Project 122 - Proposal - Hamers - 1993-03-24 ROBIN B. HAMERS 234 E 17TH ST SUITE 205
& ASSOCIATES. INC. COSTA MESA.CA 92627
CIVIL ENGINEERS PLANNERS SURVEYORS 17141546-1192
March 24 1993
Board of Directors
Costa Mesa Sanitary District
P 0 Box 1200
Costa Mesa CA 92628
RE PROPOSAL TO PROVIDE INSPECTION SERVICES
PROJECT 1112100-122 JOINT REWORKING
Gentlemen
The following proposal is submitted to provide the necessary
engineering services during the construction phase of said
project
Construction is scheduled to be completed within a 12 week
period beginning in May The necessary services to oversee the
project are engineering drafting and inspection and the
estimated maximum number of hours and proposed rate for each are
as follows
Engineering 56 hrs @ $59 00/hr = $ 3 304 00
Drafting 8 hrs @ $47 00/hr = 376 00
Inspection 160 hrs @ $42 00/hr = 6 720 00
TOTAL $10 400 00
The above are maximums and billing will be only for actual time
worked
Sincerely
/7)1(flaw
Robin B flamers
RBH/jp/proposal cms