Loading...
Agenda Packets - Board - 2009-07-23Costa Meg . S J �M,, Distr7 et ... an Independent Special District Robert ®oten Vice President James Ferryman Director Arlene Schafer President Gary Monahan Secretary Arthur Perry Director 0 Regular Meeting — Thursday, July 23, 2009 RECOMMENDED ACTION I. CALL TO ORDER — 5:30 p. M. — 628 W. 19th Street, Costa Mesa II. PLEDGE OF ALLEGIANCE — Director Perry Ill. INVOCATION — Thomas Fauth IV. ROLL CALL (If absences occur, consider whether to deem those absences excused based on facts presented for the absence — such determination shall be the permission required by law.) V. CONSENT CALENDAR - All matters listed under the Consent Calendar are considered to be routine and will be enacted in one motion in the form listed below. There will be no separate discussion on these items prior to the time the Board votes on the motion, unless members of the Board request specific items to be removed from the Consent Calendar for discussion, in which event the item will be removed from the Consent Calendar and considered in its normal sequence on the agenda. Reports Minute Approval 01 1. Sewer System Committee Meeting — June 23, 2009 2. Regular Meeting — June 24, 2009 Protecting our community's health by providing solid waste and sewer coflection services. www.crosdca.ov Costa Mesa Samta -q District AGENDA July 23, 2009 Page 2 RECOMMENDED ACTION 3. Recycling Committee Meeting — June 25, 2009 Manager's Reports 4. Refunds No Refunds 5. Occupancy Report and payment to Costa Mesa Disposal — July 2009 Approve 6. Monthly SSO Report to State Water Resources Control Board Receive & File 7. Waste Diversion Report — July 2009 Receive & File 8. Contract Payment to CR Transfer for Recycling Services & Disposal Ratify Payment for July 2009 9. Ordinance Enforcement Officer's Report Receive & File Engineer's Reports 10. Project Status Report Receive & File Treasurer's Reports 11. Financial Reports as of June 30, 2009 Approve 12. Treasurer's Reports as of June 30, 2009 Approve 13. Warrant Register for the month of June 2009 in the amount of Ratify Payments $739,942.56 14. Directors' Compensation and Reimbursement of Expenses for the Approve Compensation Month of June 2009 & Ratify Expenses -------------------------------------- - - - - -- -END OF CONSENT CALENDAR -------------------------------------------- VI. WRITTEN COMMUNICATIONS VII. PUBLIC COMMENTS VIII. MANAGER'S REPORTS A. District Yard — 174 W. Wilson Street — CMSD #187 1. Status of Construction Discussion B. Ordinance Enforcement Officer Transition Update C. Sewer System Committee 1. Transfer of Sewers from OCSD to CMSD Consider a. Proposal to Accept Lump Sump Payment from OCSD Consider is b. Add Properties to the Tax Roll Consider c. Letters to Property Owners Consider Protecting our community's health by providing solid waste and sewer collection services. ,qov Costa Mesa Sanit,o-q District July 23, 2009 AGENDA Page 3 RECOMMENDED ACTION 2. OCSD Area 7 Sewers —Offer from OCSD Consider 3. Project #186 Sewer Lateral Assistance Program Update D. Recycling Committee — Thursday, June 25, 2009,12:00 p.m., Accept Report CMSD Board Room, 628 W. 19th Street, Costa Mesa (Directors Ooten and Schafer) E. ' Recycling Committee — Wednesday, July 22, 2009,12:00 p.m. CMSD Board Room, 628 W. 19th Street, Costa Mesa (Directors Ooten and Monahan) 1. Recycling Committee Goals for 2009 -2010 Update 2. Orange County Waste & Recycling Sub - Regional Meetings and Accept Report Grant Program a. Regional Recycling and Waste Diversion Grant FY -08 -09 Accept Report 3. CR &R Report on Other Agencies Recycling Programs Accept Report 4. Tours Accept Report 5. Signs for Orange Coast College Recycling Center Accept Report 6. Signs at Estancia and Costa Mesa High Schools Accept Report 7. Pharmacy Sharps - Pharmaceuticals Collections Program Consider Recommendation 8 Large Item Collection Program Accept Report 9. Report on Other CMSD Recycling Programs Accept Report IX. ENGINEER'S REPORTS A. Waste Discharge Requirements (WDR) Update B. Independent Engineer's Review of 2009 -2010 CIP Approve Report C. Emergency or Non -bid Sewer Work — Santa Ana Pumping Station Ratify Actions by District Engineer by 4/5 Vote D. Revised Budget for Plan Check and Inspection Receive & File E. Resolution No. 2009 -768, Revised Job Description for District Engineer Adopt Resolution F. Project No. 129 Bristol Street Sewer Ir 1. Bid Opening and Award Award Project to Lowest Responsive & Responsible Bidder Protecting our community's health by providing soCul waste and sewer collection sen*xs. www.crosdcagov Costa Mesa Sanitarq District AGENDA 0 2. Proposal for Construction Phase Services X. TREASURER'S REPORTS A. Resolution No. 2009 -769 — Adopting the Statement of Investment Policy for Fiscal Year 2009 -10 B. District Yard Budget Adjustment XI. INTERIM DISTRICT MANAGER & DISTRICT ENGINEER PERFORMANCE AND EVALUATION AND CONTRACT MATTERS July 23, 2009 Page 4 RECOMMENDED ACTION Approve Proposal Adopt Resolution A. Closed Session to Discuss the Personnel Evaluation of the District Engineer pursuant to Government Code Section §54957. B. Closed Session to Evaluate the Interim District Manager pursuant to Government Code §54957 C. Open Session to Discuss Rate Restructuring for Engineering Work and Approval of the District Engineer's Contract. II. ATTORNEY'S REPORTS A. Claim by A, L Q CY Center, Ltd. U1 Property at 2651 -2675 Irvine Avenue Status Report (CMSD Project #168 — Irvine Pump Station Relocation) B. Ordinance No. 73, Adding Meetings which Qualify for a Day's Service Adopt Ordinance Rendered at the Request of the Board C. Pass Through of Costs of District's Independent Contractors Accept Report D. District Manager Newsletters and Other "One -Way" Communications Accept Report to the Board E. Charging FOG Permittees for Extra District Costs Accept Report XIII. LOCAL MEETINGS (REMINDER: In accordance with AB 1234 (Gov. Code § 53232.5), a report is required to be given by a Director for any meeting for which expense reimbursement of any kind is provided. (Vote: For meetings for which the per diem compensation is sought, the Operations Code provides that such compensation is authorized for each day's service rendered as a Director at the request of the Board (not to exceed six days in one month), and certain meetings are specified as being eligible as set forth in Approve District Operations Code § 3.01.030. For meetings not so listed, the Board must approve the service for it to be eligible for the per day compensation.) A. Orange County Sanitation District (OCSD) (Director Ferryman) Accept Report B. Santa Ana River Flood Protection Agency (SARFPA) Accept Report (Director Perry) Protecting our community's health d y providing solid waste and sewer collection services. ,qov Costa Mesa SanitGlq Dist-rict July 23, 2009 AGENDA Page 5 RECOMMENDED 0 ACTION C. Independent Special Districts of Orange County (ISDOC) Accept Report (President Schafer) D. Local Agency Formation Commission ( LAFCO) Accept Report E. California Special Districts Association (CSDA) Accept Report (President Schafer) 1. 40th Annual Conference in Indian Wells, CA — September 21 -24, 2009 Approve Attendance by Directors and Staff F. California Association of Sanitation Agencies (CASA) Accept Report 1. 54th Annual Conference in San Diego — August 12 -15, 2009 Approve Attendance by Directors G. Other Meetings Qualifying for Reimbursement under CMSD Report on Matters Ordinance No. 55, Operations Code Section 3.01.030 Pertaining to CMSD XIV. . OLD BUSINESS XV. NEW BUSINESS A. CMSD Resolution No. 2009 -770 for Election of Directors to the Special Adopt Resolution District Risk Management Authority Board of Directors B. Allocation of FY 2009 -2010 LAFCO Costs Pursuant to AB2838, Approve Payment Government Code Section 56381, in the amount of $13,865.26 XVI. ORAL COMMUNICATIONS AND DIRECTOR COMMENTS XVII. ADJOURNMENT L--] Protecting our community's health by providing solid waste and sewer collection services. wa w.crosdeaAov x i���. • • COSTA MESA SANITARY DISTRICT MINUTES OF SEWER SYSTEM COMMITTEE MEETING JUNE 239 2009 CALL TO ORDER Board members of the Costa Mesa Sanitary District met in Committee session on June 23, 2009 at 10:30 a.m. at 628 W. 19th Street, Costa Mesa. tDirector Monahan called the meeting to order at 10:30 a.m. DIRECTORS PRESENT: James Ferryman; Gary Monahan; Art Perry DIRECTORS ABSENT: Bob Ooten STAFF PRESENT: Don McIntyre, Interim District Manager; Thomas A. Fauth, Assistant Manager; Robin Hamers, District Engineer; Joan Revak, Board Secretary/Program Manager /Clerk . of the District; Sherry Kallab, Management Analyst; Teresa Gonzalez, Accountant; Debbie Bjornson, Permit Processing Specialist; Karl Dulake, Maintenance Supervisor; Paul Guzman, Inspector; Joe Limon, Inspector. OTHERS PRESENT: MONTHLY SSO STATISTICS Mr. Fauth reported no .SSOs in this Fauth complimented the Sewer Cr e Committee reviewed a documen Joe Parker, Vice President, National Clay Pipe Institute. last period. The last spill was on April 21, 2009. Mr. w for keeping the system running smoothly. The provided by EEC. regarding "FSE Inspection Enforcement Response ". Mr. Fauth referenced the first row of the chart showing CMSD does not have monetary enforcement other than back charges for District resources utilized., However, Washington, Santa Ana and Irvine Ranch Water District (IRWD) do have monetary enforcement. Santa Ana charges $100.00 for non - compliance, $200.00 for repeat non - compliance and $500.00 for continued non - compliance. IRWD has a $1000.00 fee after two to three failures to comply. Director Perry questioned if these agencies back charge in addition to the fees. Mr. Fauth will follow up and report back to the Committee regarding the issue. Mr. Hamers added Staff has notified District COSTA MESA SANITARY DISTRICT MINUTES OF BOARD OF DIRECTORS SEWER SYSTEM COMMITTEE MEETING #" JUNE 23, 2009 PAGE 2 • Counsel, Mr. Burns, the Board would like to consider fines and recommended the Board direct Mr. Burns if they wish to establish an ordinance regarding fines. Director Ferryman stated he would like to see an ordinance. Mr. McIntyre inquired if EEC could issue the citation and if they would have to be deputized to do so. Mr. Hamers stated they would have to have someone deputized but he does not think that will be an issue for EEC. Mr. Fauth discussed District enforcement costs in the chart on page two of the handout. The Committee voiced preference for Santa Ana's non - compliance strategy. The Committee will make a recommendation at the June 24, 2009 Board meeting for Mr. Burns to review and implement an ordinance similar to Santa Ana's. OCSD OFFER OF AREA 7 SEWERS Rob Hamers reported OCSD has approached CMSD regarding owning and operating Unincorporated Area 7 sewers located in Orange County. Discussion followed regarding LAFCO concerns, contract as opposed to ownership and the need for a cost /benefit analysis. Mr. McIntyre will follow up with Mr. Burns and OCSD Staff to gather additional information. Mr. McIntyre questioned why other agencies have declined the offer. NMUSD —SEWER EASEMENT NEAR VELASCO (SONORA SCHOOL)- RESIDENTS /OWNERS OUTREACH Mr. Fauth referred to the agreement with NMUSD provided in the Committee packet. Mr. Burns signed the agreement and it is ready to go. Mr. Fauth reported there is one issue related to use of the District easement. One homeowner is threatening to sue NMUSD if they use horizontal boring for the installation. NMUSD is looking into other options including use of another easement. The agreement is prepared should NMUSD decide to move forward. CMSD LINE MAINTENANCE CLEANING -NPSI AGREEMENT Mr. Fauth referred to Addendum 1 of the NPSI agreement. The agreement covers the area cleaned during the timeframe of January 2006 through June 2006 now due to be cleaned to meet the industry standard of a 3 year cleaning cycle. The agreement went into effect May 29, 2009. Mr. Fauth provided Dennis Keene's feedback report at the meeting noting 120,000 linear feet have been cleaned from June 8, 2009 through June 19, 2009. The agreement covers 236,000 linear feet. Mr. Fauth anticipates the agreement to be completed close to the agreement end date of June 30, 2009. The next step is to prepare Addendum 2 which picks up lines cleaned in the July 06 through June 07 timeframe to be cleaned in the 2009 -2010 fiscal year. Staff will meet at the end of this meeting to map out the area and put the agreement together. Director Perry asked if the cleaning per Addendum 2 was in the budget. Mr. Fauth acknowledged cleaning costs are in the budget except for some small costs such as EEC mapping of areas, about $5,000.00. Mr. Hamers reported there is $160,000.00 excess in the budget for line cleaning from the grant and those funds can be used. a COSTA MESA SANITARY DISTRICT MINUTES OF BOARD OF DIRECTORS SEWER SYSTEM COMMITTEE MEETING r JUNE 23, 2009 PAGE 3 • 32ND DISTRICT AGRICULTURAL ASSOCIATION AGREEMENT, JULY 1, 2009 Mr. Fauth reported the agreement is a standard agreement identical to the prior year's agreement. The operation code requires all agreements to be signed by the Board. Last year the Board authorized Mr. Hamers to sign the agreement. Mr. Fauth brought it to the Committee's attention he signed the agreement himself this year and stated if the Board desires the agreement could be ratified at the next Board meeting. Director Ferryman questioned if the District would still provide line cleaning for the fairgrounds once the agreement ends. Mr. Fauth reported the District would continue to clean the lines in exchange for use of the site as a stand by storage area along with possible emergency use of their equipment and other joint use arrangements. Staff will prepare a memo to this affect leading to an eventual agreement after the CMSD Yard is completed. UNIFORM CONSTRUCTION COST ACCOUNTING ACT Mr. Hamers reported the District wants to convert to the uniform construction cost accounting method to allow more flexibility for projects under $125,000.00. The Act • raises the dollar thresholds of projects that may be completed without the requirement for public bid to $30,000 and projects completed by informal bidding and award to state licensed contractors to $125,000. Then under the Act, all projects over $125,000 are completed by formal public bidding. Mr. Hamers recommended the Committee bring this item up in at the June 23, 2009 Board meeting and direct to Mr. Burns to bring the item forward on the agenda for Board consideration. CLEARINGHOUSE FOR EDUCATIONAL INFORMATION Mr. Hamers reported the Santa Ana River Basin Section (SARBS) has almost finished creating the website to provide a local site for agencies to post their educational materials. The site should be up and running within the next thirty days. TRANSFER OF SEWER LINES FROM OCSD TO CMSD Mr. Hamers reported the transfer is still in process. OCSD agreed to the $1,000,000.00 in repairs and is requesting a five year implementation period due to cash flow. DISTRICT YARD - CONTRACTOR SELECTION PROCESS /SCHEDULE/COSTS Director Monahan reported the sub - committee is ready to award the contract at the June 23, 2009 Board meeting. Mr. Fauth noted the amended bid documents, decision point information (DPI) log and construction timeline are provided in the packet. Mr. Fauth brought to the Committee's attention an error on the DPI log stating Board approval COSTA MESA SANITARY DISTRICT MINUTES OF BOARD OF DIRECTORS SEWER SYSTEM COMMITTEE MEETING JUNE 23, 2009 PAGE 4 instead of sub - committee approval. The dollar value of $2,099,006.00 on the second page is the amount the sub - committee agreed on at the June 10, 2009 meeting. Using the start date of June 24, 2009 the anticipated completion date is January 8, 2010 for certificate of occupancy. The contractor understands this is all contingent on Board approval at the June 23, 2009 Board meeting. Mr. Fauth will provide a Staff report documenting the contractor selection process for the Board meeting. Mr. Hamers added additional meetings to discuss "LEED" status will likely be scheduled after construction begins. The District is at the high end of "LEED" Gold status going into construction. Director Ferryman noted furniture and equipment are not included in the $2,099,006.00 and will be an additional cost of approximately $300,000.00. MANHOLE ADJUSTER - 23 MANHOLES Manhole Adjusters provided a bid proposal sheet to adjust twenty manholes. Staff requested a bid from an additional contractor who refused to bid the manholes located in areas difficult to access. They also quoted a higher unit price of $600.00 rather the $370.00 per unit for eleven manholes located in the street. Staff added three additional manholes to the list for a total of twenty three manholes. The City asphalting the streets in those areas required the