Loading...
Project 166 - Proposal - Sancon - 2004 -05-26 PROPOSAL PROJECT NO 1112100-166 MANHOLE AND PUMP STATION COATING AND MISCELLANEOUS WORK TO THE BOARD OF DIRECTORS COSTA MESA SANITARY DISTRICT 77 FAIR DRIVE COSTA MESA, CALIFORNIA 92626 GENTLEMEN In compliance with the NOTICE INVITING BIDS for MANHOLE AND PUMP STATION COATING AND MISCELLANEOUS WORK which is hereto attached the undersigned has ca_efully examined the location of the proposed work the plans specifications and other contract documents the efore and is satisfied as to the conditions to be encountered as to the character quality and quantity of work to be performed and materials to be furnished as -c the requirements of the specifications and the contract It is mutually agreed that the submission of a proposal shall be considered prima facie evidence that the bidder has made such examination If awarded the contract the undersigned agrees to commence work under the ccntract within ten calendar days from the date of the contract and to complete said work within one hundred twenty (120) working days from the first day of commencement of said work unless legal extension is granted in accordance with the terms set forth in the specifications and to perform and complete the work as shown on the plans and in accordance with the specifications and other contract documents and to furnish all labor materials tools and equipment necessary tc complete the we K in place in the manner and time prescribed at the following prices o wit PROPOSAL SCHEDULE Item Approx Item with Unit Price Unit Price No Quantity Written in Words Figures Total 1 L S Repair e _isting manhole #1 for TWtrry uNf /(t/N1)M1SO S x!y Dollar and O Cents $ L S Z 8(00 -- per Lump Sum 2 L S Repair existing manhole #2 for 17!. .1 4 e tr _ vNDM1m'D CIxTi Dollars and o Cents $ L S $ 2 , SGO pet Lump Sum P-1 Bidder s Initials 3 L S Repair existin manhole #3 for Dollars and 5°C' _ _C_ent_s $ L_ S $ Z , 8 <oo per Lump Sum 4 L S Repair e:.istinTg manhole #4 for D / !No_` CAUS ,.Q_. d- ,r\oc'- c xtz-- Dollars and u Cents $ L S $ Z, 800-- per Lump Sum L S Repair existing manhole #5 for / / a � G q -ha,di X14_ Dollars and Cents $ L S $ Z, 8ho - per Lump Sum 6 L S Repair existing xi/sting manhcle #6 for Dollars and f Cents $ LT S $ Z F3 4, 0— per Lump Sum 7 L S Repair existing man oleo #j7 for �j�� Dollars and �7 U Cents $ L S $ 2 8(0o --per Lump Sum lll"' 8 L S Repair existing manhole #8 for % Dollars and Cents $ L S a Z SGv - per Lump Sum 9 L S Repair existing nhole #9 for /mod`t1auJ I Au-n,bric li Dollars and //l ' Cents $ L S $ Z $(0� — per Lump Sum C 10 L S Repair existing manhole #10 for Dollars and Cents $ L S $ Z QC, o — per Lump Sum Al P-2 Bidder s Initials 544 11 L S Repair existing m Whole # 1 for / --_7;30 QIXACial4 Pr/ CA tf74 Dollars and ,gY —. cents $ L S $ Z, °Coo - per Lump Sum 12 L S Repair existing ma hole #12 for Dollars and Cents $ L S $ z So - per Lump Sum 13 L S Repair e .isting m Whole #13 for �I Dollars and Cents $ L S $ 2 goo- ' per Lump Sum 14 L S Repair existing manhole #14 for 76,30 cilai ou,rdzid.61,1 &ul ct4 Dollars and /a -Cents $ L S $ £360 — per Lump Sum J� 15 L S Repair existing an24 15, for G Dollars and Cents $ L S $ a gCoo — per Lump Sum ///��� 16 L Repair existing manhole #16 for /Rio * 4d / t Jred e Dollars and eim -- Cents $ L S $ 2 Snoo - per Lump Sum r 17 L S Repair existing manhole #17 fo �,� 7e/di) ` hoxi S