Project 140-145 - Proposal - 1997-09-05 COSTA MESA SANITARY DISTRICT
ORANGE COUNTY, CALIFORNIA
RECONSTRUCTING VARIOUS SEWER LINES
PROJECT NOS. 1112100-140 & 1112100-145
��SASA�y
O�
er o0o nc °o
n ma l �-'
cORpOROP`�
Is
ROBIN B HAMERS
MANAGER/DISTRICT ENGINEER
9,0FESSI04
'
� N HAM<c
icl
Q N0. N
\
sec 1 20 m
2� in
�i'Itt C!\/\U Q�■P BID SET NUMBER
COSTA MESA SANITARY DISTRICT
ORANGE COUNTY CALIFORNIA
NOTICE INVITING BIDS
NOTICE IS HEREBY GIVEN that sealed proposals for furnishing all labor
materials, equipment, transportation and such other facilities as may
be required for the CONSTRUCTION OF THE FOLLOWING PROJECT
RECONSTRUCTING VARIOUS SEWER LINES, PROJECT NOS 1112100-140 & 1112100-
145
Bids will be received by the Costa Mesa Sanitary District, at the
office of the City Clerk, 77 Fair Drive, Costa Mesa California until
the hour of 10. 00a.m. , September 29, 1997, at which time they will be
opened publicly and read aloud in the council chambers Sealed
proposals shall bear the title of the work and the name of the bidder
but no other distinguishing mark Any bid received after the scheduled
closing time for the receipt of bids shall be returned to the bidder
unopened It shall be the sole responsibility of the bidder to see
that his bid is received in proper time
A set of plans and specifications may be obtained at the City of Costa
Mesa, Department of Public Services 4th Floor 77 Fair Drive Costa
Mesa, California upon a non-refundable payment of $10 00 An
additional charge of $2 00 will be made if handled by mail [Phone
(714) 754-5307 for purchasing information ]
Each bid shall be made on the Proposal Form provided in the contract
documents and shall be accompanied by a certified or cashier's check
or a bid bond for not less than 10% of the amount of the bid, made
payable to the Costa Mesa Sanitary District No proposals shall be
considered unless accompanied by such cashier's check, cash or bidder's
bond
No bid shall be considered unless it is made on a blank form furnished
by the Costa Mesa Sanitary District and is made in accordance with the
provisions of the Proposal requirements
Each bidder must be licensed and also prequalified as required by law
A Class A or C42 contractor's license is required
The Board of Directors of the Costa Mesa Sanitary District reserves the
right to reject any or all bids
The Contractor shall comply with the provisions of Section 1770 to 1780
inclusive, of the California Labor Code, the prevailing rate and scale
of wages determined by the Director of the Department of Industrial
Relations, State of California, which are filed with the Clerk of the
District and shall forfeit penalties prescribed therefore for
noncompliance of said code
Pursuant to California Contract Code Section 22300 CONTRACTOR will be
entitled to post approved securities with the District or an approved
financial institution in order to have the District release funds
retained by the District to insure performance of the contract
Liquidated damages in the sum of $250 per day shall be imposed for each
unexcused day beyond the contract completion date
Dated September 5 1997 BY ORDER OF THE BOARD OF DIRECTORS
OF THE COSTA MESA SANITARY DISTRICT
TABLE OF CONTENTS
Page
Proposal p-1
PART 1
A Standard Specifications 1
Part 1 - General Provisions 1
1-2 Definitions 1
1-3 Abbreviations 2
2-1 Award and Execution of Contract 2
Procedure for Proposal Submittal 2
Request for Interpretation 3
Return of Bid Security 3
Execution of Contract 4
2-3 1 Subcontracts General 4
2-4 Contract Bonds 4
2-5 Plans and Specifications 4
2-9 1 Permanent Survey Markers 5
2-11 Inspection 5
3-1 1 Changes Requested by the Contractor General 7
3-3 1 Extra Work General 7
6-1 Construction Schedule and Commencement of Work 7
6-6 2 Extensions of Time 7
7-2 Labor 8
Apprentices 8
7-3 Liability Insurance 8
7-5 Permits 9
7-6 The Contractor's Representative 10
7-8 1 Cleanup and Dust Control 10
7-8 5 Temporary Light, Power and Water 10
7-10 Public Convenience and Safety 11
7-13 Laws To Be Observed 11
9-3 2 Partial and Final Payment 11
9-3 3 Delivered Materials 12
PART 2
Special Provisions
Part 2 - Construction Materials
208-2 3 Type "G" Joints (Polyurethane) 13
Part 3 - Construction Methods
A-I General Description of Work 13
B-1 Additions to Standard specifications 13
306-1 2 1 Pipe Bedding 13
306-1 2 3 Field Jointing of Clay Pipe 14
306-1 3 Backfill and Densification 14
306-1 5 1 Temporary Resurfacing 14
B-II Connections to Existing Facilities 14
B-III Intentionally Omitted
B-IV Guarantees and Tests 14
B-V Safety Requirements and Permits 15
B-VI Traffic 15
B-VII Sheeting Shoring and Bracing 16
B-VIII Testing 16
C-I Link-Pipe Repair 16
C-I 1 General 16
C-I 2 Material Composition 16
C-I 3 Grouting Materials 17
C-I 4 Types of Applications 17
C-II Installation 18-19
PROPOSAL SCHEDULE (continued)
Item Approx Item with Unit Price Unit Price
No. Quantity Written in Words Figures Total
2 L S Repair existing sewer line No 113
in place by installing Link-Pipe or
equal without excavation at
dollars and
cents per Lump Sum $ $
3 L S Remove and reconstruct existing
sewer line No 114 at
dollars and
cents per Lump Sum $ $
4 L S Remove and reconstruct existing
sewer line No 115 at
dollars and
cents per Lump Sum $ $
5 L S Remove and reconstruct existing
sewer line No 5 at
dollars and
cents per Lump Sum $ $
6 L S Remove and reconstruct existing
sewer line No 8 at
dollars and
cents per Lump Sum $ $
7 L S Remove and reconstruct existing
sewer line No 9 at
dollars and
cents per Lump Sum $ $
8 L S Remove and reconstruct existing
sewer line No 11 at
dollars and
cents per Lump Sum $ $
Alternative "A" - "Link-Pipe"
dollars
and cents per Lump Sum
P-2 Bidder' s Initials
PROPOSAL SCHEDULE (continued)
Item Approx Item with Unit Price Unit Price
No. Quantity Written in Words Figures Total
9 L S Remove and reconstruct existing
sewer line No 16 at
dollars and
cents per Lump Sum $ $
Alternative "A" - "Link-Pipe"
dollars
and cents per Lump Sum
10 L S Remove and reconstruct existing
sewer line No 146 at
dollars and
cents per Lump Sum $ $
11 L S Remove and reconstruct existing
sewer line No 89 at
dollars and
cents per Lump Sum $ $
12 L S Remove and reconstruct existing
sewer line No 147 at
dollars and
cents per Lump Sum $ $
13 L S Remove and reconstruct existing
sewer line No 95 at
dollars and
cents per Lump Sum $ $
14 L S Remove and reconstruct existing
sewer line No 96 at
dollars and
cents per Lump Sum $ $
15 L S Remove and reconstruct existing
sewer line No 97 at
dollars and
cents per Lump Sum $ $
P-3 Bidder' s Initials
PROPOSAL SCHEDULE (continued)
Item Approx Item with Unit Price Unit Price
No. Ouantitv Written in Words Figures Total
16 L S Repair existing sewer line No 133
