Santa Ana Heights Redevelopment Area
Review of Sewer Study
We have reviewed the proposed three party agreement with the supporting report by BSI
Consultants, Inc. titled `Santa Ana Heights Redevelopment Project Area Comprehensive
Infrastructure Improvement Plan, dated March 15 1990 covering the sewer improvements to
serve drainage Area 2 in the unincorporated Santa Ana Heights area of the District. We have
also reviewed CMSD and other pertinent documents that were supplied, as well as conducting a
field review The following summarizes our review
The Areal Outfall improvements include the followinc elements
• A new sewer pump station. For the purposes of this review it is assumed to be located in
golf course property near the southwest corner of the Irvine Ave./Bristol St. intersection.
• A 750 foot long 8-inch force main from the pump station along Bristol St. and across a
new proposed bridge expansion across the Corona Del Mar Freeway at Birch Street.
• A 1 475 foot long gravity sewer to convey the flow from the northbound Bristol Street in
Birch Street to the County Sanitation District s Von Karman Trunk Sewer in MacArthur
Blvd.
• Replacement of the existing 8-inch gravity sewer in Bristol Street from Irvine Avenue to
Birch Street with a 12-inch gravity sewer and an influent gravity connection to the new
pump station.
A map illustrating these improvements is attached to this report.
We have prepared a conceptual opinion of probable construction cost for these improvements.
The agreement calls for the facilities to be in accordance with the City of Newport Beach
standards. Accordingly the pump station estimate is based on a separate wet well/dry pit cast-in-
place concrete structure with two submersible type pump; located in the dry pit, all below grade.
Mr Robin B Hamers January 27 1997
Page 2
The electrical controls would be located on a grated mezzanine above the pumps. Attached is a
sketch illustrating this concept.
Attached Table 1 is an opinion of probable construction cost we have prepared independent of
information that has been provided. Table 2 provides detail of the pump station estimate.
Total construction cost for the Area 2 outfall facilities is estimated to be $ 1,850,000. The
proposed three party agreement has an allowance of$ 2,250,000 for construction of the Area 2
outfall facilities plus $ 200,000 for construction of the 8-inch force main within the bridge across
the Corona Del Mar Freeway at Birch Street. It, therefore, appears that the costs listed in the
three party agreement are sufficient to construct the project. However, in view of the difficult
construction that can be anticipated along South Bristol Street due to the heavy utility and traffic
encumbrances and other possible unknowns at this time, we would suggest the budgets currently
in the three party agreement not be reduced. Based upon our review we find the project to be
warranted and the design and construction fees to be reasonable.
We do wish to point out a few other items. The pump station will require the acquisition of
right-of way from the golf course at the southwest corner of the Irvine Avenue/So. Bristol Street
intersection. We have not attempted to estimate a cost for this acquisition, since we understand
the District is arranging for this separate from the three party agreement. We also reviewed the
alternative of having a gravity line through the bridge widening area; however the bridge profile
has a high point in the middle so a gravity line will not function. We also understand the
District had obtained written acceptance of this plan to convey flow to the County Sanitation
Districts Von Karman Trunk Sewer system a few years ago. We suggest you obtain a written re
affirmation of this approval from the County Sanitation Districts.
We would be pleased to review this in more detail with you or the board at your convenience.
Boyle Engineering Corporation
a le
Bruce D Mattern, PE Philip E. Stone, PE
Assistant Managing Engineer Principal Engineer
QPpF ESSI64,
oj C O NI A 7.)F F�, �F�eaF11GEgE Nq�
ti 19388 y i a? tic
m 7� m 'W N0.C17714 2
y EXP 9 � A ,*
EN). 6/.10/97 r ;
�Qlq� CIVIL, �a�P '
sr CIV1V Q.� FOFCALiFOQ`%
�TF OF CA�FIcO
0C-C62-10U-U6/pes/CMSDL IR_.DUC
TABLE 1
Costa Mesa Sanitary District
SANTA ANA HEIGHTS REDEVELOPMENT PROJECT
AREA 2 OUTFALL FACILITIES
Opinion of Probable Construction Cost
Description Unit Quantity Unit Price Total
Pump Station ( See Detailed Estimate) LS 1 $496,100 $496,100
Gravity Sewer, Force Main to CSDOC Trunk; 15"VCP LF 3,475 $150 $521,250
Gravity Sewer, Birch to Irvine; 12"VCP LF 660 $175 $115,500
Gravity Sewer, Irvine to Pump Station; 12"VCP LF 150 $175 $26,250
48" ID Manholes EA 12 $5,000 $60,000
Connection to Existing CSDOC Manhole LS 1 $3,000 $3,000
Force Main Pump Station to Freeway, 8" Pipe LF 850 $150 $127,500
Jacked Casing Across Intersection LF 120 $500 $60,000
Freeway Crossing 8" Pipe in Bridge LF 380 $300 $114,000
8" Pipe in North Bristol St. LF 70 $125 $8,750
SUBTOTAL $1,532,350
Contingency @ 20% $306,470
Total $1,838,820
SAY $1,850,000
Page 1 1/27/97
TABLE 2
Costa Mesa Sanitary District
SANTA ANA HEIGHTS REDEVELOPMENT PROJECT
AREA 2 PUMP STATION
Opinion of Probable Construction Cost
Description Unit Quantity Unit Price Total
MOBILIZATION LS 1 $25,000.00 $25,000
EARTHWORK
Excavation CY 1000 $3.50 $3,500
Backfill CY 780 $5.00 $3,900
Dewatering LS 1 $5,000.00 $5,000
STRUCTURAL
Concrete (incl. rebar) CY 121 $600.00 $72,600
Wet Well PVC Liner SF 630 $2.00 $1,260
Precast Vault EA 1 $5,000.00 $5,000
Grating, Stairs, etc. LS 1 $20,000.00 $20,000
MECHANICAL
Pumps with Motors EA 2 $35,000.00 $70,000
Piping LS 1 $75,000.00 $75,000
Ventilation System LS 1 $15,000.00 $15,000
ELECTRICAL
Electrical System LS 1 $80,000.00 $80,000
Instrumentation/Telemetry LS 1 $25,000.00 $25,000
SITEWORK
AC Paving SF 1760 $2.50 $4,400
Fencing LF 184 $15.00 $2,760
Misc. Grading LS 1 $5,000.00 $5,000
Subtotal $413,420
Contingency @ 20% $82,680
TOTAL $496,100
Page 1 1/27/97
C.os-N-A Ms51a SA1-4,n-m 4 D\STR\Cr I(2
AREA 2 PUMP STATlOM CONCE Pr
r
14 '
4 4 4 4 � 2'
' N. v■ X
in
>"--- -pt...
, PUG
VAL E
VALve.f- i i I
N Tee w
/
•
✓ # it IL 41 ',6 VAULT
`— LAPEyi7E
Cl I STAI
5--------- GRATING
/ fr.
ELECT
A
MI
PLAN
%4 _ / 0"
2(2
■
litY1W i>
1
n
s\\._fr
rJ De.t _Sg3LE t [�MP
r.1DRYPsT SECT/nN A
y4 = I ' o