Loll tuAdle_ dch '0 Dollars__and_ Cents $ I S $ 21 SGo _ per Lump Sum 18 L S Repair existing manhole #18 for t/mod (#d :&irZe 1p l Dollars and X ents $ L S $ Z e c ,v — per Lump Sum P-3 Bidder s initials OA 19 L S Repair existing manhole #19 for r H uo *4q S ho Kc $ c .1 Dollars and ,'y_�,± Cents $ L S $ 2 3coo- per Lump Sum 20 L S Repair existing manhole #20 for rwo 7HUJSPrrab 4c.6_I7" µ,NJ(t1+ Sixy Dollars and Cents $ L S $ 2,g(win— per Lump Sum 21 L S Repair existing manhole #21 for rut- T/4U-.G:- Snnoi-'T KUND,'D .Sixri Dollars and Cents $ L S $ S 84V — per Lump Sum 22 L S Repair existing manhole #22 for _ t1 ?1 +0 4ic9 .r F4Jrt•th 5 x"ry Dollars and -'-t�0..0 Cents $ L S $ 2, 3(00 -- per Lump_Sum 23 L S Repair existing manhole #23 for Two r1 4.0o>,>-.+1) S,vKr fLvNgPCO S.xr� Dollars and 472-0 Cents $ L S $ 2, ieco - per Lump Sum 24 L S Repair existing manhole #24 for -7-2;p." S-ea r ota S1 fry Dollars and _[/2-c )Cents $ L S $ 113 84,0 — per Lump Sum 25 L S Repair existing manhole #25 for Two TM wsA..f D S I ko r c) .S/h T/ Dollars and .24/v' Cents $ L S a 2 g6.0- _ per Lump Sum 26 L S Repair existing manhole #26 for -r1,a TH-o'u-ss-N D 5.,, r 1-147N48..D .S/ver-f Dollars and n-4-o Cents $ L $ Z. moo, per Lump Sum P-4 Bidders Initials vA 27 L S Repair existing manhole #27 for ._71✓O 77-401-,4-A/0 S/4-ter Alm4W0 sixr✓- --- i Dollars _and __2A-.- ce,v-rs Cents $ L S $ -Z gC:po-- per Lump Sum 28 L S Repair existing manhole #28 for lkt& nfouf?.vo 6/4N1 #7.4w J)- 'KrY _. Dollars and - 2,,E2a c ✓TS Cents $ L S $ z, Scoo per Lump Sum. _ - 29 L S Repair existing manhole #29 for 7!✓V fl gS,WILL!4Kr 4o!beet-b suerr ---- _ _ -- Dollars and f+?° Gfr✓ri- Cents $ L S $ Z sc.() — per Lump Sum 30 L S Repair existing manhole #30 for floe 7/14'w5,4-,,.'12 tiker Ng(,oAt) sLt'ry Dollars and '2t o Cents $ L S $ 2 gc0o — per Lump Sum 31 L S Repair existing manhole #31 for T:"J w5A70, 41dar . tbrA4t) s7gc' Dollars and ?ten-' Cents $ L S $ a eco — per Lump Sum 32 L S Repair existing manhole #32 for -ma Tl4 riel gi ct r AtieV?/i9 5-«.y Dollars and 2E4-9 Cents $ L S $ a .86, o -- per Lump Sum 33 L S Repair existing manhole #33 for 34!62 907sfA4✓"04 ttd/fr /4."(4p Dollars and PLR.. Cents $ !. S $ z $6J _ per Lump Sum 34 L S Repair existing manhole #34 for Dollars_ and WAD _ Cents $ L $ Z gCno _ per Lump Sum P-5 Bidders I„itialsj 35 L S Repair existing maaan_nhole #35 for ! � - Dollars and I Cents $ L S $ `Z, $rov- per Lump Sum 36 L S Repair existing manhole #36 for e Dollars and i Cents $ L S $ Z 8cao- per Lump Sum 37 L S Repair existing manhole #37 for Dollars and 0( Cents $ L S $ Z , 8coo - per Lump Sum 38 L S Repair existing manhole 38 for ��7 - 7 �4c7 yC x> Dollars and fl Cents L S $ Z E3Go — per Lump Sum 39 L S Repair existing manhole #39 for Dollars and U Cents $ L S $ Z, SGo- per Lump Sum 40 L S Repair existing manhole 0 for X:-r <fil-r t/' 1'l'��' _5 XA Dollars and Cents $ L S $ Z, 8 6o - per Lump Sum 41 L S Repair existing manhole #41 for Dollars and Cents $ L $ $ 2 Boo — per Lump Sum 42 L S Repair existing manhole 4/442 fcr Dollars and r Cents $ L S $ 2 gt,v-- per Lump Sum P-6 Bidders Initials ' I 97 L S Repair existing manhole #47 for Dollars and 94 Cents $ L S $ 'Z S coo- er Lump P Sum 48 L S Repair existing manhole #48 for 7,-, 22-7 Dollars and la Cents $ L S $ .t ecoo-- per Lump Sum 99 L S Repair e-listing manhole #49 for Dollars_ and Cents $ L S /$ z, Seoo — per