Loading...
Proposal - Hamers - 1993-05-27 ROBIN B. HAMERS 234 E 17TH ST SUITE 205 & ASSOCIATES, INC. COSTA MEGA CA 92627 CIVIL ENGINEERS PLANNERS SURVEYORS [7141540-1192 May 27 1993 Board of Directors Costa Mesa Sanitary District P 0 Box 1200 Costa Mesa CA 92628 RE PROPOSAL TO BEGIN DESIGN PHASE PROJECT 1112100-131 TELEVISING SEWER LINES Gentlemen The previous four large phases of televising projects completed over a four year period covered the majority of the District s sewer mains and the results of the televising have become the foundation for determining the schedule for maintenance and rehabilitation of the sewer system At this point it is desired to scale down the televising to a series of small yearly projects_ that will achieve the following results 1 By limiting the televising to less than $5 000 per year the project does not have to be bid The District can select its own contractor which will be the contractor who was the low bidder and completed the four large televising projects This will provide continuity in record keeping and efficiency in completing the work since the contractor is familiar with the system. 2 The District receives frequent calls from homeowners who believe tree roots in the District s main line are causing stoppages in their laterals By having the televising contractor working on a regular basis throughout the District the contractor can easily include areas where there is a potential dispute 3 Certain areas need to be re-televised to check the structural condition of the pipe and to determine the effectiveness of the root cutting and foaming 4 There are some areas that have not yet been televised and these areas will be a part of the proposed small yearly televising projects .J Printed on Recycled Paper. 5) ROBIN B. HAMERS 234 E.17TH ST SUITE 205 6 ASSOCIATES, INC. COSTA MESA,CA 92627 CIVIL ENGINEERS PLANNERS SURVEYORS 17141540-1192 Board of Directors May 27 1993 Page 2 The original project appropriation is $50 000 however it is proposed to restructure the project as follows Design $ 2 500 Construction 5 000 Inspection 3 500 Reserve 1 000 TOTAL $12 000 It is recommended the Board authorize the televising to be completed for less than $5 000 and the Manager/District Engineer to complete the design and inspection at the following hourly rates not to exceed $2 500 and $3 500 respectively Engineer $ 59 00/hr Inspection $ 42 00/hr Si/1cerely I Robin B Hamers RBH/jp/proposal cms n CJ Printed on Recycled Paper