Project 155 - Proposal - Hamers - 2001-02-22 i ROBIN B HAMERS 234 E 17TH ST SUITE 205 & ASSOCIATES INC. COSTA MESA, CA 92627 CIVIL ENGINEERS 0 PLANNERS • SURVEYORS (949) 545-1192 FAX(949)548-6516 February 22, 2001 Board of Directors Costa Mesa Sanitary District 77 Fair Drive Costa Mesa, CA 92628 RE. PROPOSAL TO COMPLETE PROJECT PROJECT 1112100-155 SEWER MASTER PLAN UPDATE Dear Board of Directors: Enclosed is a proposal to perform the Master Plan Update for the District's sewer system as included in the 1997-98 Capital Improvement Program. The Master Plan Update was included in the 97-98 budget and would be completed by now, however, focus had to be shifted to design of the$2 million Bristol Street Pumping Station facility which has been ongoing for a number of years. As discussed at the February 2001 Strategic Planning Sessions, the Master Plan Update is to be completed by the end of this calendar year In addition to the sewer capacity analysis and other usual components of a master plan, the study will include a storm water inflow and infiltration WI) reduction plan and a condition assessment of the sewer system as a whole. In accordance with the attached excerpt from the District s Capital Improvement Program Report and the follow-up Boyle Engineering independent review, it is proposed to complete the update as follows; Engineering $ 63 00/hr not to exceed$18,000 Sincerely Robin B. Flamers y1 Printed on Recycled Paper 4Q'14ITA4 i �,SARI71R COSTA MESA 14 C3rtr, DISTRICT Costa Mesa Recycles ♦w DIRECTORS A CORPORlap James Ferryman t, = Arthur Perry Arlene Schafer Dan Worthington Nate Reade REVIEW OF PROPOSED CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 1997-98 C) It Mil, 'CP 7- L. ST rN/+1 ,, J!\ t, Prepared by- Robin B. Hamers Manager/District Engineer FAX(714)432-1436 P.O. BOX 1200, COSTA MESA, CALIFORNIA 92628-1200 77 FAIR DRIVE (714) 754-5043 4,r1IT4q47,� COSTA MESA t�S `°-N., DISTRICT O n u�9WbSl3$ `i Costa Mesa Recycles y ww DIRECTORS rORPORA'��`9 lames"Ferryman t, Arthur Perry 5/27/97 Arlene Schafer Revised 5/28/97 Dan Worthington Nate Reade PROPOSED BUDGET COSTA MESA SANITARY DISTRICT CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 1997-98 Project 1112100-149 Sinking Fund for Future Sewer Replacement $ 200,000 (CR) Project 1112100-155 Sewer Master Plan Update 18,000 (CR) Project 1112100-156 Earthquake/Major Emergency Sewer Reconstruction fund 450 000 (CR) Project 1112100-157 Televising Sewer Lines 17 000 (CR) Project 1112100-158 Reimbursement for Sewer Work by Others 50 000 (CR) Sub Total (CR) $ 735 000 Sub Total (CI ) 0 Sub Total ( 0) 0 TOTAL $ 735 000 (CR) Denotes Capital Replacement Project (CI ) Denotes Capital Improvement Project (D ) Denotes Design Phase only at this time (0 ) Denotes Other cc. Rob Hamers Lois Thompson Susan Temple Reba Coulter FAX(714)432-1436 P.O. BOX 1200, COSTA MESA, CALIFORNIA 92628-1200 77 FAIR DRIVE (714)754-5043 PROJECT 1112100-149 SINKING FUND FOR FUTURE SEWER REPLACEMENT This project was initiated in the 1995-96 fiscal year at which time a$100,000 initial deposit was placed into the fund. Subsequently in the 1996-97 fiscal year an additional $200,000 was deposited into the fund. The project will provide funding for replacement or reconstruction of sewer lines as the system reaches its life expectancy Although the Engineer s Report is still in progress and a funding schedule has not been determined, the Finance Department has determined that $200,000 is available for the fund without causing an increase in sewer rates. Therefore, it is deemed prudent to set aside the money while it is available, especially considering that early deposits have the advantage of compounding interest over time. Third deposit to sinking fund $ 200 000 TOTAL $ 200,000 PROJECT 1112100-155 SEWER MASTER PLAN UPDATE A typical component of a sewer agency is its Sewer Master Plan. The master plan is a study of the size and capacity of the existing sewer system and short and long term projections of needed improvements. The plan includes information on future zoning of the lands, whether the zoning will require increased sewer capacity in the future, and information on the remaining useful life, and recommended improvements to, existing facilities. Usually each and every sewer line in the system is analyzed by size, slope, carrying capacity and existing and future flows. A financial analysis of short term and long term improvements is also included. The Costa Mesa Sanitary District last updated its Sewer Master Plan in June, 1983 The recommended upsizing of the lines identified in the study have either been completed or are part of long range plans. Since then the District has been concentrating on maintenance and rehabilitation of existing facilities. The proposed update to the District s Master Plan will reflect the completed and in progress construction since the 1983 update. The City of Costa Mesa adopted a new general plan entitled City of Costa Mesa 1990 General Plan wherein the City rezoned various areas and created new land use designations for other areas. At the time