Project 162 - Proposal - Ennix - 1999-11-16 ENNIX BIO-SERVICES"'
ODOR AND GREASE CONTROL
BIOREMEDIDATION PROPOSAL
t
1
r
Prepared for-
Robin B. Hamers
Manager/District Engineer
Costa Mesa Sanitary District
234 E. 17th Street, Ste. 205
Costa Mesa, CA 92627
3H
l4
(�h'SI
By•
Ennix Incorporated
39212 Big Bear Blvd.
P O. Box 1687
Big Bear Lake, CA 92315
Tel. (909) 878-3388
ENNIX
November 16, 1999
•'.; -.s. Robin B. Hamers
esa Manager/District Engineer
toy Costa Mesa Sanitary District
"?,#) ;:z.-2-1-_, 234 E. 17th Street. Ste. 205
INCORPORATED Costa Mesa, CA 92.627
Subject: Ennix Bio-ServicesM Collection System Pilot Program Proposal
Dear Rob.
Thank you for your consideration of the 100% natural Ennix Bio_ServicesM This proposal offers a
performance guaranteed 60-day turnkey pilot program. The pilot program will demonstrate Ennix
ability to economically reduce and control noxious odors, hydrogen sulfide and FO&G in your collection
system without the use of degreasers and odor control chemicals.
Significant benefits will also accrue in the following areas:
• Improved personnel safety and elimination of citizen odor complaints;
• Reduced system and/or equipment replacement costs due to hydrogen sulfide corrosion;
• Reduced operation and maintenance costs:
• Odor H2S and grease control in downstream lines and lift stations.
As you can see, we have reduced the proposed monthly service fee from $2,850 to $2,350 due to
increased efficiency After the conclusion of the pilot program, the Ennix Bio-Services"' may be
continued by extending the terms and conditions of the Pilot Program Proposal on a month-to-month basis
or by entering into a longer-term service agreement. Services can be expanded to treat additional areas
and pollutants. Program cost is generally more than paid for by reducing or eliminating current or
anticipated expenses for chemicals and feed equipment. system equipment replacement or upgrades and
system maintenance.
Pilot Program Plan
Ennix Bio-Feeders will be installed upstream at two manholes to feed our dry aerobic and facultative
bacteria, target enzymes and mineral complexes directly into the sewer lines. Flow volumes, pollutant
load and conditions within the system determine the feed rates. Once the biological product is in the
system, control of odors and hydrogen sulfide is based upon changing the ecosystem within gravity sewer
lines, lift stations and force mains by reducing old sludge and grease deposits. Old anaerobic slime lavers
are removed and replaced by a beneficial digestive bio-film within the piping and wet wells. Depending
upon conditions in the system, hydrogen sulfide reduction can take place is as little as two to three weeks
or as much as six to eight weeks if there is a significant amount of old deposits. It some cases, it is
beneficial to draw down the lift station and note the amount of debris, grease and sludge accumulation. If
there are large amounts of old sludge and debris, it may be worthwhile to remove as much as possible
prior to beginning Bio-Services. Odor control can then take place rapidly In any case, once the proper
Tomorrow's Wastewater Solutions Today TM
Corporate: P.O. Box 1687 39212 Big Bear Blvd. Big Bear Lake,CA 92315 TEL(909)878-3388,(800)496-0362 FAX(909)878-3389
Regional:469 Turquoise Beach Drive Santa Rosa Beach, FL 32459 TEL(850)267 1617 (800)496-0363 FAX(850)267 1040
conditions are established, economical odor control is ongoing and the newly established bio-digestive
process will keep the collection system and lift stations clean and odor free.
Ennix will provide, maintain and fill all feeding equipment, supply all necessary biological products and
provide service technicians necessary to accomplish program goals. Monthly reports will also be
submitted in which program results will be measured. Prior to program start up, we will submit a
`Service Policy' in which performance criteria will be specified.
All Ennix formulas comply with TSCA and use only ATCC Class I organisms that are naturally
occurring, non-mutagenic, non-opportunistic and non-pathogenic and will not harm personnel, plant
equipment or plant processes.
We appreciate this opportunity to be of service and to support your system operations and maintenance
goals.
Very truly yours,
MA.JJ j
Ted Mullennix
President& CEO
1;.
