Loading...
Change Order - Grbavac - 1994-02-25 Costa Mesa Sanitary District CONTRACT CHANGE ORDER NO 1 PROJECT 1112100-132 Reconstructing Various Sewer Lines TO Grgo & Gordon Grbavac Construction Co. , Inc. Contractor You are hereby directed to make the herein described changes from the plans and specifications, or do the following work not included in the plans and specifications on the contract. Note: This change order is not effective until approved pursuant to adopted District policy Change Requested by Costa Mesa Sanitary District Description of work to be done, estimate of quantities and prices to be paid. Segregate between additional work at contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. The anticipated amount of pipe replacement for each individual spot repair was based on reviewing the TV video taken from inside the line In some cases the amount of damaged pipe seen from inside the line does not reflect the total damage as seen after the line is uncovered For instance, a hole in the pipe seen from the inside, may be in reality just part of a lengthy section of cracked pipe, the cracks not having yet pene- trated to the inside of the pipe to become visible during the TV inspection, Therefore, the contractor must replace the entire damaged section Also during some excavations unanticipated obstructions are present such as other utilities or concrete. The amount of extra work on each location was negotiated to reflect the actual circumstances. See attached infor- mation for a detailed description of each location and the extra work required. Net Increase I xl Decrease ❑ in Contract $ 12,000.00 r By reason of this order the time of completion will be adjusted as follows. None Anus Prepared by Robi B flamers Date 2/25/94 3 Approved by i �I l'r 7*� Date 2/25/94 Dis % Engin Approved by District Manager 1j q J Date 2/25/94 Requlreppp Mete In st $1,000 mo • Board approval also needed when increase in cost exceeds 2% of contract or $1,000 whichever is greater We, the . rsigned Contractor, have given careful conside ation to the change proposed and hereby agree, if this proposal is approved, that we .rovide all equipment,furnish all materials,except as-may otherwise be noted above,and perform all services necessary for the work ab- -reified,and will accept as full payment therefor the pric shown above. Date allted 2/25/94 Contractor Grgo & Gordon Grbavac Construction Co Inc A 1A 11i� B y Title President CMF 1082-68 White-Distr ct File Ca ry-Contr cto Copy'Pink-Fin Golde od-Engin PROJECT 1112100-132 RECONSTRUCTING VARIOUS SEWER LINES Change Order No 1 February 25 1994 Bid Item Description of Work Extra Work Amount 1 Bid Item 3 Installed extra 4 of pipe plus wye $ 2 400 00 Line #17 2 Bid Item 5 Installed extra 8 of pipe plus wye and 4 200 00 Line #36 3 of new lateral 3 Bid Item 8 Deleted from the project To be repaired (2,400 00) Line #51 using Link-Pipe 4 Bid Item 10 Installed extra 7 of pipe plus 2 wyes 4 200 00 Line #53 5 Bid Item 11 Installed extra 2 of pipe plus wye 1 200 00 Line #54 6 Bid Item 12 Deleted from the project To be repaired (1 200 00) Line #56 using Link-Pipe 7 Bid Item 14 Installed 5 of pipe instead of 4 600 00 Line #59 8 Bid Item 15 Installed 5 of pipe instead of 4 600 00 Line #65 9 Bid Item 17 Deleted from the project Was previously (2 400 00) Line #74 repaired 10 Bid Item 21 Installed 9' of pipe plus new wye instead 3 600 00 Line #101 of 3' of pipe Water service was running into sewer main and wye 11 Bid Item 22 Installed 8' of pipe instead of 6 1 200 00 Line #117 Net increase in contract $ 12 000 00 CMSD/#132