work be done. The bid is within the $15,000.00 threshold and the Manager and Engineer signed off on the document. WEST WILSON STREET SINKHOLE Mr. McIntyre met with Peter Naghavi and Ernesto Munoz from the City of Costa Mesa Public Services Department. There was discussion regarding co- operation between the City and the District. Mr. McIntyre reported he did not have the impression the West Wilson Street sinkhole was of great concern. City Staff viewed tree roots as a bigger issue. Mr. Hamers advised there is legal precedence regarding the sinkhole issue. Mr. McIntyre agreed Mr. Burns' letter makes the point from a legal perspective. Mr. Hamers questioned if the City level of contribution toward root problems was discussed. Mr. McIntyre reported they felt the issue had not been resolved by the CMSD Board of Directors and the City Council. PROJECT #129 BRISTOL STREET SEWER; UPDATE ON DESIGN PHASE Mr. Hamers advised the project is out to bid at the engineer's estimate of $1.1 million. The project involves construction on S. Bristol Street from Birch northerly to the edge of the Autoplex. Orange County Development Agency (OCDA) is paying the District to upsize the lines from 8" to 15" as part of the John Wayne Airport Land Use Plan. Staff will recommend authorization of the contract at the July 23, 2009 Board meeting. PROJECT #164 MISCELLANEOUS SEWER WORK • COSTA MESA SANITARY DISTRICT MINUTES OF BOARD OF DIRECTORS SEWER SYSTEM COMMITTEE MEETING JUNE 23, 2009 PAGE 5 Mr. Dulake reported sensors and components have been installed in the last two stations.. The crew implemented the maintenance schedule of turning pump station valves at regular intervals. NO CHANGE #168 IRVINE PUMPING STATION RELOCATION -.UPDATE ON CONSTRUCTION & DAMAGE TO ADJOINING PROPERTY Project is complete. The party's attorneys are addressing the parking lot damage resolution. NO CHANGE PROJECT #170 PREPARE EMERGENCY RESPONSE PLANS for PUMPING STATIONS Mr. Hamers reported the emergency response plans are almost complete. The plans cover in detail what District operations will occur in the event of a major emergency such as an earthquake. When completed the plans will be placed in a book and will meet part of the Waste Discharge Requirements. Director Perry questioned if the plan would be discussed with the Committee. Mr. Hamers acknowledged the plan will be presented to the Committee. If the Committee has questions Staff will provide examples and discuss • the various options. Director Ferryman inquired if the plans will incorporate other agencies as well. Mr. Hamers explained the plan focuses on how the District would handle our own situation. At the same time the District has an agreement with Mesa Consolidated Water District and plans to talk to the City of Newport Beach and the Orange County Fairgrounds. PROJECT #171 IRVINE PUMP STATION FORCE MAIN REHABILITATION Mr. Guzman reported the design and timing are being reviewed for replacement of an additional 2000 ft section all the way to the Elden pump station, with 450 ft currently completed. NO CHANGE PROJECT #175 OCSD GRANT - TELEVISING CMSD SEWER LINES Mr. Hamers reported televising is complete. NO CHANGE PROJECT #182 - ANALYSIS OF CCTV RESULTS Mr. Hamers introduced Joe Parker, Vice President of National Clay Pipe Institute (NCPI). The Committee reviewed video of calcium build up in District pipe and discussed • possible causes and solutions. NCPI offered to test a 15 foot section of District pipe. The 15 foot section will be separated into three five foot sections. One section will be .used for porosity testing, the second section will be used for a cross sectional analysis of COSTA MESA SANITARY DISTRICT MINUTES OF BOARD OF DIRECTORS SEWER SYSTEM COMMITTEE MEETING JUNE 23, 2009 PAGE 6 • the pipe wall and the third section will be used for testing removal processes. The project is scheduled for the week of the 8th through the 12th of June. NO CHANGE PROJECT #183 - SYSTEM WIDE SEWER REPAIR - NEW PROJECT ON BRISTOL Mr. Guzman reported 330 ft of main line from manhole to manhole is repaired with chain flinging and relining, including 270 feet of VCP and 63 feet of DIP. The project is complete. NO CHANGE PROJECT #186 - SEWER LATERAL ASSISTANCE PROGRAM Staff provided updated spreadsheets. Mr. Fauth referred to the bottom of page 3 showing $143,500.00 in reimbursement completed. Year to date 111 requests have been completed and 48 applications are in progress. Director Monahan noted the spreadsheet is now highlighted to show calcium present in lateral lines. Mr. Hamers updated the Committee on the test being conducted by National Clay Pipe Institute (NCPI) on 15 feet of sewer line on Santa Rosa Ave. NCPI is testing the pipe along with the soil to determine how the calcium gets there. They found soggy soil and a high water table but the final analysis in not complete. The District hopes to find a solution before the calcium spreads to private lateral lines. Director Monahan asked if lining a private lateral would prevent the calcium build up. Mr. Hamers stated it would if the pipe is relined before calcium growth begins. Director Ferryman questioned what Staff is advising a resident to do about calcium growth in the lateral. Mr. Hamers noted the ability to remove the calcium is still in development but it will probably be some type of citric acid used to soften the calcium enough to allow removal. There is still time to find solutions before the calcium prevents a private lateral from working properly. Joe Limon provided pictures of a tree located on top of a resident's sewer lateral.. Power Pro lined the private lateral and provided photographs of the roots in the sewer lateral. Mr. Limon reported there is still a big root running in line with the sewer lateral so in time it could create a problem with the lateral. Ms. Jackson called Dean Rodia and arranged a site visit. Mr. Rodia is the City's arborist and fields the tree removal complaints for the City. Joe added the tree has moved the curb out 11/2 inches. Mr. Hamers reported the lining costs the owner $5,000.00 of which the District will reimburse $1,800.00. PROJECT #187 - DISTRICT YARD UPDATE - LEED GOLD STANDARD The District is currently at 52 credits with 3 additional pending credits (minimum 52 credits earn a platinum rating) The CMSD Yard is definitely in the gold credit rating as a minimum. Mr. Fauth reported the District is currently renting the vacant lot to a Mesa Consolidated Water District (MCWD) contractor as a staging ground to store equipment while working on a MCWD project for the period February 3, 2009 through June 30, 2009 • at the rate of $20 /day. NO CHANGE COSTA MESA SANITARY DISTRICT t-az MINUTES OF BOARD OF DIRECTORS SEWER SYSTEM COMMITTEE MEETING a r JUNE 23, 2009 PAGE 7 OTHER Mr. Fauth brought forward three items: First Mr. Fauth addressed Addendum #2, a short term lease for the District Yard property with Mesa Consolidated Water District. Mesa's contractor has removed equipment but there are still some piles of debris left which the District wants removed. Mr. Fauth reported four staff members are signed up for the CWEA SARBS meeting July 23, 2009. Mr. Fauth reviewed the Engineer's report used to provide backup for District charges. The narrative portion reviews the tonnage trend over the years. The tonnage has been declining since the District implemented the "Additional Cost Pay As You Go Program ". The report provides historical data to generate the Engineer's report. Mr. Burns requested. a basis for increase report. The basis for increase and for no increase, for the trash rate, have been updated and are available at the front counter if the public wishes to see it. Mr. McIntyre recommended adding a conclusion in terms of the rate to the Engineer's report. Mr. Hamers explained the numbers are the proportional justification for the rates. SSC MEETING SCHEDULE Director Monahan asked if the meeting date of Tuesday prior to the Fourth Thursday of each month allows Staff enough time to prepare reports. Mr. Hamers reported the date was selected because it is the same week as the Board meeting and most Directors are available that week. This date also provides Staff enough time to prepare reports for the meeting. Mr. Fauth added this schedule allows the Board access to the latest information. The next meeting will be Tuesday, July 21, 2009. PUBLIC COMMENTS There were no public comments. ADJOURNMENT Director Monahan adjourned the meeting at 11:37 a.m. 0 SECRETARY PRESIDENT V • 0 COSTA MESA SANITARY DISTRICT MINUTES OF BOARD OF DIRECTORS REGULAR MEETING JUNE 249 2009 CALL TO ORDER The Board of Directors of the Costa Mesa Sanitary District met in regular session on June 24, 2009, at 11:30 a.m. at 628 W. 19th Street, Costa Mesa. PLEDGE OF ALLEGIANCE INVOCATION ROLL CALL DIRECTORS PRESENT: President Schafer called the meeting to order at 11:35 a.m. Director Ferryman led the Pledge of Allegiance. Mr. Fauth gave the invocation. Art Perry, Arlene Schafer, Bob Ooten, James Ferryman, Gary Monahan DIRECTORS ABSENT None STAFF PRESENT: Don McIntyre, Interim District Manager; Robin B. Harriers, District Engineer; Alan Burns, Legal Counsel; Tom Fauth, Assistant Manager; Joan Revak, Board Secretary/Program Manager /Clerk of the District; Jacque Rogers, Senior Consultant for CBIZ; Teresa Gonzalez, Accountant; Sherry Kallab, Management Analyst; Janel Jackson, Office Specialist II; Karl Dulake, Maintenance Supervisor OTHERS PRESENT: None CONSENT CALENDAR Director Perry motioned to approve the Consent Calendar. Director Monahan . seconded. Motion carried 5 -0. MINUTES OF COSTA MESA SANITARY DISTRICT JUNE 24, 2009 REGULAR BOARD OF DIRECTORS MEETING PAGE 2 0 INTERIM DISTRICT MANAGER & DISTRICT ENGINEER PERFORMANCE AND EVALUATION AND CONTRACT MATTERS CLOSED SESSION TO DISCUSS THE PERSONNEL EVALUATION OF THE INTERIM DISTRICT MANAGER AND THE DISTRICT ENGINEER PURSUANT TO GOVERNMENT CODE SECTION 54957 President Schafer adjourned the regular Board meeting to move into Closed Session at 11:37 a.m. Mr. Burns reported the Board of Directors of the Costa Mesa Sanitary District went into Closed Session to discuss the personnel evaluation of the Interim District Manager and to discuss the personnel evaluation of the District Engineer: President Schafer adjourned the Closed Session and reopened the regular meeting at 12:45 p.m. Mr. Burns reported the Board provided additional direction regarding the personnel evaluation of the Interim District Manager and the District Engineer pursuant to Government Code 54957. OPEN SESSION TO RATIFY THE INTERIM DISTRICT MANAGER'S CONTRACT Director Monahan motioned to ratify the Interim District Manager's Contract. Director Perry seconded. Motion carried 5 -0. OPEN SESSION TO DISCUSS RATE RESTRUCTURING FOR ENGINEERING WORK AND APPROVAL OF THE DISTRICT ENGINEER'S CONTRACT Director Monahan motioned to approve the rate restructuring for engineering work and approval of the District Engineer's contract with further definitions of duties to be provided by the Interim Manager and District Counsel. Vice President Ooten seconded. Motion carried 5 -0. Director Perry left the proceedings. REPORTS Minute Approval Minutes of Special Meeting The Minutes of the Special Meeting of May 8, 2009 — May 8, 2009 were approved as distributed. Minutes of Recycling The Minutes of the Recycling Committee Meeting • Committee Meeting — May of May 18, 2009 were approved as distributed. 18, 2009 • • MINUTES OF COSTA MESA SANITARY DISTRICT JUNE 24, 2009 REGULAR BOARD OF DIRECTORS MEETING PAGE 3 Minutes of Special Meeting The Minutes of the Special Meeting of May 18, May 18, 2009 2009, were approved as distributed. Meeting of Sewer System The Minutes of the Sewer System Committee Committee Meeting — May Meeting of May 19, 2009, were approved as 19, 2009 distributed Minutes of Investment The Minutes of the Investment Oversight Oversight Committee Committee Meeting of May 20, 2009, were Meeting — May 20, 2009 approved as distributed. Minutes of Regular Meeting The Minutes of the Regular Board Meeting of May May 20, 2009 20, 2009, were approved as distributed. Minutes of Special Meeting The Minutes of the Special Meeting of May 28, May 28, 2009 2009, were approved as distributed. Minutes of Special Meeting June 8, 2009 The Minutes of the Special Meeting of June 8, 2009, were approved as distributed. MANAGER'S REPORTS Refunds There were no refunds for the month of May 2009. Occupancy Report and The Trash Occupancy Count documented an Payment of $196,667.14 to increase of 2 units for the occupancy report for Costa Mesa Disposal — June solid waste collection as of June 1, 2009. The total 2009 for June is 21,481. Board directed Staff to prepare a warrant for $196,667.14 for June 2009 collection based on occupancy report. Said payment in the amount of $196,667.14 to Costa Mesa Disposal to be ratified on the July 2009 warrant register. Monthly Spill Report to State The Monthly Spill Report to the State Water Water Resources Control Resources Control Board (SWRCB) for June 2009 Board was accepted as submitted. Waste Diversion Report The Waste Diversion Report dated June 2009 was accepted as submitted. Contract Payment of The contract payment of $168,324.38 to CR $168,324.38 to CR Transfer Transfer for recycling services and disposal for the — May 2009 month of May was ratified as submitted. MINUTES OF COSTA MESA SANITARY DISTRICT JUNE 24, 2009 REGULAR BOARD OF DIRECTORS MEETING PAGE 4 Contract Payment of The contract payment of $9,903.52 to CR Transfer $9,903.52 to CR Transfer — for recycling services and disposal for Santa Ana Santa Ana Heights/ Newport Heights /Newport Beach for the month of May was Beach — May 2009 ratified as submitted. Ordinance Enforcement The Ordinance Enforcement Officer's Report dated Officer's Report June 15, 2009 was accepted as submitted. ENGINEER'S REPORTS Project Status Report The Project Status Report dated June 2009 was accepted as submitted. TREASURER'S REPORTS Financial Report as of May The Financial Report as of May 31, 2009 was 31, 2009 accepted as submitted. Treasurer's Report as of The Treasurer's Report as of May 31, 2009 was May 31, 2009 accepted as submitted. Warrant Resolution #CMSD Warrant Resolution #CMSD 2009 -12 was 2009 -12 for May 2009 in the approved, authorizing the President and Secretary amount of $637,636.06 to sign the warrant ratifying the payment of certain claims and demands, and specifying the funds out of which the same were paid in the amount of $637,636.06. Directors Expenses for the Director Compensation and Expense Month of May 2009 Reimbursements for the Month of May 2009 were approved and ratified as follows: President Schafer: $1,326.00 + $89.66 + $5.50 Vice President Ooten: $1,326.00 + $111.50 Director Perry: $884.00 Director Ferryman: $884.00 + $3.30 Director Monahan: $1,105.00 • 0 END OF CONSENT CALENDAR • • MINUTES OF COSTA MESA SANITARY DISTRICT REGULAR BOARD OF DIRECTORS MEETING WRITTEN COMMUNICATIONS JUNE 24, 2009 PAGE 5 Ms. Revak reported the District received a thank -you letter from Van Laffoon, a Costa Mesa resident, thanking CMSD regarding the sewer lateral program. Ms. Revak also reported a thank -you letter was received from the Orange County Coastkeeper expressing its gratitude regarding Ms. Bjornson's participation in judging student presentations in the WHALES program at Costa Mesa High School. PUBLIC COMMENTS There were no public comments made. MANAGER'S REPORTS DISTRICT YARD — 174 W. WILSON STREET — CMSD #187 ESTIMATE OF OVERALL CONSTRUCTION PHASE COSTS Mr. Fauth reported the estimate of the overall construction phase costs as of June 17, 2009 is $2,361,161.91 with a 2% construction contingency of $41,980.12 totaling $2,403,142.03. SELECTION OF CONTRACTOR The CMSD Yard Selection Committee consists of Vice President Ooten, Director Ferryman, Mr. McIntyre, Mr. Hamers, Mr. Fauth, Mr. Dulake and periodically RTA as architectural engineering support. Vice President Ooten motioned to approve the selection of Howard S. Wright Constructors, LP to construct the CMSD yard to minimum Gold LEED and potentially Platinum LEED standards for the negotiated price of $2,099,006 with final contract language approved by CMSD General Counsel. Director Ferryman seconded. Motion carried 4 -0. CONSULTANT CONSTRUCTION PHASE PROPOSALS Mr. Fauth presented three proposals providing construction phase services during • construction of the new District Yard facility.. The three proposals are: 1) RTA for Construction Administration Architectural: $12,000.00 Structural Engineering: $ 5,500.00 M, P & E: $ 1,320.00 MINUTES OF COSTA MESA SANITARY DISTRICT .TUNE 24, 2009 REGULAR BOARD OF DIRECTORS MEETING PAGE 6 with Fee Structure as follows: Architectural $125.00/Hr. Structural Engineering $150.00 /Hr. M, P & E $165.00/Hr 2) Geo -Etka, Inc. for soil engineering services in the estimated amount of $7,600.00. 