ENNIX
Ennix Bio-Servicesm Collection System
Pilot Program Proposal
ttstr Client: Costa Mesa Sanitary District
Date. November 16, 1999 Reference: ENX-119911CS
INCORPORATED
,a.
I. Treatment Site: Two application points M.H. 0+00NW (Santa Ana Ave.)to feed 12"line and M.H. (near
FlAcapulco Restaurant on Bristol) to feed 18' line. Both lines flow into Lift Station#I3 on Irvine Ave.
II. Project Specifications:
Plant Design Flow(MGD) Not Applicable Plant Flow,avg. (MGD) Not Applicable
Domestic Sewage (%) 90% Problem Line Distance .6 Mile
Non-Domestic Sewage(%) 10% Problem Line Size 12"/18'
Problem Source Flow(MGD) 0.285 Treatment Plant Type Not Applicable
f
III.Targeted Problems:
Noxious Odors ✓ Fats. Oils & Grease ✓
Hydrogen Sulfide Odors ✓ Hydrogen Sulfide Corrosion ✓
•
IV Pilot Program Demonstration Goals: Reduce odors, H,S levels and FOG build-up in specified sewer lines
and Lift Station to levels specified in Collection System Service Policy Eliminate use of hydrogen peroxide
and degreasing chemicals and related manpower hours. In the first 30-45 days, clean the sewer lines of
accumulated solids and grease. Maintain sewer odors and H,S at levels comparable to chemical treatment. 2)
45'n to 60th day complete line clean up, achieve targeted H,S levels and confirm cost savings.
•
V Terms and Conditions:
A. Monthly Service Fee: $ 2,350.00 (Two thousand three hundred fifty dollars)
B. Pilot Program for 60 days to service specified flow for targeted problems.
C. Payment is subject to Ennix meeting the performance criteria specified herein and/or in the `Collection
System Service Policy which will be completed by Client and Ennix prior to program implementation.
D Invoicing will occur on the first business day service is implemented and be net due within the terms
indicated on the invoice. Sales taxes, if applicable, are included in this monthly service fee.
E. Monthly Service Fees quoted are based upon the preliminary data provided and in Sections 1 through IV If
survey and data gathering confirm materially different flow rates or pollutant loading prior to Program
implementation, a new proposal will be submitted to reflect actual treatment parameters.
VI.Obligations and Responsibilities:
A. Ennix will provide all automated feeding equipment, biological products, program supervision,
performance reports and client personnel training necessary to perform the pilot program tasks.
B. Client warrants that wastewater to be treated has a pH range of 6.5 to 8.5, D.O of 0.1 PPM or greater and
will notify Ennix of the presence of toxic pollutants, chemical usage, maintenance schedules, system
operation changes, chemical additions,variations in the quality and quantity of wastewater to be treated and
upsets or variations in pollutant concentration levels. Client will gather and supply data necessary to
measure program performance including laboratory analysis and personnel to perform program tasks.
li
Ef
AUTHORIZATION TO PROCEED
Ted Mullennix
President & CEO
ENNIX Incorporated
P O Box 1687
'41 39212 Big Bear Blvd.
Big Bear Lake, CA 92315
ENNIX Incorporated is hereby authorized to proceed with Ennix Bio-Services'' treatment for specified
pollutant reduction and control at Lift Station #13 and 12" and 18" influent lines on behalf of Costa
Mesa Sanitation District in accordance with proposal number #ENX 119911CS dated November 16,
1999
;r,
By.
Title
1 Date 1999
Fl
r•.
Client and Program Performance
ENNIX
_ Ennix Bio-Services'~'performance for Collection Systems, Aerobic Digesters, Aeration Basins
and Lagoon Systems has been demonstrated in numerous and challenging applications for the
past four years. Listed below is a sampling of results achieved. Client references are available
1! by request.
rk
INCORPORATED
CLIENT SIZE PERFORMANCE
Municipal WWTP—PA 3 0 MGD Co-mingled Sludge,Aerobic Digester sludge processing
and disposal costs reduced by more than 60%. Electrical
3 ''A Years of Bio-Service's" aeration usage reduced 90%. Prevented fecal re-growth
during sludge storage for up to 6 months and increased
land application rates by 300%.
x. Municipal WWTP—NC 4 0 MGD 5-Acre Lagoon/Digester — solids reduction exceeding
1,800 tons per year. Eliminated hydrogen sulfide,noxious
1 %2 Years of Bio-Service' odors and heavy algae blooms. Reduced ammonia to
re
acceptable levels for WWTP processes and discharge.