Lump Sum 50 L S Repair e- exist_inngg manhn�lee #50 fDr 972 11.77 i /x5,Yv2 s Dollars and jef Cents $ L S $ 2, 5360-- pr Lump Sum 51 L S Repair existing manhole #51 for -X ollars and ✓ j Cents $ S $ z $60— per Lump Sum J" 52 L S Repair existing manhole #52 for :1 / r �t / `�'�� 2i' 7-Y-711/7/ Dollars and }el Cents $ L S a gLoo- per Lump Sum /// 53 L S Reoai existing manhole. #53 for Dollars and Cents $ L S $ 2- g co O _ per Lump Sum 54 L S Repair existing manhole #54 for Dollars and _ _ Cents__$ L S $ Z E3Cw-- per Lump Sum P-7 Bidders Initials 3■A 55 L S Repair existing manhole #55 frr top AND 4wr4r 1-l.,N`Jti-t.1, 5 jC y Dollars and 0 Cents $ L S $ 2 °coo- per Lump Sum .36 L S Repair existing manhcle #56 far -rwo rH naN Sal.tAr +-l✓NDalD 5i/Cry Dollars and o Cents $ L S $ Z! 86 0— per Lump Sum 57 L S Repair existing manhole #57 for "roo MOJSAlob 4LS.-er f{✓NV)a-'LO 5 7- 7 Dollars and o Cents 4, L S $ #ver per Lump Sum Zf tS(o o — .,c L S Repair eAisting manhole #58 for TRcQ1#4b cf(>NT t1✓ArDAt SIX r7 Dollars and a Cents $ L S $ Z! Soo— per Lump Sum 59 L S Repair existing manhole #59 for T'Ac 7- 80-)sAWD SloNr /1UNDIwA fir?) Dollars and o Cents $ L S $ Z WOO— per Lump Sum 60 L S Repair e. isting manhole #60 for Two TH o054AOS ¶ M r ✓.1 D Si r rr Dollars and 9' Cents $ L S S Zf Bl6O- per Lump Sum 61 L S Repair existing manhole #61 for - -vp r Roos A-Al E c[, 1- >-lw rsr t Dollars and _ _ 6/ Cents $ L S $ Z G O per Lump Sum 62 L S. Repair e isting manhole #62 for TWp 'r-140JShans 5■tofr!r rtamJ-t,cD S 'Cry Dollars and Cents $ L S $ Z s o per Lump Sum 9-8 Bidders Initials Bk1 63 L S Repair existing manhole #63 for TWo Ttt,WSPWA 1•IJNDA-4D Si xr i 45 Dollars and o Cents $ L S $ 2Scp0 - per Lump Sum 64 L S Repair existing manhole #64 for 'r•WJ 'T{AO.J$ANb c.(oHr N.,vnticJ 3 Xry Dollars and ES Cents ° L S Z 8c0o — per Lump Sum 65 L S Repair existing manhole #65 for Tw J .'r AQ r!. t b rcr KJr4 -O S ,cry Dollars and o Cents $ L S $ z, wo0 — per Lump Sum 66 L S Repair existing manhole #66 for Tv.1•3 tort' -"J°Rcb S xrj Dollars and e, Cents $ L S $ Z $t0o - per Lump Sum 67 L S Repair existing manhole #67 for Tw TKCJSAJQ Stt.KT N l Pft1D 5 iKYY Dollars and o Cents $ L S $ Z 860 — per Lump Sum 68 L S Repair existing manhole #68 for •TKovsAt a - 50.Ar Y1.rvrmo -awry Dollars and O Cents $ L S $ 2,6600 — per Lump Sum 69 L S Repair existing manhole #69 for Tw, TH.0051401 4 betT rlOtiO-e-- 5' xry Dollars and Cents $ L S $ 2BE,0 — per Lump Sum 70 L S Repair existing manhole #70 for -/-WD 71460.5A- l> ci.sore r /-{JWow.t> 5-> rt 245 Dollarsand O Cents $ L S $ per Lump Sum P-9 Bidders Initials BA 71 L S Repair existing manhole #71 for Two 714O_'SA.JD dticafrir 1'itNW" $/XT7 Dollars and _fj Cents $ L S $ Lao - per Lump Sum 72 L S Repair existing manhole #72 for two cic0i- - )-tywv .tD Snstf Dollars and 0 Cents $ L S $ 2, 2f=&° per Lump Sum 73 L S Repair e_isting manhole #73 for Two 11APJSa-a cciekai NaQn+tCD Srxr, Dollars and 0 Cents $ L S $ 2 , 2,coo — per Lump Sum 74 L S Repair existing manhole #74 for 7'-vJ0 j}louSA.Jl7 4uva1T RoatgtSJ 50"-) Dollars and O Cents $ u S $ Zlecoo — per Lump Sum 75 L S Repair existing manhole #75 fcr TRID rJD I-hr-oNb SIX-7 Dollars and 0 Cents $ L S $ 2 , 8(00 - per Lump Sum 76 L S Repair existing manhole #76 for etuNDau› S1x T� Dollars and p _ Cent_ s $ L S $ Z,g(00— per Lamp Sum 77 L S Repair existing manhole #77 for -moo YNaA:W.e 54()µt JAJNPAA (x12-) Dollars and p Cents $ L S $ Z 560 — per Lump Sum 78 L S Repair existing manhole #78 for Tia> r?Vuc r0 r'i( •a r r L-ry Sin77 Dollars and p Cents $ L S $ Z- @Ga- per Lump Sum P-10 Bidders Initials 79 L S Repair existing manhole #79 for txcnrr Mo NP1K n Sw4-1y } Dollars and o Cents $ L S $ 2 Soo-- per Lump Sum 30 L S Repair existing manhole #80 for Ywo Tvtoxiva? -tr {YL✓+DAio-, • ,x*-r Dollars and v Cents $ L S $ 2 e coo-- per Lump Sum 81 L S Repair existing manhole #81 for -rNO rµovsoa-. ' Nor—'r poNNnn Siwry Dollars and 0 Cents $ L S $ Z, ,G O — per Lump Sum 82 !, S Repair existing manhole #82 for 71;•0 -Iowa-fa Cs,co-r L/wu o vkA .S my Dollars and o $ L S $ 2 Soo - per Lump Sum 33 L S Repair existing manhole #83 fer Two TNky5s-JD- 5c('+T HMDtt s/K/ Dollars and o Cents $ L S $ Z 6Go — per Lump Sum 84 L S Repair existing manhole #84 for Tc„>o T44-Q1-7S.“4 i- c_ tr rt 0 r4 O i Sb ,S ITC ry Dollars and_o Cents $ L S $ 2 G6o — pel Lump Sum 85 L S Repair existing manhole #85 for "Two TKooSA.A. Ino{ir f/JNOlso Dollars and _0 Cents $ L S $ 2 & o — per Lump Sum 86 L S Repair existing manhole #86 for T+o iotrin,JD lt/ur 4WD4GD Dollars and 0 Cents $ L S $ 2 86„0 — per Lump Sum n,� P-11 Bidders Initials iI 87 L S Recoat Elden Pumping Station interior with Sancon 200 or approved equivalent for 5s Jr,rr7 S1J' Tlao.nr4vl, rc,o& N4JO&-«5 C <r� Dollars and 0 Cents $ L S $ " :9-, L4.5-0 --- per Lump Sum 88 L S Recoat 23`a Street Pumping_ Station interior with Sancon 300 or approved equivalent for 5%)cry_ Tir O TKO.frtaD ¶Au .f Ka vJtA s r ><s7 Dollars and c> Cents $ L S $ Co2 1.5o -- per Lump Sum. 39 L S Recoat Gisler Pumping Station interior with Sancon 200 or approved equivalent for E -- .s THoataaaj rwu No N Daces SS V 13. '1 Dollars_and _ o Cents $ L S $ 14 1:1-o — per Lump Sum 90 L S Recoat California Pumping Station interior with Sancon 200 Or approved equivalent for 'rN� (fir i THamt 71-4005401 two SIONrO PV,b Dollars and o Cents $ L S $ 35 , 200-- per Lump Sum 91 L S Recoat Harbor Pumping Station interior with Sancon 200 Or approved equivalent for Slxr�_ 4�U_NV Tno.nnJ\ F,vet. a,rvi> r' tcrr 7 Dollars and O Cents L S $ G29 5So - per Lump Sum 92 L S Recoat Saata _Ana Pumping Station interior with Sancon 220 Or approved equivalent for SI sr7 G,rc THq✓5 itac vN1»J F FTY Dollars and _ o Cents $ L S $ G>5 3So per Lump Sum 4s4S/ S3o — 1-v.E L/VNOIt.s. ak4 t TNUOSNNb, P-12 Bidders Initials 10' The Contractor agrees that the District will not be held responsible if any of the approximate quantities shown in the foregoing proposal shall be found incorrect and he shall not make any claim for damages or for loss of profits because of a difference between the quantities of the various classes of work as estimated and the work actually done If any error omission or mis-statements shall be discovered in the estimated quantities it shall not invalidate this contract or release the Contractcr from the execution and completion of the whole or part of the work herein specified in accordance with the specifications and the plans herein mentioned and the prices herein agreed upon and fixed therefore or excuse him from any of the obligations or liabilities hereunder or entitle him to any damages or compensation otherwise than as provided for in tois contract The Contractor agrees that the District shall have the right increase or decrease the quantity of any bid item or portion of