in place by installing Link-Pipe or
or equal without excavation at_
dollars and
cents per Lump Sum $ $
17 L S Remove and reconstruct existing
sewer line No 135 at
dollars and
cents per Lump Sum $ $
Alternative "A" - "Link-Pipe"
dollars
and cents per Lump Sum
4A 7 5 L F Construct 12" V C P sewer at
dollars and
cents per Linear Foot $ $
4B 1 EA Construct 48" dia sewer manhole
at
dollars and
cents per each $ $
4C 1 EA Construct drop structure on exist
manhole
dollars and
cents per each $ $
4D L S Reconst Exist 60" Dia M/H Base
per detail sheet 4 at
dollars and
cents per Lump Sum $ $
4E L S Remove plug and fill portions of
exist 12" V C P sewer at
dollars and
cents per Lump Sum $ $
P-4 Bidder ' s Initials
PROPOSAL SCHEDULE (continued)
Item Approx Item with Unit Price Unit Price
No. Quantity Written in Words Figures Total
4F 3 EA Clean repair, prime and coat
exist M/H w/polyurethane
dollars and
cents per each $ $
5A 216 L F Trench & Remove exist 8" V C P
sewer
dollars and
cents per Linear Foot $ $
5B 216 L F Construct 10" V C P sewer
dollars and
cents per Linear Foot $ $
5C 2 EA Const Drop Structure & join
exist 8" V C P sewer
dollars and
cents per Each $ $
5D L S Reconst Exist M/H Base per
detail sheet 5 at
dollars and
cents per Lump Sum $ $
5E 5 EA Install Wye & 4 L F of 6" V C P
sewer lateral
dollars and
cents per each $ $
P-5 Bidder' s Initials
PROPOSAL SCHEDULE (continued)
Item Approx Item with Unit Price Unit Price
No. Quantity Written in Words Figures Total
5F 1 EA Exist Lateral to be plugged &
abandoned in place
dollars and
cents per Each $ $
5G 2 EA Join exist sewer M/H
dollars and
cents per Each $ $
5H 1 EA Protect in place or replace exist
traffic signal loop in kind
dollars and
cents per Each $ $
6A 20 L F Trench & remove exist 8" V C P
sewer
dollars and
cents per Linear Foot $ $
6B 20 L F Construct 8" V C P sewer
dollars and
cents per Linear Foot $ $
6C L S Remove & replace exist tree, curb,
gutter & sidewalk
dollars and
cents per Lump Sum $ $
Total or gross sum written in words Total or gross sum in figures
Bidder's Initials
In case of a discrepancy between the words and figures the words
shall prevail
P-6 Bidder's Initials
The Contractor agrees that the District will not be held
responsible if any of the approximate quantities shown in the
foregoing proposal shall be found incorrect and he shall not make
any claim for damages or for loss of profits because of a difference
between the quantities of the various classes of work as estimated
and the work actually done If any error omission or mis-statements
shall be discovered in the estimated quantities it shall not
invalidate this contract or release the Contractor from the execution
and completion of the whole or part of the work herein specified in
accordance with the specifications and the plans herein mentioned and
the prices herein agreed upon and fixed therefor or excuse him from
any of the obligations or liabilities hereunder, or entitle him to
any damages or compensation otherwise than as provided for in this
contract
The Contractor agrees that the District shall have the right to
increase or decrease the quantity of any bid item or portion of the
work or to omit portions of the work as may be deemed necessary or
expedient, and that the payment for incidental items of work, not
separately provided in the proposal shall be considered included in
the price bid for other various items of work
Accompanying this proposal is
($
NOTICE Insert the words "Cash" "Certified Check" or "Bidder s
Bond", as the case may be in an amount equal to at least ten per cent
of the total bid price, payable to the Costa Mesa Sanitary District
The undersigned deposits the above named security as a proposal
guaranty and agrees that it shall be forfeited to the Costa Mesa
Sanitary District as liquidated damages in case this proposal is
accepted by the District and the undersigned shall fail to execute a
contract for doing said work and to furnish good and sufficient bonds
in the form set forth in the specifications and contract documents of
the District with surety satisfactory to the District within 10 Days
after the bidder has received written notice of the award of the
contract; otherwise said security shall be returned to the
undersigned
P-7 Bidder 's Initials
Respectfully submitted,
Contractor's Business Name Contractor Title
Business Address Street BY Title
City State Zip Contractor's License Expiration
Date & Classification
Business Phone Number
Name Title
Residence Street
City State Zip
Residence Phone Number
I declare under penalty of perjury under the laws of the State of
California that the forgoing is true and correct
Dated at , this day of 19
(Signed)
The full names and residences of all persons and parties interested in
the foregoing proposal, as principals, are as follows
NOTICE Give first and last names in full; in case of corporation,
give names of President, Secretary Treasurer and Manager and affix
corporate seal in all cases of partnerships and joint ventures give
names of all the individual members
P-8 Bidder' s Initials
CONSTRUCTION PROJECT REFERENCES
In order to more fully evaluate your background and experience for
the project herein proposed it is requested that you submit a list
of Public Works and/or similar construction projects completed or
in progress within the last 24 months Your cooperation in this
matter is greatly appreciated
DATE PROJECT AGENCY' S CONTRACT
AWARDED AWARDING AGENCY ADMINISTRATOR
Bidder shall signify receipt of all Addenda here if any
Addendum No Date Received Bidder' s Signature
P-9 Bidder' s Initials
DESIGNATION OF SUBCONTRACTORS
In compliance with the "Subletting and Subcontracting Fair
Practices Act" being Sections 4100-4113 of the Public Contract Code of
the State of California and any amendments thereto, each bidder shall
set forth below the name and location of the place of business of each
Subcontractor who will perform work or labor or render service to the
prime Contractor in or about the construction of the work or improve-
ment in an amount in excess of 1/2 of 1% of the prime Contractor's
total bid and shall further set forth the portion of the work which
will be done by each such Subcontractor Only one Subcontractor for
each such portion shall be listed
If the Contractor fails to specify a Subcontractor for any portion
of the work to be performed under the contract, he shall be deemed to
have agreed to perform such work himself, and he shall not be permitted
to subcontract that portion of the work except under the conditions
hereinafter set forth
Subletting or subcontracting of any portion of the work to which
no Subcontractor was designated in the original bid, shall only be
permitted in cases of public emergency or necessity and then only