Municipal WWTP FL 1.0 MGD Aerobic Digester solids handling and disposal costs
reduced by 50%. Polishing Pond solids reduced by 70%
2 'A Years of Bio-Service" in 6 months. Chlorine use reduced by 75%.
Municipal WWTP—MS 30 0 MGD Collection System — 9 MGD flow Eliminated hydrogen
sulfide and noxious odors, cleaned system of grease and
6 Months of Bio Services" old sludge deposits and reduced BOD loading to the
WWTP by 30+%.
rfi Municipal WWTP TN 0.5 MGD Primary&Secondary Aerobic Digesters—odor problem
eliminated. Solids disposal reduced by 70%. Electrical
t3:
4 Years of Bio-Services"' aeration reduced by 95%. Provided ammonia control to
acceptable standards.
Municipal WWTP TN 0 4 MGD Aerobic Digester — Solids disposal reduced by 65%,
(. electrical utilities reduced by 95%,polymer usage reduced
4 Years of Bio-Services" by 40%, odors eliminated. Collection System Grease
deposits controlled, hydrogen sulfide reduced by 97%.
Aeration Basin Reduced MLSS and improved clarifier
bed settling and percent of solids.
Private Utilities Co—FL 2.0 MGD Aerobic Digesters — solids disposal reduced by 55%,
electrical usage reduced by 95%. Collection System
1 'A Years ofBio-Services" hydrogen sulfide and noxious odors eliminated. Grease
controlled. Pere Pond — removed 75% of sludge,
controlled algae blooms and avoided dredging.
i
'I
d CLIENT SIZE PERFORMANCE
Regional WWTP CA 3.0 MGD Collection System—controlled hydrogen sulfide levels in
enclosed aerated headworks receiving influent from 6-mile
i, 2 / Years of Bio-Service" force main to target levels. Reduced odor and hydrogen
sulfide control expenses by 50%. Improved clarifier bed
settling. Reduced BOD loading to the WWTP by 20%.
Municipal Water District CA 0.5 MGD Collection System — removed grease deposits in piping
and grease mats in lift stations. Eliminated bi-weekly
1 %2 Years of Bio-Services"' cleaning of sewer lines. Maintained effective odor and
1 hydrogen sulfide odor control. Discontinued system s
calcium nitrate odor chemical usage.
} Municipal WWTP CA 1 1 MGD Septage and Grease Waste Receiving Station —
'4 controlled severe foaming problem. Foam layer reduced
it
6 Months of Bio-Services" from average of 3 feet to less than 2 inches. Bacterial
t counts in aeration basins increased 5 fold after receiving
IL biologically rich influent from Septage station.
I
Municipal Water District—CA 0.5 MGD Lift Station — eliminated chronic hydrogen sulfide and
4, noxious odors problem in zero tolerance area. Eliminated
2 1/2 years of Bio-Services"' use of calcium nitrate for odor control and reduced man-
hours spent on line and lift station cleaning by 20 hours per
f week.
Public Works Department CA 0.6 MGD Lift Station —solved severe odor problem that had led to
s, litigation within two weeks. Reduced grease removal
1 Years of Bio-Services"' schedule from lift station from every 2 weeks to every four
months. Eliminated sewer line cleaning for grease
buildup.
tJ
Municipal WWTP CA 1 1 MGD Collection System Grease deposits controlled,hydrogen
sulfide reduced by 97%. Plant benefits include reduced
A 1 'A Years ofBio-Services"' grease entering plant and stabilized BOD effluent.
fi Previously experienced sporadic BOD fluctuations due to
# industrial discharges.
t*
it
4
rti
4.
