Project 160 - Change Order #2 - Sully-Miller - 1999-05-05 Costa Mesa'Sanitary District CONTRACT CHANGE ORDER NO 2 PROJECT #160 Fairview Park Sewer TO Sully-Miller Contracting Co Contractor You are hereby directed to make the herein described changes from the plans and specifications, or do the following work not included in the plans and specifications on the contract. Note: This change order is not effective until approved pursuant to adopted District policy Change Requested by Sully-Miller Contracting Co e - Description of work to be done, estimate of quantities and prices to be paid. Segregate between additional work at contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. During trenching for the construction of new sewer line in Canyon Drive contractor's operation was slowed by approximately two hours per day due to an existing abandoned 4" water line that had to be removed from the trench prior to installation of the sewer The water line jogged from side to side in the trench in a random alignment and necessitated the contractor making a wider sewer trench Delays and- costs are further outlined in attached request for change order and associated costs which have been verified by District staff Net Increase © Decrease H in Contract $ 8,205.86 By reason of this order the time of completion will be adjusted as follows. None // Prepared by Robin B Hamers Date <17h I G� Approved by Robin B Hamers Cr" Date `� r Distri n I eat Approved by District Manager Date t3 Required ase cost is $1,000 mo 0��n • Board approval also needed when increase in cost exceeds 2% of contract or $1,B&BOw tvhichever is greater We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment,furnish all materials,except as may otherwise be noted above,and perform all services necessary for the work above specified,and will accept as full payment therefor the prices shown above. Date accepted 5/5/99 Contractor Sully-Miller Contracting Co. By e'cCc3-cc2? CMF 1082-68 White-District File;Can ry-Contr cto Copy'Pink-Fi Golde otl-Engin RECEIVED HAY - 3 1999 COSTA MESA SANITARY DISTRICT SUM'-MILLER CONTRACTING CO April 30, 1999 Costa Mesa Sanitary District 77 Fair Drive P O Box 1200 Costa Mesa, Ca. 92628-1200 Attention. Rob Hamers Dear Rob, There have been a couple of problems encountered on our project: Sully-Miller encountered an unforeseen water line, which ran the length of our sewer installation on Canyon Drive, this line was not shown on the plans. We are estimating that the line interference cost Sully-Miller 2 hours each day of lost crew time in the street portion of Canyon Drive, which was 500 feet. The lost time along with the disposal costs for this line is currently being calculated by Sully-Miller we feel the district should be responsible for these costs. The last item is in regards to the re-alignment of line C, which has been moved. Due to this movement Sully-Miller has had to repair additional sprinklers which we estimate we have costs of$500.00 to repair. Sully-Miller is diligently calculating the additional costs associated with these problems and will foreword these costs to you as soon as possible. Thank you for your cooperation. Sincerely C-- Public•Works Manager/Project Manager MAIN-14.578.9600 FAX-14.578.2850 1100 E. ORANGETHORPE AVE 5TE 200 ANAHEIM,CA 92801 lacer 74761>1 Received 4/30/99 13 13 949 548 6516 SULLY MILLER CO Pag 2 FROM ROB HAMERS FAX NO. 949 548 6516 Apr 30 1999 02 12PM P2 REOUEST FOR CHANGE ORDER Project:_ 1112100-160 FAIRVIFW PARK SEWER CONTRACTOR does hereby certify 1. That CONTRACTOR is entitled to additional days to complete the project or addinonal compensation because THERE WAS A CONFLICTING WATERLINE IN OUR TRENCH ZONE WHICH HAD TO BE REMOVED THIS SLOWED OUR PRODUCTION 2. That CONTRACTOR discovered this condition on 4/05/99 3. That such condition: was unforeseen because THIS LINE WAS NOT SHOWN ON THE PLANS. was additional work directed by the Project Manager as follows 4. That the additional days claimed are the following dates. 4/5. 4/14. 4/15. 4/16. 4/19, 4/20, AND 4/21 5. That the cost or estimated cost to perform the additional work is as follows:$8,205.86 (Submit attachment showing details and calculations.) 6. Persons having knowledge of this request are: PAUL GUZMAN I certify under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Date �— 1 Sied Title MANAGER OF PUBLIC WORKS/ESTIMATOR Recommendation: By Position CHANGE ORDER APPROVAL Days allowed APPROVED BY WithaLA- 11/Additional Compensation 0 L' ). " � COSTA MESA SANITARY DISTRICT HOURLY MARKUP % TOTAL RATE FOREMAN 49.58 20% 9.916 59 496 LABORER 32.73 20% 6.546 39.276 LABORER 32.73 20% 6.546 39.276 PIPELAYER 34 3 20% 6 86 41 16 PIPELAYER 34 3 20% 6.86 41 16 OPERATOR 44 35 20% 8.87 53.22 OPERATOR 44 35 20% 8.87 53.22 PICKUP 8.5 15% 1.275 9 775 EXCAVATOR 105 15% 15 75 120.75 SEMI 62 15% 9.3 71.3 BACKHOE 50 15% 7 5 57 5 586.13 PER HR 2HRS DAY = 1172.266 PER DAY 7 DAYS 8205,862 TOTAL