after a finding reduced to writing as a public record of the Legisla-
tive Body of the owner
Portion State License
Of Work Subcontractor' s Name and Address Number Class
P-10 Bidder's Initials
BIDDER' S BOND TO ACCOMPANY PROPOSAL
(Required if the bidder desires to submit bond instead of a
certified or cashier' s check)
KNOW ALL PEOPLE BY THESE PRESENTS
That we, as
principals, and as surety
are held and firmly bound unto the Costa Mesa Sanitary District, a
special district, organized under the laws of the State of
California and situated in Orange County in the sum of
($ ) to be paid to the District, its successors
and assigns, for which payment well and truly to be made, we bind
ourselves, our heirs executors, and administrators, successors or
assigns, joint and severally firmly by these presents
THE CONDITION OF THIS OBLIGATION IS SUCH,
That if the certain proposal of the above bounden
is accepted by the Costa
Mesa Sanitary District and if the above bounden
his heirs executors, administrators successors
and assigns shall duly enter into and execute a contract for such
construction and shall execute and deliver the LABOR AND MATERIAL
and the FAITHFUL PERFORMANCE BONDS described within 10 days (not
including Sunday) from the date of the mailing of a notice of the
above bounden by and from District, that said
contract is ready for execution then this obligation shall become
null and void; otherwise it shall be and remain in full force and
virtue
IN WITNESS WHEREOF
We hereunto set our hands and seals this day of
, 199
P-11 Bidder 's Initials
NON-COLLUSION AFFIDAVIT
The bidders, by its officers and agents or representatives
present at the time of filing this bid, being duly sworn on their
oaths say, that neither they nor any of them have in any way,
directly or indirectly entered into any arrangement or agreement
with any other bidder or with any public officer of Costa Mesa
Sanitary District whereby such affiant or affiants or either of them
has paid or is to pay to such bidder or public officer any sum of
money, or has given or is to give to such other bidder or public
officer anything of value whatever, or such affiant or affiants or
either of them has not directly or indirectly entered into any
arrangement or agreement with any other bidder or bidder, which tends
to or does lessen or destroy free competition in the letting of the
contract sought for on the attached bids; that no bid has been
accepted from any Subcontractor or supplier through any bid
depository the By-Laws, Rules, or Regulation of which prohibit or
prevent the Contractor from considering any bid from any Subcon-
tractor or supplier which is not processed through said bid
depository, or which prevent any Subcontractor or supplier from
bidding to any Contractor who does not use the facilities of or
accept bids from or through such bid depository; that no inducement
of any form or character other than that which appears upon the face
of the bid will be suggested offered paid or delivered to any
person of the contract nor has this bidder any agreement or
understanding of any kind whatsoever with any person whomsoever to
pay deliver to or share with any other person in any way or manner,
any of the proceeds of the contracts sought by this bid
Subscribed and sworn to before me by
This day of 199
My Commission expires
Notary Public
P-12 Bidder' s Initials
PART 1
A STANDARD SPECIFICATIONS
Except as hereinafter provided the provisions of the latest
edition of the "Standard Specifications for Public Works Construction"
(green book) and all amendments thereto, adopted by the Joint
Cooperative Committee of Southern California Chapter, American Public
Works Association; hereinafter referred to as Standard Specifications,
are adopted as the "Standard Specifications" of the Costa Mesa Sanitary
District and shall be considered as a part of these specifications
Also a part of these specifications is the Costa Mesa Sanitary
District's Standard Plans and Specifications for the Construction of
Sanitary Sewers
B GENERAL PROVISIONS
The following additions are made to the "Standard Specifications"
If there is a conflict between the Standard Specifications and these
additions these additions shall have first precedence
1-2 DEFINITIONS
(a) AGENCY The Costa Mesa Sanitary District also hereinafter
called "District"
(b) BOARD The Board of Directors of the Costa Mesa Sanitary
District
(c) CONTRACT Documents including but not limited to the Proposal
Standard Specifications General Provisions Special
Provisions, Plans, Bonds, Insurance Contract Agreement
and all Addenda setting forth any modifications of the
document
(d) ENGINEER District Engineer of the Costa Mesa Sanitary District
(e) BIDDER Any individual, co-partnership, association or
corporation submitting a proposal for the work
contemplated acting directly or through a duly
authorized representative
(f) LEGAL ADDRESS The legal address of the Contractor shall be the
address of contractor given on the Contractor's bid
and is hereby designated as the place to which all
notices letters or other communications to the
Contractor shall be mailed or delivered
- 1 -
(g) LABORATORY An established laboratory approved and authorized by
the Engineer for testing materials and work involved
in the contract
(h) STATE Chapter 3 Part 5 Division 3 Title 2 of the Government
CONTRACT Code The provisions of this act and other applicable
ACT laws form and constitute a part of the provisions of this
contract to the same extent as if set forth herein, in full
1-3 ABBREVIATIONS
CCM City of Costa Mesa
CMSD Costa Mesa Sanitary District
CNB City of Newport Beach
CSD County Sanitation Districts of Orange County
OCEMA Orange County Environmental Management Agency
2-1 AWARD AND EXECUTION OF CONTRACT
The award of contract, if awarded, will be to the lowest responsible
bidder whose proposal complies with all requirements of the notice
inviting bids The District however, reserves the right to reject any
or all bids and to waive any informality in the bids received The
award if made will be made within 30 days after the opening of the
bids
PROCEDURE FOR PROPOSAL SUBMITTAL
Proposal shall be made and submitted on the Proposal Forms in accor-
dance with the Notice Inviting Bids In addition to the required signa-
tures in the spaces provided in the proposal forms each bidder shall
initial each sheet of the proposal forms at the bottom right hand corner
No person, firm, or corporation shall be allowed to make file, or
be interested in, more than one bid for the same work; unless alternate
bids are called for A person, firm, or corporation who has submitted a
sub-proposal to a bidder, or who has quoted prices on materials to a
