Project 139 - Proposal - 1995-12-04 COSTA MESA SANITARY DISTRICT
ORANGE COUNTY, CALIFORNIA
CONGRESS PUMP STATION
ABANDONMENT
PROJECT NO 1112100-139
e
h in pp❑ oo ao A•
V �� A
`-1
Tr* j
%soRla/
ROBIN B HAMERS
OQaoF ESSip
f� ,c�\� � � DISTRICT ENGINEER
U � G,,
ct 1121,5.,96 -Z
c4 j� CIVIL ��Q
yTe°FCAL\C-° BID SET NUMBER
COSTA MESA SANITARY DISTRICT
ORANGE COUNTY CALIFORNIA
NOTICE INVITING BIDS
NOTICE IS HEREBY GIVEN that sealed proposals for furnishing all labor
materials equipment transportation and such other facilities as may
be required for the CONSTRUCTION OF THE FOLLOWING PROJECT
CONGRESS PUMP STATION ABANDONMENT, PROJECT NO 1112100-139
Bids will be received by the Costa Mesa Sanitary District, at the
office of the City Clerk 77 Fair Drive, Costa Mesa, California until
the hour of 10 00 a m on January 3, 1996 at which time they will be
opened publicly and read aloud in the council chambers Sealed
proposals shall bear the title of the work and the name of the bidder
but no other distinguishing mark Any bid received after the scheduled
closing time for the receipt of bids shall be returned to the bidder
unopened It shall be the sole responsibility of the bidder to see
that his bid is received in proper time
A set of plans and specifications may be obtained at the City of Costa
Mesa, Department of Public Services, 4th floor, 77 Fair Drive Costa
Mesa California upon a non-refundable payment of $ 10 00 (full size
plans are available upon request) An additional charge of $2 00 will
be made if handled by mail [Phone (714) 754-5307 for purchasing
information ]
Each bid shall be made on the Proposal Form provided in the contract
documents, and shall be accompanied by a certified or cashier ' s check
or a bid bond for not less than 10% of the amount of the bid made
payable to the Costa Mesa Sanitary District No proposals shall be
considered unless accompanied by such cashier' s check cash or bidder's
bond
No bid shall be considered unless it is made on a blank form furnished
by the Costa Mesa Sanitary District and is made in accordance with the
provisions of the Proposal requirements
Each bidder must be licensed and also prequalified as required by law
A Class A or C42 contractor's license is required
The Board of Directors of the Costa Mesa Sanitary District reserves the
right to reject any or all bids
The Contractor shall comply with the provisions of Section 1770 to 1780
inclusive of the California Labor Code, the prevailing rate and scale
of wages determined by the Director of the Department of Industrial
Relations State of California which are filed with the Assistant
Manager/Clerk of the District and shall forfeit penalties prescribed
therefore for noncompliance of said code
Dated December 4 1995 BY ORDER OF THE BOARD OF DIRECTORS
OF THE COSTA MESA SANITARY DISTRICT
TABLE OF CONTENTS
Page
Proposal P-1
PART 1
A Standard Specifications 1
B General Provisions 1
1-2 Definitions 1
1-3 Abbreviations 2
2-1 Award of Contract 2
2-3 1 Subcontracts General 4
2-4 Contract Bonds 4
2-5 1 Plans and Specifications 4
2-9 1 Permanent Survey Markers 5
2-10 Authority of Board and Inspection 5
3-1 1 Changes in Work General 7
3-3 1 Extra Work General 7
6-1 Construction Schedule and Commencement of Work 7
6-6 2 Extension of Time 7
7-2 Prevailing Wage Rates 8
7-3 Contractor' s Insurance 8
7-5 Permits and Licenses 9
7-6 Contractor's Representatives 10
7-8 1 Cleanup and Dust Control 10
7-8 5 Temporary Light, Power and Water 10
7-10 Public Convenience and Safety 11
7-13 Laws To Be Observed 11
9-3 2 Partial and Final Payment 11
9-3 3 Delivered Materials 12
SPECIAL PROVISIONS
PART 2
CONSTRUCTION MATERIALS
208-2 3 Joints for Clay Pipe 13
PART 3
CONSTRUCTION METHODS
A-I General Description of Work 13
B-I Additions to Standard Specifications 14
300-1 Clearing and Grubbing 14
300-2 Unclassified Excavation 14
301-2 Untreated Base 14
302-5 Asphalt Concrete Pavement 14
302-5 4 Asphalt Concrete Pavement - Tack Coat 14
306-1 2 1 Pipe Bedding 14
306-1 2 3 Field Jointing of Clay Pipe 14
306-1 3 Open Trench Operations - Backfill and Densification 15
306-1 5 1 Temporary Resurfacing 15
B-II Connections to Existing Facilities 15
B-III Guarantees and Tests 15
B-IV Safety Requirements and Permits 16
B-V Traffic 16
B-VI Sheeting Shoring and Bracing 16
B-VII Removal of Existing Equipment 17
C-I Costa Mesa Sanitary District Std Drawing No S-100 18
C-II Costa Mesa Sanitary District Std Drawing No S-102 19
C-III Costa Mesa Sanitary District Std Drawing No S-104-A 20
C-IV Costa Mesa Sanitary District Std Drawing No S-104-B 21
C-V Costa Mesa Sanitary District Std Drawing No 5-105 22
C-VI Costa Mesa Sanitary District Std Drawing No S-112 23
C-VII City of Costa Mesa Std Drawing 415 24
C-VIII City of Costa Mesa Std Drawing 813 25
P R O P O S A L
PROJECT NO 1112100-139
CONGRESS PUMP STATION ABANDONMENT
TO THE BOARD OF DIRECTORS
COSTA MESA SANITARY DISTRICT
77 FAIR DRIVE
COSTA MESA CALIFORNIA 92626
GENTLEMEN
In compliance with the NOTICE INVITING BIDS for the CONGRESS PUMP STATION
ABANDONMENT which is hereto attached, the undersigned has carefully
examined the location of the proposed work, the plans, specifications and
other contract documents therefore and is satisfied as to the conditions
to be encountered as to the character, quality and quantity of work to
be performed and materials to be furnished as to the requirements of the
specifications and the contract It is mutually agreed that the
submission of a proposal shall be considered prima facie evidence that
the bidder has made such examination If awarded the contract, the
undersigned agrees to commence work under the contract within ten
calendar days from the date of the contract and to complete said work
within 60 working days from the first day of commencement of said work
unless legal extension is granted in accordance with the terms set forth
in the specifications and to perform and complete the work as shown on
the plans and in accordance with the specifications and other contract
documents, and to furnish all labor materials tools and equipment
necessary to complete the work in place, in the manner and time
prescribed at the following prices to wit
PROPOSAL SCHEDULE
Item Approx Item with Unit Price Unit Price
No. Quantity Written in Words Figures Total
1 1297 LF Construct 8" VCP Sewer Line, complete
in place including, but not limited
to, excavation, trenching, shoring,
traffic control, bedding, furnishing
and installing pipe backfill testing
and repaving street
dollars and
cents
per linear foot $ $
P-i Bidder 's Initials
PROPOSAL SCHEDULE (continued)
Item Approx Item with Unit Price Unit Price
No. Quantity Written in Words Figures Total
2 72 LF Construct 6" VCP Sewer Lateral, complete
in place, including, but not limited
to, excavation trenching shoring,
traffic control, bedding, furnishing
and installing pipe, backfill and
repaving street
dollars and
cents
per linear foot $ $
3 14 EA Tie-in existing Sewer Lateral
dollars and
cents per EA $ $
4 4 EA Construct Sewer Manhole per CMSD
Std 5-100
dollars and
cents per EA $ $
5 1 EA Construct Sewer Drop Manhole per
CMSD Std 5-102
dollars and
cents per EA $ $
6 1 EA Reconstruct Existing Manhole Base
per Detail Sheet 2
dollars and
cents per EA $ $
7 4 EA Plug Existing 8" VCP Sewer
dollars and
cents per EA $ $
P-2 Bidder 's Initials
PROPOSAL SCHEDULE (continued)
Item Approx Item with Unit Price Unit Price
No. Ouantity Written in Words Figures Total
8 2 EA Remove Existing Manhole Frame
Cover & Shaft to 2 ' Below Finished
Surface Fill w/sand Cement Slurry
and Construct 10" Full Depth A C
Pavement
dollars and
cents per EA $ $
9 L S Abandon Existing Pump Station and
Electrical Vault per Details
Sheet 5 and Rechannel Manhole
dollars and
cents per Lump Sum $ $
10 36 LF Construct 6" VCP Sewer Lateral per
CMSD Std S-104-A B
dollars and
cents per Linear Foot $ $
11 272 SF Remove and Reconstruct Cross Gutter
per CCM Std 415
dollars and
cents per Square Foot $ $
12 1 EA Remove Interfering Portions of Existing
Manhole and Construct Sewer Manhole
per CMSD Std 5-100 and Detail Sheet 4
dollars and
cents per EA $ $
Total or gross sum written in words Total or gross sum in figures
Bidder' s Initials
