Loading...
Contract - National Plant - 2012-03-22 ADDENDUM NO. 1 TO AGREEMENT FOR SEWER MAIN MAINTENANCE CLEANING AND RELATED SERVICES SERVICES FOR 2011-2012 (2ND YEAR) I �� This Addendum to Agreement is made this .9? day of /'V 1� �w'�, 2012, by and between the Costa Mesa Sanitary District, a sanitary district established pursuant to Health and Safety Code Section 6400 of seq. ("District") and National Plant Services, Inc. ("Contractor")with reference to the following facts: RECITALS WHEREAS, District and Contractor entered into an agreement in December 2010 ("Agreement"), providing for Contractor to perform regular line cleaning maintenance and emergency response; and WHEREAS, said Agreement provided for an initial term of three (3) years and contained an option to extend the agreement for two (2)additional one-year terms; and WHEREAS, the parties are preparing to enter into the second year of services under the Agreement, and Contractor and District desire to alter several terms of the Agreement; and NOW THEREFORE, Contractor agrees to perform second-year sewer main maintenance cleaning in accordance with the original Agreement dated December 2010 between District and Contractor and also in accordance with this Addendum to that Agreement: AGREEMENT 1 Continuity in Footage Counting. In order to insure continuity between videos and information obtained during televising, and the District's industry standard method of using engineering stationing for manholes, sewer mains, and laterals, Contractor is to insure video 'counter is set to zero at the center line of the beginning manhole for each section of line being televised, as opposed to having the zero point being the beginning of the sewer main being televised. For a forty-eight-inch (48°) inside diameter manhole, the beginning of the pipe will normally be at the two-foot(2 ft.) mark. 2:t: District and' Corit actor?-to.PerformkRootoiCuttin District aid Conitractor.�recogn iie,ioot;cutting;;;isyn ecessary and,_Districtsis? nalilefto;;suocassfulfy, co ioote all root cutting aheadrofControtorrOleanikoat ntie,s Th6eforonDlstricf and Contractor villteachiperformfappronnlately bu79,of rooV. uttingaandiContrractorwill i 1 be compensated on an hourly basis.for-root cutting at the hourly rates "shown in the Year"1 original Agreement subject:to.the•CPI iricrease shown:herein. Root cutting will be at the industry;standard practice of utilizing a root cutternoizle to cut out the ball:ioots Identified at specific locations in maps provided,to contractor *After. the ball roots,.are cutWand Contra_ ctorzhas4;pulied..bacl the- hose, Contractor'wlll,st It h nozzles..to a..warthog;nozzle .with prover (unless prevented* restrictions such as offset joints)and Contractor will then clean:the remainder of the lin with the:warthog nozzle:.A All roots and debris will be captured and,removed from the line after each;segment:IS,cleaned (Whether not4root-cutting..is performed) and'no debris Will.be,aliowed-t5ttavel:pastthe downstream manhole! 3. New Six-Year Cycle. District has revised the yearly footages and lines to be cleaned for all six (6) of the yearly cycles, and Contractor shall disregard all Year 2 maps and footages attached to the Year 1 original Agreement. Yeat2ifootages=are s hewn'om_the�new:Yeaf,2-mapscprovidedto,Contractor;th ..