Loading...
Project 123 - Proposal - Hamers - 1991-10-01 ROBIN B. HAMERS IS. ASSOCIATES, INC. 294 E 17TH ST Si iTE 205 COSTA MESA,CA 92627 CIVIL ENGINEERS PLANNERS SURVEYORS 17141549-1192 October 1 1991 Board of Directors Costa Mesa Sanitary District P 0 Box 1200 Costa Mesa CA 92628 RE PROPOSAL TO PROVIDE INSPECTION SERVICES PROJECT 1112100-123 PUMP STATION RECOATING & MAINTENANCE Gentlemen The following proposal is submitted to provide the necessary engineering services during the construction phase of said project Construction is scheduled to be completed within a four week period beginning in early November The necessary services to oversee the project are engineering drafting and inspection and the estimated maximum number of hours and proposed rate for each are as follows Engineering 40 hrs @ $55 00/hr = $ 2 200 00 Drafting 4 hrs @ $44 00/hr = 176 00 Inspection 160 hrs @ $39 00/hr = 6 240 00 TOTAL $ 8 616 00 The above are maximums and billing will be only for actual time worked Si cerely Robin B Hamers RBH/jp/proposal cms