Loading...
Project 130 - Proposal - Hamers - 1992-09-02 ROBIN B. HAMERS 234E 17TH ST SUITE 205 ASSOCIATES, INC. COSTA MESA,CA 92627 CIVIL ENGINEERS PLANNERS SURVEYORS 17141546-1192 September 2 1992 Board of Directors Costa Mesa Sanitary District P 0 Box 1200 Costa Mesa CA 92628 RE PROPOSAL TO BEGIN DESIGN PHASE PROJECT 1112100-130 RECONSTRUCTING FORCE MAIN FOR ELDEN PUMPING STATION (PHASE I ) Gentlemen As part of the 1992-93 Capital Improvement Program enclosed please find a proposal to begin the design phase of subject project The project was discussed in detail at a study session and subsequent Board meetings where the District Engineer s report on the project was reviewed The project also received generally favorable comments from the District s outside engineering consultant Boyle Engineering in the form of a report that was prepared to review the Districts Capital Improvement Program The Board received and filed subject report on August 27 1992 Rather than re-explain the project scope enclosed as backup are the project description as prepared for the Capital Improvement Program plus Boyle' s report It is also noted that in an effort to keep the 1992-93 sewer assessment rates as low as possible $150 000 was deleted from the construction of phase I of this project The project will be designed in its entirety but the phasing will be tailored to match the current year budget Even though Boyle mentioned in their report that the proposed design phase appropriation appears low every effort will be made to finalize the design within the amount shown in the Capital Improvement Program. 1.: Printed on Recycled Pape 1) ROBIN B. HAMERS & ASSOCIATES, INC. 234 E '17TH ST SUITE 205 COSTA MESA,CA 92627 CIVIL ENGINEERS PLANNERS SURVEYORS [7141546-1192 Board of Directors September 2 1992 Page 2 With the $150 000 reduction in the construction fund there will definitely be a second construction phase This will most likely necessitate a small design phase appropriation in the 1993-94 fiscal year to cover the cost of preparing new project specifications sufficient to bid the second phase Therefore it is proposed to complete the design phase of subject project including preparing complete construction plans for the entire project plus specifications for bidding the first phase at the following hourly rates not to exceed $19 500 Engineer $ 59 00/hr Draftsman $ 47 00/hr 3 man Survey Crew $ 170 00/hr 2 man Survey Crew $ 150 00/hr Si cerely Robin B Hamers RBH/jp/#130 Encl Pr nted on Recycled Paper