3) Robin B. Hamers & Associates, Inc. for contract administration, engineering, surveying and inspection in the estimated amount of $26,884.00. Director Monahan motioned to approve the consultant construction phase proposals. Vice President Ooten seconded. Motion carried 4 -0. 32DAA VEHICLE STORAGE AGREEMENT UPDATE Mr. Fauth reported on the 32DAA Vehicle Storage Agreement and requested ratification of the agreement with OCFEA. Director Ferryman motioned for approval of the 32DAA Vehicle Storage Agreement. Vice President Ooten seconded. Motion carried 4 -0. GRANT RESEARCH Ms. Kallab reported on her efforts in obtaining funding for the construction of the new District yard and determined no federal funds are available. ORDINANCE ENFORCEMENT OFFICER TRANSITION Mr. Fauth reported Staff met on June 10, 2009 to establish the next step in the hiring process for the part -time position of the District's Ordinance Enforcement Officer. Interim District Manager, Don McIntyre and Staff met with Mr. Roeder to discuss the details of sharing the joint agency coordinated full -time position with the City of Costa Mesa. The City proposed providing Code Enforcement Officer services to the District and the District to take responsibility of sewer lateral issues regarding roots. Mr. McIntyre will request Mr. Roeder to provide a written proposal to present to the Board for further discussion and direction. SEWER SYSTEM COMMITTEE REPORT ON MEETING HELD ON JUNE 23, 2009 • Director Monahan reported the Sewer System Committee met on June 23, 2009 and • discussed several items including the monthly spill statistics, the OCSD offer of Area 7 sewers, Uniform Construction Cost Accounting Act Bidding, and other CMSD projects. MINUTES OF COSTA MESA SANITARY DISTRICT JUNE 24, 2009 REGULAR BOARD OF DIRECTORS MEETING PAGE 7 • Director Monahan requested Mr. Bums to investigate the issue regarding citations and/or fees for violators of spills and to model the Santa Ana program. TRANSFER OF SEWERS FROM OCSD TO CMSD Director Monahan reported no new information regarding the Transfer of Sewers from OCSD to CMSD. PROJECT #186 SEWER LATERAL ASSISTANCE PROGRAM Vice President Ooten requested clarification regarding Item 117 of the Sewer Lateral Assistance Program and the payment of $2,384.00. Mr. Hamers explained the property contains more than one lateral. Mr. Hamers suggested adding a note to say "Case D." Director Monahan left the proceedings COUNTY OF ORANGE WASTE DISPOSAL AGREEMENT Mr. Fauth presented the County of Orange Waste Disposal Agreement in which the term of the new agreement will be from July 1, 2010 to June 30, 2020 with a rate increase to $29.95. Mr. Burns presented his executive summary and discussion of the agreement. Vice President Ooten motioned for approval of the waste disposal agreements to join all the other city and county entities in a new agreement. Director Ferryman seconded. Motion carried 3 -0. RECYCLING COMMITTEE — THURSDAY, JUNE 25, 2009 — 3:30 P.M., CMSD BOARDROOM, 628 W. 19TH STREET, COSTA MESA (VICE PRESIDENT OOTEN AND DIRECTOR MONAHAN) President Schafer reported the Recycling Committee meeting scheduled for Thursday, June 25, 2009 will be discussed at July's Board meeting. ENGINEER'S REPORTS WASTE DISCHARGE REQUIREMENTS (WDR) Mr. Hamers reported reserving two months for tours of the ground water replenishment system for the WDR members and agencies. Mr. Hamers reported WDR will be having a seminar on interceptor sizing. �.1 J MINUTES OF COSTA MESA SANITARY DISTRICT JUNE 24, 2009 REGULAR BOARD OF DIRECTORS MEETING PAGE 8 • ENGINEERING AND INSPECTION BUDGET BEGINNING JULY 1, 2009 Mr. Hamers recommended the Board weigh the options of updating the sewer atlas in its current hand drawn form versus the option of adding the updates as part of converting the atlas to GIS format. EMERGENCY OR NON -BID SEWER WORK — SANTA ANA PUMP STATION Mr. Hamers reported on the emergency repair of the Santa Ana Pumping Station which occurred on June 8, 2009 and recommended the Board of Directors ratify the actions taken by the District Engineer by a 4/5 vote. As all five Directors were not present and approval requires a 4/5 vote, the Emergency or Non -Bid Sewer Work for the Santa Ana Pump Station will be continued to the next regular Board of Directors meeting.. TREASURER'S REPORTS Ms. Rogers reported no new information regarding Treasurer's Reports. 0 ATTORNEY'S REPORT CLAIM BY BACK BAY CENTER, LTD. FOR PROPERTY AT 2651 -2675 IRVINE AVENUE (CMSD PROJECT #168 — IRVINE PUMP STATION RELOCATION) Mr. Burns recited a memo received from John Roddy regarding the claim by Back Bay Center, Ltd. which gave a brief update regarding the case and their plan moving forward. NMUSD USE OF CMSD SEWER EASEMENT Mr. Burns reported on the NMUSD Use of CMSD Sewer Easement and requested approval of the License and Indemnification Agreement. Mr. Fauth reported the Agreement is on hold at the moment. Vice President Ooten motioned for approval of the License and Indemnification Agreement if required. Director Ferryman seconded. Motion carried 3 -0. PROPOSITION 218: NOTICE TO TENANTS OF IMPOSITION OF PROPERTY- RELATED FEE 0 Mr. Burns investigated the issue regarding Notice to Tenants of Imposition of Property - Related Fee and provided the law governing Proposition 218. Mr. Burns reported on the District's position in imposing the property- related fee to the owners. r� LJ MINUTES OF COSTA MESA SANITARY DISTRICT JUNE 24, 2009 REGULAR BOARD OF DIRECTORS MEETING PAGE 9 REVIEW OF LOCAL MEETINGS ALLOWED FOR DIRECTOR COMPENSATION Mr. Burns reported the Ordinance regarding Local Meetings Allowed for Director Compensation will be presented at the July Board meeting. RESOLUTION NO. 2009 -766 DECLARING THAT VOLUNTEERS PERFORMING SERVICE FOR THE DISTRICT WITHOUT PAY ARE HEREBY DEEMED TO BE EMPLOYEES FOR THE PURPOSE OF THE WORKERS' COMPENSATION LAW Mr. Burns introduced RESOLUTION NO. 2009 -766, A RESOLUTION OF THE BOARD OF DIRECTORS OF THE COSTA MESA SANITARY DISTRICT, DECLARING THAT VOLUNTEERS PERFORMING SERVICES FOR THE DISTRICT WITHOUT PAY ARE HEREBY DEEMED TO BE EMPLOYEES FOR THE PURPOSES OF THE WORKERS' COMPENSATION LAW. Director Ferryman motioned to approve Resolution No. 2009 -766 that volunteers shall be deemed to be "employees" of the Costa Mesa Sanitary District for the purposes of the workers' compensation laws; and that no other benefits are intended by such action and such volunteers shall not be entitled to any other fringe benefit provided to District employees. Vice President Ooten seconded. Motion carried 3 -0. Mr. Fauth inquired as to any costs associated with the position of volunteers. Mr. Burns stated the workers' compensation carrier should be advised of any volunteers the District employees. Mr. Fauth requested Ms. Gonzalez to investigate the matter. FOG AGREEMENT WITH ENVIRONMENTAL ENGINEERING & CONTRACTING. INC. Mr. Bums introduced the AGREEMENT FOR CONSULTANT SERVICES CALIFORNIA STATE WIDE GENERAL WASTE DISCHARGE REQUIREMENTS (GWDR) FATS, OILS AND GREASE (FOG) CONTROL PROGRAM PHASE IV - CONTINUED - COSTA MESA SANITARY DISTRICT PROJECT NO. 180 and requested approval of the Agreement. Director Ferryman motioned to approve the FOG Agreement with Environmental Engineering & Contracting, Inc. Vice President Ooten seconded. Motion carried 3 -0. TECHNOLOGY RESEARCH CENTER — MIS MAINTENANCE AGREEMENT Mr. Burns introduced the AGREEMENT FOR COSTA MESA SANITARY DISTRICT INFORMATION TECHNOLOGY SYSTEM MAINTENANCE and requested approval of the Agreement. Vice President Ooten motioned to approve the Technology Research Center - MIS Maintenance Agreement subject to District Counsel's review. Director Ferryman seconded. Motion carried 3 -0. MINUTES OF COSTA MESA SANITARY DISTRICT .TUNE 24, 2009 REGULAR BOARD OF DIRECTORS MEETING PAGE 10 • LOCAL MEETINGS (INCLUDES REPORTS BY ALL DIRECTORS REPRESENTATING CMSD) ORANGE COUNTY SANITATION DISTRICT (OCSD) (DIRECTOR FERRYMAN) Director Ferryman reported attending the Orange County Sanitation District meeting on June 23, 2009 and reported nothing of significance to the CMSD was discussed. SANTA ANA RIVER FLOOD PROTECTION AGENCY (SARFPA) (DIRECTOR PERRY) Director Perry submitted the agenda and meeting minutes. INDEPENDENT SPECIAL DISTRICTS OF ORANGE COUNTY (ISDOC) (PRESIDENT SCHAFER) President Schafer was unable to attend the meeting due to attending Florida's Special Districts Conference. LOCAL AGENCY FORMATION COMMISSION (LAFCO) (PRESIDENT SCHAFER) i President Schafer was unable to attend the meeting due to being on vacation. CALIFORNIA SPECIAL DISTRICTS ASSOCIATION (CSDA) (PRESIDENT SCHAFER) President Schafer reported she participated in the CSDA meeting by conference call. CSDA MEMBERSHIP DUES FREEZE President Schafer reported a motion was made during the meeting in favor of a freeze on membership dues for CSDA. There will be no increase in 2010 membership dues due to current economic times. President Schafer reported due to CSDA's calendar fiscal year, the annual dues renewal billing will take place in November. CALIFORNIA ASSOCIATION OF SANITATION AGENCIES (CASA) Ms. Revak reported approval for directors and staff to attend the upcoming CASA and CSDA conferences in August and September, respectively, will be on the July 23, 2009 Board meeting agenda. OTHER MEETINGS QUALIFYING FOR REIMBURSEMENT UNDER CMSD ORDINANCE N. 55, OPERATIONS CODE SECTION 3.01.030 • Vice President Ooten attended the Independent Management Commission meeting and reported on the tonnage and landfill fees which were down 25 percent from last year. Vice President Ooten reported on how the Independent Management Commission will • MINUTES OF COSTA MESA SANITARY DISTRICT JUNE 24, 2009 REGULAR BOARD OF DIRECTORS MEETING PAGE 11 be utilizing recycling money and put together a recycling education program at the Discovery Science Center to educate a large audience of children regarding recycling. Vice President Ooten also attended the Water Summit held at Disneyland Hotel and reported many speeches were held regarding the dire problems associated with water conservation and lack thereof. CHAMBER OF COMMERCE President Schafer did not attend the meeting. OCCOG President Schafer did not attend the meeting. WACO President Schafer did not attend the meeting. OLD BUSINESS There was no old business discussed. NEW BUSINESS SDRMA PROPERTY & LIABILITY RENEWAL INVOICE IN THE AMOUNT OF $63,275.57 Mr. Burns reported receiving an e-mail from Ms. Kallab indicating SDRMA represented to her that the District has inverse condemnation coverage as part of the invoice and investigations are still on- going. Director Ferryman inquired as to comparisons of the program rates. Ms. Gonzalez reported the Board does receive a 15 percent rate discount for the 2009 -2010 program year in both property/liability and workers' compensation programs. Director Ferryman motioned to approve payment of the SDRMA Property & Liability Renewal Invoice in the amount of $63,275.57. Vice President Ooten seconded taking into account Director Ferryman's concerns and request in making a comparison this fiscal year before the next budget regarding the rates. Motion carried 3 -0. Mr. Hamers pointed out the District earned 11 out of 15 credits available that contribute to holding down the rate charged to the CMSD. MINUTES OF COSTA MESA SANITARY DISTRICT JUNE 24, 2009 REGULAR BOARD OF DIRECTORS MEETING PAGE 12 • ORAL COMMUNICATIONS AND DIRECTOR COMMENTS With regard to the Public Hearing on trash and sewer rates on July 30, 2009, Vice President Ooten suggested as opposed to Mr. Fauth reading the process twice to possibly do it under title only. Mr. Burns responded that it's done by script to ensure proper procedures are followed in the presence of public attendance. Mr. Burns suggested possibly cutting down the script and he will address that before the July 30, 2009 hearing. President Schafer reported Mr. McIntyre will determine the date of the closed session to be July 6th, 9th or 13th. President Schafer reported the regular Board meeting will be held on July 23, 2009; and the Rate Hearing will be held on July 30, 2009 at 6:00 p.m. Mr. Fauth distributed handouts regarding the basis for increase in the 2009 -2010 yearly sewer charges and the basis for no increase in trash collection charges. ADJOURNMENT President Schafer adjourned the Regular Meeting at 2:12 p.m. SECRETARY PRESIDENT • • • • COSTA MESA SANITARY DISTRICT MINUTES OF RECYCLING COMMITTEE MEETING June 25, 2009 The Costa Mesa Sanitary District Recycling Committee met at 12:00 p.m. at 628 W. 19th Street, Costa Mesa. Directors Present: Robert Ooten and Arlene Schafer Staff Present: Rob Hamers, Tom Fauth, Joan Revak, Sherry Kallab, Teresa Gonzalez, Denise Gilbert Others Present: Trisha Throop, Community Relations Recycling Coordinator CR &R Director Ooten called the meeting to order at 12:00 p.m. I. Recycling Committee Goals for 2009 -2010 Staff reviewed the Recycling Committee Goals for 2009 -2010 with recommended changes including updating the status of tours conducted by the CMSD. II. Viewing of CMSD DVD The Committee viewed the CMSD DVD and considered editing modifications. 1111. Orange County Waste and Recycling Sub - Regional Meetings and Grant Program The quarterly OC Waste & Recycling Quarterly Grant Status Report was presented. Funds expended through March 31, 2009 are $11,337.02 (28.3% of $40,000.00). The District is awaiting reimbursement from the City of Costa Mesa in order for the District to continue with the project. Part 2A is the submittal for the next round of funds that has not been released. As a lead agency, the District requested $143,000 in grant money. The schedule has been pushed out and the Agency is supposed to be negotiating with award of the grants in the third week in July. IV. CR &R Report on Other Agencies Recycling Programs Trisha Throop of CR &R reported on a food waste test program in seven South County cities to determine how much food waste at restaurants can be kept out of the landfill. Instead of burying the waste at Prima Deshecha, the trash hauler would truck it to a facility that can turn it into compost. Protecting our community's heafth 6y providing solid waste and sewer coflection sem*xs. www.crosdca.Aov Costa Mesa Sanitary District l £ Minutes of Recycling Committee Meeting June 25, 2009 Page 2 The South County cities served by trash hauler CR &R are applying for a grant and include Aliso Viejo, Dana Point, Laguna Hills, Laguna Niguel, Rancho Santa Margarita, San Clemente and San Juan Capistrano. Individual food establishments make their own rules on food recycling. According to Ms. Throop the hot topic is food waste recycling. A pilot program will take place at the Laguna Hills mall on July 1, 2009. The program is addressing preparation of food from the kitchens of the food court restaurants. The restaurants will be given a "slim jim" container for their prep and kitchen areas and sixty- gallon containers will be provided for collection of food waste. There are about 15 restaurants in the mall and this mandatory program is the first of its kind in Orange County. Composting bags will be provided to the restaurants. The first day of service will be July 1, 2009. CR &R is footing the bill for the twelve -month pilot program. V. Disposal of Residential Grease in CMSD Trash Collection Program An update from Mr. Fauth on the disposal of residential grease at the Orange Coast College Recycling Center was provided. VI. Composting Workshop at San Juan Capistrano — May 21, 2009 0 Staff reported on a composting workshop at San Juan Capistrano on May 21, 2009 attended by six members of District Staff. It was an excellent presentation with information on the benefits of compost, ensuring compost quality, implementing best management practices, developing model ordinances and purchasing policies for compost use. The presenters were excellent and included university professionals, researchers, soil scientists, compost industry professionals and others with extensive compost experience. VII. Presentations "Career Day 2009" at Estancia High School was attended by Denise Gilbert and Debbie Bjornson. Career Day invites area government agencies and corporations to acquaint students with professions for prospective employment and education. Approximately 15 corporate and government agencies were represented at the event. VIII. Tours A. College Park Elementary School Tour of MRF and Landfill — Friday, June 12, 2009 Staff reported on a trip to the MRF, CR &R Recycling Center and Frank R. Bowerman Landfill with fourth and fifth grade students from College Park Elementary School. The students displayed a good understanding of the process of recycling from their containers at home to the landfill. • Protecting our community's health by praviding solid waste and sewer coffection services. wwrv.crosdca.Aou ti e� Costa