the City was developing the new plan,the City requested the District comment on the potential impact on the existing sewer system. The General Plan does pose some potential impacts and these will be identified in the Master Plan Update. The project will also include coordination with the County Sanitation Districts of Orange County (CSDOC)who own trunk lines throughout the District as well as the treatment plants. CSDOC has their own master plan which includes estimates of the total flows from the Costa Mesa Sanitary District. The project costs are as follows: Update Sewer Master Plan $18,000 PROJECT 1112100-156 EARTHQUAKE/MAJOR EMERGENCY SEWER RECONSTRUCTION FUND The 1994 Northridge earthquake was a good example of the severe damage that can be caused by a large earthquake. In addition to buildings and bridges collapsing, the earth movement caused utility lines to be severed, thereby disrupting service. Once utility lines are damaged, temporary service lines must be installed until the ground is stabilized, regraded, and the repair or new installation is completed. Should a large earthquake disturb Mesa Drive in the City of Costa Mesa (the Districts most vulnerable area), damage would occur to two pumping stations,gravity sewer lines, and pressurized sewer lines (force mains). One segment of the force main is located in the Mesa Drive bridge over the Costa Mesa Freeway The Elden Avenue Pumping Station located at the intersection of Mesa Drive and Elden Avenue pumps 3 750 gallons per minute and represents flows from a large portion of east side Costa Mesa. The other nearby pumping station is the Tustin Pumping Station that feeds into the Elden station and pumps 1,200 gallons per minute. In the event damage occurs to these or other pumping stations, temporary pumper trucks must be utilized round-the-clock until the station can be reconstructed and begin operation. The estimated reconstruction cost for a station such as the Elden station is $500 000 assuming almost total damage has occurred. Added to that would be the cost of temporary measures of using pumper trucks or a quickly constructed make-shift pumping station. Additionally if the Mesa Dnve bridge were to collapse, a temporary and new permanent force main would have to be installed. An estimate of these costs is in the range of$500,000, making the total potential exposure approximately$1 million. Possible financing mechanisms for such an event are either taking the money from reserves, obtaining earthquake insurance, qualifying for FEMA(Federal Emergency Management Agency) assistance, or establishing a distinct fund for this purpose. Although using reserves is a possibility the District has a reserve balance of approximately $5 million, which is small compared to the value of 325 miles Of sewer lines, 20 sewer pumping stations, and$3 1 million of yearly trash collection and recycling contracts. Included in the$5 million are the funds the District has set aside in a sinking fund for long term future sewer replacements as well as the reserves needed to handle the beginning of the year operating deficit prior to receiving the trash and sewer charges. Use of sinking fund money for an emergency would impair the District s ability to meet its future responsibilities and is not recommended. The District's current insurance carrier SDRMA (Special District Risk Management Authority) does not provide earthquake insurance. If available, earthquake insurance would be cost prohibitive. In the past, FEMA has provided reimbursement for earthquake and other catastrophic events, however,the reimbursement usually takes a number of years and is subject to the discretion of the federal government. The State of California usually provides a share of the reimbursement, however, the State budget has vacillated back and forth from being in a deficit situation. FEMA is a probable source of reimbursement, but not a guaranteed source. The best alternative appears to be the establishment of a distinct earthquake/major emergency fund that will cover the bulk of any immediate major emergencies. Creation of the fund will prevent other reserves from being used as well as allowing the fund to grow over time with compounded interest. It is recommended that the fund be established at$1 million, with this year s appropriation being the first installment. Remaining installments can be varied in accordance with future years capital improvement requirements. Recommended Appropriation $450,000 PROJECT 1112100-157 TELEVISING SEWER LINES The project is the continuation of the ongoing yearly pick-up projects where it is proposed to continue rechecking areas that were originally televised in 1989 under the first phase of the District's televising program. Certain areas of the first phase where problems were encountered such as roots, multiple cracks or longitudinal cracks will be re-televised to compare the 1989 condition versus the current condition. This will assist in determining whether significant portions of the one million feet of District main line previously televised will need to be