Loading...
Contract - Bulot, Francis H. - 1951-06-14 i d AGREEMENT T FOR ENGI NEERING THIS AGREEJt:ENT;' executed in duplicate this day of ' June, 1951, between the COSTA MESA SANITARY DISTRICT, Costa Mesa, Orange;;County,, California', party' of the First .Part ,.,and•FRANCIS • , H BULOT, doing businesa'°as FRANCIS H . EULOT , CONSULTING. ENGINEERS, of 411m oViestn Fifth Street , Los Angeles , California; party of the• • ' n '•5 r s,... :314, k 4 .i .c,a• ' )� "'� , Y3. a .,, l ^a 'Second Part, WI ,TN `ES5' ETH 3 ;WHEREAS , .party of ti he First Part has developed°a construction t: , program 'covering the ;iiitailation' of street connections from thee' `:• main vs ewer lines; located in the Costa Mesa •Sanitary:District ,' 'to the,'propert'y line.at,-the street , -al1ley, or..$easemerit, and the house sewers connect°ing with/the above mentioned street connections , •all �n ;-accordance with the provisions of Ordinance' No .One•which • •w s approved and made effective by they Board of ,Directors of the J a • party .of the First Part on 'May 28, 1951°, and r, n WHEREASMichael Izzi, Contractor, -of Temple City; .Californ a, is under contract to;;'coi struct; the system of tsanitery, sewers in the Costa Mesa'Sanitary District •for said District and,{is now engaged,in Constructing 'said sanitary sewer system, 'and WHEREAS , contracts are -.now being`made with property owners for 'the. installation` of street connections- to the,sewer system and connecting' house•'sewer's, all';in accordance provisions of said Ordinance No. One , and WHEREAS the party of the First Parttwill',•,require the services' of a ';Civil:'Engineer duly registered under the -State of - `California statutes '`for the engineering planning, and supervision of construction of said street connections and.`house .sewers ,2. NOW, THEREFORE,',the partyrof "the First Part- does, hereby . agree to engage said. party; of •the Second- Part .to•'perform engineer- ing Services as follows • • l" Locate street connections and house sewers in such • • a :.manner that , when constructed by;;contractor; properly licensed to install said sewer' connections the: actual locations of said connections may be shown on "as built" drawings for purposes of perma- nent record. ' . . ;2,f, Inspect the materials, and itemscot eonstructionof the installations during the c'ourse, 'of, construction. 3., •"Certify to the party.•of the,-First,•Part, that each - completed" installation meets the construction re quirements provided in ordinance Number One. 41 Prepare "as built" drawings on tracing cloth; ' • showing the location oY ;thestreet connections and house sewers in ref erenee ,to lot lined --or". ; • ' •buildings located on the"property, or to other established fixed- monuments, to be provided;,$y • • r the contractor, t a i n p e ' to a _ Itis understood ;and agreed of the-First � Part will -pay 'and,the r party of the, Second Part.:will -receive for the .performance of the ,work described in items ;l "through"" 3, set forth above, -a sum equal to five per cent : ( 5%) of the cost of the construction,'- as fixed by the co`ntractor 'in his contract ' • - with the property owner for the installation of the street . • connection 'and/or house .sewer. ' For the work covered-by item 4; set forth. above, ,a charge for the work thereunder will be based on actual out—of—pocket expense , plus twentyfive per rcent' (.25%) • for overhead and profit. The payment of bills; for the services " rendered under all items 1• through 4, •above,,will be made on a`, monthly..basis.; ,bills to be rendered''for.approvalat the ,first. • regular Board Meeting .subsequent to the; month •in` vthich• the work -2- l/ was performed by said,Second Party It -is further understood and agreed_ that, the 'party of:"the ° -_ , Second; Part will carryon;the •work covered by this Agreement • concurrently with the supervision of construction of. .'the•,`system or sanitary •sewers being construoted by„said;`Contractor,Michael ,. •,-Izzi , . for the" Costa Mesa•• Sanitary` District , noy being supervised.' by sai+d Second'Party";sand'^said{'Second Party will continue his 'work under this •Agreement until all street connections and/or• " .house sewers , ;which said Michael'`Izzi las contracted.,vrith • property owners to install, have` been ,satisfactorily. constructed in accordance with the provisions of Ordinance' No., One • IN WITNESS :WHEREOF., ”FRANCIS`.'H BULOT, party of the Second . Part , has executed this Agreement and said COSTA MESA SANITARY DISTRICT:, as party of_ the First ;Part , hashereinto• caused its name to.• be subscribed' .by •its P,resid,ent ,and Secretary 'thereunto • duly authorized by .Resolution of; itsBoard ofr •Directora this 6 d day of •June ,` 1951 5 f•' L•' r+, ecti d.o••^ :"G-- .-3' ' _c7..e:Qs.+....,, d , -• t r, f _ of • COSTA MESAS=SANITARY DISTRICT ': B r 'resident • N Cf r f • + t•" � ` ATTEST . a . c® ° BY' . itt Secretary Party of -the First `Part • FRANCIS H,- BULOT CONSULTING ENGINEERS By '✓/�v e �l i2%2%��/C/ Partty of •the Second Part +r '