In case of a discrepancy between the words and figures the words
shall prevail
P-3 Bidder' s Initials
The Contractor agrees that the District will not be held
responsible if any of the approximate quantities shown in the foregoing
proposal shall be found incorrect, and he shall not make any claim for
damages or for loss of profits because of a difference between the
quantities of the various classes of work as estimated and the work
actually done If any error omission or mis-statements shall be
discovered in the estimated quantities it shall not invalidate this
contract or release the Contractor from the execution and completion of
the whole or part of the work herein specified, in accordance with the
specifications and the plans herein mentioned and the prices herein
agreed upon and fixed therefor, or excuse him from any of the
obligations or liabilities hereunder, or entitle him to any damages or
compensation otherwise than as provided for in this contract
The Contractor agrees that the District shall have the right to
increase or decrease the quantity of any bid item or portion of the
work or to omit portions of the work as may be deemed necessary or
expedient and that the payment for incidental items of work not
separately provided in the proposal shall be considered included in the
price bid for other various items of work
Accompanying this proposal is
($
NOTICE Insert the words "Cash" "Certified Check" or "Bidder s Bond"
as the case may be in an amount equal to at least ten per cent of the
total bid price, payable to the Costa Mesa Sanitary District
The undersigned deposits the above named security as a proposal
guaranty and agrees that it shall be forfeited to the Costa Mesa Sanitary
District as liquidated damages in case this proposal is accepted by the
District and the undersigned shall fail to execute a contract for doing said
work and to furnish good and sufficient bonds in the form set forth in the
specifications and contract documents of the District with surety satisfac-
tory to the District within 10 Days after the bidder has received written
notice of the award of the contract; otherwise, said security shall be
returned to the undersigned
P- 4 Bidder' s Initials
Respectfully submitted
Contractor's Business Name Contractor Title
Business Address Street BY Title
City State Zip Contractor' s License Expiration
Date & Classification
Business Phone Number
Name Title
Residence Street
City State Zip
Residence Phone Number
I declare under penalty of perjury under the laws of the State of California
that the forgoing is true and correct
Dated at this day of 19
(Signed)
The full names and residences of all persons and parties interested in the
foregoing proposal as principals, are as follows
NOTICE Give first and last names in full; in case of corporation give
names of President, Secretary, Treasurer and Manager, and affix corporate
seal; in all cases of partnerships and joint ventures give names of all the
individual members
P-5 Bidder' s Initials
CONSTRUCTION PROJECT REFERENCES
In order to more fully evaluate your background and experience for
the project herein proposed, it is requested that you submit a list
of Public Works and/or similar construction projects completed, or
in progress within the last 24 months Your cooperation in this
matter is greatly appreciated
DATE PROJECT AGENCY ' S CONTRACT
AWARDED AWARDING AGENCY ADMINISTRATOR
Bidder shall signify receipt of all Addenda here, if any
Addendum No Date Received Bidder' s Signature
P-6 Bidder' s Initials
DESIGNATION OF SUBCONTRACTORS
In compliance with the "Subletting and Subcontracting Fair
Practices Act" being Sections 4100-4113 of the Government Code of the
State of California and any amendments thereto, each bidder shall set
forth below the name and location of the place of business of each
Subcontractor who will perform work or labor or render service to the
prime Contractor in or about the construction of the work or improve-
ment in an amount in excess of 1/2 of 1% of the prime Contractor ' s
total bid and shall further set forth the portion of the work which
will be done by each such Subcontractor Only one Subcontractor for
each such portion shall be listed
If the Contractor fails to specify a Subcontractor for any portion
of the work to be performed under the contract he shall be deemed to
have agreed to perform such work himself and he shall not be permitted
to subcontract that portion of the work except under the conditions
hereinafter set forth
Subletting or subcontracting of any portion of the work to which
no Subcontractor was designated in the original bid shall only be
permitted in cases of public emergency or necessity, and then only
after a finding reduced to writing as a public record of the Legisla-
tive Body of the owner
Portion State License
Of Work Subcontractor's Name and Address Number Class
P-7 Bidder' s Initials
BIDDER'S BOND TO ACCOMPANY PROPOSAL
(Required if the bidder desires to submit bond instead of a
certified or cashier's check)
KNOW ALL PEOPLE BY THESE PRESENTS
That we, as
principals, and as surety,
are held and firmly bound unto the Costa Mesa Sanitary District a
special district , organized under the laws of the State of
California and situated in Orange County in the sum of
($ ) to be paid to the District, its successors
and assigns, for which payment well and truly to be made, we bind
ourselves our heirs, executors, and administrators, successors or
assigns, joint and severally firmly by these presents
THE CONDITION OF THIS OBLIGATION IS SUCH,
That if the certain proposal of the above bounden,
, is accepted by the Costa
Mesa Sanitary District and if the above bounden,
his heirs, executors, administrators, successors
and assigns, shall duly enter into and execute a contract for such
construction and shall execute and deliver the LABOR AND MATERIAL
and the FAITHFUL PERFORMANCE BONDS described within 10 days (not
including Sunday) from the date of the mailing of a notice of the
above bounden, , by and from District, that said
contract is ready for execution then this obligation shall become
null and void; otherwise it shall be and remain in full force and
virtue
IN WITNESS WHEREOF
We hereunto set our hands and seals this day of
199
P- 8 Bidder's Initials
NON-COLLUSION AFFIDAVIT
The bidders, by its officers and agents or representatives present
at the time of filing this bid, being duly sworn on their oaths say,
that neither they nor any of them have in any way, directly or
indirectly entered into any arrangement or agreement with any other
bidder, or with any public officer of Costa Mesa Sanitary District
whereby such affiant or affiants or either of them has paid or is to
pay to such bidder or public officer any sum of money, or has given or
is to give to such other bidder or public officer anything of value
whatever, or such affiant or affiants or either of them has not direct-
ly or indirectly, entered into any arrangement or agreement with any
other bidder or bidder, which tends to or does lessen or destroy free
competition in the letting of the contract sought for on the attached
bids; that no bid has been accepted from any Subcontractor or supplier
through any bid depository, the By-Laws, Rules, or Regulation of which
prohibit or prevent the Contractor from considering any bid from any
Subcontractor or supplier which is not processed through said bid
depository or which prevent any Subcontractor or supplier from bidding
to any Contractor who does not use the facilities of or accept bids
from or through such bid depository; that no inducement of any form or
character other than that which appears upon the face of the bid will
be suggested, offered paid or delivered to any person of the contract
nor has this bidder any agreement or understanding of any kind whatso-
ever, with any person whomsoever to pay, deliver to, or share with any
other person in any way or manner, any of the proceeds of the contracts
sought by this bid
Subscribed and sworn to before me by
This day of 199
My Commission expires
Notary Public
p- 9 Bidder's Initials
PART 1
A STANDARD SPECIFICATIONS
Except as hereinafter provided, the provisions of the latest edition
