Loading...
Contract - Mesa Consolidated Water - 2002-04-24 Applicant Acknowledgment of Responsibility for Meters I acknowledge that I have read and understand the following concerning the meter(s) to be installed on this project. 1) Meter(s) installation, operation and billing will be done in compliance with Mesa s Rules and Regulations for Water Service and Standard Specifications. 2) All meters smaller that 3' will only be installed by Mesa. Meter(s) 3' or larger will be installed only in the presence of authorized Mesa personnel regardless of the presence of any other agency(ies) representatives. 3) The meter(s) must be clearly marked and protected from damage at all times. The applicant will be responsible for all damaged meters. 4) The meter(s) must remain accessible for reading at all times. If it is not, applicant will pay for costs incurred in rereading the meter 5) Once the meter(s) is Installed the applicant will be responsible for the meter If it is damaged in any manner it will be repaired or replaced only by Mesa and the applicant will be required to pay Mesa for repairs and/or replacement. 6) Charges for the Basic Charge and any Usage Charges will commence as soon as the meter(s) is installed by Mesa or received by the applicant from Mesa. 7) If applicant wishes the meter(s) shut off and locked by Mesa he will not be responsible for the Basic Charge. Please call Customer Service, 949-631 1200 to arrange for termination of service. When the meter is turned on again any Usage registered on the meter will be billed to the applicant. If it is not possible to shut off and lock the meter(s) (which is the case with meters 3' or larger) applicant will be billed for both the Basic Charge and any Usage recorded by the meter 8) Any costs to Mesa for failure to comply with these requirements will be payable by the OS1applicant. (� , — j7(--2 — 00 Signature o Applicant Date Name o • p.lican .lease print) Witnessed by' (Mesa Engineering staff) MC Number: //38 Location: 64e/aj5 20C470/. pr/W1 U MESA_H201WPFILES\AGREEMENT\Meter Responsibility doc