Mesa Sanitary District u - Minutes of Recycling Committee Meeting • ,: June 25, 2009 Page 3 B. Special Education Class (Costa Mesa High School Annex) Tour of Landfill — Wednesday, June 17, 2009 Ms. Gilbert accompanied six students, five assistants and one teacher from the Costa Mesa High School Special Education Annex to the Frank R. Bowerman Landfill on June 17, 2009. The students were excited to see the process first hand as they had completed their studies on material recovery facilities, recycling centers and landfills. IX. Newport -Mesa Unified School District Elementary Science Advisory Committee Ms. Gilbert represented the District at the Newport-Mesa Unified School District's (NMUSD) quarterly Elementary Science Advisory Committee (ESAC). Discussion at these meetings include classroom science curriculum, material support, professional development and administrative /community support. The topic for this quarterly meeting was "Where Does Science Need to go ?" X. CMSD Signage at Estancia and Costa Mesa High Schools Ms. Gilbert reported Staff will be in contact with Estancia and Costa Mesa High School with regard to signage promoting CMSD programs. Grant funds in the amount of $500 for each • school are available to pay for the signage. XI. Signs for Orange Coast College Recycling Center • An example of signage to be placed at Orange Coast College was presented. The signs promote recycling of e- waste, fluorescent bulbs & tubes, batteries, aluminum cans, paper and plastic. XII. Large Item Collection Program Ms. Revak reported the 2009 Large Item Collection program will run from June 22 through August 22, 2009 and presented a door hanger that is placed at each residence two weeks prior to the collection date. XIII. Public Comments There was no public present at the meeting. Director Ooten adjourned the meeting at 1:05 p.m. Secretary President Protecting our community's health by providing solid waste and sewer collection sen*es. www.crosdca.gov Six Tq 0 y i h� COSTA MESA SAN, A r/ y ` i y�ORpoentF,o`�e Dis"ICT ... an Independent Specia(Distriet Memorandum To: Board of Directors From: Debbie Bjornson Date: July 1, 2009 Subject: REFUND REQUEST FOR BOARD APPROVAL There are no refund requests for the month of June 2009. • Debbie Bjornson Permit Processing Specialist Protecting our community's health by providing solid waste and sewer cofiection services costamesasanitarydtstrict.org ^y d 0 �� -► -rTct u0sta Mesa Santay�Q Dtt ,m jj-ibepe-dekit Special Dislnct, Board of Directors 9rl % %lc .scf:eie; Gm ,v rtdonuholr Arl;'rtir PCi-r Jl Bile.` Pi;- vI?ia!I, Srra ff Robin 13. 141,uners NhIvia per 0irr71•irf l'frc>rnc(v (1),9) 6.), 1 /'7. i hOO i N 1wil ( it'll" uj llrr /h,�lrt�7 lirrn R. Bier:!" r._i ".Ir 1, ( -'r;l rrl,r -1 11<n;tl� U,!?uri; '/I ( rt I )bVc1or r)l f htalr, r Phone l '(.r '> .'t ddre.�,C 0)2627-2 Rc>rr;i�tr' Pl7Pc'i July 1, 2009 Board of' Directors Costa Mesa Sanitary District 628 W. 19"' Street Costa Mesa, CA 92627 -2716 SUBJECT: TRASH OCCUPANCY COUNT Dear Board of Directors: There has been an increase of 1 unit for the occupancy report for solid waste collection as of July 1, 2009, therefore, the total occupancy count for July is 21,482 Staff recommends the following: 1. The Board of Directors accepts the occupancy count as presented using 21,482 as the correct number of units. 2. The Board of Directors directs staff to prepare a warrant to Costa Mesa Disposal for ,July collection based on this occupancy report so long as the contractor fulfills the obligations of the agreement. Said payment in the amount of $196,676.30 to be ratified on the August 2009 warrant list. Sincerely, Thomas A. Fauth Assistant Manap -cr cc: Costa Mesa Disposal Debbie Bjornson Permit Processing Specialist PYE11F_Ct.?F1, Cd{Y' coYVftMI.I.F1ihYs 6i altY 1)�? piavi6jnr 5oili) nwte 0116 SgllIeY collection sei2 °Ices. tlfYttfY9f colsbcr.;gav OCCUPAO CHANGES , June, 2009 EXISTING A.P.N. No. ADDRESS STATUS CHANGE NEEDED CHANGED OCCUPANCY 439- 451 -04 306 Salt Pond new service I unit using curbside June, 2(X)9 '1'utal for June 2009 WDR F&ed Spill Data OCCURRENCE ROORT SUMMARY 04/2009 12/30/2008 Date Sanitary Sewer Overflow Occurrence Report Summary, CY2008 SSO EVENT ID Private District Est Total Spill Completely Event Line Line # Gallons Contained ? Uncontained Est # Private Gallons Spilled Uncontained Est # Public Gallons Spilled into Storm drain into Storm drain 1/2/2008 PRIVATE Pump Station Failure,151 Kalmus Dr, Copper Tree Bus Park; 80025 2,000 N 1600 1/20/2008 Sea Bluff PS Air Bubbler Failure; 30 Sea Terrace Lane; 80575 113 N 113 1/28/2008 Roots Blocked Main Line CCM Cleaned Site 1939 Sanderlin Ctr 81341 20 Y 2/7/2008 FOG Blocked Main Line Siphon on Paulanno, 3012 -3036 Enterprise; 81171 55 N 5 2/26/2008 Debris & Roots Blocked Main Line, 2040 President Place; 81613 450 Y 3/18/2008 Grease blocked PRIVATE Lateral - Yardhouse - 1875A Newport Blvd 82152 2,100 N 1800 3/18/2008 Roots /Debris Blocked PRIVATE Lateral 700 W 16th St 82153 37 N 37 4/312008 President PS -SCE Transformer, 2034 President PI, PS MH to Park 82546 360 Y 5/5/2008 PRIVATE Above Ground Clean Out Broken - AMTEK 960 W 16th St 83276 20 N 20 7/25/2008 Roots Blocked PRIVATE Lateral - Uncapped CO - 674 Park Drive 85433 20 N 10 7/26/2008 Grease /Debris Blocked PRIVATE Lateral 3400 Ave of Arts-Heritage 85463 100 N 10 8/22/2008 PRIVATE Pump Station Failure , 151 Kalmus Dr, Copper Tree Bus Park; Repeat; 86141 85 Y 9/4/2008 Roots/Debris - PRIVATE SSO - Uncapped CO - 1010 Valencia St 86477 1,050 N 52 10/24/2008 FOG & Rock Debris in Private Lateral - The Camp 2937 Bristol St 87699 1,275 N 75 12/23/2008 FOG Blocked Main Line Drop Manhole 2752 San Juan Lane 89101 30 Y 12/26/2008 FOG Blocked Lateral Line - May Gardens - 1400 Bristol St Repeat; 89158 690 Y 12/30/2008 Unknown Debris Blocked Main Line - 1895 Swan Circle 89253 10 Y KEY: GREASE 6 4 2 ROOTS 5 3 2 PUMP STN 2 2 OTHER 4 3 1 TOTALS 17 10 7 Total #Gallons 8,4151 4,693 3,604 118 Percenta es 1 100,00% 1 55.77% 42.83% 1.40 7/11/2009 Sanitary Sewer Overflow Occurrence Report Summary, CY2009 SSO EVENT ID Private District Est Total Spill Completely Event Line Line # Gallons Contained ? Uncontained Est If Private Gallons Spilled Uncontained Est # Public Gallons Spilled Date into Storm drain into Storm drain 1/11/2009 Irvine PS Failure /SW - SCADAlarm Did Not Call - 2149 Anniversary Lane; 90244 100 N 100 1/16/2009 FOG Debris Blocked Main - Increased Hots of -1 /mo; Bristol St & 55 Freeway; 90383 86 N 86 1/26/2009 FOG Blocked Main Line near 2831 Bristol St; Italian Restaurant Upstream, 90785 10 Y 1/29/2009 Irvine PS Failure /SW - SCADAlarm Did Not Call - 2149 Anniversary Lane; 90922 50 Y 1/30/2009 PRIVATE Septic Tank Failed -Moon River Massage Parlor -2138 Newport Blvd; 90919 20 Y 3/31/2009 PRIVATE CO - Chicken Koop Restaurant - Sal: 9/645 -6086 - 432 Hamilton St; 92681 90 Y 4/21/2009 FOG blocked PRIVATE Lateral - Clean Out - FSE Strip Mall - 570 W Wilson St; 93618 10 Y 4/21/2009 Diaper & Debris blocked PRIVATE lateral - 327 West Wilson St; 93619 510 N 510 7/11/2009 Paper Products blocked PRIVATE lateral - 3190 Harbor Blvd - Chevron Station 94946 300 N 20 KEY: GREASE 3 1 2 ROOTS 1 1 PUMP STN 2 2 OTHER 3 3 TOTALS 9 5 4 Total # Gallons 1,1761 460 1 186 Percenta es 100.00% 1 39.12% 1 45.07% 15.82% X:\CMSD Doc uments \Priorities \Priorities - Occurrences 7 -11 -09 CMSD Staff: 949- 645 -8400 1 of 1 • • CR Transfer To: Joan Revak From: CR Transfer Inc. Jurisdiction: Costa Mesa Sanitary District (9) Month/Year: Jun -09 Recycling Report "' Note: This material includes food / small particulate and inert material. Total Tonnage 3214.41 Recycled Tonnage 1620.53 Landfill Tonnage 1593.88 County & Newport Bch Total 205.66 3420.07 104.51 1725.04 101.15 1695.03 Rec cle Tons Commodity Percentage Recycled Newspaper 7.88% 253.3 Cardboard 6.42% 206.27 Mixed Paper 5.13% 164.79 Glass 2.80% 89.99 PET 0.59% 18.89 HDPE 0.45% 14.44 Aluminum Cans 0.33% 10.74 Non - Ferrous Metal 0.44% 14.07 Tin /Metal 0.65% 20.74 Greenwaste 9.78% 314.4 Organic/ Fines 12.67% 407.36 Wood 1.41% 45.18 Concrete /Asphalt 1.88% 60.36 Drywall 0.00% 0 Totals 50.41% 1620.53 "' Note: This material includes food / small particulate and inert material. Total Tonnage 3214.41 Recycled Tonnage 1620.53 Landfill Tonnage 1593.88 County & Newport Bch Total 205.66 3420.07 104.51 1725.04 101.15 1695.03 CR Transfer To: Joan Revak From: CR Transfer Inc. Jurisdiction: Costa Mesa Sanitary District Santa Ana Heights (11) Month/Year: Jun -09 Recycling Report '* Note: This material includes food / small particulate and inert material. Total Tonnage 205.66 Recycled Tonnage 104.51 Landfill Tonnage 101.15 • • Rec cle Tons Commodity Percentage Recycled Newspaper 10.19% 20.95 Cardboard 6.65% 13.69 Mixed Paper 7.63% 15.69 Glass 3.30% 6.78 PET 0.78% 1.6 HDPE 0.44% 0.91 Aluminum Cans 0.51% 1.04 Non - Ferrous Metal 0.27% 0.56 Tin /Metal 0.96% 1.98 Greenwaste 1.30% 2.67 Or anic / Fines 11.67% 23.99 Wood 5.17% 10.64 Concrete/Asphalt 1.95% 4.01 Drywall 0.00% 0 Totals 50.81%1 104.51 '* Note: This material includes food / small particulate and inert material. Total Tonnage 205.66 Recycled Tonnage 104.51 Landfill Tonnage 101.15 • • 0 0 9,- , City 3.813.49 3,341.31 3,458.31 3,369.18 2,920.85 3,258.46 3.103.26 2,626.28 3,251.11 3,188.65 3223.37 3,214.41 County 219.51 133.72 160.16 194.57 167.72 193.68 156.02 146.33 169.10 203.31 189.65 205.66 Recycled Tonnage 1 1 /' 20,632.30 1.922.56 1,684.51 1.743.50 1.698.57 1.472.52 1.64275 1.564.51 1.324.02 1,639.04 1,607.55 1.625.06 1.620.53 111.56 67.95 81.39 98.85 8524 98.44 79.25 74.35 85.93 103.32 96.39 104.51 City 1,890.93 1.656.80 1,714.81 1,67061 1.448.33 1.615.71 1,538.75 1,302.26 1,612.07 1,581.09 1, 598.31 1,593.88 County 107.95 65.77 78.77 95.72 82.48 95.24 76.77 71.98 83.17 99.99 93.26 101.15 Recycled % 50.44 50.43 04 144 50.44 50.44 1 1A4 50A3 50.44 i 0.4 14 'A composite recycling percentage for City & County based on new characterization studies completed by CRT. Waste Diversion FY- 08 /09 /jr 07/15/09 0 1* *1'' City 3,103.26 2,626.28 3,251.11 3,188.64 3,223.37 3,214.41 County 156.02 146.33 169.10 203.31 189.65 205.66 City 1,564.51 1,324.02 1,639.04 1,607.55 1,625.06 1,620.53 County 79.25 74.35 85.93 103.32 96.39 104.51 Landfilled Tonnage 1,615.52 1,374.24 1,695.24 1' 1,691.57 1,695.03 8,057.65 City 1.538.75 1,302.26 1,612.07 1,581.09 1,598.31 1,593.88 County 76.77 71.98 83.17 99.99 93.26 101.15 *A composite recycling percentage for City & County based on new characterization studies completed by CRT. Waste Diversion 2009 /jr 07/15/09 INVOICE .l ION INCORPOR4TED 0 09 100140333 BILL TO: COSTA MESA SANI DIST AREA 9 628 W 19TH ST COSTA MESA CA 92627 MAIL PAYMENT TO: CR TRANSFER, INC. P. O. BOX 125 STANTON, CA 90680 -0125 TERMS: NET 10 DAYS TO PAY BY CREDIT CARD, PLEASE FILL IN INFORMATION ON BACK OF REMITTANCE INVOICE #: INVOICE DATE: 14033 7/01/09 COSTA MESA SANI DIST AREA 9 P.O. BOX 1200 COSTA MESA CA 92627 CUSTOMER #: 09- 9 2 PREVIOUS AMOUNT DUE PAYMENTS CURRENT CHARGES TOTAL DUE 168,324.3 168,324.38 171,917.11 F171,917.11 Please detach here and return with.v ur .payment CHECK # -------------------------- - - - - -- — CR TRANSFER, INC. r� • •�� • • TAL 6/01/09 RESIDENTIAL WASTE 17 160.03 52.220 8,356.77 6/02/09 RESIDENTIAL WASTE 17 133.27 52.220 6,959.36 6/03/09 RESIDENTIAL WASTE 14 126.35 52.220 6,598.00 6/04/09 RESIDENTIAL WASTE 16 168.45 52.220 8,796.46 6/04/09 ADJ TKT #42432 23.42 52.220 1,222.99- 6/05/09 RESIDENTIAL WASTE 14 128.71 52.220 6,721.24 08/09 09/09 RESIDENTIAL WASTE RESIDENTIAL WASTE��3 'g- 18 > 11�4�5Y63rr �y -}177 67 52 220 X52 220 9,277.93 1 :r7, 604.80 /10/09 RESIDENTIAL WASTE 14 �'� �'l'59435f2:220 x,138 X52 �x B 52F220 ".7, 233 .51 6/11/09 RESIDENTIAL WASTE AN r'15 8,325.43 6/12/09 RESIDENTIAL WASTE 14 143.95 52.220 7,517.07 6/15/09 RESIDENTIAL WASTEt 18 172. l8o 52.220 8,991.24 6/16/09 RE'SIDENTIALWASTE 17 14.6.06 52.220 7,627.25 6/17/09 RESIDENTIJArL WASTE 14 .,133.,65 52.2210 6, 979.20 6/18/09 `R'ESIDEN�I 1.; WASTE I,, 1576;,6, 52.220 8,230.39 6/19/09 RESIDENTIAL WASN, i5. 137.62 52.220' 7,186.52 6/22/09 .° RESIDENTIAL WASTE- 18 167.99' 8,772.44 6/23/09 RESIDENTIAL WASTE 17 141.27 52.220 7,377.12 6/24/09 RESIDENTIAL WASTE 14 13G.02oe 52.220 7,102.96 6/25/09 COMMERCIAL WASTE;, b 13: 15 4 51 060 789.39 6/25/09 RESIDENTIAL i 15 1586 97 2,20 8 301.41 , 6/25/09 ADJUST COMM.WASTE 6/25/09` 15 46 5'1 0;60 789.39- 6/26/09 RESIDENTIAL VASTE'� '14 3:143'83 52.'220 7,510.80 6/29/09 RESIDENTIAL WASTE 18 182.61 52.220 9,535.89 6/30/09 RESIDENTIAL WASTE 17 155.77 52.220 8,134.31 IF YOU HAVE ANY QUESTIONS REGARDING ANY PART OF THIS INVOICE, PLEASE CALL P"OUS AMOUNT DUE PAYMENTS CURRENT CHARGES TOTAL DUE CUSTOMER #: INVOICE # OVERDUE AMOUNTS SUBJECT TO FINANCE CHARGE (714) 826 -9049, INVOICE TOTAL (Cont.) 6) Primed m Recycled Pape 'we RAN FAR 100140333 BILL TO: INVOICE RIECEIVEID JUL 0 4 tii09 COSTS MESA SAUMI 9S1RIC1 (Cont.) COSTA MESA SANI DIST AREA 9 628 W 19TH ST COSTA MESA CA 92627 MAIL PAYMENT TO: CR TRANSFER, INC. P. O. BOX 125 STANTON, CA 90680 -0125 TERMS: NET 10 DAYS TO PAY BY CREDIT 11' I is CARD, PLEASE FILL � IN INFORMATION ON BACK OF REMITTANCE INVOICE #: INVOICE DATE: 14033 7/01/09 COSTA MESA SANI DIST AREA 9 P.O. BOX 1200 COSTA MESA CA 92627 CUSTOMER #: 09- 9 2 PREVIOUS AMOUNT DUE PAYMENTS CURRENT CHARGES TOTAL DUE 168,324.38 168,324.38 [171,917.11 171,917.11 a`oss-ms--s----s---v Pleasedetachhereandreturnwith�our�aYment - _--- _- __ -_is CHECK# __me CR TRANSFER, INC. DATE DESCRIPTION LOADS • TOTAL 348 3292.17 171,917.11- IF YOU HAVE ANY QUESTIONS REGARDING ANY PART OF THIS INVOICE, PLEASE CALL PREVIOUS AMOUNT DUE PAYMENTS CURRENT CHARGES TOTAL DUE 168 324.38 168 324.38 171 917.11 r 1�1, 917 . 11 CUSTOMER #: 0 9- 9 2 INVOICE # 14033 P.O. BOX 1200 OVERDUE AMOUNTS SUBJECT TO FINANCE CHARGE ('/14) 826 -yU4y INVOICE TOT 171917.11 MPrimed on Recycled P;— A DESCRIPTION LOADS O TOTAL INVOICE MRITR NSF RT 1 8.63 52.220 P. O. BOX 125 R,NCORPORATED o d o STANTON, CA 90680 -0125 52.220 1,947.28 6/09/09 TERMS: NET 10 DAYS 09 7.97— 500140344 RECIEIV{ED ARD,PLEASEFIL M� CARD, PLEASE FILL 6/10/09 RESIDENTIAL WASTE 4 IN INFORMATION ON BACK 52.220 2,201.07 JUL0 9 2009 OF REMITTANCE 1 8.701-1 INVOICE #: INVOICE DATE: 6/17/09 RESIDENTIAL WASTE CDSTA MESA SANITARY DISTRICT 14034 7/01/09 52.220 BILL TO: COSTA MESA SANI DIST —SA HGT 1 COSTA MESA SANI DIST —SA HGT P.O. BOX 1200 487.73 628 W 19TH ST COSTA MESA CA 92627 8 COSTA MESA CA 92627 ` CUSTOMER #: RESIDENTIAL WASTE ;t �' 5fiyx' °:; 1��8� X75 09— 11 8 PREVIOUS AMOUNT DUE PAYMENTS CURRENT CHARGES TOTAL DUE 9,903.52 9,903.52 10,739.5 1 10,739.55 Please detach here and return Lthj jur oajn ern1 CHECK # -- — — — — — — — — — — — — — — — — — — — — — — — — — — — — --------------..--------- CR TRANSFER, INC. DATE DESCRIPTION LOADS • TOTAL 6/02/09 RESIDENTIAL WASTE 1 8.63 52.220 450.66 6/03/09 RESIDENTIAL WASTE 4 37.29 52.220 1,947.28 6/09/09 RESIDENTIAL WASTE 1 7.97— 52.220 416.19 6/10/09 RESIDENTIAL WASTE 4 42.15 52.220 2,201.07 6/16/09 RESIDENTIAL WASTE 1 8.701-1 52.220 454.31 6/17/09 RESIDENTIAL WASTE 4 41.02, 52.220 2,142.06 23/09 RESIDENTIAL WASTE ..g u� 1 .52 X220 487.73 24/09 RESIDENTIAL WASTE ref °� `¢a{ r 4f411sr 8 k ��� s�5s2�220� 2 183 . 32 x: , 6/30/09 RESIDENTIAL WASTE ;t �' 5fiyx' °:; 1��8� X75 5�2 2420. 