Loading...
Project 132 - Proposal - Hamers - 1993-12-27 ROBIN B. HAMERS 234 E.17TH ST SUITE 205 & ASSOCIATES, INC. COSTA MESA,CA 92627 CIVIL ENGINEERS PLANNERS SURVEYORS 1714)549-1192 December 27 1993 Board of Directors Costa Mesa Sanitary District P 0 Box 1200 Costa Mesa CA 92628 RE PROPOSAL TO PROVIDE INSPECTION SERVICES PROJECT 1112100-132 RECONSTRUCTING VARIOUS SEWER LINES Gentlemen The following proposal is submitted to provide the necessary engineering services during the construction phase of said project Construction is scheduled to be completed within a 12 week period beginning in January 1994 The necessary services to oversee the project are engineering drafting and inspection and the estimated maximum number of hours and proposed rate for each are as follows Engineering 56 hrs @ $59 00/hr = $ 3 304 00 Drafting 8 hrs @ $47 00/hr = 376 00 Inspection 160 hrs @ $42 00/hr = 6 720 00 TOTAL $10 400 00 The above are maximums and billing will be only for actual time worked Si erely litumm Robin B Hamers RBH/jp/proposal cms a Printed on Recycled Paper.