. . .... �. ....... .. _ .r_'aa_ ..tip.• _ ,r�.r: _
fIleR te•r4}".'• 14- '�+ y sg x..t'F. "_'leis.;„., �*.li-2�r +f"•". u,.c �,5.J , yv .es4 `Tt � s5 r ,,.
t eI W'R -i e,. -A3‘ ` �`1 '., �`y, . e}', ap e 1( ' }.' ,44 r r Y' t
•i 5 yt �cr• t r'. a ,<: -Y3 i'.G`rwr'1" �c {aS "r k7':' ( �, : .�'r ,
I �s� s rs.'4 �.µ ,r?,xy � q[? r .d`V e� -
• d ♦ a se he S `," Or 1 P )"I _ 2 �?I'S+C. i k , q `[- " e # ' '-
" n - i,-.BF� r, ti a :or erv.ice: ,
." G ■ w ua t
try
f,F •.S14:' +. ��• v'^ ' . j t, .,.r 1IS "".` JC' `,f. ?>:...._. `""{,lFJl�?. 'H.ev
Rs 'Tomopo�v s,tewater� ,
k, • ficza
A,,
1 i
"1 ?a t Guaranteed ;"•I
, Cost Effective , , , ! .� ;, • . �, .
Solutions To � a� `
. , v+ r 5%° 74k
li •• Odor Complaints < ' e•---,,,-..r', t ' -,; 4,141'4.:14 6 ‘,„:,,,y04,
'I t t ; It d x•
•-I • Hydrogen Sulfide y, 1:, �.h' - I ,_ t
Gas I"
•
• Fats Oil & Grease ' f , ` 1 t z' r '• volr� r -`� +:"- r `
4a (FOG) , er / 1 � rs ,i'. g r i .r
:j Reduce Expenses -, ` 411 / .*91 . , , ,-..
• Sludge Processing & Ennix is an expert wastewater company providing engineered
Disposal biotechnology service programs for Wastewater
t • Aeration Utilities Treatment Plants and Collection Systems
1 Corrosion Repairs Collection System Program Digester Biosolids Reduction Program
Il The Ennix Bio-Ser'Les" Collection S•stem The Bio-Servicei Digester System Program
Chemical & Polymer Program combines pro-en proprietor prosides managed pollutant digestion and
,.1 Usage biotechnology automatic feeders and expert unparalleled •educ:tons in the cost to process
;,r technical sets ice to achiese the most cost and dispose or 'as"r htosolids (sludge.) Plant
le Operations & n 'e rrea[me t OG st se' cr ode rs, operating and ecsnomic benefits typically
Maintenance hydrogen sulfide and F available in the include 40-60% reductions in solids
market today Bit Service -reates a handling and disposal costs. 30-40%
clean( almost ode r tree oxygen-rich reductions of polymer usag elimination of
kil No-Risk Turnkey 'astc atcr stream and also keeps the 'stem odor control chemicals and up to 85%
-tear of crease build-up. Because the reduction in aeration electrical usage.
Service Programs program is a natural biological process
there are to bdsrdous ibseinte, Indirect Treatment Plant Enhancement Program
• No Capital Investment benefits realized Include plant influent with Bio-Serice- for Plant S, stems not only
,f signiFicantls reduced ROD FOG and provides guaranteed sasings in sludge
Fund from Existing other pollutants. processing and hauling costs. aeration utilits
Budget expenses and chemicallpols me usage, but
1t Polishing Ponds & Lagoon Program also increases overall plant process efficiency.
11 Performance Based
100% Safe for System Ennix Bio-Service has been hilly Significant operating benefits can be
implemented in municipal and Industrial aches ed in clanfiers, aeration basins
polishing ponds and sludge lagoons In these oxidation ditches. trickling filter SBR and
F
S & Personnel applications Ennix li"o-Service- eheaisrev BBC systems. D\Fs drvim beds and belt
Fe and conomicallv reduces FOG bottom presses. 4ddi[ional across the plant process
r'F• solids, 'olatile solids, BOD suspended reduction include odors. hydrogen sulfide,
solids idor. ducks red and algae tats, oil and greas ROD and 11LSS
ilk 1 r•
'w why u^.S,Y+fr. :s°. t,s,.rt mty ea.t.niFrim,rear.,.aN• "•moss—au-..c.' -e,... .a -.,..-.
'1:.. .,.t-��-s x� .:.,,:.�'� ?r.,.'+v.; �'t_!...: ..1,n ..i.•._.nSf;tS .S� X A'ax.a ._ J-.,Lai?. <:., n-. T. �. . .n
' t.' -'.KA'in. . .4.rv..\. :tY ViiZ'',1.. . ;:k,;,:;kiln iA'. ,G'l.°A,-vcb.•!•, .'"``c,YM+,.fl t a 4,1:erk?c5 M. i-14 it r l.-,.ti'4 _., ."'r."+"r'F,g'u4e.'h:l-.aa`:.
