Loading...
Project 140-145 - Proposal - Hamers 1996-06-28 ROBIN B. HAMERS 234E 17TH ST SUITE 205 & ASSOCIATES INC COSTA MESA. CA 92527 CIVIL ENGINEERS • PLANNERS • SURVEYORS (714) 549- 192 FAX [714) 546-6516 June 28 1996 Board of Directors Costa Mesa Sanitary District P 0 Box 1200 Costa Mesa CA 92628-1200 RE PROPOSAL TO BEGIN PROJECT PROJECT 1112100-145 RECONSTRUCTING VARIOUS SEWER LINES Dear Board of Directors Enclosed please find a proposal to begin the design phase of subject project The project entails repairing selected sections of sewer pipe where there is possible leaking sewage due to joint problems This project is the fifth project of this nature similar to Projects 122 126 132 and 140 The joints between sections of pipe can become out of alignment or cracked due to a variety of reasons such as sags in the line, poor installation improper backfill techniques where couplings used to connect sections of pipe made out of different materials are failing or where nearby construction has disturbed the sewer line The need for the joint reworking was established from the televising projects where the camera passed through sections of pipe with bad joints Repair of the joints will most likely be accomplished by excavating from street level down to the pipe and replacing the bad joint with a new section of pipe The construction cost of the project will be approximately $115 000 Therefore it is proposed to complete the design phase of the project including reviewing video tapes to determine the repair locations preparing plans and specifications for the construction putting the project out to bid and making a recommendation to the Board for award of the contract at the following hourly rates not to exceed $9 600 Please also refer to the project description shown in the 1995-96 capital improvement program review copy attached Engineering $63 00/hr Drafting $47 00/hr Please note that billing will be only for actual time worked Siy Rdbin B Hamers RBH/jp/#145 ®Printed on Recycled Paper. I99 - Ca19 irav _!-Kr22oveHEUr I"rloelm*/ Project 1112100-145 Reconstructing Various Sewer Lines The project is similar to past projects #122 , 126, 132 and 140 which includes rehabilitation and maintenance of the existing gravity sewer line system on an as-needed basis The results of the original four large televising projects plus the small yearly projects have disclosed existing problems in the main lines such as sags, cracked pipe collapsed pipe, offset joints and root intrusion The project sets up a priority list of the problem areas and repairs the lines on this basis The project is a yearly project and part of an ongoing maintenance program The only problem type mentioned above which is not repaired by this project is root intrusion which is handled through root cutting by the District Throughout the past four projects of this type the District has repaired the problem areas using two different methods Two of the projects were designed using standard remove and replace construction where the contractor excavates down to the line, makes the repair, and then backfills and repaves One of the projects was completed using Link-Pipe where stainless steel sleeves were inserted into the line, adjusted to the right location using a camera and then expanded to permanently seal itself Link-Pipe is generally an easier and more economical repair method however, it has some limitations in its application The decision to use Link-Pipe or remove and replace construction will be made during the design phase when the scope of each repair is more fully investigated Previous costs for excavation and reconstruction have been approximately $650/foot since the footage is only between two and six feet This would allow approximately 35 locations to be included in the project Link-Pipe costs have averaged $3 500 per location or approximately $700 per foot - 4 - N tom. An estimate of the project costs is as follows Design $ 9, 600 Construction 115, 000 Inspection 10, 400 Reserve or Contingency 15, 000 TOTAL $ 150, 000 - 5 - YL-5 14EEIZII4C1 %-eotre a Mr. Robin Hamers August 29 1995 Page 2 Project 112100-145 Reconstructing Various Sewer Lines This project is similar to previous years projects and in keeping with the District's rehab and maintenance program. Previous years projects were Nos. 122, 126, 132 and 140 This project will utilize Link-Pipe or remove and replace construction techniques depending upon conditions found after further investigation. The construction budget will allow for repairs at approximately 35 locations. Based on data provided, cost could range from $650 to $700 per foot, pending type of construction used. Because of numerous locations the design, inspection and contingency budget appears to be reasonable. Project 1112100-146 Televising Sewer Lines As discussed for previous CIP programs and with District staff this is a service type project not construction. Therefore, normal design, construction and inspection percentages do not apply Project description, reasoning of need and approval were presented well. The estimated televising costs represents approximately 11,000 feet of pipe to be televised at $ 45/1f based on discussions with District staff. Because of the nature of the project and that District staff is needed at all times for cleaning ahead of the camera, coordination, and supervision of the work, the District Engineer costs will be higher percentage wise, versus a design project. It is noted that suggestions from 1994-95 were incorporated in this year s CIP program. Project 1112100-147 Update Early Warning System Protecting Pumps Recent completed projects utilized pumps containing the latest sensing mechanisms. This project will modify existing pumps to provide similar telemetry for sensing moisture and heat. This is the first of several projects which will update pump telemetry over a three to five year period. For budgeting purposes the design, construction inspection and contingency costs appear reasonable. As a suggestion for future projects, the use of a map (Thomas Bros) showing proposed locations would be beneficial.