-.?._Districts„,consultant. An estimate of the#•footegbe;to.,beycleaned s sfiiiwn�be low;-0e ridrbilli rig fwilI kliase610i actimistd Cages cieanedyanid compensatedat.the;per:foot'prices•showri,in the''Year"'1: original'Agreement subject tto the CPl`increase•shownherein? The" footageskto=be deanedrini)yea,2„will.t also"include,fiineshneedingwio :be cleanednrto.stay£o`n�athe maximum p3ryear,}cycle',<" itA`hgap'.existsrbetweer the previous eleanmg,program and,the newt6, eartc de;andahis" a cleanin twllltbe. ,aid attttie per'footage pnce:as described'above'fortthe;Yeait,12::base.cleaning' { 1 2 NP Yr:2 NP Roots NP Gap a$iie Total Lerigtli, Siiel,FTotaI Lengthri gTotaI Lengthy 6 47-7 8 53,673 8 5;464 532,818 10 533 lb 1,708, 10 28;343. 12 989 12 69 12 17;858' 18, 269, 35. 2;471 Tot 15 24,032 al 55,465 • 21 3268, Tot 18 1711:132 al 12;981 21 3;739 24 879 3Q 30 33 351` Tot al 625,159 4. Plugging and Sealing Manhole Covers. Similar to Year 1 Contractor shall re-plug, reseal, or re-plug and reseal each manhole that is found to be plugged or sealed prior to Contractor removing the manhole cover 5. Price Adjustment. Prices shown In Year 1 shall be adjusted for Year 2 in accordance with the original Agreement that states: Compensation. The District will be charged the per linear foot prices as shown in Exhibit 'A" for maintenance cleaning services. The Contractor may request In writing an annual fee adjustment equal to the Consumer Price Index (CPI) for the Los Angeles-Riverside-Orange County Metropolitan Area published by the U.S. Department of Labor Bureau of Labor Statistics for a twelve month period (March to March), effective January 1 20 and for each consecutive year of the Agreement. The District will have discretion to approve or deny 3 Contractor's request for an annual fee adjustment. Pursuant to Contractor's written request for said adjustment, the change from the March 2010 index of 666.177 to the March 2011 index of 686.144 is three percent (3.00%), and Contractor is allowed this,adjustment. Contractor shall also provide an updated rate sheet of related services, including closed circuit television (CCTV), emergency response, root cutting, etc. 6. Manpower and Equipment Assigned to District Work. Contractor may continue the practice of assigning two cleaning crews to District work. 7 Daily Footage. The original agreement states: Contractor shall set as its goal 4,500-7,000 feet per day for maintenance cleaning. Contractor recognizes that footages substantially above this level result in less effective cleaning. Contractor is encouraged to maintain footages closer to the lower goal in order to maximize cleaning efficiencies. Distiict'and,Cpntractoi's goals are,to complete allof;tlie above,work.bOune-30)2012do,maintain:Disfid"on.its'cleaning cycles. 8. Original Agreement to Remain in Effect. Except as modified by this Addendum, the December 2010 Agreement between District and Contractor shall remain full force and effect. IN WITNESS WHEREOF the parties hereto have caused this Amendment to Agreement to be executed the day and year first above written. COSTA MESA SANITARY DISTRICT NATIONAL PLANT SERVICES, INC. [Lida I&it. President nat i i ) Secretary I Typed Name Pie,-' Title 4 APPROVED AS TO FORM: District Counsel 1 EXHIBIT A Calculations for approximate cost of Year 2 services I. Base Cleaning Size Approx Length Cost/ft CPI Total 6' 477 0.27 3% $ 132.65 8' 532,818 0.27 3% $148,176.69 10' 28,343 0.30 3% $8,757.99 12' 17,858 0.30 3% $5,518.12 15' 24,032 0.30 3% $7 425.89 18' 17,132 0.42 3% $7 411.30 21 3,739 0.56 3% $2,156.66 24' 379 0.67 3% $261.55 27' 0 0.95 3% $0.00 30' 30 1.19 3% $36.77 33' 351 1.44 3% $520.60 Sub Total $180,398.22 II. Gap Cleaning 