456.93 - n f.5, TOTATS 21 205.66 I 739.55 IF YOU HAVE ANY QUESTIONS REGARDING ANY PART OF THIS INVOICE, PLEASE CALL P OUS AMOUNT DUE PAYMENTS CURRENT CHARGES TOTAL DUE 3= F 10 739.55 � F 10, 7'�g - 55 CUSTOMER #:0 9 — 11 8 INVOICE # 14 034 P.O. BOX 1200 OVERDUE AMOUNTS SUBJECT TO FINANCE CHARGE (714) 826 -904 INVOICE TOTAL 10739.55 ® Printed .n R,eyded Papa 0 TO: Costa Mesa Sanitary District st ict Board of Directors FROM: Ron Shef, Ordinance Enforcement Officer DATE: July 14, 2009 SUBJECT: ORDINANCE ENFORCEMENT SUMMARY REPORT This report is for the monthly period of June 2009. Collection schedule remained normal this month with no holiday causing interruption. Applicant interviews and evaluations continued the. first week for a replacement Ordinance Enforcement Officer and this process was put on hold during the second week following discussions with City of Costa Mesa. Due to a program of CPR training for District staff, the Ordinance Enforcement Officer was requested to fill in for staff with phones and walk -ins for that morning. This was completed without any problems or occurrences. The large item summer collection program started mid month. Routes and schedules were requested from CR &R. These were submitted to staff late in the month. Two routes were deleted and added to remaining routes but confusion remains with District area coverage. Clarification is being attempted with contractor. It should also be noted that containers with graffiti and missing lids are still not being addressed. ��. COSTA MEsASANiTA-WYDisqRicT �`di M PROJECT STATUS REPORT July 2009 Proiect 1112100 -101 West Side Pumping Station Abandonment Directors Ferryman and Ooten along with Manager /District Engineer Rob Hamers, Assistant Manager Tom Fauth and Inspector Paul Guzman met with OCSD General Manager Jim Ruth and executive engineering staff on March 29, 2007 to discuss OCSD's participation in the project. It was agreed that the two agencies would work together to determine an approximate project cost for a regional facility and then meet again to discuss the feasibility. The cost estimate has been prepared and is being considered by both agencies. The CMSD updated its costs of the local sewer lines and confirmed the ability to fund the projects. A letter was sent to OCSD requesting the regional facility become a formal OCSD project and the letter was favorably received. The project appears in OCSD's planning documents. Proiect 1112100 -129 Bristol Street Sewer The County of Orange plans on widening Irvine Avenue from Bristol Street to University Drive, which will cause relocation of the CMSD Irvine Pumping Station. The District can upgrade the station to a level able to serve the redevelopment of the area. The upgrade alleviates the need for the Bristol Street Pump Station and the project can be reduced to construction of a new gravity sewer only. These findings were submitted to the Orange County Development Agency (OCDA) and as requested the Sanitary District prepared a new three party agreement reflecting these findings. The Sanitary District, the City of Newport Beach, and OCDA sign the agreement. Bid opening is July 16, 2009 and the results are on the regular meeting agenda for consideration. Proiect 1112100 -159 Televising Sewer Lines Areas are televised as needed, particularly for the fats, oils, and grease (FOG) program. Proiect 1112100-168 Irvine Pumping Station Relocation Construction of the pumping station is 100% complete although the adjacent parking lot asphalt paving, wall, and slope were damaged by the contractor during construction. Once the repair is resolved, the project will be completed. Protecting our community's heafth by provicCug sofuf waste and sewer co&tion services. www.crosdcmgov Proiect 1112100-170 Prepare Emergency Response Plans for Pumping Stations Now that the location of the District Yard has been resolved as well as the makeup of • the CMSD field crews, the emergency response plans may be completed. Work is nearly complete. Proiect 1112100 -171 Irvine Pumping Station Force Main Rehabilitation -Phase I The Board of Directors awarded Phase I construction consisting of 450 linear feet at the June 2008 regular meeting. Construction is complete. Proiect 1112100 -175 OCSD Cooperative Projects Grant - Televising CMSD Sewer Lines The televising is complete and delivery of the final CCTV reports occurred in late May 2009. The project report is being prepared. Project 1112100-180 WDR Grease Control Program The project is continuing. Proiect 1112100-182 Analysis of CCTV Results The project is underway. Project 1112100 -183 System -Wide Sewer Repair • The Board of Directors authorized the District Engineer to begin design of the second project under this program; the Bristol Street Sewer n/o Randolph, Project #183 -2. The sewer contains three sags and is a hot spot requiring increased maintenance by the CMSD field crews. Construction cannot begin until late 2009 when the City of Costa Mesa street cut moratorium is lifted. The Board also approved Project #183 -3, Maintenance Upgrade of SCADA System, at the May 2009 regular meeting. Proiect 1112100-186 Sewer Lateral Assistance Program The project is continuing into its second fiscal year and is very popular with the residents in the District. Calcium has been identified in a number of sewer laterals. Project 1112100-187 New Corporate Yard at 174 W. Wilson Street The construction plans are approved and ready for permits. The contractor selection process has been tailored to finding an experienced contractor in LEED construction and was approved by the Board at the December 2008 regular meeting. Award of the construction contract occurred at the June 2009 regular meeting and construction will begin in July 2009. C] Protecting our community's health by providing solid wa to andsewer colfection sen&es. wzvwxm 4cagov 1 General Ledger Balance Sheet User: tgonzalez Printed: 07/10/2009 - 9:29 A Period Ending 12 Fiscal Period 12, 2009 Description �J Solid Waste Fund Assets Cash in Bank Accounts Receivable Charges /Taxes Receivable Interest Receivable Total Assets Liabilities Accounts Payable Payroll Payable Compensated Absences Payable Deferred Revenue Total Liabilities Fund - Balance Reserved for Life Insurance Reserve for Operating Unreserved Undesignated RE Total Fund - Balance Retained Earnings: Total Fund Balance and Retained Earnings: Total Liabilities, Fund - Balance and Retained Earnings: COSTA WESA SA9V-ITAR,T (DISTRICT ... an Independent Special oistrict Amount 4,056,583.50 6,882.15 58,591.90 10,954.62 4,133,012.17 203,032.75 5,216.88 6,378.06 7,961.44 222,589.13 25,000.00 1,352,000.00 1,890,473.13 3,267,473.13 642,949.91 3,910,423.04 4,133,012.17 GL - Balance Sheet ( 07/10/2009 - 9:29 AM ) Page 1 Description Amount Liquid Waste Fund 69,598.10 Assets 19,002.44 Cash In Bank 6,351,099.73 Petty Cash/Change Funds 700.00 Accounts Receivable 9,271.70 Charges /Taxes Receivable 28,762.69 Interest Receivable 18,231.11 Due From Other Governments 310,591.00 Land 77,964.00 Property Rights 4,025.00 Building & Structures 1,340,797.29 Subsurface Sewer Lines 24,026,497.53 Office Furniture & Equipment 299,853.45 Machinery & Equipment 618,203.35 Vehicles 182,275.00 Construction In Progress 2,322,856.65 Accumulated Deprec - Vehicles (49,066.28) Accumulated Deprec - Buildings (415,571.51) Accum Deprec - Subsurface Line (12,077,709.86) Accumulated Deprec - Office Eq (59,970.63) Accumulated Deprec - Equipment (298,046.12) Total Assets 22,690,764.10 Liabilities Accounts Payable 69,598.10 Payroll Payable 19,002.44 Compensated Absences Payable 51,759.1 Retention's Payable 122,086.7 PERS Retirement 3,885.32 PERS Medical 2,909.96 Life /AD &D Insurance 330.00 Long -Term Disability 383.85 Employee Insurance 1,548.21 Deferred Compensation - 457 305.00 Deferred Medical -RHS- Employee 557.62 Due to OCSD 9,300.85 Total Liabilities 281,667.18 Fund - Balance Reserved for Capital Outlay 3,939,067.02 Investment in Fixed Assets 15,972,107.87 Reserve for Operating 618,400.00 Unreserved Undesignated RE 607,813.10 Total Fund - Balance 21,137,387.99 • GL - Balance Sheet ( 07/10/2009 - 9:29 AM ) Page 2 Description Amount • Retained Earnings: 1,271,708.93 Total Fund Balance and Retained Earnings: 22,409,096.92 Total Liabilities, Fund - Balance and Retained Earnings: 22,690,764.10 • • GL - Balance Sheet ( 07/10/2009 - 9:29 AM ) Page 3 Description Sewer Construction Fund Assets Cash and Investments 100,000.00 Total Assets 100,000.00 Liabilities Deposits Payable 100,000.00 Total Liabilities 100,000.00 Retained Earnings: 0.00 Total Fund Balance and Retained Earnings: 0.00 Total Liabilities, Fund - Balance and Retained Earnings: 100,000.00 • GL - Balance Sheet ( 07/10/2009 - 9:29 AM ) Page 4 Description •Facilities Revolving Fund Assets Cash and Investments Interest Receivable Land Construction In Progress • • Total Assets Liabilities Accounts Payable Total Liabilities Fund - Balance Reserved for Capital Outlay Investment in Fixed Assets Secured Retained Earnings Total Fund - Balance Retained Earnings: Total Fund Balance and Retained Earnings: Total Liabilities, Fund - Balance and Retained Earnings: Amount 2,080,758.76 7,087.86 901,691.41 167,160.90 3,156,698.93 1,507.50 1,507.50 96,905.69 1,068,852.31 1,992,285.28 3,158,043.28 (2,851.85) 3,155,191.43 3,156,698.93 GL - Balance Sheet ( 07/10/2009 - 9:29 AM ) Page 5 1 0 0 Genera Le r dge Revenue Analysis COSTA 9WE5A S I`-ARTDISTRICT M Independent Specid oistrict User: tgonzalez Printed: 07/10/2009 - 9:29 A Period 12, 2009 Account Number Description Budgeted Revenue Period Revenue YTD Revenue Uncollected Balance Percent Received 10 Solid Waste Fund 10- 000000 -3000 Charges for Services 5,000.00 0.00 1,367.06 3,632.94 27.34 10- 000000 -3001 Secured Property Tax 0.00 262.68 191,132.19 (191,132.19) 0.00 10- 000000 -3002 Unsecured Property Tax 0.00 593.14 7,875.53 (7,875.53) 0.00 10- 000000 -3003 Supplemental Property Tax 0.00 0.00 3,420.27 (3,420.27) 0.00 10- 000000 -3004 Homeowner Taxes 0.00 0.00 0.00 0.00 0.00 10- 000000 -3005 Misc- Delq/Penalty/PY Tx 0.00 7,750.71 16,866.66 (16,866.66) 0.00 10- 000000 -3006 Public Utility 0.00 0.00 0.00 0.00 0.00 10- 000000 -3007 Customer Refunds 0.00 (239.40) (239.40) 239.40 0.00 10- 000000 -3100 Licenses & Permits 0.00 0.00 0.00 0.00 0.00 10- 000000 -3300 Investment Earnings 60,000.00 18,212.56 64,748.27 (4,748.27) 107.91 10- 000000 -3310 Fair Market Value Adjustment 0.00 0.00 232.94 (232.94) 0.00 10- 000000 -3400 From Other Agencies 0.00 0.00 0.00 0.00 0.00 10- 000000 -3405 Grants 0.00 0.00 16,993.36 (16,993.36) 0.00 10- 000000 -3510 Additional Container Charge 150,000.00 0.00 105,034.74 44,965.26 70.02 10- 000000 -3525 Other Charges for Services 0.00 0.00 0.00 0.00 0.00 10- 000000 -3600 Annual Charge 5,140,100.00 1,797.95 4,909,610.48 230,489.52 95.52 10- 000000 -3700 Contributions 25,000.00 0.00 28,374.60 (3,374.60) 113.50 10- 000000 -3725 Other Reimbursements 0.00 380.00 5,220.00 (5,220.00) 0.00 10 Totals: 5,380,100.00 28,757.64 5,350,636.70 29,463.30 99.45 20 Liquid Waste Fund 20- 000000 -3000 Charges For Services 10,000.00 0.00 16,712.06 (6,712.06) 167.12 20- 000000 -3007 Customer Refund 0.00 0.00 0.00 0.00 0.00 20- 000000 -3100 Sewer Permits 5,000.00 550.00 9,130.00 (4,130.00) 182.60 20- 000000 -3300 investment Earnings 147,000.00 40,641.32 121,750.68 25,249.32 82.82 20- 000000 -3310 Fair Market Adjustment 0.00 0.00 396.79 (396.79) 0.00 20- 000000 -3400 From Other Agencies 15,000.00 0.00 0.00 15,000.00 0.00 20- 000000 -3500 Permits /Inspection Fees 25,000.00 960.00 7,315.00 17,685.00 29.26 20- 000000 -3505 OCSD Fees -CMSD Share 0.00 472.15 11,738.45 (11,738.45) 0.00 20- 000000 -3515 Sale of Maps & Publications 0.00 0.00 15.00 (15.00) 0.00 20- 000000 -3525 Other Charges for Services 0.00 0.00 0.00 0.00 0.00 GL - Revenue Analysis ( 07/10/2009 - 9:29 AM ) Page 1 Account Number Description Budgeted Revenue Period Revenue YTD Revenue Uncollected Balance Percent Received 20- 000000 -3600 Annual Charge 4,570,500.00 511.46 4,447,836.41 122,663.59 97.32 20- 000000 -3700 Contributions 0.00 0.00 0.00 0.00 0.00 20- 000000 -3725 Other Reimbursements 0.00 158.77 154,527.77 (154,527.77) 0.00 20 Totals: 4,772,500.00 43,293.70 4,769,422.16 3,077.84 99.94 21 Sewer Construction Fund 21- 000000 -3300 investment Earnings 0.00 0.00 0.00 0.00 0.00 21- 000000 -3310 Fair Market Value Adj 0.00 0.00 0.00 0.00 0.00 21 Totals: 0.00 0.00 0.00 0.00 0.00 30 Facilities Revolving Fund 30- 000000 -3210 Fixture Fees 0.00 997.50 24,269.69 (24,269.69) 0.00 30- 000000 -3220 Sewer Connection Fees 0.00 0.00 0.00 0.00 0.00 30- 000000 -3300 Investment Earnings 0.00 11,505.95 47,335.43 (47,335.43) 0.00 30- 000000 -3310 Fair Market Value Adjustment 0.00 0.00 155.73 (155.73) 0.00 30- 000000 -3340 Rental Revenue 0.00 600.00 3,700.00 (3,700.00) 0.00 30- 000000 -3525 Other Charges for Services 0.00 0.00 0.00 0.00 0.00 30 Totals: 0.00 13,103.45 75,460.85 (75,460.85) 0.00 Report Totals: 85,154.79 (42,919.71) 10,152,600.00 10,195,519.71 100.42 GL - Revenuceysis ( 07/10/2009 - 9:29 AM ) 0 0 Page 2 Genera Ledger Expenses vs. Budget COSTA 914E SA S ITA1RT 01ST ICT ... in Independent sSpeciat oistrict User: tgonzalez Printed: 07/10/2009 - 9:30 A Period 12, 2009 Account Number Description Budgeted Amount Period Amount YTD Amount YTD Var Encumbered Amt Available % Available 10 Solid Waste Fund 10- 100000 Solid Administration E01 Salary & Benefits 10-100000-4001 Regular Salaries 86,800.00 10,549.17 85,825.27 974.73 0.00 974.73 1.12 10- 100000 -4002 Part-Time Salaries 53,300.00 4,760.75 38,535.65 14,764.35 0.00 14,764.35 27.70 10- 100000 -4003 Board Salaries 7,200.00 552.50 5,790.20 1,409.80 0.00 1,409.80 19.58 10- 100000 -4005 Overtime 4,500.00 837.23 2,617.13 1,882.87 0.00 1,882.87 41.84 10- 100000 -4040 Compensated Absences 1,100.00 808.08 808.08 291.92 0.00 291.92 26.53 10- 100000 -4100 Cafeteria Plan 10,600.00 1,332.73 11,469.64 (869.64) 0.00 (869.64) (8.20) 10- 100000 -4105 Medicare - Employer 2,500.00 261.54 2,081.76 418.24 0.00 418.24 16.73 10- 100000 -4110 FICA - Employer 750.00 34.25 358.94 391.06 0.00 391.06 52.14 10- 1000004115 PERS - Employer 19,700.00 1,936.55 16,707.74 2,992.26 0.00 2,992.26 15.18 10- 1000004120 PERS - Employee 10,200.00 1,020.65 8,646.40 1,553.60 0.00 1,553.60 15.23 10- 1000004125 Deferred Medical - RHS 850.00 92.11 844.89 5.11 0.00 5.11 0.60 10- 1000004130 Benefits Admin Costs 250.00 28.98 275.99 (25.99) 0.00 (25.99) (10.39) 10- 100000 -4135 Unemployment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10- 100000 -4140 Workers' Compensation 2,000.00 0.00 2,004.35 (4.35) 0.00 (4.35) (0.21) Salary & Benefits 199,750.00 22,214.54 175,966.04 23,783.96 0.00 23,783.96 11.90 E03 Professional Services 10- 1000004200 Professional Services 9,250.00 0.00 2,180.53 7,069.47 0.00 7,069.47 76.42 10- 1000004205 District Manager 30,000.00 9,387.44 30,181.83 (181.83) 0.00 (181.83) (0.60) 10- 1000004210 Legal Services 20,000.00 10,907.16 28,562.46 (8,562.46) 0.00 (8,562.46) (42.81) 10- 1000004220 Fiscal Services 35,840.00 2,492.00 22,173.20 13,666.80 0.00 13,666.80 38.13 10- 1000004225 Medical /Employment Services 100.00 0.00 6.10 93.90 0.00 93.90 93.90 10- 1000004300 Contract Services 3,500.00 291.37 2,917.16 582.84 0.00 582.84 16.65 10- 1000004320 Container Collection Costs 20,000.00 0.00 9,943.55 10,056.45 0.00 10,056.45 50.28 Professional Services 118,690.00 23,077.97 95,964.83 22,725.17 0.00 22,725.17 19.14 E05 Recycling & Disposal 10-100000-4310 Trash Hauler 2,400,000.00 196,667.14 2,359,245.82 40,754.18 0.00 40,754.18 1.69 10-100000-4315 Recycling/Disposal 2,368,000.00 178,227.90 1,957,621.32 410,378.68 0.00 410,378.68 17.33 GL - Expenses vs Budget ( 07/10/2009 - 9:30 AM ) Page 1 Account Number Description Budgeted Amount Period Amount YTD Amount YTD Var Encumbered Amt Available % Available Recycling & Disposal 374,895.04 4,316,867.14 451,132.86 0.00 451,132.86 4,768,000.00 9.46 E10 Other Contract Services 10- 100000 -4305 County Collection Fee 15,500.00 0.00 15,538.14 (38.14) 0.00 (38.14) (0.24) 10- 100000 -4325 Election Costs 28,000.00 0.00 20,399.94 7,600.06 0.00 7,600.06 27.14 10- 100000 -4330 Building Maintenance 1,350.00 242.20 1,488.60 (138.60) 0.00 (138.60) (10.26) 10- 1000004335 Equipment Maintenance 2,470.00 407.02 2,592.84 (122.84) 0.00 (122.84) (4.97) Other Contract Services 47,320.00 649.22 40,019.52 7,300.48 0.00 7,300.48 15.42 E15 Materials & Supplies 10- 100000 -4400 Office Supplies 1,500.00 18.04 1304.66 195.34 0.00 195.34 13.02 10- 100000 -4405 MultiMed/Blueprint/Copies /Sub 1,000.00 4.28 2,343.59 (1,343.59) 0.00 (1,343.59) (134.35) 10- 100000 -4410 Postage 7,900.00 388.56 542.81 7,357.19 0.00 7,357.19 93.12 10- 100000 -4420 Public Info /Ed/Community Prom 16,700.00 3,480.34 16,039.08 660.92 0.00 660.92 3.95 10- 100000 -4425 Small Tools /Equipment 500.00 0.00 112.36 387.64 0.00 387.64 77.52 10- 100000 -4430 Materials & Supplies 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Materials & Supplies 27,600.00 3,891.22 20,342.50 7,257.50 0.00 7,257.50 26.29 E20 Professional Development 10- 100000 -4500 Prof Membership /Dues 8,800.00 0.00 8,466.55 333.45 0.00 333.45 3.78 10- 100000 -4505 Staff Development 1,200.00 72.10 1,032.67 167.33 0.00 1 67.33 13.94 10-100000-4510 Travel /Meals /Lodging 1,700.00 83.06 1,427.77 272.23 0.00 272.23 16.01 10- 100000 -4520 Mileage Reimbursement 1,500.00 0.00 914.96 585.04 0.00 585.04 39.00 Professional Development 13,200.00 155.16 11,841.95 1,358.05 0.00 1358.05 10.28 E25 Liability Insurance 10- 1000004550 Liability Insurance 6,500.00 0.00 6,035.69 464.31 0.00 464.31 7.14 Liability Insurance 6,500.00 0.00 6,035.69 464.31 0.00 464.31 7.14 E30 Utilities 10- 100000 -4600 Telephone 750.00 53.74 636.42 113.58 0.00 113.58 15.14 10- 1000004605 Cellular Service 650.00 35.21 446.36 203.64 0.00 203.64 31.32 10- 1000004610 Gas - Building 75.00 3.13 36.93 38.07 0.00 38.07 50.76 10-100000-4615 Water - Building 175.00 28.75 160.78 14.22 0.00 14.22 8.12 10- 100000 -4620 Electric - Building 900.00 53.23 586.72 313.28 0.00 313.28 34.80 Utilities 2,550.00 174.06 1,867.21 682.79 0.00 682.79 26.77 GL - Expen0 Budget ( 07/10/2009 - 9:30 AM) Page 2 i Account *er Description Budgeted Amount Period A*t YTD Amount YTD Var Encumbered Amt AvailabOAvailable E40 Fixed Assets 0.00 0.00 0.00 0.00 10- 100000 -4700 Depreciation 0.00 0.00 0.00 0.00 10- 100000 -4750 Gain/Loss Disposal of Asset 0.00 0.00 0.00 0.00 0.00 Fixed Assets 0.00 0.00 0.00 0.00 E45 Debt Service 32.30 0.00 6,460.28 32.30 10- 100000 -4800 Principal Payment 0.00 0.00 0.00 0.00 10- 100000 -4850 Interest Payment 0.00 0.00 0.00 0.00 Debt Service 0.00 0.00 0.00 0.00 E50 Other Financing Uses 10- 100000 -4900 Other Financing Uses 0.00 0.00 0.00 0.00 Other Financing Uses 0.00 0.00 0.00 0.00 E55 Non Operating - Other 10- 100000 -4950 Non- Operating Expense 0.00 0.00 0.00 0.00 10- 100000 -4990 Contingency 118,350.00 0.00 0.00 118,350.00 Non Operating - Other 118,350.00 0.00 0.00 118,350.00 10- 100000 Totals: 5,301,960.00 425,057.21 4,668,904.88 633,055.12 10- 100001 Sharps Program E60 Special Programs 10- 100001 -4300 Sharps Program 20,000.00 1,484.79 13,539.72 6,460.28 10- 100001 -4430 Sharps Program - Material /Supp 0.00 0.00 0.00 0.00 Special Programs 20,000.00 1,484.79 13,539.72 6,460.28 10- 10000 1 Totals: 20,000.00 1,484.79 13,539.72 6,460.28 10- 100002 Household Hazardous Waste E60 Special Programs 10- 100002 -4300 Household Hazardous Waste 32,000.00 396.00 12,012.25 19,987.75 GL - Expenses vs Budget ( 07/10/2009 - 9:30 AM ) 0.00. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 118,3 50.00 100.00 0.00 118,3 50.00 100.00 0.00 633,055.12 11.94 0.00 6,460.28 32.30 0.00 0.00 0.00 0.00 6,460.28 32.30 0.00 6,460.28 32.30 0.00 19,987.75 62.46 Page 3 Account Number Description Budgeted Amount Period Amount YTD Amount YTD Var Encumbered Amt Available % Available Special Programs 32,000.00 396.00 0.00 19,987.75 12,012.25 19,987.75 62.46 10- 100002 Totals: 32,000.00 396.00 12,012.25 19,987.75 0.00 19,987.75 62.46 10- 100003 Telephone Book Recycling E60 Special Programs 10- 100003 -4420 Telephone Bk Recycling Progra 17,000.00 0.00 8,198.75 8,801.25 0.00 8,801.25 51.77 Special Programs 17,000.00 0.00 8,198.75 8,801.25 0.00 8,801.25 51.77 10- 100003 Totals: 17,000.00 0.00 8,198.75 8,801.25 0.00 8,801.25 51.77 10- 100004 Large Item Pick -up E60 Special Programs 10-100004-4310 Large Item Pick -up 5,000.00 4,725.19 4,725.19 274.81 0.00 274.81 5.49 10- 100004 -4420 Large Item Plck -up Promo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Special Programs 5,000.00 4,725.19 4,725.19 274.81 0.00 274.81 5.49 10- 100004 Totals: 5,000.00 4,725.19 4,725.19 274.81 0.00 274.81 5.49 10- 100005 Used Tire Roundup E60 Special Programs 10- 100005 -4300 Used Tire Roundup 1,200.00 0.00 306.00 894.00 0.00 894.00 74.50 Special Programs 1,200.00 0.00 306.00 894.00 0.00 894.00 74.50 10- 100005 Totals: 1,200.00 0.00 306.00 894.00 0.00 894.00 74.50 10- 100006 Christmas Tree Recycling E60 Special Programs 10-1000064310 Christmas Tree Recycling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 GL - Expert V Budget ( 07/10/2009 - 9:30 AM) Page 4 Account 1" *er Description Budgeted Amount Period AARt YTD Amount YTD Var Encumbered Amt Availabl *Available GL - Expenses vs Budget ( 07/10/2009 - 9:30 AM ) Page 5 Special Programs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10- 100006 Totals: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10- 100007 Greeting Card Recycling E60 Special Programs 10- 100007 -4410 Greeting Card Recycling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Special Programs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10- 100007 Totals: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10- 100008 Educational Tours E60 Special Programs 10- 100008 -4420 Educational Touts 2,500.00 0.00 0.00 2,500.00 0.00 2,500.00 100.00 Special Programs 2,500.00 0.00 0.00 2,500.00 0.00 2,500.00 100.00 10- 100008 Totals: 2,500.00 0.00 0.00 2,500.00 0.00 2,500.00 100.00 10 Totals: 5,379,660.00 431,663.19 4,707,686.79 671,973.21 0.00 671,973.21 12.49 20 Liquid Waste Fund 20- 200000 Liquid Administration E01 Salary & Benefits 20- 200000 -4001 Regular Salaries 459,000.00 56,059.19 457,074.63 1,925.37 0.00 1,925.37 0.41 20- 200000 -4002 Part-Time Salaries 6,000.00 528.98 6,779.97 (779.97) 0.00 (779.97) (13.00) 20- 200000 -4003 Board Salaries 64,500.00 4,972.50 52,111.80 12,388.20 0.00 12,388.20 19.20 20- 200000 -4005 Overtime 29,300.00 7,297.16 23,316.52 5,983.48 0.00 5,983.48 20.42 20- 200000 -4040 Compensated Absences 6,300.00 2,535.86 2,535.86 3,764.14 0.00 3,764.14 59.74 20- 200000 -4100 Cafeteria Plan 56,600.00 7,552.15 64,613,61 (8,013.61) 0.00 (8,013.61) (14.15) 20- 200000 -4105 Medicare - Employer 9,500.00 1,063.19 8,415.04 1,084.96 0.00 1,084.96 11.42 20- 200000 -4110 FICA - Employer 6,500.00 308.30 3,230.99 3,269.01 0.00 3,269.01 50.29 20-200000-4115 PERS - Employer 62,000.00 7,465.07 70,053.45 (8,053.45) 0.00 (8,053.45) (12.98) 20- 200000 -4120 PERS - Employee 32,100.00 3,456.14 31,925.76 174.24 0.00 174.24 0.54 20- 200000 -4125 Deferred Medical - RHS 4,300.00 483.00 4,492.43 (192.43) 0.00 (192.43) (4.47) GL - Expenses vs Budget ( 07/10/2009 - 9:30 AM ) Page 5 Account Number Description Budgeted Amount Period Amount YTD Amount YTD Var Encumbered Amt Available % Available 20- 200000 -4130 Benefits Admin Costs 20- 2000004135 Unemployment 20- 2000004140 Workers' Compensation 13.75 Salary & Benefits E03 Professional Services 20- 200000 -4200 Professional Services 20- 200000 -4205 District Manager 20- 200000 -4210 Legal Services 20- 200000 -4215 Engineering/Architectual Sery 20- 200000 -4216 Plan Ck/Inspection- Inside 20- 200000 -4217 Plan Ck/Inspection- Outside 20- 200000 -4218 Plan Ck/Inspection -Swr Lateral 20- 200000 -4220 Fiscal Services 20- 200000 -4225 Medical /Employment Services 20- 200000 -4300 Contract Services 20- 200000 -4320 Sewer Contracts 0.00 Professional Services E10 Other Contract Services 20- 200000 -4305 County Collection Fee 20- 200000 -4325 Election Costs 20- 200000 -4330 Building Maintenance 20- 200000 -4335 Equipment Maintenance 84,561.18 Other Contract Services E15 Materials & Supplies 20- 200000 -4400 Office Supplies 20- 200000 -4405 MultiMed/Blueprints /Copies /Su 20- 200000 -4410 Postage 20- 200000 -4420 Public Info /Ed/Community Prom 20- 200000 -4425 Small Tools /Equipment 20- 200000 -4430 Material & Supplies 0.00 Materials & Supplies E20 Professional Development 20- 200000 -4500 Prof Membership /Dues 20- 200000 -4505 Staff Development 20- 200000 -4510 Travel /Meals /Lodging 20- 200000 -4520 Mileage Reimbursement 3,000.00 490.36 2,587.36 412.64 0.00 412.64 13.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,000.00 0.00 3,808.27 191.73 0.00 191.73 4.79 743,100.00 92,211.90 730,945.69 12,154.31 0.00 12,154.31 1.63 40,750.00 0.00 28,559.98 12,190.02 0.00 12,190.02 29.91 59,200.00 17,433.81 56,051.92 3,148.08 0.00 3,148.08 5.31 72,000.00 21,432.68 84,561.18 (12,561.18) 0.00 (12,561.18) (17.44) 18,000.00 2,800.00 16,800.00 1,200.00 0.00 1,200.00 6.66 200.000.00 40,932.50 218,240.00 (18,240.00) 0.00 (18,240.00) (9.12) 25,000.00 3,272.50 13,242.50 11,757.50 0.00 11,757.50 47.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 66,480.00 4,628.00 41,178.80 25,301.20 0.00 25,301.20 38.05 500.00 0.00 511.52 (11.52) 0.00 (11.52) (2.30) 6,500.00 1,154.38 9,147.84 (2,647.84) 0.00 (2,647.84) (40.73) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 488,430.00 91,653.87 468,293.74 20,136.26 0.00 20,136.26 4.12 13,800.00 0.00 14,861.10 (1,061.10) 0.00 (1,061.10) (7.68) 52,000.00 0.00 37,885.60 14,114.40 0.00 14,114.40 27.14 12,150.00 2,179.73 13,420.01 (1,270.01) 0.00 (1,270.01) (10.45) 23,530.00 3,663.17 23,476.67 53.33 0.00 53.33 0.22 101,480.00 5,842.90 89,643.38 11,836.62 0.00 11,836.62 11.66 12,000.00 162.36 11,888.37 111.63 0.00 111.63 0.93 9,000.00 38.52 13,203.55 (4,203.55) 0.00 (4,203.55) (46.70) 14,700.00 3,496.96 8,940.35 5,759.65 0.00 5.759.65 39.18 19,400.00 34.06 16,121.00 3,279.00 0.00 3,279.00 16.90 1,500.00 283.31 1,648.03 (148.03) 0.00 (148.03) (9.86) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56,600.00 4,015.21 51,801.30 4,798.70 0.00 4,798.70 8.47 33,690.00 132.00 31,490.20 2,199.80 0.00 2,199.80 6.53 6,800.00 848.90 6,362.85 437.15 0.00 437.15 6.42 26,800.00 1,377.86 17,216.34 9,583.66 0.00 9,583.66 35.76 250.00 0.00 126.92 123.08 0.00 123.08 49.23 GL - Expense Budget ( 07/10/2009 - 9:30 AM) Page 6 Account *er Description Budgeted Amount Period Aot YTD Amount YTD Var Encumbered Amt Availab ,* Available Professional Development 67,540.00 2,358.76 55,196.31 12,343.69 E25 Liability Insurance 18.27 0.00 15,678.75 22.39 20- 200000 -4550 Liability Insurance 70,000.00 0.00 54,321.25 15,678.75 0.00 Liability Insurance 70,000.00 0.00 54,321.25 15,678.75 E30 Utilities 27.64 0.00 947.55 13.53 20- 200000 -4600 Telephone 6,500.00 483.60 5,727.34 772.66 20- 200000 -4605 Cellular Service 7,000.00 569.93 7,619.68 (619.68) 20- 200000 -4610 Gas - Building 500.00 28.23 332.48 167.52 20- 200000 -4615 Water - Building 2,000.00 258.75 1,447.03 552.97 20- 2000004620 Electric - Building 7,000.00 479.12 6,052.45 947.55 Utilities 23,000.00 1,819.63 21,178.98 1,821.02 E40 Fixed Assets 20- 2000004700 Depreciation 0.00 0.00 0.00 0.00 20- 200000 -4750 G/L On Disposal of Fixed Asset 0.00 0.00 0.00 0.00 Fixed Assets 0.00 0.00 0.00 0.00 E50 Other Financing Uses 20- 2000004900 Other Financing Uses 0.00 0.00 0.00 0.00 Other Financing Uses 0.00 0.00 0.00 0.00 E55 Non Operating - Other 20- 2000004950 Non Operating Expense 182,000.00 0.00 0.00 182,000.00 20- 2000004990 Contingency 2,650.00 0.00 0.00 2,650.00 20- 200000 -4995 Transfer Out 0.00 0.00 0.00 0.00 Non Operating - Other 184,650.00 0.00 0.00 184,650.00 20- 200000 Totals: 1,734,800.00 197,902.27 1,471,380.65 263,419.35 20- 200001 Sewer Maint E25 Liability Insurance 20- 200001 -4550 Swr Liability Insurance 10,000.00 0.00 8,980.40 1,019.60 GL - Expenses vs Budget ( 07/10/2009 - 9:30 AM ) 0.00 12,343.69 18.27 0.00 15,678.75 22.39 0.00 15,678.75 22.39 0.00 772.66 11.88 0.00 (619.68) (8.85) 0.00 167.52 33.50 0.00 552.97 27.64 0.00 947.55 13.53 0.00 1,821.02 7.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 182,000.00 100.00 0.00 2,650.00 100.00 0.00 0.00 0.00 0.00 184,650.00 100.00 0.00 263,419.35 15.18 0.00 1,019.60 10.19 Page 7 Account Number Description Budgeted Amount Period Amount YTD Amount YTD Var Encumbered Amt Available % Available Liability Insurance 0.00 8,980.40 1,019.60 0.00 1,019.60 10.19 10,000.00 E41 Sewer Maint - Salary/Benefit 20-200001-4001 Swr Maint - Regular Salaries 175,200.00 19,328.66 179,701.53 (4,501.53) 0.00 (4,501.53) (2.56) 20- 200001 -4002 Swr Maint - PT Salaries 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20- 200001 -4005 Swr Maint - Overtime 19,000.00 6,769.35 21,243.39 (2,243.39) 0.00 (2,243.39) (11.80) 20- 200001 -4040 Compensated Absences 1,600.00 6,665.89 6,665.89 (5,065.89) 0.00 (5,065.89) (316.61) 20- 200001 -4100 Swr Maint - Cafeteria Plan 28,800.00 3,188.01 28,895.83 (95.83) 0.00 (95.83) (0.33) 20- 200001 -4105 Swr Maint - Medicare ER 3,400.00 394.35 3,070.28 329.72 0.00 329.72 9.69 20-200001-4115 SwrMaint - PERSER 25,400.00 2,760.87 26,681.81 (1,281.81) 0.00 (1,281.81) (5.04) 20- 200001 4120 Swr Maint - PERS EE 13,200.00 1,312.23 12,659.08 540.92 0.00 540.92 4.09 20- 200001 -4125 Swr Maint - Def Medical RHS 1,800.00 187.48 1,783.73 16.27 0.00 16.27 0.90 20- 200001 -4130 Benefit Administration 500.00 31.23 283.05 216.95 0.00 216.95 43.39 20-2000014135 Swr Maint - Unemployment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20- 200001 -4140 Swr Maint - Workers Comp 14,700.00 0.00 14,230.90 469.10 0.00 469.10 3.19 Sewer Maint - Salary/Benefit 283,600.00 40,638.07 295,215.49 (11,615.49) 0.00 (11,615.49) (4.09) E42 Sewer Maint Operations 20- 200001 -4300 Sewer Maint - Claims 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20- 2000014305 Sewer Maint -Pump Stn Contract 125,000.00 267.27 44,886.10 80,113.90 0.00 80,113.90 64.09 20- 2000014320 Sewer Maint -Sewer Line Maint 450,000.00 0.00 438,342.89 11,657.11 0.00 11,657.11 2.59 20- 200001 -4335 Sewer Maint - Equipment Maint 62,500.00 5.211.09 53,315.99 9,184.01 0.00 9,184.01 14.69 20-200001-4350 Sewer Maint - Property Lease 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20- 200001 -4405 Sewer Maint- MultiMed/Blueprin 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20- 200001 -4425 Sewer Maint -Small Tools /Eq 20,000.00 74.75 3,800.89 16,199.11 0.00 16,199.11 80.99 20- 200001 -4430 Sewer Maint-Material/Supplies 44,000.00 2,120.28 27,339.94 16,660.06 0.00 16,660.06 37.86 20- 200001 -4505 Sewer Maint -Staff Development 4,500.00 0.00 225.00 4,275.00 0.00 4,275.00 95.00 20-200001-4510 Sewer Maint- Travel/Meats 500.00 0.00 0.00 500.00 0.00 500.00 100.00 20- 200001 -4625 Sewer Maint- Water Pumps 1,800.00 135.94 1,035.80 764.20 0.00 764.20 42.45 20- 2000014630 Sewer Maint - Electric Pumps 90,000.00 7,322.00 75,212.46 14,787.54 0.00 14,787.54 16.43 Sewer Maint Operations 798,300.00 15,131.33 644,159.07 154,140.93 0.00 154,140.93 19.30 E65 Capital Improvement Program 20- 200001 -4995 Capital Outlay 40,000.00 0.00 39,254.30 745.70 0.00 745.70 1.86 Capital Improvement Program 40,000.00 0.00 39,254.30 745.70 0.00 745.70 1.86 20- 200001 Totals: 1,131,900.00 55,769.40 987,609.26 144,290.74 0.00 144,290.74 12.74 GL - Expen0Budget ( 07/10/2009 - 9:30 AM) Page 8 Account Oer Description Budgeted Amount Period A &t YTD Amount YTD Var Encumbered Amt Availab ,* Available 20- 200100 Capital Outlay E65 Capital Improvement Program 20- 200100 -4995 Capital Outlay 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Capital Improvement Program 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20- 200100 Totals: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20- 200429 Bristol Pump Station E65 Capital Improvement Program 20- 2004294300 Bristol St Pump - Contract Labor 15,000.00 13,686.50 25,218.34 (10,218.34) 0.00 (10,218.34) (68.12) Capital Improvement Program 15,000.00 13,686.50 25,218.34 (10,218.34) 0.00 (10,218.34) (68.12) 20- 200429 Totals: 15,000.00 13,686.50 25,218.34 (10,218.34) 0.00 (10,218.34) (68.12) 20- 200449 Sinking Fd/Future Sewer Lines E65 Capital Improvement Program 20- 2004494300 Sinking Fund #149 /Swr -Contr Sv 1,895,805.00 0.00 0.00 1,895,805.00 0.00 1,895,805.00 100.00 Capital Improvement Program 1,895,805.00 0.00 0.00 1,895,805.00 0.00 1,895,805.00 100.00 20- 200449 Totals: 1,895,805.00 0.00 0.00 1,895,805.00 0.00 1,895,805.00 100.00 20- 200456 Earthquake/Major Emer Swr Rep E65 Capital Improvement Program 20- 2004564300 Earthquake/Emergency -Contr Sv 1,000,000.00 0.00 0.00 1,000,000.00 0.00 1,000,000.00 100.00 Capital Improvement Program 1,000,000.00 0.00 0.00 1,000,000.00 0.00 1,000,000.00 100.00 20- 200456 Totals: 1,000,000.00 0.00 0.00 1,000,000.00 0.00 1,000,000.00 100.00 20- 200459 Televising Swr Lines E65 Capital Improvement Program 20- 200459 -4300 Televising Swr#159 -Contr Svc 52224.00 0.00 10,230.00 41,994.00 0.00 41,994.00 80.41 GL - Expenses vs Budget ( 07/10/2009 - 9:30 AM ) Page 9 Account Number Description 20- 200464 E65 20- 200464 -4300 20- 200468 E65 20- 200468 -4300 20- 200470 E65 20- 200470 -4300 20- 200471 E65 20- 200471 -4300 Budgeted Amount Period Amount YTD Amount YTD Var Encumbered Amt Available % Available Capital Improvement Program 52,224.00 0.00 10,230.00 41,994.Uu 20- 200459 Totals: 52,224.00 0.00 10,230.00 41,994.00 Misc. Swr Work/Manhole Adj. Capital Improvement Program Misc Swr Wk #164 -Coot Svc 194,806.00 40,836.14 197,170.76 (2,364.76) Capital Improvement Program 194,806.00 40,836.14 197,170.76 (2,364.76) 20- 200464 Totals: 194.806.00 40,836.14 197,170.76 (2,364.76) Tustin Pump Stn Remodel Capital Improvement Program 34.87 Irvine /Tustin Pump Stn #168 -Con 4,478.00 Capital Improvement Program 4,478.00 20- 200468 Totals: 4,478.00 Emerg Response Plan Pump Stn 12,920.00 Capital Improvement Program 11,280.00 Emerg Pump Plan -Contr Svc 24,200.00 Capital Improvement Program 24,200.00 20- 200470 Totals: 24.200.00 Irvine PS Free Main #171 4.443.13 Capital Improvement Program Irvine PS Free Main# 171 -Contr 455.640.00 Capital Improvement Program 455,640.00 0.00 34.87 4,443.13 0.00 34.87 4.443.13 12,920.00 12,920.00 11,280.00 12,920.00 12,920.00 11,280.00 0.00 174,518.20 281,121.80 0.00 174,518.20 281,121.80 0.00 41,994.00 80.41 0.00 41,994.00 80.41 0.00 (2,364.76) (1.21) 0.00 (2,364.76) (1.21) 0.00 (2,364.76) (1.21) 0.00 4,443.13 99.22 0.00 4.443.13 99.22 0.00 11,280.00 46.61 0.00 11,280.00 46.61 0.00 11,280.00 46.61 0.00 281,121.80 61.69 0.00 281,121.80 61.69 GL - Expenle Budget ( 07/10/2009 - 9:30 AM) Page 10 Account *er Description Budgeted Amount Period A& YTD Amount YTD Var Encumbered Amt Availablo Available 20- 200471 Totals: 455,640.00 174,518.20 0.00 281,121.80 61.69 0.00 281,121.80 20- 200473 SC Plaza Stn Force Main Replac E65 Capital Improvement Program 20- 200473 -4300 SC Plaza Pump# 173 -Contr Svc 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Capital Improvement Program 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20- 200473 Totals: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20- 200575 OCSD Grant E65 Capital Improvement Program 20- 200575 -4215 OCSD Grant # 175 - Eng Svc 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20- 200575 -4300 OCSD Grant #175 - Cont Svc 259,708.00 0.00 73,547.52 186,160.48 0.00 