Loading...
Project 169 - Proposal - Hamers - 2001-09-28 ROBIN B HAMERS 234 6. 17TH ST SUITE 205 & ASSOCIATES, INC. COSTA MESA. CA 92627 CIVIL ENGINEERS • PLANNERS • SURVEYORS (949] 549-1192 FAX(949] 548-6516 September 28, 2001 Board of Directors Costa Mesa Sanitary District 77 Fair Drive Costa Mesa, CA 92628 RE. PROPOSAL TO BEGIN PROJECT PROJECT 1112100-169 TELEMETRY SYSTEM UPGRADE Dear Board of Directors: The enclosed excerpt from the 2001 2002 Capital Improvement Program report fully describes the project which is essentially an upgrade to the telemetry system. Telemetry is the relay of pumping station information from the stations to the communications headquarters. Problems at the station are detected by electrical impulses which cause 800 MHz signals to be sent from the pumping station antennae to the communications receiver Personnel at communications will then notify the field crews of the corresponding problem. In addition to detecting problems, the telemetry also collects information that is used in planning and design. However,the telemetry s most important feature is being the initial warning system for pumping station failure. And pumping station failure, without a quick response, will always result in a sewer spill. That is because pumping stations are needed in low lying areas where the effluent has to be pumped uphill so it can again flow by gravity Because of the varying land formations in Costa Mesa, the District has 20 pumping stations. District Staff has already met with three vendors who can provide the needed upgrade to the telemetry system. Also enclosed is the independent engineer s review of the project by Norris Repke. Sincerely Robin B. Hamers • Printed on Recycled Pape