8' 5,464 0.27 3% $1,519.54 10' 1,708 0.3 3% $527 77 12' 69 0.3 3% $21.32 15' 2,472 0.3 3% $763.85 21 3,268 0.56 3% $1,884.98 Sub Total $4,717 46 III. Root Cutting (assuming CMSD and NPS divide root cutting 50/50 A. 55,465 L.F @ 1 Root Cutting/300'= 185 sections B. Root Cutting @ 30 minutes/section = 2 sections/hr= 16 sections/day C. 185 sections/16 sections/day= 12 days of root cutting D With 2 crews =6 days of root cutting E. Cost for 2 crews 2@ Jet/Vac with operator @ $190/hr=$380 1@ Technician @$110/hr= $110 Total $490 w/3%CPI $504.70 F 6 days x 8 hrs/day x$504 70=$24,225.60 IV Manhole replugging and sealing Assume 300 manholes @ $22.50/mh x 1.03 = $6,952.50 V Total estimated cost $180,398.22 $4,717 46 $24,225.60 $6,952.50 Approximate Total $216,293.78 1 s _ ,_ Ri93tflka& > qq 20' . d000 n G O d .....N N N. g .. 0 F rN N Q OPNNgi� t gel 2 a °q Wes $ 606066dd, 6 W � Ll O O OOG '.>o� .= E. pp V C p o p —}-' t r NNNNNNNNbw i (j 0000000 - 0. a W a "e -a W r n a .75 s.1 8 V . a u O @ J r i c 0000000 - t 6 N N N N N M N N N ° m giA7. - §"g fig W S I- , _ woge & Si0000$ W U W Z o 6 0 0 0 G C G r, 7 g a Xyi41B� �yS& 8 o. W m a W O5 S I V W QL y N r W C 6 6_ f 0 Y Y O 0 Y Y 0 Cl 000000000 G N o 6 O d p o o ry m m �i YyNC Q$$ 9 n _ ! .12 ; H mg i 6 a" a: ° uJs co W Lu 0--_)- 0,} ZU r VINNNNNNNNM O r O Y g 0- N N I-O y ® - pr ° mz gv 2 aaaaaaaaa . 2 E R a m1, iis`l ,gi 0 % v v v b 6 6 0 1i_ flfilU �y • E (E b •- •- - N N N a Z I- N t7 Y J I�[!(0 t-m 9 _ iiti=1, NATIONAL PLANT SERVICES, INC Specializing in today's needs for environmental protection. ��.= 1461 Harbor Avenue• Long Beach,CA 90813-2741 •562.436-7600•Fax: 562-495-1528 October11 2010 Costa Mesa Sanitary District 234 E. 17TH Street,Suite 205 Costa Mesa, CA 92627 Attention: Mr Robin B. Hamers Re: District Sewer Maintenance Services 2010-2011 In accordance with your request,we are pleased to submit the following proposal: Scope of Work: To provide sewer system and pump station maintenance and emergency services to the District at the direction of the District. Services include(but are not limited to): `hot spot' jetting, pump station cleaning, emergency sewer response services, and pre-CCTV inspection cleaning of sewers. National Plant Services Will Furnish:All supervision, equipment and personnel necessary to perform this work at the direction of Costa Mesa Sanitary District. Costa Mesa Sanitary District Will Furnish: Complete access, openings and rights-of-way to the work area; any and all local permits or licenses that may be required; all maps;all public relations and public notifications; all traffic control plans and permits that may be required; any additional traffic control that may be required in excess of NPS'truck-mounted arrowboard and cones; an unlimited water supply from the nearest available hydrant(with water meter if required); Note: Debris will be transported to OCSD' Plant 1 for off-loading. As of this date, off-loading at OCSD' Plant 1 is a no-fee procedure. If this procedure changes during the course of the project, CMSD will be responsible for disposal fees and charges. Price: The following schedule of rates and charges will apply to the performance of this work. 1 JetNac Unit w/Operator @$190.00/Hr ST $230.00/Hr OT $270.00/Hr PT 2. CCTV Unit w/Operator @ $185.00/Hr ST $225.00/Hr OT $265.00/Hr PT 3. Jet/Vac Unit w/Operator&Tech w/utility truck @$300.00/Hr ST $380.00/Hr OT $460.00/Hr PT 4. Additional Tech @ $110.00/Hr ST $140.00/Hr OT $170.00/Hr PT 5. Heavy Industrial Air-Moving Unit w/Operator @$195.00/Hr ST $235.00/Hr OT $275.00/Hr PT 6. 