Project 144 - Change Order - 1997-06-05 Costa Mesa Sanitary District
CONTRACT CHANGE ORDER NO 1
PROJECT #144 Manhole Rehabilitation
TO Sancon Engineering II Inc Contractor
You are hereby directed to make the herein described changes from the plans and specifications, or do the
following work not included in the plans and specifications on the contract.
Note: This change order is not effective until approved purivant to adopted District policy
Change Requested by Costa Mesa Sanitary District
Description of work to be done, estimate of quantities and pricer to be paid. Segregate between additional work
at contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only
such time as equipment is actually used and no allowance will be made for Idle time.
Additional manhole in the intersection of Mesa Drive and Irvine
Avenue needs rehabilitation Manhole is brick and 15 feet deep and requires
rehabilitation per methods A & C per Plans and Specifications
Negotiated price is $1 770 Manhole now designated as Manhole No 55
See attached sketch
Net Increase Ig I Decrease Li in Contract $ 1,770.00
By reason of this order the time of completion will be adjusted as follows: Wotfr
Prepared by Robin B Hamers Date 5/30/97
Approved by Robin B Hamers Date
Date 5/30/97
Distri t E Tram/ 6.../54c1/
Approved by District Manager
Requ ed whell I c cost is $1,000 mor
• Board approval also needed when increase in cost exceeds 2% of contract or $1,000, whichever is greater
We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved,
that we will provide all equipment,furnish all materials,except as may otherwise be noted above,and perform all services ecessary for the
work above specified,and will accept as full payment therefor the prices shown above.
Date acce ted 0151a Contractor CttN C.e.A •
By WIY � ifJ Title 40C- 41:1-51AleI j
CMF 1082-68 White-District File Ca ry-Contr cto Copy' pink-Fin Golde od-Engi
Ma
i 1 I t1 I A I I ,o Cr
iy ..r... ,....... x) D:2} a c•fl - X -4- diA es .5-
MP
! a 4 LCao-c71'w ,sr
` RI `*�
(4-\ �1
rsi _
N
T
_r y
Zr Ft °" e o
0
\jV apse9C 1 .�V
11 \" rS\\\ G 0 `. y.
\i11 Y \\ _OiE. tlP .�♦
4..N arlik
� z to,
z
-� it �I..�e p O O / ,\J C A\
WW
f: s 3 \ \`o
Si. Ii� '
9 `
o
i y- .S
k` - -, (lam
a- c 9 _
, /4.
, 4
, ,.
JILU 1, r,„ i ,
;, I s 'TO, f
c If Z.rI=_r...--J _�
� Irk �t I I ti=7-1. y (4 �� C .�f �
I I
- 9 t2p�^�1-`�,y� i J ® �. �I O ME.S'A �I ' I. h �I li , D
X.\,c `J .„iy) ____ .G 1a _��� �J'/ \lS; ���1. µU�Y:IY _ +Z} f,F
1,
10 Civ PP,(SSaa! rAr'aN
ti viely.,■4 NI ,/isWie 2 A 142 #k 0 un
.
n A 1 To
ll D
Costa Mesa Sanitary District RECEIVED
CONTRACT CHANGE ORDER NO 2 JUN 1 2 1997
PROJECT #144 Manhole Rehabilitation COSTA MESA SAMIARgis icr
TO Sancon Engineering II Inc Contractor
You are hereby directed to make the herein described changes from the plans and specifications, or do the
following work not included in the plans and specifications on the contract.
Note: This change order is not effective until approved pursuant to adopted District policy
Change Requested by Costa Mesa Sanitary District
9
Description of work to be done, estimate of quantities and prices to be paid. Segregate between additional work
at contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only
such time as equipment is actually used and no allowance will be made for idle time.
Additional manhole in the intersection of Victoria Street and
Harbor Blvd needs rehabilitation Manhole is concrete and 6 7 feet
deep and requires rehabilitation per method B per Plans and Specification, .
Negotiated price is $1 565 Mnaho].e now designated as Manhole No 56
See attached sketch
•
Net Increase Ixi Decrease ❑ in Contract $ 1,565 00
By reason of this order the time of completion will be adjusted as follows: Nola
Prepared by Robin B. Hamers Date 6/6/97
Approved by Robin B. Hamers L Date 6/6/97
Distr ct n er / /
Approved by District Manager Date i?[ l0(l�
Requ ed w e ' c ate st ' $1,000 mo
• Board approval also needed when increase in cost exceeds 2% of contract or $1,000 whichever is greater
We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved,
that we will provide all equipment,furnish all materials,except as may otherwise be noted abov and perform all services necessary for the
work above specified,and will accept as full payment therefor the prices shown above.
