Project 125 - Proposal - Hamers - 1992-03-26 5) ROBIN B. HAMERS 234 E 17TH ST SUITE 205 & ASSOCIATES, INC. COSTA MESA,CA 92627 CIVIL ENGINEERS PLANNERS SURVEYORS (714J540-1192 March 26 1992 Board of Directors Costa Mesa Sanitary District P 0 Box 1200 Costa Mesa CA 92628 RE PROPOSAL TO COMPLETE CONSTRUCTION PHASE PROJECT 1112100-125 TELEVISING SEWER LINES Gentlemen The following proposal is submitted to provide the necessary engineering services during the construction phase of said project Construction is scheduled to be completed within a 6 month period beginning in June The necessary services to oversee the project are engineering drafting and inspection and the estimated maximum number of hours and proposed rate for each are as follows Engineering 80 hrs @ $ 55 00/hr = $ 4 400 00 Drafting 6 hrs @ $ 44 00/hr 264 00 Inspection 600 hrs @ $ 39 00/hr 23 400 00 TOTAL $ 28 064 00 The above are maximums and billing will be only for actual time worked Sincerely, WJAA, Robin B Hamers RBH/jp/proposal cms fa Printed on Recycled Paper.