Loading...
Proposal - Hamers - 1998-12-23 ROBIN B HAMERS 234 E 17TH ST sun-E 205 KEW ASSOCI ENGIINEERS • PLANNERS • SURVEYORS P 17147 s 49-1192 MESA, A 92627 CIVIL FAX [714754B-6516 December 23 1998 Board of Directors Costa Mesa Sanitary District P O Box 1200 Costa Mesa, CA 92628 RE. Project#151 Reconstructing Various Sewer Lines Proposal to Begin Design Phase Dear Board of Directors: With the upcoming construction of the Fairview Relief Sewer by Orange County Sanitation District (OCSD), the Costa Mesa Sanitary District has the opportunity to reconstruct two sewer lines in Fairview Road and abandon two existing sewer siphons. The siphons are a maintenance headache and have to be cleaned every Friday The two sewer lines in question serve Orange Coast College property on the west side of Fairview Road. The original sewer services to the site were reconstructed in 1972 when the County of Orange installed a storm drain system in Fairview Road. The depth of the storm drain conflicted with the sewer service so the sewer was reconstructed using two siphons to cross the storm dram. The new OCSD Fairview Relief Sewer will be deeper in the street thereby allowing the CMSD sewers to be reconstructed to flow by gravity under the County storm drain and still tie into the new OCSD line. OCSD is providing sewer stubs specifically for this purpose as part of their project. Upon completion of the sewer work by OCSD the City of Costa Mesa will be repaving Fairview Road. Upon completion of the repaving, a five year street cut moratorium will become effective. The repaving project will begin in November 1999 at which time the CMSD construction must be complete. A preliminary engineer s estimate of the sewer work is $130,000 ® Printed m Re cled Pape Attached for review are copies of the approved 1996-97 Capital Improvement Program (CIP) report along with the Boyle Engineering independent review of the project. As shown in the 1996- 97 CIP it is proposed to complete the design phase of the project including preparing plans, specifications, and estimates, and advertising for bids at the following hourly rates not to exceed $9,600 Engineer $ 63 00/hr Survey Crew(2 men) 155 00/hr Survey Crew(3 men) 185 00/hr Sin erely Robin B. Flamers Co% all Tel•i pANI: COSTA MESA y4 '-\°-.P DISTRICT u Aw y DIRECTORS \J_! 9p James Ferryman Costa Mesa Recycles /w Nate Reade I< Arth Perry Arlene Schafer Printed on Recycled Paper Dan Worthington REVIEW OF PROPOSED CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 1996-97 ; OFESS/O;F,1 N m ca E�Ry�12131/9 * ,JI n `Pl. CIV11_ 9 �P TFOF CALIF°� Prepared by Robin B flamers Manager/District Engineer FAX(714)432 1436 P.O. BOX 1200, COSTA MESA, CALIFORNIA 92628-1200 77 FAIR DRIVE (714) 754-5043 PROJECT 1112100-151 RECONSTRUCTING VARIOUS SEWER LINES The project is similar to past projects #122 , 126, 132 , 140 and 145 which includes rehabilitation and maintenance of the existing gravity sewer line system on an as-needed basis The results of the original four large televising projects plus the small yearly projects have disclosed existing problems in the main lines such as sags, cracked pipe collapsed pipe, offset joints, and root intrusion The project sets up a priority list of the problem areas and repairs the lines on this basis The project is a yearly project and part of an ongoing maintenance program The only problem type mentioned above which is not repaired by this project is root intrusion which is handled through root cutting by the District Throughout the past projects of this type the District has repaired the problem areas using two different methods Two of the projects were designed using standard remove and replace construction where the contractor excavates down to the line makes the repair, and then backfills and repaves One of the projects was completed using Link-Pipe, where stainless steel sleeves were inserted into the line, adjusted to the right location using a camera, and then expanded to permanently seal itself Link-Pipe is generally an easier and more economical repair method however it has some limitations in its application The decision to use Link-Pipe or remove and replace construction will be made during the design phase when the scope of each repair is more fully investigated Previous costs for excavation and reconstruction have been approximately $650/foot since the footage is only between two and six feet This would allow approximately 35 locations to be included in the project Link-Pipe costs have averaged $3 500 per location or approximately $700 per foot - 7 - An estimate of the project costs is as follows Design $ 9, 600 Construction 115, 000 Inspection 10,400 Reserve or Contingency 15, 000 TOTAL $ 150 000 - 8 - ft Boyle Engineering Corporation ccrsul.lnc enC '.ceis r 1 w 1 Quail PO.Zc FAX t / 2 Newport cc' CA -55-0020 Telc ^61 . Tdw1-1-oi.,i?'