re- televised. Upon completion of the televising, an Engineer's Report will be prepared that outlines the results of the comparison and determines the need for future similar projects. The areas to be televised are included in the 1989 televising area which is shown on the attached map. Recently the District adopted Ordinance No. 26 which allows, in accordance with State law, sewer projects up to $10,000 to be completed without going to bid. The televising portion of this project is $6,000 and this will allow continued use of the contractor who has completed the District's previous televising projects. The design portion of the project encompasses preparing maps and schedules for the contractor Preparing the maps includes reviewing previous televising projects to determine areas where re- televising is appropriate. The previously used area and manhole designation system will be reused. Inspection consists of monitoring the Districts cleaning forces schedule, since the District must clean the lines immediately prior to televising, as well as being present during the televising operation The televising cost is estimated at 12,200 feet of pipe at$0 49 per foot. An estimate of the project costs is as follows: Design $ 2,750 Televising Cost 6,000 Inspection 3 750 Engineer's Report 2,500 Reserve or Contingency 2,000 TOTAL $17,000 1 q 41 i: , % ti. I al tn \, I, g k Q) \ ,\ _--- it MI 1 _ kJ k / 40, i 7 / Chr .. 09.* \ a -X 4 AP • I__ \ r t AVA, / at: 04 ils- I - i \ r _tie "\\ ,A; \ in El , /1 , ,,insfiva70-1:40 z 4)-Ir\; " \ 7 , 1 \ V ON le -f>. ' „. / SI 0- f _ N44 4. a \ ,-/-C " '''' ... -- _ • - -- 77i___g fig 101 , *dia, / W./ - / "A 1 - --Alfas 1 si - ‘• , Jar ‘ --Art----- 11111S1--Miiii ,, ,.. .„ I EG1 I - -t " ------ 1, -4 -1:: ' 11 F_‘" .;.- _ _ it Irii i , , ea\ „------- ---,-- - iil ' 1 ,. _ i-,Isi a. t1,-------t. < ,_. II Ilya lei E Ifs a . + Z \ II I to ao cv TAF -..---* f \ 11. v i n a \ 0 / f col 7 \I\ I 'El ■ k.i Illvr ^ ,I i f.1 / I } Z IZI 421‘.......L... e ■, ek \\ 0■ - , - -,, , 1 I ,/ t------------ - _ \ 9 / / i tit• t: 4 -t 1,-1 4 H\ ci 0- r ii.1/4,4 „. j 4. 1 i 'i \ ° -L"L-I 1 -I '- 1 I - )21 4, , 1 , ti i7,1141 N It . \ _ CC .±-, _ CI. tti N ri lr E \ ( \ q.,. -tr.-.- 1 - CO (12 CL ISI 0 < il o .2. gl - -riegiligi nri - 111 )1 e'c Iti 404) 0 < > c, I— op - 11 - z 61° < to PROJECT 1112100-158 REIMBURSEMENT FOR SEWER WORK BY OTHERS This project is a reimbursement to the City of Costa Mesa or County of Orange for performing work on District sewer facilities during a City or County construction project. Under existing laws whenever a City or County project such as a street widening project or storm drain installation project requires relocation, reconstruction or protection in place of any District facilities, the cost of said work is the responsibility of the District. The District has always chosen to have said work incorporated in the City or County contract thereby achieving the lowest price possible for said work plus reducing scheduling problems. Upon completion of the City or County project the District Engineer and Inspector verify the work done, the unit price, and approve a reimbursement to the City or County As an example, the City of Costa Mesa recently completed a street widening project on 19'h Street where sewer laterals had to be lowered. This is tn addition to raising or lowering manholes which is occurring frequently due to the City s extensive street rehabilitation program. Past experience has shown that of the$50,000 budgeted every year, approximately $35 000 $45,000 is spent. Engineering and inspection costs for the project are included in the monthly invoices from the District Engineer for plan checking and inspection. The project is included in the budget to allow Finance to properly budget for the expenditure. Estimated construction cost = $ 50,000 BID RECAP OF PREVIOUS PROJECTS REMOVE & RECONSTRUCT SEWER-LINES 4' SECTIONS OF 8' VCP CMSD#126, 1993 $2,600.00 CMSD#132, 1994 $2,400.00 2' SECTIONS OF 8' VCP CMSD#126, 1993 $1 ,950.00 CMSD#132, 1994 $1,200.00 LINK PIPE REPAIR 4' SECTIONS OF 8' VCP CMSD#122, 1992 $2,063.00 2' SECTIONS OF 8' VCP CMSD#122, 1992 $1 183.00 TELEVISING SEWER LINES PER L.F CMSD#125, 1992 $0.32 TOTAL 224,807 L.F TELEVISED PER L.F CMSD#131 1994 $0 45 TOTAL 9 321 L.F TELEVISED PER L.F CMSD#137 1995 $0.49 TOTAL 10,000 L.F TELEVISED RAISE MANHOLES TO GRADE EACH, CMSD#143, 1995 $225.00 - 16 - f304,LE El7G/f7EERlf7G COR1°ORr4T/Of7 1501 Quail Street P.O. Box 3030 714 /476 3300 Newport Beach, CA 92658-9020 FAX 714/721 7142 Mr Robin B Hamers. PE August 4 1997 Manager/District Engineer COSTA MESA SANITARY DISTRICT P O Box 1200 Costa Mesa, C A 92628-1200 Capital Improvement Program Review Dear Rob I have completed mv review of the District s 1997 98 Capital Improvement Program (CIP) that you sent me on July 11 1997 1 have enclosed my independent review report as you requested. As usual, I found the CIP report to be very complete. containing adequate information for me to make my review The use of vicinity maps. lists, and recap sheets were beneficial. it made