of the "Standard Specifications for Public Works Construction" (green
book) and all amendments thereto, adopted by the Joint Cooperative
Committee of Southern California Chapter, American Public Works
Association; hereinafter referred to as Standard Specifications are
adopted as the "Standard Specifications" of the Costa Mesa Sanitary
District and shall be considered as a part of these specifications Also
a part of these specifications is the Costa Mesa Sanitary District's
Standard Plans and Specifications for the Construction of Sanitary
Sewers
B GENERAL PROVISIONS
Following additions are made in the "Standard Specifications" If
there is a conflict between Standard Specifications and these additions
these additions shall have first precedence
1-2 DEFINITIONS
(a) AGENCY The Costa Mesa Sanitary District, also hereinafter called
"District"
(b) BOARD The Board of Directors of the Costa Mesa Sanitary District
(c) CONTRACT Documents including but not limited to the Proposal Stan-
dard Specifications General Provisions Special Provi-
sions Plans, Bonds Insurance, Contract Agreement and all
Addenda setting forth any modifications of the document
(d) ENGINEER District Engineer of the Costa Mesa Sanitary District
(e) BIDDER Any individual, co-partnership association or corporation
submitting a proposal for the work contemplated acting
directly or through a duly authorized representative
(f) LEGAL ADDRESS The legal address of the Contractor shall be the
address of contractor given on the Contractor' s bid
and is hereby designated as the place to which all
notices , letters or other communications to the
Contractor shall be mailed or delivered
- 1 -
(g) LABORATORY An established laboratory approved and authorized by
the Engineer for testing materials and work involved
in the contract
(h) STATE Chapter 3 Part 5, Division 3 Title 2 of the Government
CONTRACT Code The provisions of this act and other applicable
ACT laws, form and constitute a part of the provisions of this
contract to the same extent as if set forth herein, in full
1-3 ABBREVIATIONS
CCM City of Costa Mesa
CMSD Costa Mesa Sanitary District
CNB City of Newport Beach
CSD County Sanitation Districts of Orange County
OCEMA Orange County Environmental Management Agency
2-1 AWARD OF CONTRACT
The award of contract, if awarded, will be to the lowest responsible
bidder whose proposal complies with all requirements of the notice
inviting bids The District, however, reserves the right to reject any
or all bids and to waive any informality in the bids received The
award, if made, will be made within 30 days after the opening of the
bids
PROCEDURE FOR PROPOSAL SUBMITTAL
Proposal shall be made and submitted on the Proposal Forms in accor-
dance with the Notice Inviting Bids In addition to the required signa-
tures in the spaces provided in the proposal forms, each bidder shall
initial each sheet of the proposal forms at the bottom right hand corner
No person, firm or corporation, shall be allowed to make file, or
be interested in more than one bid for the same work; unless alternate
bids are called for A person, firm or corporation who has submitted a
sub-proposal to a bidder or who has quoted prices on materials to a
bidder, is not hereby disqualified from submitting a sub-proposal or
quoting prices to other bidders If, on the opening of bids more than
one bid appears in which the same person, firm or corporation is inter-
ested as a principal all such bids shall be rejected
Proposals with interlineations, alterations, or erasures shall be
initialed by the bidder ' s authorized agent Alternative proposals
special conditions, or other limitiations or provisions affecting the
bid, except as such called for by the contract documents will render the
bid informal and may cause its rejection All proposals must give the
prices bid for the various items of work and must be signed by the
bidder, who shall give his
- 2 -
address Each bid shall have thereon the affidavit of the bidder that
such bid is genuine and not sham or collusive or made in the interest or
behalf of any other person not therein named and that the bidder has not
directly or indirectly induced or solicited any other bidder to put in a
sham bid or any person firm or corporation to refrain from bidding and
that the bidder has not in any manner sought by collusion to secure
himself an advantage over any other bidder
REQUEST FOR INTERPRETATION
If any person contemplating submitting a bid is in doubt as to the
true meaning of any part of the plans, specifications, or other proposed
contract documents, or finds discrepancies in, or omissions from the
drawings or specifications he may request the Engineer in writing for
an interpretation or correction thereof The person submitting such a
request shall be responsible for its prompt delivery All such interpre-
tations of the contract documents will be made only by Addenda duly
issued and a copy of each such Addendum will be mailed or delivered to
each person receiving a set of contract documents at his last address of
record The District will not be responsible for any other explanations
or interpretations of the contract documents
RETURN OF BID SECURITY
Any bidder may withdraw his bid, either personally, or by
telegraphic or written request at any time prior to the scheduled
closing time for the receipt of bids It is the sole responsibility of
the bidder to see that any such telegraphic or written request is
delivered to the City Clerk prior to said closing time Bid security of
such bidders will be returned promptly to the bidder
The bid security of the three lowest bidders will be retained until
the contract is awarded, entered into and executed with the bidder of
accepted bid, after which those will be returned to the respective
bidders with whose proposal they accompanied The bid security of all
other bidders will be returned after the canvass of bids
The bid security of the bidder of accepted bid will be held by the
District until the contract has been entered into and the bonds
accompanying the same are approved and filed whereupon the said bid
security will be returned to the bidder
If the bidder fails or refuses to enter into contract to do the
work the bid security shall be forfeited to the District and shall be
collected and paid to the General Fund of the District
- 3 -
EXECUTION OF CONTRACT
The contract shall be signed by the successful bidder and returned
to the District together with the contract bonds as specified in Section
2-4 of the Standard Specifications and as amended below and any changes
or additions made thereto in these specifications within 10 days after
receipt of written notice of award of contract The form of contract
agreement to be executed by the Contractor will be supplied by the
Attorney for the District No proposal shall be considered binding upon
the District until the execution of the contract by the District
2-3 1 SUBCONTRACTS GENERAL
The Engineer as duly authorized officer may consent to
Subcontractor substitution requested by the Contractor subject to the
limitiations and notices prescribed in Section 4107 of the Government
Code
2-4 CONTRACT BONDS
The "Faithful Performance Bond" and the "Labor and Material Bond"
shall both be one hundred percent (100%) of the contract price
In addition to the "Faithful Performance Bond" and the "Labor and
Material Bond" , Contractor shall also furnish to District a "Guarantee
Bond" in the amount of $10, 000 or ten percent (10%) of the contract
price, whichever is greater as security for this guarantee to be
retained by District for a period of one (1) year after the date of
written acceptance by the District, of all work performed under this
contract The date of written acceptance shall be the date of recording
of the Notice of Completion
Sureties providing performance bonds for Contractors must be
licensed or agree to employ a licensed Contractor with a Class A or
other applicable specialty contractor ' s license from the State of
California
2-5 1 PLANS AND SPECIFICATIONS
Engineer will provide the Contractor free of charge copies of
plans and specifications that are reasonably necessary for the execution