.inr1' ; izi7?;!xi `will:rtfitv� .�+..ic:�z-cs:'.3'ri ! ntiZtrrTzE3Irry-vn..'1 TRRrISPORTRTIOrl SERVICES Mr Robin B Hamers. PE, Manager/District Engineer August 12. 1996 COSTA MESA SANITARI' DISTRICT Post Office Box 1200 Costa Mesa, California 92628-1200 Capital Improvement Program Review I have completed my review, of the District s 1996-97 Capital Improvement Program (CIP) that you sent me on June 10, 1996. I have enclosed m\ independent review report as you requested. As usual. I found the CIP report to be very complete. containing adequate information for me to make m} review The use of vicinity maps. lists and recap sheets was beneficial, it made m` review easier Overall I found the CIP report to be were concise. well defined, and complete. I applaud you. the District and the cit\ for undue-taking the Sewer Lat:.tai Stud' The end results should be well received by the end users, the residents and businesses of Costa \'Icsa. I appreciate the opportunit\ to continue to `vark with you and ser c the District. Best wishes to you. the Directors. and the District staff Boyle Engineering Corporation Bruce D Mattern. PE Assistant Managing Engineer Enclosure CIP Review Report OC-C 1 100-0>/crosdlet nc2"6DNI/tt Independent Review Costa Mesa Sanitary District Capital Improvement Program Fiscal Year 1996-97 e Project 1112100-149/SINKING FUND This is the second year that funds have been set aside for future replacement or reconstruction of sewer lines as they reach life expectancy Setting aside funds for future use now will benefit from compounding over time. o Project 1112100-150/PUMP STATION ALARM SYSTEM UPDATE The Districts existing radio-alarm system is reaching its life expectancy Parts may be obtainable for the radios but the alarm reporting system appears to be unsalvageable. The District Engineer has recommended that bids include replacing the radios as an alternative, which I support. The use of a radio-alarm system has great value and benefit. The main saving has been in reduced response time. auto shut down of pumps when a problem has occurred. and a reduction in overflows when there has been a failure. The construction cost appears reasonable as does the design and inspection fees. s Project 1112100-151/SEWER LINE RECONSTRUCTION Various Locations This is the sixth .Ilocation in a continuing program to provide funding for maintenance of sewer lines at arious locations. This is a maintenance program and priorities are established from the data and analysis received from previous televising of the Districts sewer lines. Since repairs are small in length the average cost per toot will be higher when compared to major replacement projects. The engineers estimate appears reasonable. The design and inspection fees of 8 1'°.%0 and 9% respect\eh appea, to be within acceptable standards. The 13% contingencti estimate is reasonable. + Project 1112100-152/TELEVISING SEWER LINES This is part of an ongoing program to insure that the Districts facilities are functioning propel-1\ The District Engineer proposes to check lines that were televised approximately eight years ago this will provide significant information in which to draw assumptions regarding other portions of the Districts facilities. The engineering fees are higher than normal projects but since this requires proper selection of locations to be televised coupled with reviewing the tapes and report preparation. the seem acceptable. The inclusion of the vicinity map was beneficial and appreciated. + Project 11121100-153/ROOT INTRUSION STUDY Sewer Laterals This is the first year for this program. It appears to be a joint effort between the District and the Cit\ to provide a public service as yell as helping to identif\ potential problems/conflicts. The District and the City should be complimented for undertaking this project. especiall} the District for funding this first phase. Hopefull- the public will view this as a positive step and that the information can be used for preventati\e maintenance rather than finger pointing. I whole heartily support this program. Again. the use of the vicinity map was beneficial. • Project 1112100-154/SEWER WORK BY OTHERS-Reimbursement This provides the funding for a continuing program to reimburse others for work that they either do or have done on District facilities. Other agencies perform construction activities which affect District facilities, i.e. raise or lower manhole to grade. Since it is the responsibility of the District for its own facilities, providing funds to reimburse other agencies is appropriate. Based on the data contained in the engineers report, the funding amount appears reasonable. 2