my review easier Overall I found the CIP report to be very concise. well defined- and complete. I applaud you and the District for continuing the funding for future sewer replacement and for establishing a separate funding program for earthquake and major emergency sewer repairs. The District s management and financial ability to provide these services without increasing fees should be promoted to the end users. the residents and businesses of Costa Mesa. I appreciate the opportunity to continue to work with you and serve the District. Best wishes to you. the Directors, and the District staff. Boyle Engineering Corporation Bruce D Matters. PE Assistant Managing Engineer Enclosure CIP Review Report OC-c41 I00-07'hdm/CNISDLf97 DOC Independent Review Costa Mesa Sanitary District Capital Improvement Program Fiscal Year 1997 98 o Project 1112100-149 / SINKING FUND FOR FUTURE SEWER REPLACEMENT This is the third year ( project was initiated in the 1995-96 fiscal year) that funds have been set aside for future replacement or reconstruction of sewer lines as they reach life expectancy Setting aside funds for future use now will benefit from the compounding of interest over time. The report indicates that funds can be set aside without affecting existing sewer user rates: this is a point worth promoting. * Suggestion. for future Capital Improvement Program Reports, it might be useful to summarize total the amount of funds set aside and what is the present value. This is not a suggestion for the benefit of the independent reviewer but since this is a public document, it might be beneficial when read by District constituents. + Project 1112100-155 / SEWER MASTER PLAN UPDATE The Costt Mesa Sanita. District (CMSD) has lc updated it s Sewer °? istei Plan since 1983 The City of Costa Mesa revised its General Plan in 1990 Based on discussions with staff and the reviewers knowledge. the recommendations contained in the 1983 Master Plan have been completed or are part of ongoing / continuing long term planning goals. It is anticipated that any variances / differences between the District s 1953 Master Plan and the City s 1990 General Plan will be identified as part of the update: including recommendations for needs along with associated financial costs. The Master Plan update will also include coordination with the County Sanitation Districts of Orange County (CSDOC). The project cost of$18 000 appears to be more than reasonable and may be under funded. e Project 1112100-156 / EARTHQUAKE/MAJOR EMERGENCY SEWER RECONSTRUCTION FUND This project would establish a distinct fund solely for earthquake/major emergency repairs. The reviewer concurs with the reasoning behind establishing this fund. While other sources of funding / reimbursement may be available (i.e. State. FEMA, etc.). these sources will probabh not be timely nor is there a guarantee that full reimbursement will be available. It appears that the District has the financial resources available which will allow establishment of this fund without affecting other District operations nor cause an increase in fees. This fund will benefit from compounding interest over time (as does Project 4149). It appears that, based on good management and sound financial controls. the District is able to provide service and protection to the District s constituents without increasing fees. Again. a point worth promoting. CLISDRPT DOC t • Project 1112100-157 /TELEVISING SEWER LINES This is part of an ongoing program to insure that the District s facilities arc functioning properk The District Engineer proposes to check lines that were televised in 1989 under the first phase of this program. this will provide significant information (compares 1989 condition to present condition) in which to draw assumptions regarding other portions of the District s facilities. The engineering fees are higher than normal projects but since this requires proper selection of locations - to be televised, monitoring the District s cleaning schedule, coupled with reviewing the tapes and report preparation, they are acceptable. The inclusion of the vicinity map was beneficial and appreciated. The reviewer recognizes that the District Engineer prepares a report which defines the results of this project: however it might be beneficial for future years to provide a very brief summary of the value of this type of work. A brief indication of percentage of pipeline unchanged versus continued deterioration, versus actual repairs would provide support for funding continuation. e Project 1112100-158 / SEWER WORK BY OTHERS—Reimbursement This provides the funding for a continuing program to reimburse others for work that they either do or have done on District facilities. Other agencies perform construction activities which affect District facilities (i.e. raise or lower manhole to grade). Since it is the responsibility of the District for its own facilities. providing funds to reimburse other agencies is appropriate. Based on the data contained in the engineers report. the funding amount appears reasonable. QASORPT DOC 2