of work
Contractor shall at his own expense, obtain copies of Standard
Specifications and Standard Plans and Specifications of the State of
California for his general use
- 4 -
If after award of contract, should it appear that the work to be
done or any matter relative thereto, is not sufficently detailed or
explained in the specifications and plans, the Contractor shall apply to
the Engineer for such further explanations as may be necessary and shall
conform to such explanation or interpretation as part of the contract
All scaled dimensions are approximate Before proceeding with any
work, the Contractor shall carefully check and verify all dimensions and
quantities and shall immediately inform the Engineer or his
representative of any discrepancies
2-9 1 PERMANENT SURVEY MARKERS
Unless otherwise provided in the Special Provisions, the Contractor
shall be responsible for protecting all existing horizontal and vertical
survey controls, monument, ties and benchmarks located within the limits
of the work If any of the above require removal relocating or
resetting, the Contractor shall, prior to any construction work and under
the supervision of a California-licensed Land Surveyor or Civil Engineer,
establish sufficient temporary ties and benchmarks to enable the points
to be reset after completion of construction
Any ties, monuments and benchmarks disturbed during construction
shall be reset per local agency standards after construction and the tie
notes submitted to the appropriate governing agency on 8-1/2" X 11" loose
leaf paper The Contractor and his sureties shall be liable for, at his
own expense, any resurvey required due to his negligence in protecting
existing ties, monuments, benchmarks or any such horizontal and vertical
controls
Unless a separate bid item is provided, full compensation for
conforming to the requirements of this sub-section shall be considered as
included in the contract bid price paid for various other items of work
and no additional compensation will be allowed
2-10 AUTHORITY OF BOARD AND INSPECTION
Authority of Board and Inspection shall conform to Section 2-10 of
Standard Specifications and the following
The Contractor shall give at least 48 hours advance notice of time
when he or his Subcontractor will start or resume the various units of
operations of the work as per the contract or resume the said units or
operations when they have been suspended as per the contract
- 5 -
The above notice is to be given during working hours, exclusive of
Saturday Sunday or holidays for the purpose of permitting the Engineer
to make necessary assignments of his representative or inspector on the
work
Any work performed in conflict with said notice without the presence
or approval of the inspector or work covered up without notice approval
or consent may be rejected or ordered to be uncovered for examination at
Contractor' s expense and shall be removed at Contractor' s expense if so
ordered by the Engineer or inspector on the work Any unauthorized or
defective work, defective material or workmanship or any unfaithful or
imperfect work that may be discovered before the final payment and final
acceptance of work shall be corrected immediately without extra charge
even though it may have been overlooked in previous inspections and
estimates or may have been caused due to failure to inspect the work
All authorized alterations affecting the requirements and
information given on the approved plans shall be in writing No changes
shall be made on any plan or drawing after the same has been approved by
the Engineer except by direction of the Engineer in writing Deviations
from the approved plans , as may be required by the exigencies of
constructions will be determined in all cases by the Engineer and
authorized in writing
All instructions rulings and decisions of the Engineer shall be in
writing and shall be final and binding on all parties unless formal
protest is made in writing as provided in the following paragraph, and
as provided in Section 1670 of the Civil Code
If the Contractor considers any work demanded of him to be outside
the requirements of the contract or if he considers any instruction,
ruling or decision of the Inspector or Engineer to be unfair, he shall
within 10 days after any such demand is made or instruction ruling or
decision is given, file a written protest with the Engineer stating
clearly and in detail his objections and reasons therefore Except for
such protests and objections as are made of record, in the manner and
within the time above stated, the Contractor shall be deemed to have
waived and does hereby waive all claims for extra work, damages and
extensions of time on account of demands, instructions, rulings and
decisions of the Engineer
Upon receipt of any such protest from the Contractor, the Engineer
shall review the demand instruction, ruling or decision objected to and
shall promptly advise the Contractor in writing of his final decision
which shall be binding on all parties unless with the 10 days thereafter
the contractor shall file with the Board of Directors a formal protest
against said decision of the Engineer The Board of Directors shall con-
sider and render a final decision on any such protest within 30 days of
receipt of same
- 6 -
3-1 1 CHANGES IN WORK GENERAL
Engineer shall be the duly authorized officer who may grant the
changes prescribed in this section
3-3 1 EXTRA WORK GENERAL
The extra work as defined in this section of Standard Specifications
and any work done beyond the lines and grades shown on the plans shall
only be performed when ordered in writing by the Engineer In absence of
such written order any such work shall be considered unauthorized and
will not be paid for Work so done may be ordered removed at the
Contractor's expense
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK
Prior to the commencement of construction arrangements will be made
for a meeting between the Contractor and the Engineer The purpose of
this meeting is to coordinate the activities of the Contractor within the
limits of this contract, review scheduling, discuss construction methods
and clarify inspection procedures The Contractor will be required to
submit for approval by the Engineer, a complete schedule showing the
number of working days required to complete the project
6-6 2 EXTENSION OF TIME
In the event the work called for under the contract is not finished
and completed in all parts and requirements within the time specified
the Board of Directors shall have the right to increase the number of
working days for completion or not, as may seem best to serve the
interest of the District
Except for the delays beyond Contractor 's control as described in
Sections 5-5 and 6-6 1, the District shall have the right to charge the
Contractor his heirs assigns or sureties and to deduct from the final
payment for the work all or any part, as it may deem proper of the
actual cost of engineering inspection superintendence and other
overhead expenses which are directly chargeable to the Contractor and
which accrued during the period of such extensions except that the cost
of the final services and preparation of the final estimates shall not be
included in such charges
In addition to the above charges Contractor shall pay to the
District liquidated damages as specified in Section 6-9 for such delays
No extension of time for the completion of the work called for under
the contract shall be allowed unless at least 10 days prior the the time
fixed for the completion thereof or the time fixed by the Board of
Directors or its designee for such completion as extended, Contractor
shall have filed application for extension thereof, in writing, with the
- 7 -
Engineer addressed to the Board of Directors or its designee In this
connection it is understood that the Engineer shall not transmit any such
request to the Board or its designee if not filed within the time herein
prescribed
7-2 PREVAILING WAGE RATES
The Contractor shall comply with the provisions of Section 1770 to
1780 inclusive of the California Labor Code, the prevailing rate and
scale of wages determined by the Director of the Department of Industrial
