Loading...
Project 181 - Proposal - Hamers - 2007-01-31 0 ROBIN B. HAMERS & ASSOC., INC. 234 E. 17TH ST SUITE 205 CIVIL ENGINEERS PLANNERS SURVEYORS COSTA MESA, CA 92627 • Since 1981 phone 949/548-1192 fax 949/548-6516 January 31 2007 Board of Directors Costa Mesa Sanitary District 628 W 19th Street Costa Mesa, CA 92627-2716 RE. PROPOSAL TO PROVIDE INSPECTION SERVICES PROJECT 1112100-181 NEWPORT BLVD SEWER @ 19TH STREET Dear Board of Directors: The following proposal is for providing the necessary construction administration, • engineering, construction surveying and inspection services during the construction phase of the project. Attached are copies of the project reports as described in the Capital Improvement Program as well as the independent engineer's report. It is proposed to provide the following services, as needed, during the construction phase of the project, not to exceed $25,000.00 Engineering $80.00/hour Inspection $55.00/hour Surveying (2 man crew) $220.00/hour Sincerely Robin B. Hamers Attachments • SANlTgR D c.. 1c Costa Mesa Sanitary District *pa � an InaepenOent Special District • Kitt Roan!of Directors -Irlene Schafer (in Ilbodctde .Lames F'I'rpinm! -II tPTry I. a, Il,irthltlgtu i CAPITAL IMPROVEMENT PROGRAM Staff Fiscal Year 2006-2007 R rha; /1 /Loners A bntagcr ()U lilt Lii tnrccr (0,9) 6_ 1 17 / FESSIo l Mama 4 iuig c \ \vverrt Jlmrag', c", �o �y-- • 2 it% . Revak a GXP IiWW oi sc eet an' . Pl jI Uri A tanager • '41:e F CA10-�! ihrn h' Barns LP ill (UiII cal Prepared by heath iLi Te, L)arr.s rraoin`'r Robin B. Hamers Manager/District Engineer Phone (949) 645-8400 Far (949) 00-2253 address 6 8 I I 19th Street C>,■ra d(esa, c4 July 7,2006 9'6'-?7/8 • (, it Protecting oMr community's ljealtG 6h providing solie waste aril setter collection services. R il,. Par costanlesasanitarydistrict.org Project#181 Newport Blvd. Sewer at 19th Street • In order to improve traffic flow the City of Costa Mesa and CALTRANS are constructing an additional lane on Newport Blvd Southbound at 19th Street in Costa Mesa. Due to grade differences between the existing roadway and the adjacent property at 1901 Newport Blvd, a retaining wall will be constructed at the edge of the street right-of-way However,the District's existing 8-inch sewer main is located directly under the proposed retaining wall. The CMSD engineering staff investigated various alternatives for relocating and protecting the existing sewer line in place including the installation of concrete encasement, installation of a ductile iron pipe sleeve, or relocating the portion of the line that is under the new retaining wall. The best alternative was determined to be the `relocation' alternative that consists of constructing a 400 foot long segment of new 8-inch sewer main away from the location of the retaining wall. The `relocation' option allows the line to be excavated in the future, if necessary since the line will be located in one of the asphalt driving lines. The alternative of concrete encasement is less expensive, however, future excavation would be extremely expensive because the retaining wall would have to be removed and replaced. The option of installing a protective steel sleeve around the sewer line is expensive in • itself as the sewer line must be removed and then installed in the sleeve plus the line is still located under the retaining wall. Attached is an exhibit showing the project area and the existing and proposed sewer lines. PROPOSED BUDGET Design $ 25,000 Construction 250,000 Inspection 25,000 Contingency 25,000 Total $ 325,000 411 TAN-31-200' 12 41 FROM COSTH MESH SRN DIST TO ROE 011i ED AUG 3 1 2006 COS1A MESA SANf1ARY 113 1 i, • `,I1', ri • d r'^,i WSSUC ' •!�'� August 28, 2006 Board of Directors Costa Mesa Sanitary District 628 W 1,9't' Street Costa Mesa, CA 92627 Anon. Joan Revak, Board Secretary/Program Manager Subject: Independent Review 2006-07 CIP Report Honorable Board of Directors: • I have completed my review of the District's Draft-Revision 3 and the District s 2006-07 Capital Improvement Program (CIP) report dated July 7 2006. I have enclosed my independent review reports as requested by the Manager/District Engineer. I continue to applaud the District and staff for continuing the funding for future sewer replacement and for the efforts in meeting the Regional Water Quality Control Board requirements for Fats, Oils and Grease control. I found the SSO Occurrence Report Summaries to be very enlightening; the reports definitely confirm that the District and staff are doing an exceptional job in meeting State standards. I also want to thank staff for providing me with revisions to the Master Plan sections, County s and the Districts FOG reference material and meeting minutes. All of which