" L -.;., r t, ;ilk yr i•s xt _. t: e x nt F ^.+.' material on a timed basis determined bs
. z': ' s,' } w r r �` "r r . 5. ,
'-xP ' -�� b-�.'[r.' 'i 'ti I rY5°` v `E �'f6x � "'" K specific flow rates, pollutant levels, system
�� rs�". t}SKr ( tt .sby b Fb a#7ri'� iLi,,ii4
p Jy;,,rt t v"4 { Ff` 4.? s. t y sr,� wr. .6 : pS1�� y7Yr,-; r layout, pollutant loading data and other
$ -f r's,� 4� } y_ I i / ' ��.1'tci,. ',L•=mot>t z pertinent factors such as the location and•
' 'r 5 ikt 4qv " 1 t r f�fF7•• bi :t'en '1,..,d^t� ,r r, type of trouble areas (see figure.) AutoFeed
Si •t-"••.'• ", F'e �A, -• sr 4. " er i1:2 S-"eryv� t �) is easily installed in wet wells, inside•
n. '' n `'��'' .. t; � ' _ "' ;; manholes or at the treatment plant and does•
; srf v ` r. �...: y ;;n.r�,,,� s`a; ryr„1 ts; not require electricity, water or any type of
$" 3' T � f ` ' `l`���'a••r, :, , housing structure. Personnel and safety issues
t ' L - r are eliminated.
.ate ` •:: w''?wa '
-r tr r xh r
> I3 t+. , j„ur Is? Ongoing Service
' 'ri- x .�;. Regular on-site technical support by trained
(,e.'r r 1 r r r "'''.1%,;••11•'•:•\t rt?i•'•5 t wastewater professionals is an integral part of•
t ��, tys. `i 4. *' the Ennix Bio-ServicesM Professional service
'� lal t•f f z � it
+..rt_,r� sa�''P- yr • ,�.xv , - r, , ,,�, .'r ? allows Ennix to guarantee problem-tree.
Compact, efficient and battery operated, Ennix AutoFeedT t units are easily sustained results. Ennix technicians will
installed wherever odor H S and grease problems are found. supervise installation. perform regular on-site
service, train plant personnel and prepare and
Six key elements ensure the success of submit project reviews.
r Nevada-WWTP Eliminates'AlgaeA, the Ennix Bio-Servicesm
i-and Duckvieed;ReducesUtility ;.
FExpense and Doubles Capacity 1 Advanced Proprietary Biotechnology No Capital Commitment•nsrx� ,�tgtgliiLisixa'x Xa `cTk, � r4t! H' 2. Ennix AutoFeed' Automatic Dispenser The cost of the Rio-Service is typically
. 2fIr-i.,xs... ,�?r tH i,„,,p.,„,„" t>';i'' 3. Ongoing, On•Site Technical Support recouped from savings achieved in item:
�.a024,1 ;S'r'i b1t J3t.e afrt, ri.sR,r,~., 4 No Capital Commitment previousls budgeted for system operation and•
+ittl}r', ' £�Llitr ,i4 - , .Ytl4'ti 5. Dramatic Cost Savings maintenance. AutoFeedT" units and bio-
•Yy-'i%0rt1fi �; '*`c"" '- 1141+s}a., 6. Performance Guarantee formulations are included along with
f'jyC�t '�ii� 441.11 s'' ;riTtl.' ivy.: !Is technical support and project reviews in the
"i'�1!eKr1 t;t T-. ...t.4 ” trpr,.t monthly service tee.
e Advanced Biotechnology
1 t tht r r s CCC"""yM1y c"4, ,5; Ennix bio-formulas are blends of adapted
npiOkf t Yo tr 'efLsa microorganisms, enzymes and supporting bio- Dramatic Cost Savings
L + .