Relations , State of California, which are filed with the Assistant
Secretary of said District, and shall forfeit penalties prescribed
therefore for noncompliance of said Code
In order to verify the compliance of said code Contractor may be
required by the District, from time to time, to furnish weekly, for the
duration of the contract period, copies of his payroll statements showing
wages paid each employee during the preceding week and the employee work
classification to the Engineer for checking Using Form DH-H-347 ,
Payroll Statement of Compliance is an acceptable method of fulfilling the
above requirement
APPRENTICES
Attention is directed to the provisions in Section 1777 5 and 1777 6
of the Labor Code concerning the employment of apprentices by the Con-
tractor or any Subcontractor under him The Contractor and any Subcon-
tractors under him shall comply with the requirements of said sections in
the employment of apprentices
Information relative to apprenticeship standards wage schedules and
other requirements may be obtained from the Director of Industrial Rela-
tions, Ex-Officio the Administrator of Apprenticeship, San Francisco,
California, or from the Division of Apprenticeship Standards and its
branch offices
7-3 CONTRACTOR'S INSURANCE
The Contractor shall not commence work under his contract until he
has obtained all insurance required under this heading in a company
acceptable to the District nor shall the Contractor allow any Subcon-
tractor to commence work on his sub-contract until all insurance required
of the Subcontractor has been obtained The Contractor shall take out
and maintain at all times during the life of the contract the following
policies of insurance
a Workman's compensation insurance to cover his employees as re-
quired by the Labor Code of the State of California and the
Contractor shall require all subcontractors similarly to
provide such compensation insurance for all of the latter's
employees
- 8 -
b Public liability and property damage insurance on account of
bodily injuries, including death resulting therefrom in the sum
of $5 000 000 combined, single limit for any one accident
which may arise from the operations of the Contractor in
performing the work provided for herein
c Motor vehicle public liability and property damage insurance to
cover each automobile truck and other vehicles used in the
performance of the contract in an amount of not less than
$250, 000 for one person and $500 000 for more than one person
and property damage in the sum of $100, 000 per occurrence and
$250, 000 in the aggregate resulting from any accident which may
arise from the operations of the Contractor in performing the
work provided for herein
Each of the policies of insurance provided for shall contain a clause
substantially in the following words
It is hereby understood and agreed that this policy may not be
cancelled nor the amount of coverage thereof be reduced until ten
days after receipt by the Engineer of a written notice of such
cancellation or reduction in coverage as evidenced by receipt of a
registered letter
The Contractor shall, at the time of the execution of the contract,
present the original policies of insurance required herein or present a
certificate of insurance showing the issuance of such insurance
Contractor shall also provide an endorsement naming the District as an
additional insured
7-5 PERMITS AND LICENSES
Except as otherwise specified in the Special Provisions the
Contractor shall procure all permits and licenses, pay all charges and
fees, and give all notices necessary and incident to the due and lawful
prosecution of the work These permits and licenses shall be obtained in
sufficient time to prevent delays to the work
In the event that the agency has obtained permits licenses or other
authorization, applicable to the work, the Contractor shall comply with
the provisions of said permits licenses and other authorizations In
the case the agency does procure any permits it is understood that the
agency is acting as an authorized agent for the contractor and that the
Contractor shall be soley responsible for all work performed under the
permit
- 9 -
7-6 THE CONTRACTOR' S REPRESENTATIVE
Contractor shall also file with the Engineer the addresses and tele-
phone numbers where he or his designated representative may be reached
during hours when the work is not in progress
Instructions and information given by the Engineer to the
Contractor' s authorized representative or at the address or telephone
numbers filed in accordance with this section shall be considered as
having been given to the Contractor
7-8 1 CLEANUP AND DUST CONTROL
All surplus materials shall be removed from the site of the work
daily after completion of the work causing the surplus materials
Unless the construction dictates otherwise, and unless otherwise
approved by the Engineer, Contractor shall furnish and operate a self-
loading motor sweeper with spray nozzles at least once each working day
to keep paved areas acceptably clean whenever construction including
restoration is incomplete
Failure of the Contractor to comply with the Engineer 's dust control
orders may result in an order to suspend work until the condition is
corrected; and after filing notice to the Contractor the Engineer may
order this accomplished by others All costs thus incurred shall be
deducted from the amount to be paid to the Contractor No additional
compensation will be allowed as a result of such suspension
No separate payment will be made for any work performed, of material
used, to control dust resulting from the Contractor's performance on the
work, or by public traffic, either inside or outside the right of way
Full compensations for such dust control will be considered as included
in the prices paid for the various items or work involved
7-8 5 TEMPORARY LIGHT, POWER AND WATER
The Contractor shall provide for his employees and adequate supply
of clean potable drinking water, which shall be dispensed through
approved sanitary facilities
- 10 -
7-10 PUBLIC CONVENIENCE AND SAFETY
The Contractor shall abide by the following publications which are
hereby made a part of these specifications
The Work Area Traffic Control Handbook (WATCH)
The Manual of Warning Signs , Lights and Devices for Use in
Performance of Work Upon Highways
State Labor Code Sections 6704 , 6706 and 6707
The Construction Safety Orders (CAL/OSHA)
The General Industry Safety Orders (CAL/OSHA)
Standard Specifications for Public Works Construction (The Green
Book)
7-13 LAWS TO BE OBSERVED
The Contractor shall protect and indemnify the District, the Board
of Directors the Engineer and all of its or their officers, agents and
servants against any claim or liability arising from or based on the
violation of any existing or future State, Federal and Local laws
ordinances regulations orders or decrees, whether by himself or his
employees If any discrepancy or inconsistency is discovered in the
plans, drawings, specifications or contract for the work in relation to
any such law, ordinance, regulation, order or decree the Contractor
shall forthwith report the same to the Engineer in writing
9-3 2 PARTIAL AND FINAL PAYMENT
The leading time for processing invoices for the monthly progress
payment approved by the Engineer for inclusion on the warrant list of the
District is governed by the rules and regulations established by the
Board of Directors Invoices for monthly payments shall be submitted to
the Engineer no later than the 25th of each month
After completion of the contract, the Board shall, upon recommend-
ation of the Engineer, accept the work as complete and authorize the
final payment
- 11 -
The amount retained and deducted by the District shall be 5% of the
progress estimates for all progress payments The final payment of the
retention amount to the Contractor shall be made 35 days from the date of
the recording of the Notice of Completion of the work after it is
accepted by the Board of Directors and shall be made on duly certified
voucher therefore
It is mutually agreed among the parties to the contract that no
certificate given or payment made under the contract, except the final