was very beneficial in understanding and completing my review Please note that my report includes several projects from the Draft-Revision 3 that are not shown in the CIP Report dated July 7th I did that to show the funding relationship between the CIP projects and those projects that had funds reallocated. It actually helped me to view the total picture of what the District decided to do to reach an overall finding program for the 2006-07 Fiscal Year I believe the District's management and financial ability to plan for the future, conduct day to day operations including a very aggressive CIP program as well as responding to requirements • JHN-31-200' 12 41 FROM COSTH MESA SRN 01ST TO ROB v e 'el Board of Directors-Costa Mesa Sanitary District 2006-07 CIP Transmittal Letter August 28,2006 • from outside agencies to be an outstanding feature of the District's overall operation. It was an honor to serve the District and I thank you for giving me this opportunity Sincerely r o O / / inr∎ eAOF ESSIo& � i3 M ! Bruce D Mattem. PE ` MA .y bdmg,soeal.rr.com 44, c 19388 -Z- 714-962 0 1136 `n w � c EXP o • F-\Work\CMSO\2006-07\Ltr Transmit 2006-07/rid Review 081206.dnc 1111 THN-31-2007 12 41 FROM COSTA MESH SAN DI I ID ?LIE r u- 1 nn !It II 11 I., tl c, GRNs pktnNS� : ;:;, Independent Review Costa Mesa Sanitary District Capital Improvement Program Fiscal Year 2006-2007 O Project#101 /Westside Pumping Station Abandonment Project Funding reallocation This project is an ongoing long term project to eliminate six (6) pumping stations on the Westside of the District. The project also affects and involves the City of Newport Beach and the OCSD Funding of $15,000 to prepare exhibits for the environmental constraint study will be left in the fund and • $85 000 will be transferred to Project#181 Newport Blvd Sewer at 19"Street. O Project#149/Sinking Fund For Future Sewer Replacement This is the 12th year (project was initiated in the 1995-96 fiscal ycar) that funds have been set aside for future replacement or reconstruction of sewer lines as they reach life expectancy In accordance with accepted accounting principles, the interest derived from these funds is credited to the General Reserve Account. This year's program will add $25,000 to the fund for a total deposit of$1,720,805. Last year the District received a grant from OCSD (Project #175) which will allow for a complete televising of the District's sewer system. This will assist in determining the appropriate rehabilitation program and this will also enable the District Treasurer and District Engineer to review and comment on the level of funding ultimately needed. The mainline televising project is anticipated to be initiated mid to late 2005 with an anticipated completion date of November 2007 O Proiect#159/TELEVISING SEWER LINES This year project is part of an ongoing program to insure that the Districts' facilities are functioning properly It is noted that this year's program will be for small-scale miscellaneous sewer televising work and may center on the following: I Homeowners claims of District mainline problems 1111 2. Visual assessment of vactor jetting hose problems-hitting obstructions 3 Assessment of FOG issues 4 Assessment of when other utilities construct facilities under-over District facilities JRN-v1-2OOri 12 41 FROM COSTH •ESH SHN DI5 I [LI ku.a Independent Review CMSD OP Report 2006-07 August 28,2006 Page 2 of 4 • The proposed budget of$15,000 appears reasonable. The benefits to the District provide for flexibility an on-call contractor, and immediate response capability O Project#164/Miscellaneous Sewer Work And Manhole Adjustment This provides the funding for a continuing program to reimburse other agencies (Cities of Costa Mesa and Newport Beach, County of Orange and/or Orange County Sanitation District) for work that they either do or have done on District facilities. This includes the purchase of manhole rings and covers and for adjusting District sewer manholes to grade. The program has been expanded to include pumping station, small sewer line repairs that need to be handled immediately emergency repair work and for roach control in sewer manholes. It is noted that the District-City of Costa Mesa agreement has been terminated as of December 2005 The District has determined that additional maintenance funds arc need to bring the pumping stations to the desired level of care. Therefore the 2006-07 project appropriation was increased to $200,000 The appropriation, based upon required work will be reviewed toward the end of the year and adjustments will be made accordingly This appears to be a reasonable approach. O Project#168/Tustin Pumping Station Remodel • Project Funding reallocation • This project involves multiple agencies, County of Orange, City of Newport Beach and the Irvine Ranch Water District. In order for the Tustin Pumping Station Remodeling to be completed by June 2007 additional funds are needed. Therefore funds were re-appropriated as follows: 1. 