bidder, is not hereby disqualified from submitting a sub-proposal or
quoting prices to other bidders If, on the opening of bids, more than
one bid appears in which the same person, firm, or corporation, is inter-
ested as a principal, all such bids shall be rejected
Proposals with interlineations, alterations, or erasures, shall be
initialed by the bidder ' s authorized agent Alternative proposals
special conditions or other limitiations or provisions affecting the
bid, except as such called for by the contract documents will render the
bid informal and may cause its rejection All proposals must give the
prices bid for the various items of work and must be signed by the
bidder who shall give his
- 2 -
address Each bid shall have thereon the affidavit of the bidder that
such bid is genuine and not sham or collusive or made in the interest or
behalf of any other person not therein named and that the bidder has not
directly or indirectly induced or solicited any other bidder to put in a
sham bid, or any person, firm or corporation to refrain from bidding and
that the bidder has not in any manner sought by collusion to secure
himself an advantage over any other bidder
REQUEST FOR INTERPRETATION
If any person contemplating submitting a bid is in doubt as to the
true meaning of any part of the plans, specifications, or other proposed
contract documents, or finds discrepancies in, or omissions from the
drawings or specifications, he may request the Engineer, in writing, for
an interpretation or correction thereof The person submitting such a
request shall be responsible for its prompt delivery All such interpre-
tations of the contract documents will be made only by Addenda duly
issued and a copy of each such Addendum will be mailed or delivered to
each person receiving a set of contract documents at his last address of
record The District will not be responsible for any other explanations
or interpretations of the contract documents
RETURN OF BID SECURITY
Any bidder may withdraw his bid, either personally or by
telegraphic or written request, at any time prior to the scheduled
closing time for the receipt of bids It is the sole responsibility of
the bidder to see that any such telegraphic or written request is
delivered to the City Clerk prior to said closing time Bid security of
such bidders will be returned promptly to the bidder
The bid security of the three lowest bidders will be retained until
the contract is awarded entered into and executed with the bidder of
accepted bid after which those will be returned to the respective
bidders with whose proposal they accompanied The bid security of all
other bidders will be returned after the canvass of bids
The bid security of the bidder of accepted bid will be held by the
District until the contract has been entered into and the bonds
accompanying the same are approved and filed whereupon the said bid
security will be returned to the bidder
If the bidder fails or refuses to enter into contract to do the
work, the bid security shall be forfeited to the District and shall be
collected and paid to the General Fund of the District
- 3 -
LICENSE REQUIRED
Contractor shall have a Class A or C42 license to perform this work
"OR EQUAL" PROVISION
When otherwise specified, any product called for on these
Specifications may be substituted using the process described in Public
Contract Code Section 3400
EXECUTION OF CONTRACT
The contract shall be signed by the successful bidder and returned
to the District, together with the contract bonds as specified in Section
2-4 of the Standard Specifications and as amended below and any changes
or additions made thereto in these specifications within 10 days after
receipt of written notice of award of contract The form of contract
agreement to be executed by the Contractor will be supplied by the
Attorney for the District No proposal shall be considered binding upon
the District until the execution of the contract by the District
2-3 1 SUBCONTRACTS GENERAL
The Engineer as duly authorized officer may consent to
Subcontractor substitution requested by the Contractor subject to the
limitiations and notices prescribed in Section 4107 of the Public
Contract Code
2-4 CONTRACT BONDS
The "Faithful Performance Bond" and the "Labor and Material Bond"
shall both be one hundred percent (100%) of the contract price The
Faithful Performance Bond shall be held for one year from the date the
Notice of Completion is recorded
Sureties providing performance bonds for Contractors must be
licensed or agree to employ a licensed Contractor with a Class A or
other applicable specialty contractor ' s license from the State of
California
2-5 PLANS AND SPECIFICATIONS
Engineer will provide the Contractor free of charge, copies of
plans and specifications that are reasonably necessary for the execution
of work
Contractor shall at his own expense obtain copies of Standard
Specifications and Standard Plans and Specifications of the State of
California, for his general use
- 4 -
If after award of contract, should it appear that the work to be
done, or any matter relative thereto, is not sufficently detailed or
explained in the specifications and plans the Contractor shall apply
to the Engineer for such further explanations as may be necessary and
shall conform to such explanation or interpretation as part of the
contract
All scaled dimensions are approximate Before proceeding with any
work, the Contractor shall carefully check and verify all dimensions
and quantities and shall immediately inform the Engineer or his
representative of any discrepancies
2-9 1 PERMANENT SURVEY MARKERS
Unless otherwise provided in the Special Provisions the
Contractor shall be responsible for protecting all existing horizontal
and vertical survey controls, monument, ties and benchmarks located
within the limits of the work If any of the above require removal,
relocating or resetting, the Contractor shall , prior to any
construction work and under the supervision of a California-licensed
Land Surveyor or Civil Engineer establish sufficient temporary ties
and benchmarks to enable the points to be reset after completion of
construction
Any ties, monuments and benchmarks disturbed during construction
shall be reset per local agency standards after construction and the
tie notes submitted to the appropriate governing agency on 8-1/2" X 11"
loose leaf paper The Contractor and his sureties shall be liable for,
at his own expense, any resurvey required due to his negligence in
protecting existing ties monuments, benchmarks or any such horizontal
and vertical controls
Unless a separate bid item is provided full compensation for
conforming to the requirements of this sub-section shall be considered