certificate of final payment, shall be conclusive evidence of full or
substantial performance of this contract; and no payment shall be
construed to be an acceptance of any defective work or improper material
The acceptance of final payment by the Contractor shall release the
District, the Board of Directors and the Engineer from any and all claims
or liabilities on account of work performed by the Contractor under the
contract or any alterations thereof
9-3 3 DELIVERED MATERIALS
Materials delivered, but not in place, will not be classed as work
done, except as otherwise provided in these specifications
- 12 -
SPECIAL PROVISIONS
The following additions are made to Parts 2 & 3 of the "Standard
Specifications" If there is a conflict between these additions and
Standard Specifications, these additions shall have precedence
PART 2
CONSTRUCTION MATERIALS
208-2 3 JOINTS FOR CLAY PIPE
Joints for vitrified clay pipe shall be Type "D" in conformance
with Section 208-5 of the Standard Specifications
PART 3
CONSTRUCTION METHODS
A-I GENERAL DESCRIPTION OF WORK
The work to be done in general consists of the following
Removal of existing improvements and obstructions; controlling traffic
in and around the work site; excavating the trenches for sewer main;
controlling and disposing of surface and groundwater flows during all
phases of construction; removing existing sewer main; laying the sewer
main; construction of manholes; joining existing manholes; rechanneling
existing manholes; connecting existing laterals to new sewer; testing
the sewer main and manholes ; backfilling excavations; removal and
disposal of excess trench materials ; also removal of pumps and
appurtenances from wet well and electrical vault; cleaning wet well and
electrical vault; backfilling wet well and vault; plug existing force
main; reconstructing paving and other improvements to the satisfaction
of the City Engineer of Costa Mesa
-13-
B-I ADDITIONS TO STANDARD SPECIFICATIONS
300-1 CLEARING AND GRUBBING
Clearing and grubbing shall consist of removing all obstructions
and improvements as shown on the plans and specififed in Section 300-1
of the Standard Specifications
300-2 UNCLASSIFIED EXCAVATION
Unclassified excavation shall consist of all excavation
301-2 UNTREATED BASE
Payment for aggregate base required for the roadway structural
section above the trench shall be included in the contract price for
the related item of work No separate compensation will be allowed
Payment for aggregate base used as bedding or trench backfill
shall be included in the contract price for the related item of work
No separate compensation will be allowed
302-5 ASPHALT CONCRETE PAVEMENT
The asphalt concrete class and grade shall conform to the
requirements of the City of Costa Mesa Standard No 813 , as modified on
the plans
302-5 4 ASPHALT CONCRETE PAVEMENT - TACK COAT
Grade SS-Ih emulsified asphalt shall be used as a tack coat as
required for asphalt concrete overlay and as required by the City
Engineer
All surfaces to be overlaid shall be cleaned to the satisfaction
of the City Engineer before tack coat is applied
306-1 2 1 PIPE BEDDING
Underground pipe bedding shall be per "Trench Detail" shown on
City of Costa Mesa Std No 813 and per CMSD Std S-112 and as shown on
the Plans
306-1 2 3 FIELD JOINTING OF CLAY PIPE
Field joints shall be Type "G"
-14-
306-1 3 OPEN TRENCH OPERATION - BACKFILL AND DENSIFICATION
Sawcutting of the A C and backfill of the trench shall be as
shown on City of Costa Mesa Standard No 813 with backfill material
being sand-cement slurry, unless otherwise shown on City Std 813
Payment for slurry used as backfill for excavations shall be
included in the contract price for the related item of work no
separate compensation will be allowed
306-1 5 1 TEMPORARY RESURFACING
Payment for temporary resurfacing shall be included in the
contract price for the related construction item No separate payment
will be allowed
B-II CONNECTIONS TO EXISTING FACILITIES
Work on, and connection to, existing facilities shall be
accomplished while maintaining existing sewer service Such work on
existing facilities shall be accomplished at a time and in a manner
approved by the Engineer
The Contractor shall be particularly aware that such connections
and work on existing facilities will be performed during periods of low
sewage flow possibly during the night time or early morning hours
The Contractor will be required to install and maintain temporary
by-pass facilities with continuous 24 hour a day supervision, capable
of by-passing all of the sewage flow through the area of work during
the construction Such equipment and its installation shall meet the
prior approval of the Engineer It shall be the Contractor ' s
responsibility to see that such equipment is operating properly at all
times
B-III GUARANTEES AND TESTS
The Contractor shall guarantee all materials to be new and all
materials and workmanship to be free from defects for a period of one
year from the date of written acceptance of the completed work by the
Board of Directors of the Costa Mesa Sanitary District This guarantee
does not extend to claims for injury to person or property of third
parties due to negligent construction
-15-
B-IV SAFETY REQUIREMENTS AND PERMITS
The Contractor shall obtain a permit from the City of Costa Mesa
or other local agency having jurisdiction The Contractor will be
required to comply with all requirements of Sections 6704, 6706, and
6707 of the State Labor Code
The Contractor will submit to the Engineer in advance of
excavation, a structurally approved plan showing the design of shoring
bracing, sloping or other provisions to be made for worker' s protection
from the hazard of caving ground during the excavation of trenches and
provisions for the control of groundwater
The Contractor will obtain, in advance of excavation, a permit
authorizing such construction from the Division of Industrial Safety of
the State of California
Unattended excavation will be backfilled, covered, or protected to
the satisfaction of the Engineer and local governing agency
B-V TRAFFIC
The Contractor shall furnish, erect, and maintain at his own
expense such fences, signs barricades, lights, arrow board, flagmen
guards and such other devices as are necessary and so directed by the
Engineer to prevent accident damage or injury to the public
The Contractor shall be guided by the State of California
Business and Transportation Agency, Department of Public Works
publication "Manual of Warning Signs, Lights and Devices for use in
performance of Work Upon Highway" latest edition and the WATCH
handbook
The Contractor shall at all times abide by the local agencies
inspector ' s directives concerning the control of traffic during
construction
The Contractor shall maintain local access for all residences and
businesses within the limits of construction
The Contractor shall cover, or fill open trenches after each
construction day and on holidays or weekends to the satisfaction of the
City Engineer
B-VI SHEETING, SHORING AND BRACING
The Contractor will be required to furnish all labor materials,
tools , equipment and performing all work involved in providing
adequate sheeting, shoring and bracing or equivalent methods for the
protection of life or limb which shall conform to applicable safety
orders
-16-
The Contractor will be required to submit to the Engineer a
detailed plan showing a structurally approved design of shoring or
equivalent methods to provide protection for workers as specified in B-
IV of these specifications
B-VII REMOVAL OF EXISTING EQUIPMENT
The contractor shall remove all existing equipment from the
existing pumping station and return it to the City Corporation Yard
2300 Placentia Avenue, Costa Mesa This equipment shall include, but
not be limited to motors, pumps , gate valves, check valves
appurtenances, and piping
-17-
Alhambra Fdry A-1270
_c—
frame and cover per Std. 24"
Dwg. Ne S-105 it 'i
'a L L
cli E iIIi II
=I Grade rings ;lipg=y
n
Eccentric cone
n n
48 1 6 III 6'
C C
G 1 G
in 0
la A
SECTION A-A SECTION B-B
Z z ROUTS AT BOTH NOTES
INLETS AND OUTLETS FOR Is B
VIP. DUST. —h. 4'
