Project 181 - Proposal - Hamers - 2006-06-28 dg\ ROBIN B. HAMERS & ASSOC., INC. 234 E. 17TH ST SUITE 205 \ / CIVIL ENGINEERS PLANNERS SURVEYORS' COSTA MESA, CA 92627 since 1981 Phone 949/548-1192 Fax 949/548-6516 June 28, 2006 Board of Directors Costa Mesa Sanitary District 628 W 19th Street Costa Mesa, CA 92627 Re: Proposal to Begin Design Phase Project#181 Newport Blvd Sewer at 19th Street Dear Board of Directors: Enclosed please find a proposal to begin the design phase of the above referenced project that will relocate a portion of the CMSD sewer in Newport Blvd. Southbound out from under a proposed retaining wall that will be constructed in order to add another southbound lane. A plan showing the proposed street improvements and the new sewer line is attached for reference. The street improvement project is a combination CALTRANS and City of Costa Mesa project and because the CMSD sewer line does not enjoy prior rights status, the District must relocate the line at its expense. The District was first notified of the required relocation at a point beyond inclusion of the project in the 2005-2006 Capital Improvement Program (CIP ) Additionally the City originally stated the relocation must be completed by January 2007 thereby requiring the District Engineer to begin the design phase prior to preparation of the 2006-2007 CIP and its review and approval by an Independent engineer and the CMSD Board of Directors. The overriding factor to begin the preparation of the plans prior to the independent review of the 2006-2007 CIP followed by approval by the Board is to complete the plans in a timeframe that allows proper bidding and construction as required under California law No expenditures beyond plan preparation and bidding will occur prior to the 2006- 2007 CIP being reviewed by an independent engineer and subsequently approved by the Board of Directors. Attached is the project description as included in the proposed 2006-2007 CIP that is being reviewed by an independent engineer followed by consideration by the Board of Directors. As shown in the project description, the budgeted amount of the design phase is typically 10% of the construction cost and billing is hourly for actual work completed. 4gp ROBIN B. HAMERS & ASSOC , INC 234 E. 47TH ST SUITE 205 CIVIL ENGINEERS PLANNERS SURVEYORS COSTA MESA, CA 92627 since 1981 Phone 949/548-1192 Fax 949/548-6516 Board of Directors June 28, 2006 Page 2 Therefore, it is proposed to complete the design phase of subject project at the following hourly rates with a not to exceed total of$25,000. Engineering $ 80 per hour 2 Man Survey Crew $205 per hour Soils Engineering At cost, if needed Traffic Engineering At cost, if needed Sincerely, Robid B limners Registered Civil Engineer RCE 31720