Loading...
Proposal - Hamers - 2000-12-06 ® ROBIN B. HAMERS 234E 17TH ST. SUITE 205 & ASSOCIATES, INC. COSTA MESA. CA 92527 CIVIL ENGINEERS • PLANNERS • SURVEYORS (9497 546-1192 FAX(949) 548-6515 December 6, 2000 Board of Directors Costa Mesa Sanitary District 77 Fair Drive Costa Mesa, CA 92628 RE. PROPOSAL TO BEGIN DESIGN PHASE PROJECT 1112100-165 REHABILITATE CANYON PUMPING STATION FORCE MAIN Dear Board of Directors: Enclosed is an excerpt from the Fiscal Year 2000-2001 Capital Improvement Program (CIP) outlining the existing condition of the pressurized sewer main(force main) in Wilson Street and the need for its rehabilitation. As described in the CIP the line is deteriorating and has failed twice. It is proposed to take advantage of trenchless technology and rehabilitate the pipe line interior using one of the half dozen, no-dig methods. No-dig methods such as slip-lining allow a new pipe to fit within the existing pipe without excavation from the street surface. The project will be bid in a manner allowing the traditional excavation method as well as no-dig methods to achieve the lowest price. In addition to the project description in the CIP also attached is the independent review of the project by Norris-Repke, Inc. civil engineers. It is proposed to complete the design phase engineering at the following hourly rate, not to exceed $13 125 Engineering $ 63 00/hr Surveying(2 man crew) 160 00/hr Sincerely ncer V' Robin B Hamers el Printed on Recycled Paper.