I Manholes shall be precast concrete as manufactured
® by Associated Concrete Products, Inc. or approved
NM equal
A ) A 2. Concrete base and stub walls shall be poured in one
1. In lu _I operation to an elevation 2' above top of pipe.
Slope Slope 3. Concrete shall be Class 5G0 C-3250
4 Depth of the channel shall equal pipe diameter for
all sizes of pipe
III
5. The floor of manholes shall be steel troweled.
I� 6. Steps shall be 14 wide s'irrup-step, 3/4' diameter
B galvanized steel cast-in-place at IG 0.0
SECTION C-C 7 Manhole bases must be poured against undisturbed
soil
8. Steps for manhole shall be placed upstream.
9 Mortar for joints shall be per Costa Mesa Sanitary
-18- District Std Dwg. No. 5-103.
COSTA MESA SANITARY DISTRICT Approved
A1Dat^ 8 GIB 82
� �l(ry'm"
Standard 48" I D. Manhole District Engineer -R.C.E. 31120
Drawing N2 S ' 100
2 2 JIElMT5 AT BOTH
INLETS AND OUT1ET5 FOR
V.L.P. COOT.
Lip Std. tee
Yom: : ..: MEI)"I �
r. -1 A ■
6 1 6"
COI •
kn
-SAME SIZE
ININCOMING LI LIVE
SECTION A-A
90°bend
NOTES
I Manhole construction shall conform to Costa Mesa Sanitary District Std. Dwg No. 5-100
2. Concrete encasement shall be Class 560 C 3250
3. Encasement shall be poured against undisturbed soil or temporary forms to the dimensions
shown above.
a. V C.P sewer pipe snail not protrude into manholes.
5. Steps for drop manholes shall be installed downstream.
G. DROP MANHOLE TO BE 15E0 WHEN 51OPE OF INLOMIUG MAIN EXLEED5 10%
-19-
COSTA MESA SANITARY DISTRICT Approved !Date 6 18 82
Standard Drop Manhole
District 31720
Drawing S —102
STREET SURFACE �
c
oE
6" V C P sewer lateral
min slope I/4"to I'-0"
Std 45° bend a
° ' —VariabIe size Sewer main
ELEVATION
E �
m
0 0 C_
i?I
-
1
L
d
a
, °
^C. a
90' unless noted otherwise on plans
L– - Alternate 'Tee' branch -6"V C P sewer
r r r Sta.
Sta. Std. 45° bend
Const. of -- Std. 'Wye branch
wye only PLAN
NOTES
1 DISTRILT ENGINEER ONLY WITH PRIOR APPROYAL FROM
0
-20-
COSTA MESA SANITARY DISTRICT Approved a 0 i8 »
Lateral Connection Type I AI District Engineer -R.C.E. 31720
Drawing Ne S - 104 -A
STREET SURFACE "-" -° — -
���iru
"' c
- 6" V.C.P sewer lateral
min. slopes I /4" to I'-0"
o 1
E
S
°' Std 45° bend -'
3
d
CO
1
_40 45°max. ELEVATION Variable size
Sewer main
c
-
I N
9• ° unless noted otherwise on plans o
Alternate ' Tee' branch 6" V.C.P. sewer ? a
I sta.
Std 45° bend
� 1
PLAN)
sta. ./4
_1 Std 'Wye' branch
const of
wye only NOTES
tI 1 TEE BRAMLH USED DULY WITH PRIOR APPROVAL FROM DISTRILT ENGIMEER
IDate• GIB B2
COSTA MESA SANITARY DISTRICT Approved fi 4. A filar
He r
Lateral Connection Type ' B' District Engineer - R.C.E: 5112D
Drawing N° S -104-8
Concrete collar rims 5G0-C 3250 COUCRETE
ro A C paving
Typ.
00 NI O o
_La
NOTES
I Sewer manhole frame and cover shall be Alhambra Foundry A-1270 or approved equal
2. COVER TO BE STAMPED ' SEWER
3 See Std. Dwg. 5-103 for grade ring joint detail
4, See Std Davy- 5-100 for manhole construction detail
-22-
COSTA MESA SANITARY DISTRICT Approved Q IDare is ES2
#(,,
District Engineer -R.C.E. 31720
Manhole Cover Detail Drawing Ne S — 105
TRENCH WTDTH 1
BACKFILL — 1X 0 D X
12'
BEDDING B
TRENCH SHEETING OR
c4
1 SHORING PER TI•TLE 8
CALIFORNIA ADMINISTRATIVE
EWER LINE ` CODE
BEDDING A °
r d ' a 6 MIN
n p D o
A\ `C.A.
BARREL OF PIPE BELL OF PIPE
NOTES
1 Bedding A shall be composed of 3/4 crushed gravel
2 Backfill and Bedding B shall be as required by the local
agency standards Backfill w/slurry whenever possible
3 'X shall be between 6 and 8 inches and shall include the
thickness of any shoring
4 All trenching and bedding operations shall be done in
conformance with the latest edition of the Standard
Specifications for Public Works Construction
5 Structural section of pavement shall be replaced as required
by the local agency
6 Applicable agency standards are City of Costa Mesa Std No
813 City of Newport Beach Std 106-L County of Orange EMA
Std Plan 1319
-23- REVISED 8/11/88
COSTA MESA SANITARY DISTRICT Ate 8 -��- 8 � j
Approved
/,��,,,u
TRENCHING AND BEDDING D'a;,�Q No'"eS_ ,R2'E. 372•
•
OF GROSS-SKITTER
I. 8 �
" MRRIEt-SEE PLANS ' 4 4 WAR] Ai
� SLOPE FROM SLOPE FROM o
•1 STREET CROWN t71tEET CROWN 2 I/1 PER 1' 1/1 PER 1'
•W . �S•CLEAR �laa�/ I
.F�KR STREET SECTION SEE PLANS.
€C.A.Y. 3}NRt (P4iV. % 4'-O"LS.
le tr�,`I Jl AT t-O O.C. 1-0 /ROY EDGE.
SECTION A-A
st: W
I ,
A'� 1
F` OF STREET
`'4 M1 RIG SEE FLANS
*RIES-SEE PLANS
•74 II SUTTER
a 1 W LINE
•
:r
I
I E —
E.t:.R. <4 [C.R.•xs.t. ...... 4 I IC
.:t.- 1* a -
al
` L7TTEN u
UI • I I•
iZ� 1 .. P1.AiT � OONTiIOL JOINTS ._-
1 �c ., l7TN Lt.. —r t 'C' v
•Iii I .t 1
A . \ I
ear •
1
'I 3 V/V of Rt7tRSECTINS tTRRT LW-
- .