as included in the contract bid price paid for various other items of
work and no additional compensation will be allowed
2-11 INSPECTION
The Contractor shall give at least 48 hours advance notice of time
when he or his Subcontractor will start or resume the various units of
operations of the work as per the contract or resume the said units or
operations when they have been suspended as per the contract
- 5 -
The above notice is to be given during working hours, exclusive of
Saturday, Sunday or holidays for the purpose of permitting the Engineer
to make necessary assignments of his representative or inspector on the
work
Any work performed in conflict with said notice without the presence
or approval of the inspector, or work covered up without notice approval
or consent may be rejected or ordered to be uncovered for examination at
Contractor's expense, and shall be removed at Contractor 's expense, if so
ordered by the Engineer or inspector on the work Any unauthorized or
defective work defective material or workmanship or any unfaithful or
imperfect work that may be discovered before the final payment and final
acceptance of work shall be corrected immediately without extra charge
even though it may have been overlooked in previous inspections and
estimates or may have been caused due to failure to inspect the work
All authorized alterations affecting the requirements and
information given on the approved plans shall be in writing No changes
shall be made on any plan or drawing after the same has been approved by
the Engineer, except by direction of the Engineer in writing Deviations
from the approved plans , as may be required by the exigencies of
constructions will be determined in all cases by the Engineer and
authorized in writing
All instructions rulings and decisions of the Engineer shall be in
writing and shall be final and binding on all parties unless formal
protest is made in writing, as provided in the following paragraph, and
as provided in Section 1670 of the Civil Code
If the Contractor considers any work demanded of him to be outside
the requirements of the contract, or if he considers any instruction,
ruling or decision of the Inspector or Engineer to be unfair he shall
within 10 days after any such demand is made or instruction, ruling or
decision is given file a written protest with the Engineer stating
clearly and in detail his objections and reasons therefore Except for
such protests and objections as are made of record, in the manner and
within the time above stated the Contractor shall be deemed to have
waived and does hereby waive all claims for extra work, damages and
extensions of time on account of demands, instructions, rulings and
decisions of the Engineer
Upon receipt of any such protest from the Contractor, the Engineer
shall review the demand instruction ruling or decision objected to and
shall promptly advise the Contractor, in writing, of his final decision,
which shall be binding on all parties, unless with the 10 days thereafter
the Contractor shall file with the Board of Directors a formal protest
against said decision of the Engineer The Board of Directors shall con-
sider and render a final decision on any such protest within 30 days of
receipt of same
- 6 -
3-1 1 CHANGES REQUESTED BY THE CONTRACTOR GENERAL
Engineer shall be the duly authorized officer who may grant the
changes prescribed in this section
3-3 1 EXTRA WORK GENERAL
The extra work as defined in this section of Standard Specifications
and any work done beyond the lines and grades shown on the plans shall
only be performed when ordered in writing by the Engineer In absence of
such written order any such work shall be considered unauthorized and
will not be paid for Work so done may be ordered removed at the
Contractor's expense
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK
Prior to the commencement of construction arrangements will be made
for a meeting between the Contractor and the Engineer The purpose of
this meeting is to coordinate the activities of the Contractor within the
limits of this contract review scheduling, discuss construction methods
and clarify inspection procedures The Contractor will be required to
submit for approval by the Engineer a complete schedule showing the
number of working days required to complete the project
6-6 2 EXTENSIONS OF TIME
In the event the work called for under the contract is not finished
and completed in all parts and requirements within the time specified
the Board of Directors shall have the right to increase the number of
working days for completion or not, as may seem best to serve the
interest of the District
Except for the delays beyond Contractor' s control as described in
Sections 5-5 and 6-6 1 the District shall have the right to charge the
Contractor, his heirs assigns, or sureties and to deduct from the final
payment for the work, all or any part as it may deem proper, of the
actual cost of engineering, inspection, superintendence and other
overhead expenses which are directly chargeable to the Contractor and
which accrued during the period of such extensions except that the cost
of the final services and preparation of the final estimates shall not be
included in such charges
In addition to the above charges, Contractor shall pay to the
District liquidated damages as specified in Section 6-9 for such delays
No extension of time for the completion of the work called for under
the contract shall be allowed unless at least 10 days prior the the time
fixed for the completion thereof, or the time fixed by the Board of
Directors or its designee for such completion as extended, Contractor
shall have filed application for extension thereof, in writing, with the
- 7 -
Engineer addressed to the Board of Directors or its designee In this
connection it is understood that the Engineer shall not transmit any such
request to the Board or its designee if not filed within the time herein
prescribed
7-2 LABOR
The Contractor shall comply with the provisions of Section 1770 to
1780, inclusive, of the California Labor Code, the prevailing rate and
scale of wages determined by the Director of the Department of Industrial
Relations , State of California, which are filed with the Assistant
Secretary of said District and shall forfeit penalties prescribed
therefore for noncompliance of said Code
In order to verify the compliance of said code, Contractor may be
required by the District, from time to time to furnish weekly for the
duration of the contract period, copies of his payroll statements showing
wages paid each employee during the preceding week and the employee work
classification to the Engineer for checking Using Form DH-H-347 ,