the work or to omit portions of the work as may be deemed necessar, or expedient and that the payment for incidental items of work not separately provided in the proposal shall be considered included in the price bid fcr other various items of work Accompanying this proposal is A L30DVELS tor ) ($ 10 aio of Sib A..r NOTICE Insert the words Cash Certified Check or Bidder s Bond as the case may be in an amount equal to at least ten per con- of the total bid price payable to the Costa Mesa Sanitary District P-13 Bidder s Initials i til# The undersigned deposits the above named security as a proposal guaranty and agrees that it shall be forfeited to the Costa Mesa Sanitary District as liquidated damages in case this proposal is accepted by the District and the undersigned shall fail to execute a contract for doing said work and to furnish good and sufficient bonds in the form set forth in the specifications and contract documents of the District with surety satisfactory to the District within 10 Days after the bidder has received written notice of the award of the contract otherwise said security shall be returned to the undersigned Respectfully submitted Name Contractor Title Street BY Title City State Zip Contractor s License Expiration Date & Classification Business Phone Number Name Title Residence Phone Number Residence Street City State Zip I declare under penalty of perjury under the laws of California that the forgoing is true and correct Dated at ______ ____ ____ _______ this______ day of ___ _ 2004 the State of (Signed) The full names and residences of all persons and parties interested in the foregoing proposal as principals are as follows Q�� P-14 Bidder s Initials T1 Ii 1 NOTICE Give first and last names in full in case of corporation give names of President Secretary Treasurer and Manager and affi corporate seal in all cases of partnerships and joint ventures give names of all the individual members I '•� ct Y Ri 6r�EDt,ZO �1SS 6„ti StPN W ti$ PJ e1j N o N,o5W..)o ScjL CONSTRUCTION PROJECT REFERENCES In order to more fully evaluate your background and experience cr e project herein proposed it is requested that you submit a list of Works and/or similar construction projects completed or in prog ess within the last 24 months Your cooperation in this matter is greatly appreciated DATE PROJECT AGENCY S CONTRACT AWARDED AWARDING AGENCY ADMINISTRATOR SEE' A'TrPK.KS. Bidder shall signify receipt of all Addenda here if any --- -- Addendum--No Date Received Bidder s- Sign-a-tare- P-15 Bidder s Initials - Sancon Engineering Annual Manhole Rehabiliation Contracts Revised 2/15/2003 AGENCY CONTACT PHONE CITY OF BUENA PARK JIM ELLIS (714)562-3701 COSTA MESA SANITATION DISTRICT ROB HAMERS (714)631-1731 CITY OF EL SEGUNDO GARY MORRIS (310)322-4670 EL TORO WATER DISTRICT WES MAUTZ 949-837-7050 CITY OF FOUNTAIN VALLEY Pat Danahy 714-593-4611 CITY OF HANFORD Mike Wegley 559-585-2556 IRVINE RANCH WATER DISTRICT A.T KILANI (714)453-5749 LAKE ARROWHEAD COMM.SVCS. DIST TONY GRADILLIOS (909) 337-8555 X 232 CITY OF LAGUNA BEACH Cloy Thompson 949-497-0765 LEUCADIA WATER DISTRICT Tom Zuniga 760-753-0155 CITY OF LOMPOC DALE DUCHARME (805)736-5083 CITY OF NORCO STEVE JAYNES (909)270-5607 CITY OF OCEANSIDE RAY LABELLE 760-435-5935 ORANGE COUNTY SANITATION DISTRICT MIKE MCCUSKER (714)962-2411 X7212 CITY OF OXNARD DOUG CARLSEN (805)271-2208 CITY OF PASO ROBLES 1ED MOLDREM (805)237 