Project 161 - Proposal - Hamers - 2000-05-03 ROBIN B HAMERS 234E 17TH ST SUITE 205 & ASSOCIATES INC. COSTA MESA, CA 92627 CIVIL ENGINEERS • PLANNERS • SURVEYORS (949)540-1192 FAX(949)540-6516 May 3, 2000 Board of Directors Costa Mesa Sanitary District 77 Fair Drive Costa Mesa, CA 92628 RE. PROPOSAL TO BEGIN DESIGN PHASE PROJECT 1112100-161 CONSTRUCT WATER SERVICE TO PUMPING STATIONS Dear Board of Directors: As more fully described in the attached excerpt from the 1998-99 Capital Improvement Program, the project encompasses constructing water services to 11 of the District's pumping stations. The running water supply will enhance worker safety due to the continued use of various chemicals at the stations plus will allow a hose down of the station interior Please refer to the attached report. It is proposed to complete the design phase of the project at the standard hourly rates as shown below not to exceed$7,500 Engineer $ 63 00/hr Field Crew(2 man) 155 00/hr Field Crew(3 man) 185 00/hr Also attached is the Boyle Engineering dependent review of the report. Sincerely g1414).4 Robin 13 Flamers End. 3 Printed on Recycled Pape 5pgANlr4 COSTA MESA 1 pit, DISTRICT Costa Mesa Recycles y +- e° DIRECTORS c0'QpORA `9 James Ferryman int Arthur Perry Arlene Schafer Dan Worthington Nate Reade REVIEW OF PROPOSED CAPITAL IMPROVEMENT PROJECTS FISCAL YEAR 1998-99 \39„.0 Evil l'J�1 Qw° �t`g"qd,qt� ri 2�3 ce..% % E(l 'ci1 cc * * ('T CIV1u ��� 1TF OF ()toy-Q Prepared by Robin B. Hamers Manager/District Engineer FAX(714)432-1436 P.O. BOX 1200, COSTA MESA, CALIFORNIA 92628-1200 77 FAIR DRIVE (714)754-5043 'oS R r*Vie t: .o,'f9 &�...r ty rs �-:_R: . ;i1•:",i .,2:�gr.E.t�� t—�tia�"k.. Fir.,,..wr c �' ..,t.. ._ _ ,� , , .. I n;" i PROJECT 1112100-161 CONSTRUCT WATER SERVICE TO PUMPING STATIONS The District's number one priority at all times is worker safety This was the reason the District adopted a policy for converting the District s pumping stations from a wet well thy well design to a submersible design whereby daily checking could be done from the street surface rather than descending a 20 foot vertical ladder The old pumping station design was also considered a confined space by OSHA which necessitates a three man crew and comprehensive safety equipment and techniques for entering the stations. Now, a single worker can check the majority of the stations easily since the electrical controls and monitoring equipment is located above ground and operation of the pumps can also be observed from street level. For the remaining wet well dry well stations (which will be abandoned in the future as part of a combination project with the County Sanitation Districts of Orange County) District workers have been properly trained and certified through OSHA. As an additional safety precaution,the availability of a running fresh water supply is desired at the 11 largest pumping stations. At a number of these stations hydrogen peroxide and other chemicals are used to prevent odors and grease build-up. The availability of running fresh water will allow immediate wash down in the event workers come into contact with any chemicals. Currently the District trucks are equipped with water jugs, however, running water is much more effective. Four of the stations are served by Irvine Ranch Water District and seven are served by Mesa Consolidated Water District. The Sanitary District will prepare plans showing the installation of 11 water services and meters meeting the approval of the water agency Proposed Budget Design $ 7,500 Construction 50,000 Inspection 7,500 Contingencies 5 000 TOTAL $70,000 O 13OYLE E/7G7/7EER//7G COR/=OR/377O/7 1501 Quail Street P.O. Box 3030 949 /476 3300 Newport Beach, CA 92658-9020 FAX 949 / 721 7142 Mr Robin B 1-Iamers, PE, Manager/District Engineer July 30 1998 COSTA MESA SANITARY DISTRICT P O Box 1200 Costa Mesa, CA 92628-1200 Capital Improvement Program Review (1998-99) Dear Rob I have completed my review of the District s 1998-99 Capital Improvement Program (CIP) that you sent me on June 17 1998 I have enclosed my independent review report as you requested. As usual, I found the CIP report to be very complete, containing adequate information for me to make my review The use of letters, vicinity maps, and recap sheets was beneficial, it made my review easier Overall, I found the CIP report to be very concise, well defined, and complete. I applaud you and the District for continuing the funding for future sewer replacement and funding for earthquake and major emergency sewer repairs. The District s management and financial ability to provide these services without increasing fees should be promoted to the end users, the residents, and businesses of Costa Mesa. Projects No. 161 and No. 163 will not only provide a safer working environment but should help the efficiency of handling a major power failure; I m sure the field crews will appreciate the District s expenditure for these two projects. I look forward to seeing your research results on sewer age and the use of enzymes for odor and grease control. I would hope that you and the District would consider publishing the results of your investigations; this could go a long way in showing the end user that the District is a forward thinking agency I appreciate the opportunity to continue to work with you and serve the District. Best wishes to you, the Directors, and the District staff Boyle Engineering Corporation Bruce D Mattern, PE Assistant Managing Engineer Enclosure C1P Review Report OC-C62-100-0Sibth /c J117S.do Independent Review Costa Mesa Sanitary District Capital Improvement Program Fiscal Year 1998-99 • Project 1112100-149 / Sinking Fund for Future Sewer Replacement This is the fourth year (project was initiated in the 1995-96 fiscal year) that funds have been set aside for future replacement or reconstruction of sewer lines as they reach life expectancy Setting aside funds for future use will benefit from the compounding of interest over time. The report indicates that funds can be set aside without affecting existing sewer user rates; this continues to be a point worth promoting. To date, $700,000 has been deposited into this fund. The report indicates that the District Engineer is conducting research of Eastern and Midwest municipalities where various existing sewer systems are older than 100 years. Information from this research should be of great value to the District in planning its future. This reviewer would be interested in the results of the research. e Project 1112100-156 /Earthquake/Major Emergency Sewer Reconstruction Fund This year s allocation continues the funding established in 1997 The District's goal is to set aside $1,000,000 in the event of an earthquake or other major emergency The reviewer concurs with the reasoning behind establishing this fund. As stated in last years review tither sources of funding/reimbursement may be available (i.e. State, FEMA, etc.)