Payroll Statement of Compliance is an acceptable method of fulfilling the
above requirement
APPRENTICES
Attention is directed to the provisions in Section 1777 5 and 1777 6
of the Labor Code concerning the employment of apprentices by the Con-
tractor or any Subcontractor under him The Contractor and any Subcon-
tractors under him shall comply with the requirements of said sections in
the employment of apprentices
Information relative to apprenticeship standards, wage schedules and
other requirements may be obtained from the Director of Industrial Rela-
tions Ex-Officio the Administrator of Apprenticeship, San Francisco,
California or from the Division of Apprenticeship Standards and its
branch offices
7-3 LIABILITY INSURANCE
The Contractor shall not commence work under his contract until he
has obtained all insurance required under this heading in a company
acceptable to the District, nor shall the Contractor allow any Subcon-
tractor to commence work on his sub-contract until all insurance required
of the Subcontractor has been obtained The Contractor shall take out
and maintain at all times during the life of the contract the following
policies of insurance
a Workman' s compensation insurance to cover his employees as re-
quired by the Labor Code of the State of California and the
Contractor shall require all subcontractors similarly to
provide such compensation insurance for all of the latter's
employees
- 8 -
b Public liability and property damage insurance on account of
bodily injuries, including death resulting therefrom in the sum
of $5, 000, 000 combined single limit for any one accident
which may arise from the operations of the Contractor in
performing the work provided for herein
c Motor vehicle public liability and property damage insurance to
cover each automobile truck and other vehicles used in the
performance of the contract in an amount of not less than
$250, 000 for one person and $500 000 for more than one person
and property damage in the sum of $100, 000 per occurrence and
$250, 000 in the aggregate resulting from any accident which may
arise from the operations of the Contractor in performing the
work provided for herein
Each of the policies of insurance provided for shall contain a clause
substantially in the following words
It is hereby understood and agreed that this policy may not be
cancelled nor the amount of coverage thereof be reduced until ten
days after receipt by the Engineer of a written notice of such
cancellation or reduction in coverage as evidenced by receipt of a
registered letter
The insurance required to be provided herein shall be provided by a
domestic carrier authorized to and doing business in, the State of
California and rated A+ XI by Best Key Rating Guides--Property--Casualty
and admitted for coverage in the State of California Insurance Guarantee
Fund
The Contractor shall, at the time of the execution of the contract
present the original policies of insurance required herein or present a
certificate of insurance showing the issuance of such insurance
Contractor shall also provide an endorsement naming the District as an
additional insured
7-5 PERMITS
Except as otherwise specified in the Special Provisions the
Contractor shall procure all permits and licenses, pay all charges, and
fees, and give all notices necessary and incident to the due and lawful
prosecution of the work These permits and licenses shall be obtained in
sufficient time to prevent delays to the work
In the event that the agency has obtained permits, licenses or other
authorization applicable to the work the Contractor shall comply with
the provisions of said permits, licenses and other authorizations In
the case the agency does procure any permits it is understood that the
agency is acting as an authorized agent for the contractor, and that the
Contractor shall be soley responsible for all work performed under the
permit
- 9 -
7-6 THE CONTRACTOR'S REPRESENTATIVE
Contractor shall also file with the Engineer the addresses and tele-
phone numbers where he or his designated representative may be reached
during hours when the work is not in progress
Instructions and information given by the Engineer to the
Contractor's authorized representative or at the address or telephone
numbers filed in accordance with this section shall be considered as
having been given to the Contractor
7-8 1 CLEANUP AND DUST CONTROL
All surplus materials shall be removed from the site of the work
daily after completion of the work causing the surplus materials
Unless the construction dictates otherwise and unless otherwise
approved by the Engineer, Contractor shall furnish and operate a self-
loading motor sweeper with spray nozzles at least once each working day
to keep paved areas acceptably clean whenever construction including
restoration, is incomplete
Failure of the Contractor to comply with the Engineer's dust control
orders may result in an order to suspend work until the condition is
corrected; and after filing notice to the Contractor, the Engineer may
order this accomplished by others All costs thus incurred shall be
deducted from the amount to be paid to the Contractor No additional
compensation will be allowed as a result of such suspension
No separate payment will be made for any work performed of material
used, to control dust resulting from the Contractor 's performance on the
work, or by public traffic, either inside or outside the right of way
Full compensations for such dust control will be considered as included
in the prices paid for the various items or work involved
7-8 5 TEMPORARY LIGHT, POWER AND WATER
The Contractor shall provide for his employees and adequate supply
of clean potable drinking water which shall be dispensed through
approved sanitary facilities
- 10 -
7-10 PUBLIC CONVENIENCE AND SAFETY
The Contractor shall abide by the following publications which are
hereby made a part of these specifications
The Work Area Traffic Control Handbook (WATCH)
The Manual of Warning Signs Lights and Devices for Use in
Performance of Work Upon Highways
State Labor Code Sections 6704, 6706 and 6707
The Construction Safety Orders (CAL/OSHA)
The General Industry Safety Orders (CAL/OSHA)
Standard Specifications for Public Works Construction (The Green
Book)
7-13 LAWS TO BE OBSERVED
The Contractor shall protect and indemnify the District, the Board
of Directors, the Engineer and all of its or their officers agents and
servants against any claim or liability arising from or based on the
violation of any existing or future State, Federal and Local laws
ordinances, regulations, orders or decrees, whether by himself or his
employees If any discrepancy or inconsistency is discovered in the
plans, drawings, specifications or contract for the work in relation to