L�h� Y}vo?paaid 'P�gtalf+ ,k:plarh�s� stimulators specifically formulated for Ennix municipal clients realize dramatic cost
to ce 012 s fr1 , +yy , he If.: asterater treatment. The microorganisms savings in the collection system and at the•
( '�1GD) emg Ypraeesagd tLtoug6`3 efficiently process organic rite materials treatment plant by reducing expenditures for
anothewertes o 9tonds.7 Walt &o Ser�viccceeS°'
r . � into environmentally beneficial and odorless mechanical cleaning of sewer lines and lift
treatment, bottom aeration was decreased
from�24�hours ro 0 hours pier da and tapes 'ater. carbon dioxide, pH neutral amino stations, chemical usage, sludge process ins,
.aeration ovas red'ueed from l•2-,1�4xhour's ro�6„ acids and other micronutrients. and disposal. excess manpower and utility
hours per-day. Taal aeration utility usage", usage. These displaced costs typically more
was 1ecr sed % 'Afteri120 days, others' The formulations are 100% natural and than pay for the Ennix Bio-Services" In
€ uitrymeludu ,(s . ' i* " ' ;� s'J' failsafe The contain no hazardous plant and digester programs. En n'c
58%•redtretion'lir Suspended3Solids xen substances and can not harm the environment guarantees minimum combined savings of
-'!�+.EI'm`sna o`°of,hhe try el.lgae d',dduck or create any byproducts that do not already 120% of the cost spent on Ennix Rio-
: za:d:ssocia la or 4•: P
+-andassomatedilaBoreosts 'y:5: ; ' x exist in a wastewater treatment plant Services"
e -'; s-nx-
':°28%decrease in:Yolaiile•Solids'equigalen? ecosystem. Ennis bio-formulas have proven
to 24 tons ofargamid sludge dige-sstion;,s.,, their cost-eftecuceness and performance in Additional savings are generated in the long
The enhanced treatment efficiency,provided' P -
.„. vastesater systems for over five years term by avoiding expensive repairs and
by Ennix Bio-ServicesM will enable the ,
Client to process the total plant Rot': replacement of equipment such as sewer
through the treated ponds and remove the 2 Ennix AutoFeedim lines, manhole covers, pumps and other metal
other aerated ponds from service. This will AutoFeed1" is an auger based, DC powered and concrete components that can be
effectively double both the cost savings dispensing system that delivers Ennix bio- destroyed by hydrogen sulfide corrosion
achieved as veil as the treatment capacity of formulas directly into the wastewater stream. Also, by reducing pollutant loading and
the entire system. The unit dispenses precise amounts of increasing sludge digestion rates, plant
Pi I
♦ treatment capacity can effectively be rc+ "' , !%.5,.4. ``� �a. 4e+
:t( increased without additional capital costs �"p _ - �'�r�G kAt i'f TIZ
Performance Guarantee le-4-1 r „ ' 3r+T ate v' .
•I The unique performance guarantees r ry'^ t,.. - `+,j%,rrk,�F '"•�'^,��t • 4 " ' t, . 3 y r I`." - '+ �,t
extended by Ennix assure that a client f e�k kr+ },� "�i�+•-t'v b°e � + t`r �C�&.g([a�[r�!y�� �j,(' -$`ti•
1 pays only for actual performance results ' .G'�'�.'`sys+ r Ca tai nr : �
achieved Performance is measured against '�"a t7•r*.F c'S&_A <-47'.i '.r ;'4trua'+4r fix- =a s ' .r*' '1-'t!4 "sw' t,
mutually agreed-to baseline criteria t, �'- "` ft ' r? ` 4 t1`�. r
Specified minimum cost reduction Z� tI. ;ea3 Is-I--. n +/ tµ °' t' " ; o ,- 4 '4.T • rrt,
k1y.r r
,e,r •' . ..te' '` "r' ' . t[ia ; 'e :,-...,,,=),-
opportunities are identified and included , a ' � r N .1471,1•1 � ..•I ' +k " s` ' . e
:as part of the performance guarantee. `'u, ss� z i +-fAi,, ��y�F . e � a{ �
. [
. Program Implementation f e A :dr � d w mss t"x �Lc + y �a, �• 5j
1 Ennix Rio-Services" programs are 1 'y' c"'rtv+ . >4 7,.- 'in w"`�' Y4ni41.- "- kre, ii3O' ' s? , ;!,
y guaranteed to solve specific problems and '"�Y4. s..t y •:..A� r!+t"' _ ''i irl '' 4';S4' tot 1 1 ..
