to staff for additional information Attachment A: Robin B. Hamers & Associates, Inc. Proposal Reviewed by: s Teresa Gonzalez Accounting Manager Attachment A N ROBIN B. HAMERS & ASSOC., INC. CIVIL ENGINEERS • PLANNERS ' SURVEYORS ... since 1981 11 August 20, 2012 Board of Directors COSTA MESA SANITARY DISTRICT 628 West 19th Street Costa Mesa, CA 92627 RE: #192 System Wide Sewer Reconstruction Phase II Proposal for Contract Administration /Inspection Services Dear Directors: 234 E. 17TH ST., SUITE 205 COSTA MESA, CA 92627 Phone 949/548- Fax 949/548 -6516 RBH, Inc. is pleased to submit this proposal for contract administration /inspection services for the construction phase of the project, which consists of repairing 73 line segments with one or more Grade 5 deficiencies. The project will have a 75 working day construction period. The attached proposal includes all services necessary to successfully administer the project including project management, engineering, and inspection. No surveying is needed. Services for the District are typically billed on an hourly basis with the not to exceed total as shown in the attached fee table. Thank you for the opportunity to prepare this proposal. Please call me at (714) 293 -2727 (cell) if there are questions or comments. Sincerely, Robin B. Hamers, PE RCE 31720 SCOPE OF WORK & FEE TABLE PREPARED BY: Robin B. Hamers, PE Client: Costa Mesa Sanitary District (CMSD) District Engineer Project: CMSD #192 System Wide Sewer Reconstruction Phase II Contract Administration (75 working days) Job No. Date: August 20, 2012 I ask Description Pre - Construction IT P] I wa] I- cc 1.0 Arrange Preconstruction Meeting 1 2 1.1 Process Contract, Insurance, Bonds 2 1 1.2 Prepare Progress Payment Spreadsheet 1 2 1.3 Attend Preconstruction Meeting 2 2 1 1.4 Prepare and Distribute Notice of Construction 1 1 1.5 Issue Notice to Proceed 1 1 Engineering and Management 2.0 Review and respond to shop drawings 2 6 2.1 Periodic site visits _ 2 2 2.2 Prepare written correspondence as appropriate 1 2 2.3 Reveiew and prepare monthly progress payments 2 1 2.4 Prepare updates for Board of Directors 1 4 2.5 Liaison with and reports to City of Costa Mesa 2 2 2.6 1 Liaison with and reports to City ofNewport Beach 2 2 2.7 Prepare As -Built Plans 1 2 15 2.8 Prepare Staff R rt for Board of Directors acceptance of improvements 2 Survey Work 3.0 Pre -Calcs for Sewer Staking 3.1 Establish Control and Stake Sewer Main 3.2 Check grades during construction (# trips) 3.3 Check final grades Inspection 4.0 Construction Observation (75 working days) 189 4.1 As -built plans 4.2 Organize notes and daily reports I 1 Labor 11ours I otal and Fee In -House Labor Project Team 28 40 Class 190 Rate S. 8 17. Total Cost I) Managing Engineer Rob Hamers ME 28 96.5 2,702.00 2) Project Engineer Yefim Tsalyuk PE 40 96.5 3,860.00 3) Project Inspector Joe Limon PI 190 64.5 12,255.00 4 Survey Crew Tim Fettig, Rich Dupree SC 230