any such law, ordinance regulation order or decree the Contractor
shall forthwith report the same to the Engineer in writing
9-3 2 PARTIAL AND FINAL PAYMENT
The leading time for processing invoices for the monthly progress
payment approved by the Engineer for inclusion on the warrant list of the
District is governed by the rules and regulations established by the
Board of Directors Invoices for monthly payments shall be submitted to
the Engineer no later than the 25th of each month
After completion of the contract the Board shall, upon recommend-
ation of the Engineer accept the work as complete and authorize the
final payment
- 11 -
The amount retained and deducted by the District shall be 5% of
the progress estimates for all progress payments The final payment of
the retention amount to the Contractor shall be made 35 days from the
date of the recording of the Notice of Completion of the work after it
is accepted by the Board of Directors and shall be made on duly
certified voucher therefore
It is mutually agreed among the parties to the contract that no
certificate given or payment made under the contract, except the final
certificate of final payment, shall be conclusive evidence of full or
substantial performance of this contract; and no payment shall be
construed to be an acceptance of any defective work or improper
material
The acceptance of final payment by the Contractor shall release
the District, the Board of Directors and the Engineer from any and all
claims or liabilities on account of work performed by the Contractor
under the contract or any alterations thereof
9-3 3 DELIVERED MATERIALS
Materials delivered, but not in place, will not be classed as work
done, except as otherwise provided in these specifications
- 12 -
SPECIAL PROVISIONS
The following additions are made to Parts 2 & 3 of the "Standard
Specifications" If there is a conflict between these additions and
Standard Specifications, these additions shall have precedence
PART 2
CONSTRUCTION MATERIALS
208-2 3 TYPE "G" JOINTS (POLYURETHANE)
Joints for vitrified clay pipe shall be Type "G" for main line
construction and Type "D" for laterals and repair work in conformance
with the Standard Specifications
PART 3
CONSTRUCTION METHODS
A-I GENERAL DESCRIPTION OF WORK
The work to be done in general consists of the following
Removal of existing improvements and obstructions; controlling traffic
in and around the work site; excavating the trenches for sewer main;
controlling and disposing of surface and groundwater flows during all
phases of construction; removing existing sewer main; laying the sewer
main; joining existing manholes; connecting existing laterals to new
sewer; backfilling excavations; removal and disposal of excess trench
materials ; reconstruction of paving and other improvements to the
satisfaction of the applicable local agency
The preceding shall include furnishing all labor, materials tools,
equipment and incidentals necessary to perform and complete said work
to the satisfaction of the Engineer
The work to be done under Alternative "B" "Link-Pipe" is generally in
accordance with manufacturer' s recommendations and as further outlined
herein
B-I ADDITIONS TO STANDARD SPECIFICATIONS
306-1 2 1 PIPE BEDDING
Underground pipe bedding shall be per "Trench Detail" as shown on
Costa Mesa Sanitary District Standard No S-112 and shall be 3/4"
crushed rock per Section 200-1 2 of the Standard Specifications
-13-
306-1 2 3 FIELD JOINTING OF CLAY PIPE
Field joints shall be Type "G" for main line sewer construction
and Type "D" for laterals or repair work
306-1 3 OPEN TRENCH OPERATION - BACKFILL AND DENSIFICATION
Sawcutting of the A C and backfill of the trench shall be as
required by the applicable local agency
Payment for slurry used as backfill for excavations shall be
included in the contract price for the related item of work and no
separate compensation will be allowed
306-1 5 1 TEMPORARY RESURFACING
Payment for temporary resurfacing shall be included in the
contract price for the related construction item No separate payment
will be allowed
B-II CONNECTIONS TO EXISTING FACILITIES
Work on and connection to existing facilities shall be
accomplished while maintaining existing sewer service Such work on
existing facilities shall be accomplished at a time and in a manner
approved by the Engineer
The Contractor shall be particularly aware that such connections
and work on existing facilities will be performed during periods of low
sewage flow, possibly during the night time or early morning hours
The Contractor will be required to install and maintain temporary
by-pass facilities with continuous, 24 hour a day supervision, capable
of by-passing all of the sewage flow through the area of work during
the construction Such equipment and its installation shall meet the
prior approval of the Engineer It shall be the Contractor ' s
responsibility to see that such equipment is operating properly at all
times
B-IV GUARANTEES AND TESTS
The Contractor shall guarantee all materials to be new and all
materials and workmanship to be free from defects for a period of one
year from the date of written acceptance of the completed work by the
Board of Directors of the Costa Mesa Sanitary District This guarantee
does not extend to claims for injury to person or property of third
parties due to negligent construction
-14-
B-V SAFETY REQUIREMENTS AND PERMITS
The Contractor shall obtain a permit in the District' s name from
the City of Costa Mesa The Contractor will be required to comply with
all requirements of Sections 6500, 6704 6706, and 6707 of the State
Labor Code
The Contractor will submit to the Engineer in advance of
excavation, a structurally approved plan showing the design of shoring,
bracing, sloping or other provisions to be made for worker' s protection
from the hazard of caving ground during the excavation of trenches
provisions for the control of groundwater will be included in these
plans
The Contractor will obtain in advance of excavation, a permit
authorizing such construction from the Division of Industrial Safety of
the State of California
Unattended excavation will be backfilled covered or protected to
the satisfaction of the Engineer and local governing agency
B-VI TRAFFIC
The Contractor shall furnish, erect, and maintain at his own
expense such fences, signs barricades, lights arrow board flagmen,
guards and such other devices as are necessary and so directed by the
Engineer to prevent accident damage or injury to the public
The Contractor shall be guided by the State of California
Business and Transportation Agency Department of Public Works
publication "Manual of Warning Signs, Lights and Devices for use in