I provide operating and maintenance cost Bio-Service Plant System Programs are guaranteed to increase sludge
II reductions in collection and plant digestion and reduce expenses for waste disposal, polymers and aeration.
treatment systems. In order to assure the
client that the agreed upon results -ill be On, the client provide an authorization to
ongoing pertorma ce guarantee significantly
r
,� attained, Ennix technical personnel proceed. our trained personnel install an, red_ce client risk Ennix Bio-Services" and
analyze each potential treatment nee ,ara equipment, cuppl, bio-formulations its performance _uaranteed pilot programs
�+ application after a thorough survey of and start the treatment program. Included in can acute our Best Available No-Risk
'd1 system characteristics. A proposal is then the Bio-Se; ice is thorough operator training Opnortunir to sot a troublesome wastewater
presented identifying client needs, esaluauon and reparom- of treatment results -ollection and treatment stem problems,
Iperformance guarantees and proposed and an, needed troubleshooting cervices. All reduce current operating expenses and
,� service fees for a 60 to 90 day pilot the above components are supplied as part of control rising our -ear costs.
program. Prior to program start-up and a lo, month!, sere ice tee
1 based upon survey information, Ennix and Call Ennui today our national toll free line
the client mutually agree on the treatment In combination, the freedom from capital (S00) 496-0362 [or service in -our area.
1 objectives and the baseline criteria used to tn,estment. a month-to-month service Information can atso be requested by e-mail
I+ measure performance agreement. the economical cost and the at into@ennix.com.
I.
d
• I x r Calwfornra WWTP;Replaices; iii
,r r r x t = r #, f Chemical Controls'HZS'and ; >
:s
rr . :rtl,`�^$ : rz R'a &1fl itionalBenefits5er
.y'ZF7- {Y� R r ��y �. 3�" "i^" .:.�+r".^��xj v+-.: ,i �x :. ayF'y xr•.1 i. w w ',. {
,fir, -., :t 4:1; wx.?;+tz .r .. -- ••Gales m'nttrat w ,etn•' to (n o i
_ " •'•y r , ..tom a 5S----- - errn'cu ei fi •. i , w
ck -a tel ‘ 7, ri „ . , FIi tr tbe'ct) ectt nra•Stem an treatinen
d+{ + ,) ,l,Ifi 4 ` Vic• Y f plan bead or0 a ,,1 t • E nnl,fr.
5 X1c q ) r{. i ti ) ,y t
St i I*.++, - Servtees wa chosruiz' teplac• '+-[his:'•• . as ray nF a Yt -t'k*g'tti x''.j - . t 1 ' } I,t ,.`s 'diem kat itn aft ad onsctattng not
i', tt opt' su err'a " t co too buiral�so the
',/..1}7.-z i f°'?: '�T y r(..t 1* v n �e7. [ ,--f,. r x.i `74.5C.: "".11-k.w< 2 s ' 1f Y p a r P
t ' � ' e ( s ^ .,+�- t"i`, rem'oJal-of, FOG�burd up to these Ilee[Son
— 's > clpU`�Rt �`-�t'et' r .« . �f',y"•?,r r " sfi�. t k'G . � . .., 'V19dY"+.x
Lire.. �, 't x�r.,2 d i.r fir , ".x 4,,r . : yj t system,and at the punt. Additional benefits
-1- oA . r t a.�'sned ti
' 4°',q `d" iki,, --•1 c a ... e Ati:r ~, illeficantlef reduc l'Ievels o"feBOD and
r h$�r ,r �'T,� i.a;cart° 9;11k , '�. z.B ..' 3 Y ,� .
-e-1 Act... , ,c. » r ,•r te .2 r � gasper ded,sdlidi: Sludge settling.was`also
.�%; g �4fa � �l7 r ua ' Ix 1;51 O i_'-" notably improvedr�in the yyse�ondary
s.a;S*i> ,,� a ry ` ?irtr ,g a a'twro !2+A, �.. aIaitFiers �"tBacsed a o .,the succe4hg of'`
< �+-o,f ' .._` °'..'y � #"�{+� r;r<rt`i _•,.}r' ,• tfi "r ; collections "ireaCi :nr,t a
.s.. .Y rt��„ .,. ._ .r. ,.-isr +3dt.s rJ e+a "¢' ystetntreatment, [heWWTPhas-
ry implemented a Plant System Bio-Services"
A single AutoFeed " unit (see arrow dot, ) installed in a manhole replaced this pilot program to reduce sludge wasting and
costly and space consuming chemical storage and feed -ystem without capital cost. associated processing and hauling costs.
