Loading...
Project 187 - Addendum - Thornton - 2009-04-17 A1.170r1 Vo a To - A1 ST"( a A-gm ‘4111tarikata Robert Thornton Architects Inc P 0 Box 1512 • Newport Beech • CA 92659-1512 (949) 650-9676 • FAX (949) 215-5927 April 17 2009 Robin B Hamers Manager/ District Engineer Costa Mesa Sanitary District 628 W 19"' Street Costa Mesa,CA 92627 2716 Dear Mr Hamers, Thank you for the opportunity to submit the following proposal for Construction Administration for the new building and site improvements located at 174 West Wilson Street in Costa Mesa, CA. The following is an outline of the services required to execute the Construction Administration portion of the project I. Construction Administration: Architectural $12,000.00 a. Attend weekly meetings with owner and contractor b Review shop drawings. c Coordinate engineers and consultants with project modifications. d Respond to RFI's e Coordinate with LEED consultant Construction Administration: Structural Engineering $5,500.00 a. Respond to RR s b. Review shop drawings. c Review concrete mix design. d Structural Observation & written reports. Construction Administration: Mechanical,Plumbing & Electrical Engineering. $1,320.00 a. Anything outside "Construction Support Phase to assist construction manager II. Fee Structure: Our fees for performing these services will be billed at a rate of Architectural: $125.00/Hr Structural Engineering: $150.00/Hr M, P& E Engineering: $165.00/Hr This proposal is based on our understanding of the services required to execute the project. The term and conditions agreed upon in previous contract shall apply If this meets with your approval,please sign both copies, retain one copy for your files and return one copy Thank you. We look forward to providing our services. ges3teas,„ Bob Thornton Robert Thornton Architects. Inc APPROVED AND ACCEPTED: 11/ Lod Robin . Hamers Date District engineer c'M 6-;1-4-619 Thomas A. Fauth Date Assistant Manager