performance of Work Upon Highway" latest edition and the WATCH
handbook
The Contractor shall at all times abide by the local agencies
inspector ' s directives concerning the control of traffic during
construction
The Contractor shall maintain local access for all residences and
businesses within the limits of construction
The Contractor shall cover, or fill open trenches after each
construction day and on holidays or weekends to the satisfaction of the
City Engineer
-15-
B-VII SHEETING, SHORING AND BRACING
The Contractor will be required to furnish all labor, materials,
tools , equipment and performing all work involved in providing
adequate sheeting, shoring and bracing or equivalent methods, for the
protection of life, or limb which shall conform to applicable safety
orders
The Contractor will be required to submit to the Engineer a
detailed plan showing a structurally approved design of shoring or
equivalent methods to provide protection for workers as specified in B-
V of these specifications
B-VIII TESTING
1 General - The Contractor shall, at his own expense, furnish
all labor, equipment, materials and water necessary for tests
and for reworking unacceptable piping
C-I LINK-PIPE REPAIR
Link-Pipe repair shall be made by the use of the Link-Pipe
Grouting Sleeve for use in repairing 8" VCP sewer lines as
recommended by the manufacturer Link-Pipe Inc Only the
Link-Pipe Grouting Sleeve is being selected to insure low
installation pressures on the existing sewer pipe wall The
sleeves shall have flares at both ends
C-I 1 General - LINK-PIPE Grouting Sleeves are made of stainless
steel coiled into a spiral The diameter of the spiral is
smaller than the pipe to be repaired A locking and
retention mechanism locks the sleeve into place when expanded
by a standard sewer plug
The Grouting Sleeve is surrounded by an closed celled
polyethylene foam sheet that is impregnated with foam grout
prior to installation Immediately prior to and during
expansion, the sleeve is sprayed with water to start the
foaming reaction The expansion process squeezes the grout
into the cracks and spaces in the pipe wall After the
sleeve is locked into place, the reaction continues until the
foam has penetrated the surrounding back fill material
C-I 2 Material Composition - The Grouting Sleeves shall be made
from SST-316 stainless steel manufactured to ASTM A-167 and
ASTM A-240 specifications
-16-
C-I 3 Grouting Materials - In order to install LINK-PIPE Grouting
Sleeves , LINK-PIPE Inc currently recommends 5600 Grout
manufactured by 3M of St Paul MN for most applications
This grout is a single component, moisture reactive urethane
grout that is designed to seal cracks, fractures, joints, and
holes in clay tile pipe, concrete, and masonry This grout
is similar in viscosity and appearance to medium weight motor
oil The cured material has a 700% to 800% elongation
The 5600 Grout is available in 1 and 5 gallon pails
With the LINK-PIPE Grouting Sleeve properly installed the
grout forms a flexible , tough rubbery seal that stops
infiltration and exfiltration In addition to forming a
composite structure that prevents further deterioration of
the repaired location, the LINK-PIPE Grouting sleeve cures to
form a three way seal by
1 bonding chemically to the surface
2 forming a mechanical anchor within the pores or fissures
in the wall
3 forming a compression seal within the joint or crack
When cured the 5600 Grout is EPA approved for use with
potable water
C-I 4 Types Of Applications - There are 3 main types of sewers
1 dry sewer with dry back fill and no infiltration
2 damp sewer and damp back fill with some seepage or
dripping infiltration (a few drops per second) and not
more than 1" of water in the invert
3 rapid infiltration (free flowing, spraying, or gushing)
with or without more than 1" of water in the invert
Since the grouts react quickly (3 to 6 minutes of reaction
time) careful installation procedure shall be used to prevent
premature curing in type (3) sewers
-17-
C-II INSTALLATION
After thorough inspection and documentation of the repair
site and after the LINK-PIPE Grouting Sleeves have been
selected and delivered to the repair site the location of
the repair should be cleaned All calcite deposits and
protruding laterals should be removed All debris should be
removed such that only the existing pipe itself remains
For type (1) and (2) sewers defined above the LINK-PIPE
Grouting Sleeve may be installed using the following
guidelines Type (3) sewers may require prior grouting of
the damaged location with a packer using standard grouting
techniques prior to installation of the Grouting Sleeve
1 inspect and record locations of deterioration
2 have the sewer plug, water spray, CCTV camera and air
pressure hose assembly ready for passing into the
manhole
3 prepare cables to pull sleeve sewer plug, CCTV camera
and water spray into position
4 prepare grouting tray and pour in the prescribed amount
of grout material
5 insert the handles into the two ends of the Grouting
Sleeve
6 apply grout to the sleeve gasket - make sure that there
is grout in the gasket under the free gasket flap
7 put an elastic band around each end of the sleeve to
hold the gasket flap in place - for longer sleeves more
rubber bands should be spaced along the sleeve (every 6"
to 8")
8 remove the rollers and insert the sewer plug into the
sleeve
-18-
9 inflate the plug to grab onto the sleeve
10 put skids onto the ends of the sewer plug to prevent the
sleeve from dragging along the invert and to keep it
away from any water
11 assemble all the cables camera air hose etc and pass
the assembly into the sewer line
12 use the CCTV to monitor the installation
13 when the sleeve is correctly positioned and ready for
expansion, turn on the water spray
14 inflate the sewer plug immediately at a constant rate of
approximately 1 psi per second to between 37-40 psi
(more may be needed if the sleeve does not lock the
first time) - allow the plug and sleeve to settle for 1-
2 minutes
15 deflate and inspect the installation to verify that the
sleeve has locked
16 repeat (14) and (15) if it is not locked
17 remove the installation equipment when finished
18 flush the sewer to remove excess grout
-19-
0)
z
J
w
3 fl N 3 A V
C
Z — ---------
1 3 8 V S I V I N V S
0
w
LL
0
w
w
w
=
co
0
O
CC
U-
0
\\ N
47 w
w F
z I
V O
_____
cc w 3 1 3 3 bel S �7 NOS I M
N r /V
U) a
CI E z°
a m
11 } I- CC Z
in
p z _o LU °n-
Z Q o °° W
� � w C Q
H o F— -
Z z ? �l
G CD 00 m o
CI) cn
Z ¢ w 00 Z W Q Z
Q
LLI a a < N _ \
w 7
CI
CO o 2D H w
z
c
Q .2 ¢ O f n CO o
o Z o
0
o 0 ¢ Q : i. Z >
Q " 0 VJ W 3 LLI w !
Nz co W > Et a s
< v
O ino a
U w o CO
a \ \
a
CC 0 LO F- ° \ \
< LO f0
C \,\, `\
O
LL
Z
a 1 3 3 b 1 SA
LL
t
P a C Z