20 - SEWER CLEANING PROGRAMITEM 20 COSTA MESA SA9V77ART InIS7RiL7 Memorandum To: Board of Directors ... an Independent Specia[District Via: Scott Carroll, General Manager From: Robin B. Hamers, District Engineer Date: July 26, 2012 Subject: Sewer Cleaning Program Summary With the recent addition of a new maintenance worker, District field crews now total four men including the Maintenance Supervisor. Additionally, the District will soon be acquiring a new sewer cleaning truck (a.k.a. vactor truck) and the combination of the larger crew and new vactor truck allow the District to perform regular sewer line cleaning. Currently, the District's contractor, National Plant Services (NPS), performs all sewer line cleaning. Staff Recommendation That the Board of Directors: 1. Direct the General Manager to implement a blended yearly sewer cleaning program as detailed below whereby the District will provide regular cleaning of approximately 350,000 linear feet (LF) of sewer per year and NPS will clean approximately 350,000 LF per year. 2. Direct the General Manager to re- negotiate the existing cleaning contract with NPS to effect this change either this year 2012 -2013 or next year 2013 -2014. Analysis Currently, the District cleans a portion of the sewers every year, a portion every two years, and a portion every three years. These cycles were developed in combination ,Protecting our community's health and the environment by providing sofidwaste andsewer collection services. www. crosdca.gov Board of Directors July 26, 2012 Paqe 2 of 4 by the previous Maintenance Supervisor and previous Senior Inspector based on size of pipe, flows, historical debris and grease buildup, and other factors. The District is just now completing the 2nd cycle under this program. The present Maintenance Supervisor and staff believe a simpler approach of dividing the District into five sections and cleaning slightly more than one -half of the system each year will decrease travel time and increase efficiency by concentrating work in selected areas rather than having to drive to certain areas just to clean selected sewer lines. Staff also believes cleaning sewers every two years is a safe and reliable practice that will not lead to backups and sanitary sewer overflows. Sewer lines requiring annual maintenance will continue being cleaned annually. In this regard, the District's GIS consultant EEC prepared two options (see attached): cleaning one -half of the system each year plus the sewers that need cleaning every year, which equals a total of 700,000 feet per year out of the District's 1.2 million feet of sewer main. The second option is cleaning the entire system every year although this is the least desired option due to cost and manpower requirements. An analysis of the proposed plan is as follows: Clean 700,000 feet per year. The District would then have a 2 -year cleaning cycle, which conforms well to the Waste Discharge Requirements (WDR). 2. Have NPS and the District each clean 350,000 LF per year. 3. The District would clean: 3,000 LF /day @ 3 days /week @ 39 weeks /year = 350,000 LF This schedule provides flexibility for staffing, vactor maintenance, and other use. The District will continue cleaning hot spots and pump stations. 4. NPS would clean 350,000 LF instead of 700,000 LF per year, which will save the District $105,000 per year. 5. EEC would have to produce revised maps and work orders but this would be relatively easy. A cost estimate for this work is not currently available. 6. The District will have to amend its Sewer System Management Plan (SSMP). Important Considerations The contract with National Plant Services is in the 3rd year of a 3 -year contract with two possible one -year extensions. The contract contemplates the District one day possibly taking over line cleaning (the statement is contained in the whereas clauses), but there is no procedure in the contract to make this change during the 3 -year initial term, only Board of Directors July 26, 2012 Page 3of4 a termination clause, which the District might have to exercise to make this change. The contract with NPS provides a 90 -day notice for termination without cause and NPS would certainly accept a reduced role as opposed to being terminated. However, National Plant Services has been faithfully serving the District since 1989 in line cleaning, two District -wide televising projects, emergency response and clean up, small scale televising in support of the hot spot abatement program, and in other roles. NPS is very responsive and provides high quality work. The contract with NPS has some of the lowest cleaning rates in the industry and the contract is working well. Strategic Plan Element & Goal This item complies with Strategic Plan Element 1.0, Sewer Infrastructure, and the strategy for this element states: "We will do this by the careful management of the collection infrastructure using prudent planning and maintenance, with financial strategies to maintain sufficient capacity and respond to changing regulatory demands." Legal Review District Counsel has reviewed the existing contract with NPS and advised that it has a three -year term and will expire in December 2013 (my file does not have signed copy — please confirm from District records). The recitals recognized that the District may take over sewer cleaning "in house." There is a termination provision that can be exercised without