PLAN ki
MOTES: _
I. SMOOTH TROWEL 1 WIDE FLOW LINE IN CROSS-OUTTtR AND SPANDRELS.
2. AGGREGATE SASE THICKNESS FOR SPANDRELS WALL RE THE SAYE AS FOR CROSS-GUTTER.
b •1 POUR CURB MONOLITHICALLY WITH SPANDREL.
l FOR JOINT DETAIL_,SEE STD. DWG. NO.314 AND AII.
{ S.CONCRETE SHALL 1E 160 C 3250 PER CURRENT Minos DF STANMRD SPECIFICATIONS FOR PSIS WORKS
< S.CONSTRUCTION,SEC 201.4.1.2
All ELEVATIONS SHALL SE PER PLAN.
u.
T.DISTANCE L PROM MIDDLE ORDINATE OF CURS RETURN TO JOINT SHALL SE 7' FOR S" C.F at 1' FOR /" C.F.
'CI AXT CROSS-COTTER TO SE CONSTRUCTED ON LESS THAN 020 % SHALL NAVE DRAINAGE STRUCTURES
CONSTRUCTED TO MITIGATE THE ADVERSE EFFECTS OF NUISANCE WATER AND FULL CON'CFETE APRON WITH
t%RNSIOII SITS ALONG j MO AWNS EDS! OF SUTTER S.
}::.I
4:'.-' —24-
1
DRAWN MJ(.S.
CITY OF COSTA MESA 1 TYPICAL 'CROSS-GUTTER KALE NONE
t'''';
CALIFORNIA S STD. DWG. NO
., DAT /d
{ PUBLIC SERVICES DEPARTMENT APPRO'VEO DUCE D. MA TERN R.C.E. 191.5 4 15
E
WiEEICUT OR SAWCUT — --
0.2' EXISTING
REPLACEMENT PAVEMENT PAVEMENT
A.C. OR P.C.C.
/
�\\//�\� \\• 0.65 MINIMUM C.A.B. OR SLURRY FOR LOCAL STREETS.
. A' \ B'
'� R 2' 0.50' 1.00' MINIMUM L.A.B. OR SLURRY FOR HIGHER TRAFFIC
ER 2' 1.0' \-% "\\\ STREETS.
SEE NOTE II 1 —,
. TABLE HEREON
MRFILL IONE
SEE NOTE 02
_ - a
1.0' MINIMUM
BEDDING 'A' AS PER SUBSECTION 701 1.2.1 OF THE STANDARD
PIPE ZONE SPECIFICA1IONS. SLURRY, C.A.B. OR AS SPECIFIED, COMPACTED
0.50' 0.50' TO THE SATISFACTION OF THE CITY ENGINEER.
OR D' OR D'
BEDDING 'B' CONCRETE AGGREGATE, C.A.B., C.M.B. OR AS
/ 0.1 T 3TECIFIED, MAXIMUM GRADATION N0. 2 COMPACTED TO THE
D/10 SATISFACTION OF THE CITY ENGINEER.
\\
// D/10 BUT NOT
\Ye�X:122\\\���\\\/11../// LESS THAN .5'
'WHICHEVER IS
LESS BUT NOT UNDISTURBED FOUNDATION
LESS THAN .35
NOTES.
1. ALL EXCAVATION AND CONSTRUCTION OPERATIONS SMALL COMPLY WITH THE REQUIREMENTS OF CALIFORNIA DIVISION OF
INDUSTRIAL SAFETY AND THE WORK AREA TRAFFIC MUDBOOK. (W.A.T.C.H. LATEST EDITION)
2. ALL TRENCHES WHICH ARE TRANSVERSE OR DIAGONAL TO EXISTING OR FUTURE STREETS (INCLUDING ALL INTERSECTION
CROSSINGS) ALL LONGITUDINAL TRENCHES IN THE STREET WITHIN 1.5' OF THE EDGE OF THE GUTTER OR CURB (IF
NO GUTTER), MOUND MANHOLES, AND ALL NARROW (LESS THAN 2') LONGITUDINAL TRENCHES WHICH ARE LESS THAN
20' LONG SHALL BE BACKFILLED WITH CLASS 100-E 100 SAND-CEMENT SLURRY ALL OTHER CONDITIONS SHALL BE {{
BACKFILLED WITH SLURRY C.M.B. OR C.A.B. OR AS SPECIFIED.
3. BACKFILL AN) COMPACTION METHODS SHALL CONFORM TO SUBSECTION 306-1.3 OF STANDARD SPECIFICATIONS FOR
PUBLIC WORKS CONSTRUCTION (LATEST EDITION) EXCEPT THAT 95% MINIMUM RELATIVE COMPACTION SHALL BE REQUIRED
WITHIN THE STRUCTURAL SECTION AND 0.5' BELOW. WITH 90% REQUIRED IN THE REMAINDER OF THE BACKFILL ZONE
A. ALL REFERENCES TO SLURRY SHALL MEAN CLASS 100.E-100 SAID-CEMENT SLURRY
5. ALL A.C. REPLACEMENT REQUIRES A TACK COAT ON EXISTING EDGES AND A SEAL COAT ON THE SURFACE.
6. ALL WORK SHALL CONFORM TO THE CITY OF COSTA MESA 'GUIDELINES FOR TRENCH EXCAVATION' ATTACHED HERETO.
7 PRIOR TO PLACING BACKFILL, CALL CITY OF COSTA MESA ENGINEERING DIVISION FOR MOOING INSPECTION.
B. THE WHEEL CUT OR SAWCUT OF A.C. SHALL BE A STRAIGHT CLEAN LINE ACCEPTABLE TO THE CITY ENGINEER.
9. WHERE A.C. EXCEEDS 0.5' IN THICKNESS, ALTERNATE PAVEMENT REPLACEMENT THAN REQUIRED HEREIN WILL BE SPECI-
FIED BY THE CITY ENGINEER.
10. PRIOR TO PERFORMING ANY WORK IN THE PUBLIC RIGHT-OF-WAY A PERMIT MUST BE OBTAINED FROM THE CITY OF
COSTA MESA ENGINEERING DIVISION.
11. ON ALL HIGHWAYS SHOWN ON THE MASTER PLAN OF HIGHWAYS, A .B'.B' SHALL BE OF A WIDTH SUFFICIENT TO ACCOM-
MODATE A SELF-PROPELLED STEEL ROLLER.
12. THIS STANDARD SHALL APPLY TO ALL UTILITY CUTS IN THE PUBLIC RIGHT-OF-WAY
C.A.B. RUSHED AGGREGATE BASE I AS PER SUBSECTION 200-2 OF THE STANDARD SPECIFICATIONS
C.X.B. RUSHED MISCELLANEOUS BASE
ISED 4-16-86 -25
,CITY OF COSTA MESA TRENCHING DETAIL COMM
.�R
OHE
CALIFORNIA STD.DWGNO
•• PUBLIC SERVICES DEPARTMENT APPROVEOC K-. DATE VAS/14. 813
BRUCE MATTERN R.C.E. 19380