Loading...
Project 166 - Warranty - Sancon - 2005-07-01 RU5-04-2005 12 01 RobHamers P 02/02 SANCON ENGINEERING INC GENERAL ENGINEERING CONTRACTOR Tel (714)891-232 STATE CONTRACTORS LICENSE#731'97 Cl ASS A Fax (710 891-2524 WARRANTY Owner Costa Mesa Sanitary District Project: Manhole & Pump Station Coating Project # 1112100-166 Lift Stations: Elden, 23`a Santa Ana, Gisler California, & Harbor Manholes: As noted on the project plans Contractor Sancon Engineering, Inc Warranty Period: 7/2005 — 7/2010 SANCON 100 & 200 POLYURETHANE PROTECTIVE LINING Sancon Engineering, Inc. warrants its Sancon 100 polyurethane protective lining system to be free of defects for a period of five (5) years from date of installation During the warranty period, Sancon Engineering, Inc. will repair any defects resulting from improper installation or faulty material in an expeditious manner usually within 10 working days of notification, under similar site conditions as the original work was performed. No cost will be borne by the owner for labor or materials to perform these repairs. Inspections should take place at regular intervals to insure prompt attention to any questioned areas. Failure to notify Sancon in a timely manner of such an occurrence may void this warranty No cost will be borne by the owner for labor or materials to perform these repairs. Sancon Engineering, Inc. makes no other warranties concerning the product or installation. No other warranties, whether express or implied shall apply In no event shall Sancon Engineering, Inc. be liable for consequential, incidental damages or costs thereof SANCON ENGINEERING, INC. /841 Lnginccr Drive Ile uungton ch. CA 9 2649 TOTAL P 02 RU5-04-2005 11 59 094 P 02