Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Insurance - Enovity - 2009-01-09
ACORD CERTIFICATE OF LIABILITY INSURANCE OP ID AS DATE(MWDDIYYYY) ENOVI-1 01/09/09 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Snapp & Associates Insurance ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE Services Inc (SL) HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR 438 Camino del Rio S #112 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW San Diego CA 92108 Phone 619-908-3100 Fax 619-908-3110 INSURERS AFFORDING COVERAGE NAIC N INSURED INSURER A Gemini Insurance Company I INSURER B Progressive Casualty Enovity Inc INSURERC Lunch Aaesioan In Company 19305 5 Third Street Ste. 320 INSURERD CNA San Francisco CA 94103 INSURER E I COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS TNSR OPL' POLICY EFFECTIVE-POCIC'EXPIRATTON LTR NERD TYPE OF INSURANCE POLICY NUMBER _DATE(MM/DDIYY) DATE(M DI M/DYY) LIMITS GENERAL LIABILITY EACH OCCURRENCE 51,000,000 A © COMMERCIAL GENERAL LIABILITY VCGP016019 05/31/08 05/31/09 PREMSESmaocclurence) $50,000 ■ CLAIMS MADE X OCCUR MED EXP(Any o person) 55,000 PERSONALS ADV INJURY $ 1,000,000 GENERAL AGGREGATE 2,000,000 GGEENI'L AGGREGATE LIMIT APPLIES PER PRODUCTS COMP/OP AGG S 2,000,000 POLICY n PECOT n LOG AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT S 1000000 B ANY AUTO 019495328 12/13/08 06/13/09 (Ea rodent) ■ ALL OWNED AUTOS BODILY INJURY I X SCHEDULED AUTOS (Pe pars n) X HIRED AUTOS BODILY INJURY c S X NON•OWNED AUTOS (Pe °dent) PROPERTY DAMAGE (Pe d t) I GARAGE LIABILITY AUTO ONLY EA ACCIDENT 5 ANY AUTO EA ACC S OTHER THAN AUTO ONLY AGG I S EXCESSAIMBRELLA LIABILITY EACH OCCURRENCE $ nOCCUR I I CLAIMS MADE AGGREGATE 15 S I DEDUCTIBLE S RETENTION S S WORKERS COMPENSATION AND XI TORY LIMITS OER C EMPLOYERS LIABILITY wc0300481100 06/07/08 ANY PROPRIETOR/PARTNER/EXECUTIVE / /OS 06/07/09 EL EACH ACCIDENT 51000000 OFFICERIMEMBER EXCLUDED? EL DISEASE EA EMPLOYEE 51000000 If yes,de cnbe under E L DISEASE POLICY LIMIT $ 1000000 SPECIAL PROVISIONS below OTHER D Professional AEA254115735 07/10/08 07/10/09 Aggregate 2000000 Liability Each Occ. 1000000 DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS Re Operations of the named insured for LEED Management Services Reports Writing and Field Verifications subject to the terms and conditions of the policy Certificate holder is named as additional insured per the attached endorsement 10* days notice of cancellation in the event of nonpayment of premium. • CERTIFICATE HOLDER CANCELLATION COS TAME SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIR ION DATE THEREOF THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30* DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO SO SHALL Costa Mesa Sanitary District IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR 628 W 19th Street Costa Mesa CA 92627-2716 REPRESENTATIVES A gD EPRE$[yT6T�yfc ACORD 25(2001/08) ©ACORD CORPORATION 1988 CMSD District Yard Project Bid Costs Comparison by Division DPR Wright Oltmans Division 1 General Requirements $ 343,765.00 $ 271 131.00 $ 132,394.00 Division 2 Site Work 177,999.00 282,000.00 169 629.00 Division 3 Concrete 153,000.00 98,000.00 109 661 00 Division 4 Masonry 231,000.00 191,000.00 178,940.00 Division 5 Metals 146,844.00 65,300.00 65,898.00 Division 6 Carpentery 123,360.00 118,100.00 98,629.00 Division 7 Moisture 174 749.00 229,800.00 138,887.00 Division 8 Doors and Windows 140 425 00 135,620.00 125,843.00 Division 9 Finishes 170 732.00 135,481.00 129,219.00 Division 10 Specialties 78,362.00 21,236.00 43,859.00 Division 11 Equipment 3,800.00 4,000.00 5,745.00 Division 12 Furnishings 4 472.00 Division 13 Special Conditions 54,061.00 Division 14 Conveying Systems Division 15 Mechanical 277,270 00 222,900.00 233,100.00 Division 16 Electrical 301,000.00 323,000.00 298,000.00 Overhead and Profit 96,763.00 52,430.00 124,333.00 Base Bid Total $ 2,419,069.00 $ 2,149,998.00 $1,912,670.00 Adjustment (8,000.00) Final Bid Total $ 2,411,069.00 $ 2,149,998.00 $1,912,670.00