t
i
Ennix Bio Service' reduces or eliminates these key pollutants and their associated costs
".-' t sPr',r't '� c. -jtMN ''i olv'' P Sjil a ni ' - Sylfelifi' ' $y tiiiii t5}A;d Pond tiros cv-
-'5yt;7. xotw� trn r rs t� J LP
Hlydrogen SUlfidem t ✓ ✓ ✓ ✓
word :-` , h: ,n< Y i;� ✓ ✓ ✓
.`r: 1 o .l Pt F'v r e J,t W„ ✓
SIUd9 itit -4s.,, w ire a t7 r t/ ✓ 17 1.-
✓ ✓
eo's•t Sa '`nlg's '
wistat.dt �1y
Aerati � �tilitiesW • . . . t•
y try., ✓ ✓ ✓ ✓
Pol mess / e emicalst—tar• - ;.:
i ✓ ✓
I
Slgdge Proces sing /Disposal ✓ ✓
When implemented as an auxiliary to a mechanically sound system Ennix Rio-Set lc prt ran r {u,tranrecd to solv
specific problems and pri rde uperatinv and maintenance cost reductions. Perform Inc uarantee a sur that .t -lient pay I
only for actual p f rmanc result achie ed.
Tnnesssee,WWTP Solves,
Ennix Bio S e r v i c e sM lIf;mmonia;Problein CutstCosts'
THE 100% NATURAL REMEDIATION SOLUTION tandReduc�sSludge'Hauliny '.,
i R '`l ? �� This W10rTP receive ttfluea wttb am o t .
5014 $e°rels 6F 255to 30 pp .prrn pally sal ut t.
z ORGANIC'SOLIDS ; HYDROGEN SULFIDE of wastewater f�om [ o �eavdiroath d
r "6 ' r roadsiAP °r'Pe area' ast E odlre tantantvand;`
°DESTI{UCTION # »'ODOR CONTROL' t. tourist stotprahe nutld riIiii of ',
a: z FOG, od'orsr and HtS m the olle°�c[ttin
%T `,
s stem. Hi b rates of mfittrauon
ytrus.ion ,g x
m«uston were rseverely curtailing plant:.
:trmass, microbiil Inds ands slndgb=
, ice: �.
digeson 'at�ihe «atmcnt plarit:.�Hi
• Guaranteed Performance Anintiiie i siadge and aeratti nrtutitity
'costs weree.eiaceibated -b-y c silyy `'liquid-
• No Capital Outlay Required ftw Tana=pPlic> n~-z ` •
Ah'combin d.B 5 ivic m ro ram°fo the
• Self funding From Budget collection system,plani iys em and`aaobic i
• Controls Out year Expenses digester was implemented to assist the city ,
to meeting ammonia discharge levels, i;Tit;
increase sludge digestion,and control odor,
• Conserves Financial Resources H,S and FOG problems. After 60 days of
treatment, this integrated approach
produced the Following results:
s ' '.,, ;=yc x'r • Plant ammonia discharge levels were
''' ' e`Y.tStt ,.0 is " n' � reduced br's0°'o
OPERATING COSTS`; k 'ENVIRONMENTAL " • H.S,odors and FOG problems sere solved
4 T • Plant MESS vas reduced '_0°o and sludge
4 "COMPLI'A`NCE
z' w REDUfTION , "F F wi hauled born ,tie digester educed hs 65%
.,:at;-..,:..,D-w-,:+ ?"e+- .. • Aeration mill: usage m the digester was
, „` `•�: reduced S5°° and plant act arion by 25%
ENNIX CORPORATE OFFICE ENNIA cGIOtIAL OFFICE.
P 0 Bo. 1687/39212 Big Bear Blvd Big Bear Lake, CA 92315 469 Turquoise Beach Dr. Santa Rosa Beach, FL 32459
Phone (909) 378-3388, (800) 496-0362 Fax (909) 878-3389 Phone. (850) 257 617 'a' (850) 267 1040
E-mail mto@ennix corn roll tree Phone (800)496-0363
Tomorrow s Wastewater Solutions Today TA'