3865 CITY OF PORT HUENEME (BRIAN FOMENKO (805)986-6509 CITY OF SAN DIEGO I Craig Whittermore 858-292-6471 SOUTH COAST COUNTY WATER DISTRICT I Ernie Garcia (714)499-1349 VALLEY SANITATION DISTRICT I DAN CAIN 1760-347-2356 DESIGNATION OF SUBCONTRACTORS In compliance with the Subletting and Subcontracting Fair Practices Act being Sections 4100-4113 of the Government Code cf the State of California and any amendments thereto each bidder shall set forth below the name and location of the place of business cf each Subcontractor who will perform work or labor or render service to the prime Contractor in or about the construction of the work or impro^emen in an amount in excess of 1/2 of 1% of the prime Contractor s total bid and shall further set fortn the portion of the work which will be none by each such Subcontractor Only one Subcontractor for each such portion shall be listed If the Contractor fails to specify a Subcontractor for any portran of the work to be performed under the contract he shall be deemed have agreed to perform such work himself and he shall not be perms en to subcontract that portion of the work e. cept under the condi .irs hereinafter set forth Subletting or subcontracting of any portion of the work to which no Subcontractor was designated in the original bid shall only be permitred in cases of public emergency or necessity and then cnly after a inding reduced to writing as a public record of the Legislative Body o he owner Portion State License Of Work Subcontractor s Name and Address Number Class ByPnss CnP(AlaS ICaN4 ar-fA0.1 •3"L5(o A COf■leto enk Au 'J1(ONA•-- VA CA qo -sS P-16 Bidder s Initials Mar 26 2004 II 38AM SANCON No 9331 P 2/2 BIDDER S BOND TO ACCOMPANY PROPOSAL #148 65 68 (Required if the bidder desires to submit bond instead of a cashier s check) KNOW ALL PEOPLE BY THESE PRESENTS That we SANCON ENGINEERING II INC as principals and INSURANCE COMPANY OF THE WEST as surety are held and firmly bound unto the Costa Mesa Sanitary District a special district organized under the laws of the State of California and situated n Orange County in the sum of TEN PERCENT OF THE TOTAL AMOUNT OF THE BID IN DOLLARS ($ 1O ) to be paid to the District its successors and assigns for which payment well and truly to be made we bind ourselves our heirs executors and administrators successors or assigns o_n and severally firmly by these presents THE CONDITION OF THIS OBLIGATION IS SUCH, That if the certain proposal of the above bounden SANCON ENGINEERING II INC , is accepted by the Costa Mesa Sanitary District and if the above bounden, SANCON ENGINEERING II INC , his heirs executors administrators successors and assigns shall duly enter into and execute a contrac for such construction and shall execute and deliver the LABOR AND MATERIAL and the FAITHFUL PERFORMANCE BONDS described within 10 days (not including Sunday) from the date of the mailing of a notice of t.,e above bounden SANCON ENGINEERING II , INC by and from District that said contract is ready for execution, then his obligation shall become null and void, otherwise it shall be and remain in full force and virtue IN WTTNESS WHEREOF We hereunto set our hands and seals this 26th day May of 2004 SANCON ENGINEERING II INC BY � p � I INSURANCE COMPANY I THE WEST BY Michael R L ngan (ittorney in Fact P-17 Bidder s Initials CALIFORNIA ALL.PURPOSE ACKNOWLEDGME[N]T �cce':r.tcc& cC: '.crcricr: .crw:cr` ' -c-s::,e ccf'-.crcr ,c:c,ncrc-cce,c--n ':c':t..xwc ,ccegc.c ,c�'cr'-c�'tir�r, Y t, Y.