60 BBL Vacuum Truck w/Operator @$165.00/Hr ST $205.00/Hr OT $245.00/Hr PT 7 Grouting Unit w/Operator @$200.00/Hr ST $240.00/Hr OT $280.00/Hr PT 8. Materials/Supplies @ Cost plus 15% (sand bags, bleach, etc.) 9. Equipment Rentals @ Cost plus 15% (pressure cleaners, boom trucks, arowboards, etc.) Terms: National Plant Services'Terms and Conditions are attached and incorporated into this proposal. Respectfully submitted, Accepted by Doti R. !Craw Dennis R. Keene Customer/Date: President N N N N N N N N N N N N N 0 0 0 0 0 0 0 0 O O O O O tO to N m N t0 0 m .5 0 0 0 0 0 0 0 0 0 0 co CO 10 (o CO CO CO D O'U in N -1 O N CO V m (T A CO N -1 0 CO CO V m lT A W p m 3 tGn et m m m m m ro — 'o 0W N N o CO m m m (T or y1 or N a a a a a a a a ' O •F ao ( m _ m N O V to a N go CO V V m Ut A A A cn 49 X cc A" cc o co m CO V rn V CO 'a 0 CT m O O m CO 0 > �. 0 -1 m -1 m N to to m V N O W N O to m W Z Ni ;20 n- '1,0 z C0 V a 0 m L N CO W a a m m m N N m N m a A A A A A A W m maim -Aram -4 V a (T a s 7. y .Cr N N N N O ? W 43 N co O m m O m co co T I Jr.•m Ni V co m in Ni Ni V O Ni Ni Ni A — W a m a co m On a r al p N O CC a Ca Ca a Co a a a O m m m a m m m m a a a a a a a D co C^ C z C S o m W ai. m m m co N O V m V 'RI m m m a p A- V A W . m m o m m O A co O N 3 T V N co m co N N + -+ m co A CO N CO CO m V0 t a -� Q la A F m m m ai m C r CO m m _ (O V A W A N 00 a (0 CO C N O CO v v m m A A O 5 W A cc m� W a m A m -- a N m N (T V CO N 1 a O. A C V m co co m m co tO + A V + N co tO -+ (O m r X T D N o r m m m m w C C00001 WC CO CO m CO m m m m m to m A a A A A A A N CO A tO a m 3A31 -4 0 . 0 0 La A (0 31 O (VO -• N W V W 3 N C m [O W N 3 CO (O O V m m W O V m A m to m 'co W N W A j _. y] T' m r v o CD m m m n > CO m m V orn V m $i m cT m m m m m a a a a a a a oo Z o "n N t0 V m W N O CO V m m _ cc {A N a -. CO N N O V CO m co t0 N V m N Z Q tO -+ CO m tO m tO 10 a m (31 -, V A O t0 A CD W m D r 9 n = m e V m m m m p C , ? W CO a m - "1". N CO N 41 Co i N 0 m V V a (0 a s 7 OW ✓ a N m Ni a N O co m V OD CD m m co N r L1 A W tO a a m m O A m A m W m O - N m N m r ? co o mm m a in 3 m CO A m co N m m m m Dt mn m a A A A AA a A 0 W A N o o 0 -. CO vl A N O op o N O NJ CO O -1. m OD N C t0 V a W » N A -1 in 0 OO W in in OO to N m 0 n Z v 0 m m m m m C 0 CO V0 -• 010) 1000 (1100 A a a a a a m 0 L op d co A Ni 0 V m A Ni OD m V m m a A m W CO V A m N CO N O A V m W O co m co co N m0 to N o o — + 0 in N a V O co 11 > a m m o or V m a pp1 (nn CO a a a A N - a Omn A N -. O Ap m V m a a a W N a V m a -1 0 a N m W A N G mO co co m 0 0 — m — m N m tO m Sr a 14 W to -• A m m a m a m a m m V V N m m m m m m a m a A A A A AA m m V m A N 0 m N AN) -- 4103 .0000101 A z (O N co m CO CO V N CO m N CO N A CO m V O -1 CD co Ni m V a m V m N m m co V — Ni a a ma m m m a t0 a a m m m a 010 a a A a a a a a a A Ni 0 V a A Ni CO m V CO 010t a ' m V (m(nn m N N co N N co N A W m V m W co m — co O a " co V m to W in A — N V V - tO 0 m m m m CO 0 a m tan N m m m m m m N m A A a A A A a co N N v (O W ' m m N W N O m V j m tT A = m m CO m mT N CO V W V CO N D K V o a — mO mn m m m N A m A m N L O m m T (4 D Z Z m m m m j mina r o w W m a m m m a m a tT A a A A A A a N 0 V m a N a m V m m m A = V m m ON (mJ m m a m co m - ro A V m -1 0 > Z N A V A W O O m -• V W 0 A O CO -' CO T O D taa V t• m0 A Qa CO m m m m m m A A A A A m Z• Z N a V m W N 0 CO V V m n N W A V Ni CO O N OCT CO m O OD N m 03 to co C O Ni V N - -4 Co m W A m m V m in W O 0 co 0 m r