Loading...
Project 161 - Addendum - 2002-04-15 0s,„,,,„„ Project 1112100-161 Water Services for Pump Stations Addendum No. 1 April 15, 2002 Project Specifications: In Section 7 3 Liability Insurance, at the top of page 10 the insurance carrier shall be rated A VII or better instead of A+ XI as written in the Specifications. Plans and Specifications: Bid Item No. 8 shall be revised as follows: Contractor shall delete the cost of constructing the water service, angle stop and repaving in Santa Ana Avenue. Contractor's work shall begin at the angle stop and include all items on the plan past the angle stop. Bid Item No 9 shall be revised as follows: Contractor shall delete the cost of constructing the water service, angle stop, and repaving in the drive area. Contractor's work shall begin at the angle stop and include all items on the plan past the angle stop. Bidders are reminded to signify receipt of this Addendum on page P-8 of the Proposal. Bidder is also requested to confirm receipt of this Addendum by faxing this page to (714) 432 1436. A copy will not be sent by mail. Received by Company Costa Mesa Sanitary District: Engineering Office (949) 631 1731 Administrative Office (949) 754-5087