< State of California 55. p County of Los Angeles n P fl: On May 26 2004 before me, Katherine L. Banks, Notary Public Y Date Name rid Title of Ottic (e g 'Jo. Do Notary Public") Li personally appeared Michael R. Langan Name(s)of Sign r(s) r] P.P 3 personally known to me e. (II to me on the basis of satisfactory r� P evidence A, to be the person whose name$* is/are P subscribed to the within instrument and acknowledged to me that he/S executed . the same in his/» authorized PPP 0 KATHERINE L. BANKS capacity q, and that by his/I St COMM. # 1337229 < signature($ on the instrument the personO, or 4 " NOTARY PUBLIC CALIFORNIAN the entity upon behalf of which the person($ 15 > ,�`, J LOS ANGELES COUNTY .% acted, executed the instrument. h / My Comm.Expires Jan.31,2006 .5 r WIT ESS • y hand, ^a� offici I se� � a 7i�tan ,,P Place Notary Seal Ahoy Signatu oI Notary Public 2); fi OPTIO i,AL 0 Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document fr, pTitle or Type of Document: Bid Bond n P r p Document Date: Number of Pages: r) P r, A, Signer(s) Other Than Named Above' p Capacity(ies) Claimed by Signer el P Signer's Name: Michael R. Langan Rloirrn UMSPRINT 9, 8 ❑ Individual oli No. 0000952 ICW GROUP Purer of Al tornet Inst nee Company of the W st Th Explores lust nt Company Independent Casualty id St rely Comp iv KNOW ALL MEN BY THESE PRESENTS That Insura tee Company of the West,a Corporation duly re. d ider the la )f th State if Cab ft The E.xph rer Insu C' ipa a Corps an duly igai'zed under the lax if th State of Ariz( and Independen Casualty and Surety Compa ry,a Corporation duly ed tdei th la if the State if xas (collect] ely referred to th 'Compa 'I,dc hereby app( nt MICHAEL R. LANGAN the tr and lax'Inl Attorney(s)- -Fact with authn sty to date xecute, 'g' al, ad deliver behalf of the C tp n' fidelity and surety bonds tdertaku and othe sim'la contr its ofsureta ship, id ay related docui nts In vanes vhereof,the Cc tpames have cat' ed th pr sews R he executed by its duly nh( zed WTI th 16th day ilia wary,2001. µn 4,4oYrµrn QtRSUq' hex Mp.G INSURANCE COJIPANY OF THE WEST 3p nwMt 44 @F'ev°44;,N, e, $ T, ,� THE EXPLORER INSURANCE COMPANY SEAL_ n K INDEPENDENCE CASUALTY AND SURETY r a \ tin ~ I:,'In+ox• ii.e./ \ a i COMPANY clorotsd crrtfc......- • Joh I I.Cr As sta it Sc etary John L.Hai nut Executive Vice I' sident State if Califomi ) 5s Cot sty of San Diego On Decemhe 2003,befm Mary Cobb,Nuttily Public.pers all', appeared Joh L Hannum and Jnhi H.Craig,personally known to me to be the person vhose ar ibscribed tr the ith str tent, ad acknowledged to me that they xecuted the thei auth rt-"d capacities nd that bt the ig'itt res the stniment,th anti ipo behalf if vh ch the pens( eted,executed the instil tent Wilnes ma ha id ad offi it al h. MARY COBB g COMM:#1321341 OF R7 cn ��� /O"CJGJ N�"'nz+,-j2 NOTARY M:#1 21341IA N SAN OIEGO COUNT' V{` Y M commission Exphes ten. SEPTEMBER 20.2005 1 �S Mary Cobb.Notary Public RESOLUTIONS no P ver tf Attorney ranted and ned.sealed nd tlarized vith facsn ale signatures nd seals u tiler nhonty if the follow tag resolutions adopted by the specti Boards if Directo of each If th Co Tana 'RESOLVED That the Preside it, an Execute Sen V ice President oC the Company, together ith the Secretary an Assistant Sec etary, hereby author, ed to execute