5500,00 transfer from Project#171-Tustin Pumping Station Force Main Replacement 2. $60,000 transfer from Project#173-South Coast Plaza Force Main This provides a total appropriation of$836,647 O Project#171 1 Tustin Pumping Station Force Main Replacement Project Funding reallocation The existing appropriation for the construction of Phase 1 is $540,000. Funds are needed to complete the Tustin Pumping Stations remodeling so the$540,000 has been reallocated as follows. 1. Project#171 $40,000 for design phase 2. Project#168-5500,000 for construction It is understood that Project#171 will be refunded in futures years. O Proiect#173/South Coast Plaza Force Main • Project Funding reallocation • This project has an existing appropriation of$190,000 and the design is nearly complete. However, the District has determined that additional funding is needed for Projects #168 and #l8l in order to meet specific time frames. Therefore funds have been reallocated as follows. THN-31-2o r 12 42 FROM COS IH ['ESN SHN 111SI IU R116 r u t Independent Review CMSD CIP Report 2006-07 August 28.2006 Page 3 of 4 1. Project#173 515,000 to complete the design phase • 2. Project#168 $60,000 for construction 3. Project#181 5115,000 for construction Recognizing there are serious problems with the South Coast Plaza Force Main, it is hoped that funds to complete the project will be made available in future years. O Project 01771 Capital Facilities Acquisition Fund This project was first funded in the 2005-06 fiscal year to purchase capital facilities and assets such as maintenance vehicles.sewer cleaning trucks and other equipment. The District also transferred Slmillion from the Facilities Revolving Fund to initiate acquisition of a Maintenance Yard. While the Distnct is actively searching for a new yard location it has been using contract services for daily operation and maintenance functions; the District has also recently hired a full time Maintenance Supervisor to oversee the contractors operations. This year s appropriation is$100,000 O Project#179!Building and Grounds Improvement Fund The Districts new headquarters interior improvements have been completed and the exterior renovations • arc nearing completion. Remaining exterior improvements include column reconstruction. painting and landscaping. The 2006-07 appropriation of$10,000 appears reasonable and appropriate. O Project#180—Fats,Oils and Grease(FOG) Control Program Phase I was initiated in the 2003-04 FY Project #172 because of requirements imposed by the SAR RWQCB. Phase 11 was programmed in the 2004-05 FY with Project#174 and Phase III was programmed in the 2005-06 FY with Project #176. All three phases have been managed by Environmental and Engineering Contractors, Inc (EEC) with District staff spending considerable time to keep the severity of sanitary' sewer overflows (SSOs) to a minimum. Based on review of the SSO Occurrence Report Summaries, it would appear that the District has been extremely successful. The District had originally anticipated that consultant involvement could decrease with staff increasing their time in handling the FOG program. However additional demands in staff time and functions have precluded this from happening. Therefore the District will continue to use the consultant that performed Phases I through III for at least another year. The recommended appropriation of $150,000 appears reasonable and is in-keeping with previous years appropriations. • JHN-71-200' 12 42 FROM COSTA MESA SAN DI ST TD ROB r ub U Independent Review CMSD CEP Report 2006-07 August 28,2006 Page 4 of 4 • Project#181 —Newport Blvd Sewer at 19th Street The District has an 8' sewer main running parallel to Newport Blvd. Caltrans and the City of Costa Mesa are proposing to widen Newport Blvd which would place a retaining wall over the 8' line. After reviewing various alternatives, the District has decided to relocate the 8' line into the existing right turn lane which will become a through-right turn lane. This is a multi-agency time sensitive project (construction to be completed by November 2006) and requires immediate funding. Funds from Projects 4101 and 4173 have been reallocated to the project in the amount of$85,000 and $115,000 respectively The Design-Inspection budget equals 20% of construction which is keeping with industry standards as is the contingency factor of 10%. 01/4 Slpa\ �O Jcc p ftdgTT �e cc 1S3B8 �y • m Sa s EXP. --0`th w p / (�f7 `• • r CPL F Mork\CNISD\2006-078006-07 CIP Report 080606 doc 4111