Date accepted G I s) Contractor a corl a rafu—t'Aie
By �—• s+ Title —Latrt�z�7.—
CMF 1082-68 White-Distr ct File Ca ry-Contr cto Copy Pink-Fl Golde od-Engln
r� /'/- n, \ - \ \
\' /j \J \ \
T• �Er< j4,, ,\ \ ".\ \ MH '2t LiEinCD , a 7 � }; ,� \ c35l 2
G , CFE TE DROP C /� Z.\z‘',:' .
O. 'CRETE A, C � , / / �� l_ , �t.
O, C E}E, DROP A, C 63J �Q�/r Y �/ N\� \ rI . .
OH CRETE A, C .. / �" \ ` % \_)„,p ° . MykZ2
G CFETE, DR OP A, C j G� �� _ ��1 ,
OrC ,ET- A C o� ` L' „,"*\\\(0 �/ \
P:'GK., ES,✓ J T AREA a C 1z ti; /P C P,- / l�
`, _ / 4_
F,GK, CR..P A, C � �✓
0` �� r �H \ c�„ a s'
F/CK j B, c NH 16 . . . \ ` t„o� 6
0 3
RIC B. C \ /hilt-17 ., /3� Pg-v ze \ ,, z
Oi�CRETE B C �\ s � S
C ‘'CRETE B MN # � ,S, s , �� \/°
OH CRETE B \�'\\2 -/ 0 31s � o
C z \ /
C 'CRETE B C ��' . \\� � �`}/�r \v \•
G CRETE B C / ci5 %/ ' L `:A C3 L� 2 c
"�<•
1 yet 9�\\`\\; j- R.\IT.0 N\\••
e `fN /°H \ \ r \\�
AZ-
I
t-JE-E B C 1 I
ci 'CRE E C I ; C
\\:\c-:;;\
:1 f C)--3 Aillif.41EM\-
s
'^nETE a I „II ---- 77N 42:
B = _ = I��—_ _ ' /271 3-f
---- 1 —
-cTE B
1P ;
-Ti-_-. B ��rt.i it i G'4-- t J�, ----c' 'r.,,--'h;_ C.,TX�m,,,
- _ G L 2 �i-nC irrQQ kL I� .1 it' L-,5 - G�,-
` -E =
B I - ���
H j , '_ L
= ;_I!I is ` �Efll c /J TA A..A�. _iu_'!_'
I 1 \ J C 'CRETE J DAI ! • >1y
7 Tl / � fir c '> \ _/ tr1/
Costa Mesa Sanitary District RECEIVED
CONTRACT CHANGE ORDER NO 3 JUL - 8 1997
PROJECT #144 Manhole Rehabilitation COSTA MESA SANITARY DISTRICT
TO Sancon Engineering II, Inc Contractor
You are hereby directed to make the herein described changes from the plans and specifications, or do the
following work not included in the plans and specifications on the contract.
Note: This change order is not effective until approved pursuant to adopted District policy
Change Requested by Costa Mesa Sanitary District
■
1
Description of work to be done, estimate of quantities and prices to be paid. Segregate between additional work
at contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only
such time as equipment is actually used and no allowance will be made for idle time.
Manhole #54 on plans and specs also needs a new lining Contractor
to remove existing amerplate lining and install lining per plans
and specs method B Negotiated price is $1,565 This work is
in addition to method D already specified for manhole #54
•
•
Net Increase ® Decrease ❑ in Contract $ 1,565.00
ti
By reason of this order the time of completion will be adjusted as follows: None
Robin B Hamers 6/25/97
Prepared by Date
Approved by Robin B 110 Date 6/25/97
Dist i t gi e r
Approved by District Manager 1 ; tut Date L 1 iell
Requ'r4 h n cost Is $1,000 or more
• Board approval also needed when increase in cost exceeds 2% of contract or $1,000 whichever is greater
We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved,
that we will provide all equipment,furnish all materials,except as may otherwise be noted above,and perform all services necessary for the
work above specified,and will accept as full payment therefor the prices shown above.
Date accepted 2b/g7 . Contractor S G0^/ ENG/nlFER/A .
By K ge — Title e-A/4/^/6-E-k i
CME 1082-68 White-Distr ct F lie 'Ca ry-Contr cto Copy' Pink-Fin Golde od-Engin