P.we of Attorney appuintink the per itsk ted as Attc •y(sl-in-Fact to date execute, igr seal,and deliver or behalf if th Cc mpany, fidelity and rely bi ds undertakin id othe 'la ci antis of reta ship and ny related documents RESOLVED FuR THER That th 'g' es the Tic the apps w iii igi ii iy oft it it. ' nd cu it status of the appointment,may be fact the representauc of the se signatures nd the no and seal of ai otary and the seal if the Co tpany,may he fa 'le ep ttaui of tho egi atur nd als id ch fa 'le epr sentatic shall have the ame force and effect as if manually affixed The ft file repres owlet referred tc her In ma be afti ed by sta ape tg, pi in tg,type ig, photocopying CERTIFICATE I.thc.under ned,As sta it Secretary of li ranee Cc ma ty if the West,Th Explorer I' Coi teat and Independence Casualty nd Surety Ci tpanv,do he clay certify that th fl egomc Power if Attorney Lull force and effect, nd ha not been re)eked, nd that the above resoluta "ere duly adopted by the revrec re&, rds if D' ea 'fth Cc spa ad ( i full force IN WITNESS WHEREOF I have et h nd this 2eq41-1 day of M 441 /� 0 If �b t 4444(Ar John H Cr 4, sta it Secreta To ay the authenticity )f the Pc ver if Attorney ay ill 1 800-877-1111 ad ask ft the St ety Di Please refe tc the Po of Attorney Numhe the above amed nil' idt t1(s) ad details tithe bend to vh ch the pr,ver watched F ifs in Eh sg cif pie coon et St'et) Clai ICW Group, 1 145')El Carrot Real,Sai Diego CA 921 i0-2045 rcall(858)350-1400 NON-COLLUSION AFFIDAVIT The bidders by its officers and agents or representatives present at the time of filing this bid being duly sworn on their oaths say that neither they nor any of them have in any ay directly or indirectly entered into any arrangement or agreement with any other bidder or with any public officer of Costa Mesa Sanitary District whereby such affiant or affiants or either of them has paid or is to pay to such bidder or public officer any sum or money or has given or is to give to such other bidder or public officer anything of value whatever or such affiant or affiants n- either of them has not directly or indirectly entered into an" arrangement or agreement with any other bidder or bidder which tends to or does lessen or destroy free competition in the letting o the contract sought for on the attached bids that no bid has been accepted from any Subcontractor or supplier through any depository the By-Laws Rules or Regulation of which prohibit or prevent the Contractor from considering any bid from any Subcontractor or supplier which is not processed throu'h said old depository or which prevent any Subcontractor or supplier from biddi g to any Contractor who does not use the facilities of o_ accept bids from or through such bid depository that no inducement of any form or character other than that which appears upon the race of the bid will be suggested offered paid or delivered to any person of the contract nor has this bidder any agreement or understanding of any kind whatsoever with any person whomsoever to pay deliver to or share with any other person in any wa or manner any of the proceeds of the contracts sought by this bid SQ.3CG..1 v-E ti,.11 lL , =NL Zing 0 0..k..ac�swon.<0-1 51°7 G. edik Subscribed and sworn to before me by This gm day of n-,J,,,f 2004 My mmiss on -.spires TY.. CHARLESILMRSONS `• ' won I ICMC b Notary Pub is IMYCOmm.Oytei�,2007 � P-18 Bidder s Initials I