cause on 90 days' notice. Given that we have the authority to terminate with 90 days' notice, I am sure the contractor would be willing to negotiate a new amendment that provides that they will receive an amendment for some lesser quantity of work. Financial Review For fiscal year 2012 -13 the sewer line maintenance /cleaning budget is $192,000 and the GIS support budget is $20,000. The anticipated savings of $90,000 for the sewer line cleaning would be offset by the additional cost paid to EEC to produce revised maps and work orders and the engineering costs to amend the SSMP. In the future, a budget adjustment will be necessary to provide the necessary funds for the GIS and CMMS support, because the approved budget in the amount of $20,000 is insufficient to cover these additional costs. Committee Recommendation On June 19, 2012, the Operations Committee recommended that the Board of Directors approves the new cleaning program. Board of Directors July 26, 2012 Page 4 of 4 Public Notice Process Copies of this report are on file and will be included with the entire agenda packet for the July 26, 2012 regular Board meeting. Alternative Actions 1. Continue the sewer cleaning program as is. 2. Refer the matter back to staff for additional information. Reviewed by: Teresa Gonzalez, Accounting Manager Rob Hamers From: Rob Hamers [robh2 @cox.net] Sent: Tuesday, June 26, 2012 10:16 AM To: RBH, Inc. Subject:. please print email and all attachments Attachments: ProposedCleaning.pdf; ATT00227.htm Begin forwarded message: From: Ramon Gallegos <RGallegos(a)eecworld.com> Date: June 26, 2012 9:45:52 AM PDT To: Scott Carroll <scarroll(cDcrosdca.gov>, "Robin Hamers (robh2(o)cox.net)" <robh2(a)cox.net >, Steve Cano <scano(a)crosdca.gov> Cc: Jim Kolk <JKolk(Oileecworld.com> Subject: Proposed Annual CLeaning Schedule Hello Gentlemen, In case you have not already heard, NIPS has reported completion of all line cleaning work orders, (including Year 2 cleaning, Root cutting, and Gap). Looking ahead to line cleaning scheduling for next year, as you know Steve suggested using CMSD crews to clean the system based on a "Quadrant" schedule. The District can be broken into 5 sections based on voting precincts. Steve and I met to discuss his concept, what we will now call the Precinct schedule, and based on this discussion we have developed a few cleaning workload scenarios for review and comparison. With the current cleaning schedule your annual cleaning workload average is roughly 600,000'. The Precinct suggestion would have the District crew cleaning all pipes annually and would increase the annual cleaning load to 1,200,000'. We also added another possibility, a compromise between the two schedules that would keep annuals as annuals but combine biennials and triennials into biennials; this schedule would result in increasing the annual average workload to roughly 700,000'. These scenarios are broken down in the tables below. As is the case -for the current 3 -year cleaning schedule, the proposed cleaning scenarios would also route crews systematically based on the WDWs (from upstream to downstream within each WDW, and geographically from one WDW to an adjacent WDW). Attached for your reference is a map of the Precincts that Steve suggested. Below are the corresponding cleaning footages associated with each scenario. Note: Current designated cleaning frequencies (annual, biennial, triennial) were determined by prior CMSD staff (Paul, Karl) based on historical knowledge. These cleaning frequencies can be changed based on cleaning crew observations during routine cleaning activities. H Current Cleaning Schedule Precinct Annual Biennial Triennial Total College Park 16,706 50,451 70,595 65,463 East Side 114,714 97,962 173,348 221,478 Mesa North 34,480 49,475 198,250 125,300 Mesa Verde 28,402 39,300 1 105,543 83,233 West Side 49,802 51,383 1 82,284 102,922 1 This total per year = annuals + 1/2 of biennials+ 1/3 of triennials) -- I- - - - - -- - - - - -- - - -_ -- ------ •— •-- •-- •---- - - -... - - -- __------ - - -I_- _ - __ _ _ - - - __ ...-__..-_.---- - - -- Average ttequirea aeanmg per Year: SytS,.iyb � 1 2 3 4 5 1 2 3 4 5 Proposed Cleaning Schedule 1 Clean all Annuals annually; Clean all Triennials and Biennials biennially Precinct Annual Biennial Total College Park 16,706 60,523 77,229 East Side . 114,714 135,655 250,369 Mesa North 34,480 123,863 158,342 Mesa Verde 28,402 72,422 100,824 West Side 49,802 66,834 116,636 Average Required Cleaning per Year: 703,400 Proposed Cleaning Schedule 2 Clean all Pipes per Year Precinct Footage College Park 137,752 East Side 386,024 Mesa North 282,205 Mesa Verde 173,245 West Side 183,469 Required Cleaning per year: 1,162,696 This total per year = annuals+ 1 /2(biennials + triennials) Please let us know which direction you would like to take so that we may begin to prepare Year 3 work orders. Ramon Gallegos GIS /IT Supervisor Envirotunental Engineering cC Contracting, Inc. 501 Parkcenter Drive Santa Ana, CA 92705 PH: (714) 667 -2300 FAX: (714) 667 -2310 CELL: (714) 335 -2649 2 _3- EN V IRO fV MENTAL ENGINEERING 4 CONTRACTING. INC File: PM I Author: ProposedCleaning RG RG District VVDW College Park College Park ® East Side O East Side Mesa North Mesa North Mesa Verde Mesa Verde West Side West Side CMSD Active Gravity Main 0 0.35 0.7 1 4 Miles PROPOSED CLEANING SCHEDULE CMSD Project Number: 2039.02 Figure �I Date: 6/21/2012