Change Order - Atlas Underground - 1995-03-17 Costa Mesa Sanitary District CONTRACT CHANGE ORDER NO 1 PROJECT 1112100-135 Reconstructing Force Main for Elden Pumping Station Phase II TO Atlas Underground Co Contractor You are hereby directed to make the'herein described changes from the plans and specifications, or do the following work not included in the plans and specifications on the contract. Note: This change order is not effective until approved pursuant to adopted District policy Change Requested by Costa Mesa Sanitary District -• Description of work to be done, estimate of quantities and prices to be paid. Segregate between additional work at contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment covet only such time as equipment is actually used and no allowance will be made for idle time, On January 31, 1995 and February 16, 1995 the Contractor encountered unknown underground utilities which were not shown on any plans of record. On January 31, 1995 the Contractor found an old steel fuel line and a concrete water line. The contractor was requested to delay work until it was determined the lines were abandoned and the interferring portions could be removed. On February 16, 1995 the Contractor encountered a 10" water line at' Sta. 23+38 which was determined to be live The charges shown herein are for delay time associated with encountering the unknown utilities See attached paperwork • Net Increase g Decrease ❑ in Contract $ 2,418,50 a 4 By reason of this order the time of completion will be adjusted as follows: None Prepared by Robin B Hamers Date 3/17/95 Approved by .Robin B. Hamers Date 3/17/95 District/ n e Approved by District Manager ( u _ Date 3/17/95 Requ' ed w Inc st ' $1,000 mo • Board approval also needed when increase in cost exceeds 2% of contract or $1,000 whichever is greater We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment,furnish all materials,except as may otherwise be noted above,and perform all services necessary for the work above specified,and will accept s full pay• ent the efor the prices shown abov Date accepter _ Contractor Atlas Underground Co B Hector Loya Title President Y CMF 1082-68 White-Distr ct File Ca ry-contr cto Copy Pink-Fi Goltle otl-Engi Costa Mesa Sanitary District CONTRACT CHANGE ORDER NO 2 PROJECT 1112100-135 Reconstructing Force Main for Elden Pumping Station Phase II TO Atlas Underground Co Contractor You are hereby directed to make the herein described changes from the plans and specifications, or do the following work not included.in the plans and specifications on the contract. Note: This change order is not effective until approved pursuant to adopted District policy Change Requested by Costa Mesa Sanitary District Description of work to be done, estimate of quantities and prices to be paid. Segregate between additional work at contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for Idle time. On February 17 and 20, 1995 the Contractor had to relocate a 10' water line at Sta 23+38 that interferred with the new sewer The water line was not shown on any plans of record and was not marked as part of the Underground Service Alert notification The line is owned by the Orange County Fairgrounds on .whose property is where the work is taking place . The charges as shown on the attached paperwork are for relocating the line • Net Increase ® Decrease ❑ in Contract $ 2,445 32 4 By reason of this order the time of completion will be adjusted as follows. None Prepared by Robin B. Hamers -Date 3/17/95 Approved by Robin B Hamers / yy Date 3/17/95 • Dist c rigi eer Approved by District Manager lwn) Date 3/17/95 Requ ad h re h st Is $1,000 mo • Board approval also needed when increase in cost exceeds 2% of contract or $1,000 whichever is greater We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment,furnish all materials,except as may oche wise.he noted above,and perform all services ecessary for the work above specified,and will ac.ept as full payment therefor the prices shown above. Date accepd.ed� Contractor Atlas Underground Co By Hector Loya Title President CMF 1082-68 White-District File Ca ry-Contr cto Copy.Pink-Fi Guide od-Engin Costa Mesa Sanitary District CONTRACT CHANGE ORDER NO 3 PROJECT 1112100-135 Reconstructing Force Main for Elden Pumping Station - Phase II TO Atlas Underground Co Contractor ou are hereby directed to make the herein described changes from the plans and specifications, or do the following work not included in the plans and specifications on the contract. Note: This change order is not effective until approved pursuant to adopted District policy Change Requested by 'Costa Mesa Sanitary District Description of work to be done, estimate of quantities and prices to be paid. Segregate between additional work at contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. Contractor is requested to replace the existing air release valve on the pipeline in the Mesa Drive overcrossing It is desired to have an automatic air release valve since the pipeline is located in one of the bridge cells and is hard to access As shown on the attached quotation contractor to provide and install new 2" air release valve model Val Matic 485 for a total price of $850 00 • Net Increase EA Decrease I I in Contract $ 850.00 By reason of this order the time of completion will be adjusted as follows: None Prepared by Robin B Hamers Date 3/23/95 Approved by Robin B Hamers /IH " Date 3/23/95 District nglneer Approved by District Manager Date 3/23/95 Requ ed whe ncr st $1,000 mo • Board approval also needed when increase in cost exceeds 2% of contract or $1,000 whichever is greater We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment,furnish all materials,except as may otherwise be noted above,and perform all services necessary for the work above specified,a c t as full pay t therefor the prices shown above. Date accepte - Contractor Atlas Underground Co. . By Hector Loya Title President CMF 1082-68 White-District File Ca ry-contr cto Copy•Pink-Fi nce Golde od-Engi