• however these sources will probably not be timely nor is there a guarantee that full reimbursement will be available. It appears that the District continues to have the financial resources available which will allow continuation of this fund without affecting other District operations nor cause an increase in fees. This fund (as does Project No. 149) will continue to benefit from compounding interest over time. With this years allocation of$150,000, the total deposit into the Fund equals $600,000 It appears that with good management and sound financial controls, the District continues to be able to provide service and protection to the District s constituents without increasing fees. Again, a point worth promoting. e Project 1112100-159 /Televising Sewer Lines This year s project is part of an ongoing program to insure that the District s facilities are functioning properly In reviewing the cost data provided, the per linear foot cost for televising has increased at a minimal rate. The engineering fees are higher than normal projects but since this requires proper selection of locations to be televised, monitoring the District s cleaning schedule, coupled with reviewing the tapes and report preparation, they are acceptable. 0C-C62-100-08IgwICMSDRPT DOC t BOYL E The reviewer recognizes that the District Engineer prepares a report which defines the result: of this project; however it might be beneficial for future years to provide a very brief summary of the value of this type of work. A brief indication of percentage of pipeline unchanged versus continued deterioration, versus actual repairs would provide support for funding continuation. e Project 1112100-160 /Fairview Park Sewer Line This project will provide a gravity sewer through a portion of Fairview Regional Park and will initially provide rest room service for the Orange County Model Engineers (OCTAL), with future service for other real room facilities. This will also allow the OCME to expand its facilities and to add a snack bar The District Engineer s letter of May 15 1998 to the City Manager was provided as supporting information. It is understood that this is a capital improvement project (as compared to a capital replacement project) and that the City and OCME will contribute to the construction fund. It is also understood that this project will only proceed subject to a final agreement between the City and the District. The design and inspection costs appear to be high (30 percent of estimated construction costs) unless these costs also include surveying and geotechmcal services. + Project 1112100-161 / Construct Water Service to Pumping Stations Throughout the years, the District has conducted various safety type projects, i.e. converting climb- in wet well-dry pump stations to submersible where checking could be done from above ground. Also, staff has gone through training and are certified by OSHA for entering into the remaining wet well-dry well stations. This project will add a potable eater supply to each of the 11 largest pump stations, thus allowing for immediate wash down in the event of chemical and/or hazardous material contact. Considering the number of locations and two different Water Districts to deal with, the proposed budget appears reasonable. o Project 1112100-162 /Enzymes for Grease / Odor Control (Pilot Program) This pilot project will initiate the use of enzymes to control odor and grease. The present use of hydrogen peroxide for odor and a de-greaser sometimes counteract each other when used together. The District is presently spending $60,000 per year fol. odor and grease control and this may not be the best use-of the District s funds. The reviewer understands that CSDOC and the Rossmoor/Los Alamitos Area Sewer District may also be experimenting with the use of enzymes and is investigating its use The District may want to contact these other agencies to share and compare notes. The budget appears reasonable. • Project 1112100-163 / Upgrade Emergency Response Equipment The reviewer is very familiar with the effects of a power outage or electrical failure on a sewer pump station. The reviewer is also familiar with the use of by-pass pumps in the event ofa power failure or break in the main line. This project will purchase generators and will modify the electrical system at 11 of the most critical pump stations. This will allow for the generators to be connected directly 0C-C62-100-08lgw/CMSORPT DOC 2 13O4.1L E to the affected pump station electrical panel, will keep the station operational, and should eliminate the need of always relying on by-pass pumps. The budget of$140,000 appears reasonable since it also includes a new advanced design root cutter + Project 1112100-164 / Miscellaneous Sewer Work/ Manhole Adjustment This provides the funding for a continuing program to reimburse others for work that they either do or have done on District facilities. The program has been expanded to include small sewer line repairs that need to be handled immediately Other agencies perform construction activities which affect District facilities, i.e. raise or lower manholes to grade. Since the District is responsible for its own facilities, providing funds to reimburse other agencies is appropriate. The reviewer understands the benefit of expanding the program to provide funding for small sewer lines and manhole repairs/adjustments, when the need is found rather than waiting to include them in a larger project. Based on the data contained in the engineers report, the funding amount appears reasonable. 0c-C631OO-C$/ wfCM$DRPT DOC 3 E30YLE