186,160.48 71.68 Capital Improvement Program 259,708.00 0.00 73,547.52 186,160.48 0.00 186,160.48 71.68 20- 200575 Totals: 259,708.00 0.00 73,547.52 186,160.48 0.00 186,160.48 71.68 20- 200601 Westside Abandonment #101 E65 Capital Improvement Program 20-200601-4300 Westside Aband #101 -Cont Svc 499,941.00 0.00 0.00 499,941.00 0.00 499,941.00 100.00 Capital Improvement Program 499,941.00 0.00 0.00 499,941.00 0.00 499,941.00 100.00 20- 200601 Totals: 499,941.00 0.00 0.00 499,941.00 0.00 499,941.00 100.00 20- 200676 WDR Phase III #176 E65 Capital Improvement Program 20- 200676 -4300 WDR Ph III # 176 - Contr Svc 17,404.00 0.00 0.00 17,404.00 0.00 17,404.00 100.00 Capital Improvement Program 17,404.00 0.00 0.00 17,404.00 0.00 17,404.00 100.00 GL - Expenses vs Budget ( 07/10/2009 - 9:30 AM ) Page 11 Account Number Description Budgeted Amount Period Amount YTD Amount YTD Var Encumbered Amt Available % Available 0.00 20- 200676 Totals: 17,404.00 0.00 0.00 17,404.00 20- 200677 Capital Facility Aq #177 0.00 96,636.87 98.87 E65 Capital Improvement Program 98.87 0.00 26,723.00 20- 200677 -4300 Capital Fac Aq #177 -Contr Svc 97,737.00 0.00 1,100.13 96,636.87 0.00 Capital Improvement Program 97,737.00 0.00 1,100.13 96,636.87 20- 200677 Totals: 97,737.00 0.00 1,100.13 96,636.87 20- 200678 Replace Sewer Bypass #178 100.00 0.00 142,132.99 E65 Capital Improvement Program 0.00 142,132.99 60.20 20- 200678 -4300 Rep Swr Bypass #178 -Contr Svc 26,723.00 0.00 0.00 26,723.00 Capital Improvement Program 26,723.00 0.00 0.00 26,723.00 20- 200678 Totals: 26,723.00 0.00 0.00 26,723.00 20- 200679 Building/Grounds Fund #179 E65 Capital Improvement Program 20- 200679 -4300 Bld /Grds Fund #179 -Contr Svc 3,753.00 0.00 0.00 3,753.00 Capital Improvement Program 3,753.00 0.00 0.00 3,753.00 20- 200679 Totals: 3,753.00 0.00 0.00 3,753.00 20- 200780 Fog #180 E65 Capital Improvement Program 20- 200780 -4300 Fog Program #180 - Contract Svc 236,096.00 16,594.80 93,963.01 142,132.99 Capital Improvement Program 236,096.00 16,594.80 93,963.01 142,132.99 20- 200780 Totals: 236,096.00 16,594.80 93,963.01 142,132.99 0.00 17,404.00 100.00 0.00 96,636.87 98.87 0.00 96,636.87 98.87 0.00 96,636.87 98.87 0.00 26,723.00 100.00 0.00 26,723.00 100.00 0.00 26,723.00 100.00 0.00 3,753.00 100.00 0.00 3,753.00 100.00 0.00 3353.00 100.00 0.00 142,132.99 60.20 0.00 142,132.99 60.20 0.00 142,132.99 60.20 GL - Expen0 Budget ( 07/10/2009 - 9:30 AM) Page 12 Account Ober Description Budgeted Amount Period Ant YTD Amount YTD Var Encumbered Amt Availabi . Available 20- 200781 Newp/ 19th Swr # 181 E65 Capital Improvement Program 20- 200781 -4300 Newp /19th Swr #181 Contr Svc 48,658.00 0.00 0.00 48,658.00 0.00 48,658.00 100.00 Capital Improvement Program 48,658.00 0.00 0.00 48,658.00 0.00 48,658.00 100.00 20- 200781 Totals: 48,658.00 0.00 0.00 48,658.00 0.00 48,658.00 100.00 20- 200882 Analysis of CCTV Results #182 E65 Capital Improvement Program 20- 200882 -4300 Analysis of CCTV Results # 182 125,000.00 0.00 0.00 125,000.00 0.00 125,000.00 100.00 Capital Improvement Program 125,000.00 0.00 0.00 125,000.00 0.00 125,000.00 100.00 20- 200882 Totals: 125,000.00 0.00 0.00 125,000.00 0.00 125,000.00 100.00 20- 200883 System Wide Repair Prog # 183 E65 Capital Improvement Program 20- 200883 -4300 Systm Wide Repair Prog. #183 700,000.00 3,619.39 297.304.71 402,695.29 0.00 402,695.29 57.52 Capital Improvement Program 700,000.00 3,619.39 297,304.71 402,695.29 0.00 402,695.29 57.52 20- 200883 Totals: 700,000.00 3,619.39 297,304.71 402,695.29 0.00 402,695.29 57.52 20- 200886 Sewer Lateral Program # 186 E65 Capital Improvement Program 20- 200886 -4300 Sewer Lateral Program #186 186,894.00 19,665.00 152,715.78 34,178.22 0.00 34,178.22 18.28 Capital Improvement Program 186,894.00 19,665.00 152,715.78 34,178.22 0.00 34,178.22 18.28 20- 200886 Totals: 186,894.00 19,665.00 152,715.78 34,178.22 0.00 34,178.22 18.28 20 Totals: 8,710,767.00 360,993.50 3,497,713.23 5.213,053.77 0.00 5,213,053.77 59.84 GL - Expenses vs Budget ( 07/10/2009 - 9:30 AM ) Page 13 Account Number Description Budgeted Amount Period Amount YTD Amount YTD Var Encumbered Amt Available % Available 21 Sewer Construction Fund 21- 200000 Liquid Administration E55 Non Operating - Other 21- 200000 -4995 Residual Fund Transfer 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Non Operating - Other 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21- 200000 Totals: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21 Totals: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30 Facilities Revolving Fund 30- 200887 District Yard E65 Capital Improvement Program 30- 200887 -4300 District Yard 119,606.00 1,507.50 78,312.70 41,293.30 0.00 41,293.30 34.52 Capital Improvement Program 119,606.00 1,507.50 78,312.70 41,293.30 0.00 41,293.30 34.52 30- 200887 Totals: 119,606.00 1,507.50 78,312.70 41,293.30 0.00 41,293.30 34.52 30 Totals: 11906.00 1,507.50 78,312.70 41,293.30 0.00 41293.30 34.52 Report Totals: 14210,033.00 794,164.19 8,283,712.72 5,926,320.28 0.00 5,926,320.28 41.70 GL - Expen0 Budget ( 07/10/2009 - 9:30 AM) Page 14 CosTA MESA SANiTA-Ry DisqRicT Memorandum ... an Independent Special District To: Board of Directors From: Marc Davis, Treasurer /Director of Finance� Date: July 13, 2009 Subject: Treasurer's Report for the Month of June 2009 Attached is the Treasurer's Report for the month of June 2009. As required by the District's Statement of Investment Policy, the Treasurer's report delineates all investment activity during the month. is This report lists the types of securities held in the District's portfolio, the institutions from which the securities were purchased, maturity dates and interest rates as of June 30, 2009. The District's investments are in compliance with the Statement of Investment Policy adopted by the Board at the June 23, 2008 regular meeting, as well as the California Government Code. The market values in this report were provided by our third party custodian, Bank of New York, except for the Local Agency Investment Fund (LAIF). The market value of LAIF was provided by the State Treasurer's Office. It does not represent the value of the underlying securities within the pool, but rather the par or cost amount, which is the amount the District is entitled to withdraw. This reporting practice is consistent with industry standard practices for similar funds. 0 The weighted average stated rate of return (current yield) for the District's investment portfolio as of June 30, 2009, was 1.658 %. The yield to maturity of the portfolio was 1.656 %. The District's weighted average interest rate was 54 basis points (0.538 %) above the daily effective yield of LAIF, which was 1.12% as of June 30, 2009. The weighted average number of days to maturity for the District's total portfolio was 432 days (1.18 years). The average duration of the underlying securities in LAIF as of June 30, 2009, which is the most current information available, was 235 days. Protecting our community's health by providing solid waste and sewer collection services. crosdcagov 1 Compliance Reporting The District's investment portfolio is in compliance with its liquidity limitations, which requires that a minimum of 20% of the portfolio must mature within one year. The percentage of the portfolio maturing in less than one year as of June 30, 2009 was 67.97 %. As of June 30, 2009, the District has adequate operating reserves necessary to meet its obligations for the next six months. r L_J 2 COSTA MESA SANITARY DISTRICT Treasurer's Report of Pooled Cash and Investments as of June 30, 2009 Costa Mesa Sanitary District Pooled Cash and Investments by Fund as of June 30, 2009 CMSD Solid Waste Activities $ 4,056,583.50 CMSD Liquid Waste Activities 8,531,858.49 Total Pooled Cash & Investments $ 12,588,441.99 Marcus D. Davis Treasurer /Director of Finance • 3 Date Deposits Outstanding Active Accounts Bank Balance In Transits Checks Book Balance Bank of America $ 46,462.38 - 2,614.98 $ 43,847.40 Reconciling Items - - - - Total Active Accounts 46,462.38 - 2,614.98 43,847.40 Market Adjustment Investments Market Value Increase Decrease Cost Local Agency Investment Fund $ 7,422,652.14 - $ 7,422,652.14 Money Market/Sweep Account 1,121,942.45 - 1,121,942.45 Federal Agency Securities 4,027,187.50 - 27,187.50 4,000,000.00 Total Investments 12,571,782.09 - 27,187.50 12,544,594.59 Total Pooled Cash & Investments $ 12,618,244.47 $ - $ 29,802.48 $ 12,588,441.99 Costa Mesa Sanitary District Pooled Cash and Investments by Fund as of June 30, 2009 CMSD Solid Waste Activities $ 4,056,583.50 CMSD Liquid Waste Activities 8,531,858.49 Total Pooled Cash & Investments $ 12,588,441.99 Marcus D. Davis Treasurer /Director of Finance • 3 Date COSTA MESA SANITARY DISTRICT Investment Activity Summary as of June 30, 2009 Total investments outstanding as of May 31, 2009 Additions: Gain on Sale of Investment: Investment Purchases: Deductions: Investment Maturity /Sale Proceeds: Loss on Sale of Investment: Investments Called: Net increase (decrease) in Sweep Account Net increase (decrease) in LAIF Total investments outstanding as of June 30, 2009 N • $ 13,120,243.91 34, 350.68 610,000.00 • $ 12,544,594.59 • COSTA MESA S &ARY DISTRICT Investment and Investment Earnings as of June 30, 2009 * *Represents the LAIF daily rate at 6/30/09 5 $ 12,544,594.59 $ 36,273.59 • Comments Interest CUSIP Purchase Maturity Coupon Investment Earned at Number Investment Date Date Rate Cost 06/30/09 n/a Local Agency Investment Fund n/a n/a 1.120% $ 7,422,652.14 n/a n/a Bank of New York -Sweep Acct n/a n/a 0.010% 1,121,942.45 n/a 3133XRGZ7 Federal Home Loan Bank 06/24/08 06/24/11 3.550% 1,000,000.00 690.27 31331GKJ7 Federal Farm Credit Bank 01/21/09 01/21/14 3.000% 1,000,000.00 13,333.33 3133XSWG9 Federal Home Loan Bank 02/05/09 02/05/14 .2.875% 1,000,000.00 11,659.72 3133XT2W5 Federal Home Loan Bank 02/26/09 02/26/13 3.050% 1,000,000.00 10,590.27 * *Represents the LAIF daily rate at 6/30/09 5 $ 12,544,594.59 $ 36,273.59 • Comments COSTA MESA SANITARY DISTRICT Summary of Policy Limitations as of June 30, 2009 Description U.S. Treasury Bills U.S. Treasury Notes Federal Agency Issues: FICB FLB FHLB FHLMC FNMA FFCB Other Banker's Acceptances Certificates of Deposit Negotiable Certificates of Deposits Commercial Paper Medium Term Corporate Notes LAIF (Local Agency Investment Fund) Money Market/Mutual Funds (Sweep Acct) Total % of portfolio maturing under one year % of portfolio maturing over one year Current % of Market Value 06/30/09 Maximum % 0.00% UNLIMITED 0.00% UNLIMITED 0.00% UNLIMITED 0.00% UNLIMITED 24.09% UNLIMITED 0.00% UNLIMITED 0.00% UNLIMITED 7.95% 0.00% UNLIMITED 0.00% 25%(1) 0.00% 25% 0.00% 25%(1) 0.00% 25%(1) 0.00% 25%(1) 59.04% 40, 000, 000.00 8.92% 10% per fund (2) 100.00% 67.97% no less than 20% 32.03% 100.00% (1) Further limited to 10% in any single issuer (2) Also limited to 20% in total. *These securities are not considered for purchases: SBA, GNMA, TVA and SALLIEMAE 0 U • 0 — Represents the LAIF daily rate at 6/30/09 7 COSTA MESA SANITARY DISTRICT Schedule of Investments by Instrument Type as of June 30, 2009 Purchase Maturity Coupon Investment % of Market % of Description Broker /Dealer Date Date Rate Cost Portfolio Value Portfolio Comments State Treasurer's Pool LAIF n/a Continuous 1,120% $ 7,422,652.14 $ 7,422,652.14 POOL 7,422,652.14 59.17% 7,422,652.14 59.04% Money Market Mutual Fund Bank of New York n/a Continuous 0.010% 1,121,942.45 1,121,942.45 SWEEP 1,121,942.45 8.94% 1,121,942.45 8.92% Federal Farm Credit Bank Union Banc 01/21/09 01/21/14 3.000% 1,000,000.00 999,062.50 FFCB 1,000,000.00 7.97% 999,062.50 7.95% Federal Home Loan Bank Morgan Stanley 06/24/08 06/24/11 3.550% 1,000,000.00 1,027,812.50 FHLB Federal Home Loan Bank Union Banc 02/05/09 02/05/14 2.875% 1,000,000.00 991,250.00 FHLB Federal Home Loan Bank Union Banc 02/26/09 02/26/13 3.050% 1,000,000.00 1,009,062.50 FHLB 3,000,000.00 23.91% 3,026,125.00 24.09% Total Investments $ 12,544,594.59 100.00% $ 12,571,782.09 100.00% — Represents the LAIF daily rate at 6/30/09 7 Broker /Dealer Local Agency Investment Fund Bank of New York Morgan Stanley Union Banc Union Banc Union Banc Total Investment Portfolio Total Portfolio Weighted Avg Interest Rate Weighted Avg Yield to Maturity Weighted Avg Days to Maturity COSTA MESA SANITARY DISTRICT Investment Portfolio as of June 30, 2009 Investment Purchase Maturity Days to Coupon Yield to Type Date Date MaturitV Rate Maturity Pool 1 1.120% ** 1.120% Sweep 1 0.010% 0.010% FHLB 06/24/08 06/24/11 724 3.550% 3.550% FFCB 01/21/09 01/21/14 1,666 3.000% 2.978% FHLB 02/05/09 02/05/14 1,681 2.875% 2.875% FHLB 02/26/09 02/26/13 1,337 3.050% 3.050% * *Represents the LAIF daily rate at 6/30/09 1.658 % 1.656 % 432 Days 1.18 Years Investment Cost $ 7,422,652.14 1,121, 942.45 1,000,000.00 1,000,000.00 1,000,000.00 1,000,000.00 $ 12,544,594.59 i • • 9 0 COSTA MESA SANITARY DISTRICT For all Maturities with Market Values as of June 30, 2009 Purchase Maturity Intuition Investment Coupon Investment Market Accrued Date Date Broker /Dealer Type Par Rate Cost Value Interest n/a Continuous LAIF POOL $ 7,422,652.14 1.120% 7,422,652.14 7,422,652.14 - n/a Continuous Bank of New York SWEEP 1,121,942.45 0.010% 1,121,942.45 1,121,942.45 - 01/21/09 01/21/14 Union Banc FFCB 1,000,000.00 3.000% 1,000,000.00 999,062.50 13,333.33 06/24/08 06124/11 Morgan Stanley FHLB 1,000,000.00 3.550% 1,000,000.00 1,027,812.50 690.27 02/05/09 02/05/14 Union Banc FHLB 1,000,000.00 2.875% 1,000,000.00 991,250.00 11,659.72 02/26/09 02/26/13 Union Banc FHLB 1,000,000.00 3.050% 1,000,000.00 1,009,062.50 10,590.27 Total Investments $ 12,544,594.59 12,544,594.59 12,571,782.09 36,273.59 "Represents the LAIF daily rate at 6/30/09 E • Net Gain /(Loss) If Sold (937.50) 27, 812.50 (8,750.00) 9,062.50 27,187.50 COSTA MESA SANITARY DISTRICT Call Schedule as of June 30, 2009 Type of Purchase Maturity Coupon Investment Date Date Rate Par Value FFCB 01/21/09 01/21/14 3.000% 1,000,000.00 FHLB 06/24/08 06/24/11 3.550% 1,000,000.00 FHLB 02/05/09 02/05/14 2.875% 1,000,000.00 FHLB 02/26/09 02/26/13 3.050% 1,000,000.00 $ 4,000,000.00 • Investment Cost Call Features 1,000,000.00 Callable 4/21/09 and anytime after w/7 days notice. 1,000,000.00 Callable 6/24/10w/5 days notice. 1,000,000.00 Callable 2/5/10 and anytime after w/5 days notice. 1,000,000.00 Callable 2/26/10 and anytime after w/5 days notice. 4,000,000.00 i • 0 0 6, COSTA MESA SANITARY DISTRICT - MATURITIES DISTRIBUTION as of June 30, 2009 -------------------------------- 70% 68.11% -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 60% ------ - - - - -- ----- - - - - -- 50 %- ' , 40% - -F4- -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 400 - - - - - - - - - - - - - - - - - - 30 /o - - ----------------------------- 15.94% 20 %— .— n ' 7.97% 7.97% 10% -- ----------------------- - - - - -- 'r -- � 0.00% ' 0.00% . t' t' 1 -180 181 -365 1 -2 2 -3 3 -4 4 -5 Days Days Years Years Years Years 11 Cost In Thousands 1 - 180 Days $ 8,544 181 - 365 Days - 1 - 2 Years 1,000 2 - 3 Years - 3 - 4 Years 1,000 4 - 5 Years 2,000 TOTAL $ 12,544 4.00% 3.50% 3.00% 2.50% 2.00% 1.50% 1.00% 0.50% 0.00% \� \oz \�� \oVO \�� \oz \o \�6 \0z \� \o \�� \00 0 \� \0z \�� \oz � \� \oz \\0 ��p �� \o ��o \oe \�� \o� \�� \o ��o \o �\oa \moo \o� \�� \oa �N\rt,� \o� • • Costa Mesa Sanitary District Yield Curve Data as of June 30, 2009 12 h 0 0 0. , -3 month T -Bill -6 month T -Bill 2 year T -Note ­3 year T -Note 5 year T -Note *CMSD- monthly -LAI F- monthly OC Pool- monthly 0 • COSTA MESA SANITARY DISTRICT Warrant Resolution No. CMSD 2010 -01 A RESOLUTION OF THE COSTA MESA SANITARY DISTRICT RATIFYING THE PAYMENT OF CERTAIN CLAIMS AND DEMANDS, AND SPECIFYING THE FUNDS OUT OF WHICH THE SAME WERE PAID. THE BOARD OF DIRECTORS OF THE COSTA MESA SANITARY DISTRICT DOES HEREBY ORDER AND RESOLVE AS FOLLOWS: Section 1. That the attached claims and demands totaling $739,942.56 have been audited as required by law and that the same were paid out of respective funds as hereinafter set forth. Section 2. That the Clerk of the District shall certify to the adoption of this Resolution and shall retain a certified copy thereof in her own records. PASSED AND ADOPTED this 23rd day of July 2009. ATTEST: Secretary President STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss COSTA MESA SANITARY DISTRICT ) I, JOAN REVAK, Clerk of the Costa Mesa Sanitary District, hereby certify that the foregoing Warrant Resolution No. CMSD 2010 -01 was duly adopted by the Costa Mesa Sanitary District at a regular meeting held on the 23rd day of July 2009. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the Seal of the Costa Mesa Sanitary District on this 23rd day of July 2009. Clerk of the Costa Mesa Sanitary District Accounts Payable Checks for Approval User: tgonzalez Printed: 07/06/2009 - 3:35 PM Check Number Check Date Fund Name Account Name COST,4 9YES.A SiWITART (DIST IM - - -art Independent Special Oistrkt Vendor Name Amount 0 06/03/2009 Liquid Waste Fund Federal Withholding Taxes Internal Revenue Service 3,959.06 0 06/03/2009 Liquid Waste Fund Medicare - Employee Internal Revenue Service 463.34 0 06/03/2009 Liquid Waste Fund Medicare - Employee Internal Revenue Service 352.24 0 06/03/2009 Liquid Waste Fund Medicare - Employee Internal Revenue Service 111.10 Check Total: 4,885.74 0 06/03/2009 Liquid Waste Fund State Withholding Taxes State of Cal Emp Dev Dept 1,128.17 Check Total: 1,128.17 0 06/03/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 108.85 0 06/03/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 34.53 0 06/03/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 210.49 0 06/03/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 66.79 0 06/03/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 1,554.86 0 06/03/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 3,007.10 0 06/03/2009 Liquid Waste Fund PERS Survivor Benefit Cal Pers Employee Ret System 11.16 0 06/03/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 493.32 0 06/03/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 954.06 0 06/03/2009 Liquid Waste Fund PERS - Employer Cal Pers Employee Ret System -0.01 Check Total: 6,441.15 0 06/01/2009 Liquid Waste Fund Life /AD &D Insurance Guardian 330.00 0 06/01/2009 Liquid Waste Fund Long -Term Disability Guardian 237.75 0 06/01/2009 Solid Waste Fund Benefits Admin Costs Guardian 0.50 0 06/01/2009 Liquid Waste Fund Benefits Admin Costs Guardian 4.50 Check Total: 572.75 0 06/05/2009 Liquid Waste Fund PERS Medical Cal PERS 6,089.50 AP - Checks f *roval ( 07/06/2009 - 3:35 PM) P09 1 Check Nutt Check Date Fund Name Account Name . Vendor Name Amount 0 06/05/2009 Solid Waste Fund Benefits Admin Costs Cal PERS 2.74 0 06/05/2009 Liquid Waste Fund Benefits Admin Costs Cal PERS 24.66 Check Total: 6,116.90 0 06/17/2009 Liquid Waste Fund Federal Withholding Taxes Internal Revenue Service 4,397.27 0 06/17/2009 Liquid Waste Fund Medicare - Employee Internal Revenue Service 484.24 0 06/17/2009 Liquid Waste Fund Medicare - Employee Internal Revenue Service 372.98 0 06/17/2009 Liquid Waste Fund Medicare - Employee Internal Revenue Service 111.26 Check Total: 5,365.75 0 06/17/2009 Liquid Waste Fund State Withholding Taxes State of Cal Emp Dev Dept 1,333.79 Check Total: 1,333.79 0 06/17/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 115.31 0 06/17/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 34.53 0 06/17/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 222.96 0 06/17/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 66.79 0 06/17/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 1,647.06 0 06/17/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 3,185.39 0 06/17/2009 Liquid Waste Fund PERS Survivor Benefit Cal Pers Employee Ret System 11.16 0 06/17/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 493.32 0 06/17/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 954.06 0 06/17/2009 Liquid Waste Fund PERS - Employer Cal Pers Employee Ret System 0.02 Check Total: 6,730.60 0 06/15/2009 Solid Waste Fund Investment Earnings Bank of America 264.44 Check Total: 264.44 0 06/30/2009 Liquid Waste Fund Federal Withholding Taxes Internal Revenue Service 150.00 0 06/30/2009 Liquid Waste Fund FICA - Employee Internal Revenue Service 342.55 0 06/30/2009 Liquid Waste Fund FICA - Employee Internal Revenue Service 342.55 0 06/30/2009 Liquid Waste Fund Medicare - Employee Internal Revenue Service 80.12 0 06/30/2009 Liquid Waste Fund Medicare - Employee Internal Revenue Service 80.12 Check Total: 995.34 0 06/30/2009 Liquid Waste Fund Federal Withholding Taxes Internal Revenue Service 9,765.29 0 06/30/2009 Liquid Waste Fund Medicare - Employee Internal Revenue Service 800.97 AP - Checks for Approval ( 07/06/2009 - 3:35 PM ) Page 2 Check Number Check Date Fund Name Account Name Vendor Name Amount 0 06/30/2009 Liquid Waste Fund Medicare - Employee Internal Revenue Service 590.14 0 06/30/2009 Liquid Waste Fund Medicare - Employee Internal Revenue Service 210.83 Check Total: 11,367.23 0 06/30/2009 Liquid Waste Fund State Withholding Taxes State of Cal Emp Dev Dept 3,371.71 Check Total: 3,371.71 0 06/30/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 111.76 0 06/30/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 34.53 0 06/30/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 216.12 0 06/30/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 66.79 0 06/30/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 1,596.42 0 06/30/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 3,087.44 0 06/30/2009 Liquid Waste Fund PERS Survivor Benefit Cal Pers Employee Ret System 11.16 0 06/30/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 493.32 0 06/30/2009 Liquid Waste Fund PERS Retirement Cal Pers Employee Ret System 954.06 Check Total: 6,571.60 0 06/30/2009 Liquid Waste Fund PERS Medical Cal PERS 6,089.50 0 06/30/2009 Solid Waste Fund Benefits Admin Costs Cal PERS 2.74 0 06/30/2009 Liquid Waste Fund Benefits Admin Costs Cal PERS 24.66 Check Total: 6,116.90 6367 06/04/2009 Solid Waste Fund Building Maintenance 949 Storage 16.00 6367 06/04/2009 Liquid Waste Fund Building Maintenance 949 Storage 144.00 Check Total: 160.00 6368 06/04/2009 Solid Waste Fund Building Maintenance Bay Alarm 14.40 6368 06/04/2009 Liquid Waste Fund Building Maintenance Bay Alarm 129.60 Check Total: 144.00 6369 06/04/2009 Liquid Waste Fund Contract Services Bruce Mattern 498.75 Check Total: 498.75 6370 06/04/2009 Solid Waste Fund Legal Services Alan R. Bums 3,534.93 6370 06/04/2009 Liquid Waste Fund Legal Services Alan R. Burns 6,564.87 AP - Checks f *roval ( 07/06/2009 - 3:35 PM) PPO Check Nus Check Date Fund Name Account Name Vendor Name Amount 6370 06/04/2009 Liquid Waste Fund Legal Services Alan R. Burns 1,647.10 6370 06/04/2009 Solid Waste Fund Legal Services Alan R. Burns 253.40 6370 06/04/2009 Solid Waste Fund Legal Services Alan R. Burns 335.75 6370 06/04/2009 Liquid Waste Fund Legal Services Alan R. Burns 623.55 Check Total: 12,959.60 6371 06/04/2009 Liquid Waste Fund Sewer Maint - Material /Supplies Chemsearch 327.78 Check Total: 327.78 6372 06/04/2009 Liquid Waste Fund Sewer Lateral Program #186 City of Costa Mesa 1,800.00 Check Total: 1,800.00 6373 06/04/2009 Solid Waste Fund Building Maintenance City of Costa Mesa 103.50 6373 06/04/2009 Liquid Waste Fund Building Maintenance City of Costa Mesa 931.50 Check Total: 1,035.00 6374 06/04/2009 Liquid Waste Fund Sewer Maint -Pump Stn Contract C &R Drains 176.00 6374 06/04/2009 Liquid Waste Fund Sewer Maint -Pump Stn Contract C &R Drains 80.00 Check Total: 256.00 6375 06/04/2009 Solid Waste Fund Household Hazardous Waste Curbside, Inc. 198.00 Check Total: 198.00 6376 06/04/2009 Liquid Waste Fund Sewer Lateral Program #186 David Bartholomew 1,866.50 Check Total: 1,866.50 6377 06/04/2009 Liquid Waste Fund Fog Program #180 - Contract Svc Environmental Engr & Cont, Inc 11,191.65 Check Total: 11,191.65 6378 06/04/2009 Solid Waste Fund Travel/Meals /Lodging Jim Ferryman 0.33 6378 06/04/2009 Liquid Waste Fund Travel/Meals /Lodging Jim Ferryman 2.97 Check Total: 3.30 6379 06/04/2009 Solid Waste Fund Legal Services Filarsky & Watt LLP 6,783.08 AP - Checks for Approval ( 07/06/2009 - 3:35 PM ) Page 4 Check Number Check Date Fund Name Account Name Vendor Name Amount 6379 06/04/2009 Liquid Waste Fund Legal Services Filarsky & Watt LLP 12,597.16 Check Total: 19,380.24 6380 06/04/2009 Solid Waste Fund Gas - Building The Gas Company 1.46 6380 06/04/2009 Liquid Waste Fund Gas - Building The Gas Company 13.16 Check Total: 14.62 6381 06/04/2009 Liquid Waste Fund Engineering/Architectual Sery Robin B. Hamers & Assoc., Inc. 1,400.00 6381 06/04/2009 Solid Waste Fund District Manager Robin B. Hamers & Assoc., Inc. 2,740.94 6381 06/04/2009 Liquid Waste Fund District Manager Robin B. Hamers & Assoc., Inc. 5,090.31 Check Total: 9,231.25 6382 06/04/2009 Solid Waste Fund Postage Hasler 4.30 6382 06/04/2009 Liquid Waste Fund Postage Hasler 38.66 Check Total: 42.96 6383 06/04/2009 Liquid Waste Fund Sewer Maint- Water Pumps Irvine Ranch Water District 7.50 Check Total: 7.50 6384 06/04/2009 Liquid Waste Fund Sewer Maint -Pump Stn Contract .limni Systems, Inc 638.04 Check Total: 638.04 6385 06/04/2009 Solid Waste Fund Building Maintenance Sherry Kallab 12.63 6385 06/04/2009 Liquid Waste Fund Building Maintenance Sherry Kallab 113.70 Check Total: 126.33 6386 06/04/2009 Liquid Waste Fund Sewer Lateral Program #186 Mary Martineau 1,634.50 Check Total: 1,634.50 6387 06/04/2009 Liquid Waste Fund Sewer Maint- Water Pumps Mesa Consolidated Water Dist 17.50 6387 06/04/2009 Liquid Waste Fund Sewer Maint- Water Pumps Mesa Consolidated Water Dist 20.00 6387 06/04/2009 Liquid Waste Fund Sewer Maint- Water Pumps Mesa Consolidated Water Dist 17.50 Check Total: 55.00 P� AP - Checks 1 *roval ( 07/06/2009 - 3:35 PM) � Check Nuo Check Date Fund Name Account Name 10 Vendor Name Amount 6388 06/04/2009 Liquid Waste Fund Sewer Maint- Equipment Maint Nextruk 2,420.55 Check Total: 2,420.55 6389 06/04/2009 Solid Waste Fund Office Supplies Office Depot 21.75 6389 06/04/2009 Liquid Waste Fund Office Supplies Office Depot 195.74 6389 06/04/2009 Solid Waste Fund Office Supplies Office Depot 5.91 6389 06/04/2009 Liquid Waste Fund Office Supplies Office Depot 53.18 Check Total: 276.58 6390 06/04/2009 Liquid Waste Fund Misc Swr Wk#164 -Copt Svc Peninsula Pump Company 2,283.75 Check Total: 2,283.75 6391 06/04/2009 Liquid Waste Fund Sewer Lateral Program #186 Robert Mulvihill 1,313.00 Check Total: 1,313.00 6392 06/04/2009 Liquid Waste Fund Staff Development SARBS - CWEA 200.00 Check Total: 200.00 6393 06/04/2009 Solid Waste Fund Electric - Building Southern California Edison 53.23 6393 06/04/2009 Liquid Waste Fund Electric - Building Southern California Edison 479.12 Check Total: 532.35 6394 06/04/2009 Solid Waste Fund Travel/Meals/Lodging Arlene Schafer 0.55 6394 06/04/2009 Liquid Waste Fund Travel/Meals/Lodging Arlene Schafer 4.95 6394 06/04/2009 Liquid Waste Fund Travel/Meals /Lodging Arlene Schafer 535.37 6394 06/04/2009 Solid Waste Fund Travel/Meals/Lodging Arlene Schafer 8.97 6394 06/04/2009 Liquid Waste Fund Travel/Meals /Lodging Arlene Schafer 80.69 Check Total: 630.53 6395 06/04/2009 Liquid Waste Fund Sewer Lateral Program #186 Thomas Mulryan 1,800.00 Check Total: 1,800.00 6396 06/04/2009 Solid Waste Fund Building Maintenance Trimco Landscape 11.40 6396 06/04/2009 Liquid Waste Fund Building Maintenance Trimco Landscape 102.60 AP - Checks for Approval ( 07/06/2009 - 3:35 PM ) Page 6 Check Number Check Date Fund Name Account Name Vendor Name Amount Check Total: 114.00 6397 06/04/2009 Liquid Waste Fund Contract Services Underground Service Alert/SC 114.50 Check Total: 114.50 6398 06/04/2009 Solid Waste Fund Postage USPS - Hasler 50.00 6398 06/04/2009 Liquid Waste Fund Postage USPS- Hasler 450.00 Check Total: 500.00 6399 06/04/2009 Liquid Waste Fund Deferred Compensation - 457 VantagePoint Transfer Agents 305.00 Check Total: 305.00 6400 06/04/2009 Liquid Waste Fund Deferred Medical -RHS- Employee VantagePoint Transfer Agents 277.43 6400 06/04/2009 Liquid Waste Fund Deferred Medical -RHS- Employee VantagePoint Transfer Agents 206.95 6400 06/04/2009 Liquid Waste Fund Deferred Medical - RHS - Employee VantagePoint Transfer Agents 70.48 Check Total: 554.86 6401 06/04/2009 Liquid Waste Fund Sewer Lateral Program #186 Van Laffoon 1,800.00 Check Total: 1,800.00 6402 06/12/2009 Liquid Waste Fund Postage United States Postmaster 2,700.00 6402 06/12/2009 Solid Waste Fund Postage United States Postmaster 300.00 Check Total: 3,000.00 6403 06/18/2009 Liquid Waste Fund Employee Insurance AFLAC 922.22 Check Total: 922.22 6404 06/18/2009 Solid Waste Fund Telephone AT &T 6.12 6404 06/18/2009 Liquid Waste Fund Telephone AT &T 55.00 6404 06/18/2009 Solid Waste Fund Telephone AT &T 47.62 6404 06/18/2009 Liquid Waste Fund Telephone AT &T 428.60 Check Total: 537.34 6405 06/18/2009 Liquid Waste Fund Sewer Maint- Equipment Maint Bank of America 9.77 AP - Checks f0proval ( 07/06/2009 - 3:35 PM 1 P Check Nu* Check Date Fund Name Account Name • Vendor Name � Amount 6405 06/18/2009 Liquid Waste Fund Sewer Maint -Small Tools/Eq Bank of America 74.75 6405 06/18/2009 Liquid Waste Fund Sewer Maint- Equipment Maint Bank of America 84.50 6405 06/18/2009 Liquid Waste Fund Sewer Maint- Equipment Maint Bank of America 59.00 6405 06/18/2009 Solid Waste Fund Travel/Meals/Lodging Bank of America 9.24 6405 06/18/2009 Liquid Waste Fund Travel/Meals /Lodging Bank of America 83.20 6405 06/18/2009 Solid Waste Fund Building Maintenance Bank of America 4.49 6405 06/18/2009 Liquid Waste Fund Building Maintenance Bank of America 40.36 6405 06/18/2009 Liquid Waste Fund Sewer Maint - Equipment Maint Bank of America 400.00 6405 06/18/2009 Liquid Waste Fund Sewer Maint - Equipment Maint Bank of America - 254.96 6405 06/18/2009 Solid Waste Fund Travel/Meals /Lodging Bank of America 8.25 6405 06/18/2009 Liquid Waste Fund Travel/Meals /Lodging Bank of America 74.24 6405 06/18/2009 Liquid Waste Fund Sewer Maint - Equipment Maint Bank of America 89.00 6405 06/18/2009 Solid Waste Fund Travel/Meals /Lodging Bank of America 7.64 6405 06/18/2009 Liquid Waste Fund Travel/Meals/Lodging Bank of America 68.77 6405 06/18/2009 Solid Waste Fund Staff Development Bank of America -1.00 6405 06/18/2009 Liquid Waste Fund Staff Development Bank of America -9.00 6405 06/18/2009 Solid Waste Fund Office Supplies Bank of America 1.41 6405 06/18/2009 Liquid Waste Fund Office Supplies Bank of America 12.72 6405 06/18/2009 Solid Waste Fund Staff Development Bank of America -3.90 6405 06/18/2009 Liquid Waste Fund Staff Development Bank of America -35.10 6405 06/18/2009 Solid Waste Fund Equipment Maintenance Bank of America 17.40 6405 06/18/2009 Liquid Waste Fund Equipment Maintenance Bank of America 156.59 6405 06/18/2009 Solid Waste Fund Travel/Meals/Lodging Bank of America 10.00 6405 06/18/2009 Liquid Waste Fund Travel /Meals /Lodging Bank of America 90.00 6405 06/18/2009 Solid Waste Fund Staff Development Bank of America 38.50 6405 06/18/2009 Liquid Waste Fund Staff Development Bank of America 346.50 6405 06/18/2009 Liquid Waste Fund Sewer Maint- Equipment Maint Bank of America 64.74 6405 06/18/2009 Solid Waste Fund Equipment Maintenance Bank of America 30.52 6405 06/18/2009 Liquid Waste Fund Equipment Maintenance Bank of America 274.71 6405 06/18/2009 Solid Waste Fund Equipment Maintenance Bank of America 236.19 6405 06/18/2009 Liquid Waste Fund Equipment Maintenance Bank of America 2,125.72 6405 06/18/2009 Solid Waste Fund Travel/Meals/Lodging Bank of America 27.98 6405 06/18/2009 Liquid Waste Fund Travel/Meals /Lodging Bank of America 251.77 6405 06/18/2009 Solid Waste Fund Travel /Meals /Lodging Bank of America 10.10 6405 06/18/2009 Liquid Waste Fund Travel/Meals /Lodging Bank of America 90.90 Check Total: 4,495.00 6406 06/18/2009 Solid Waste Fund Fiscal Services CBIZ ATA Orange County LLC 2,492.00 6406 06/18/2009 Liquid Waste Fund Fiscal Services CBIZ ATA Orange County LLC 4,628.00 Check Total: 7,120.00 6407 06/18/2009 Solid Waste Fund Trash Hauler Costa Mesa Disposal 196,667.14 AP - Checks for Approval ( 07/06/2009 - 3:35 PM ) Page 8 Check Number Check Date Fund Name Account Name Vendor Name Amount 6408 06/18/2009 Liquid Waste Fund Dental Insurance Check Total: 196,667.14 CoPower 630.63 Check Total: 630.63 6409 06/18/2009 Solid Waste Fund Staff Development CPR and Safety Training Team 38.50 6409 06/18/2009 Liquid Waste Fund Staff Development CPR and Safety Training Team 346.50 Check Total: 385.00 6410 06/18/2009 Solid Waste Fund Recycling /Disposal CR Transfer, Inc. 168,324.38 6410 06/18/2009 Solid Waste Fund Recycling /Disposal CR Transfer, Inc. 9,903.52 Check Total: 178,227.90 6411 06/18/2009 Liquid Waste Fund Prof Membership /Dues CWEA -TCP 132.00 Check Total: 132.00 6412 06/18/2009 Solid Waste Fund Customer Refunds David Miller 239.40 Check Total: 239.40 6413 06/18/2009 Liquid Waste Fund Sewer Lateral Program #186 Gerald Townsend 1,800.00 Check Total: 1,800.00 6414 06/18/2009 Liquid Waste Fund Sewer Maint - Material /Supplies Golden Bell Products, Inc. 1,495.31 Check Total: 1,495.31 6415 06/18/2009 Liquid Waste Fund Plan Ck/Inspection- Inside Robin B. Hamers & Assoc., Inc. 8,117.50 6415 06/18/2009 Liquid Waste Fund Plan Ck/Inspection- Outside Robin B. Hamers & Assoc., Inc. 1,147.50 6415 06/18/2009 Liquid Waste Fund Plan Ck /Inspection- Inside Robin B. Hamers & Assoc., Inc. 14,550.00 6415 06/18/2009 Liquid Waste Fund Plan Ck/Inspection- Outside Robin B. Hamers & Assoc., Inc. 270.00 6415 06/18/2009 Liquid Waste Fund Bristol St Pump - Contract Labor Robin B. Hamers & Assoc., Inc. 8,946.00 6415 06/18/2009 Liquid Waste Fund Emerg Pump Plan -Contr Svc Robin B. Hamers & Assoc., Inc. 3,040.00 6415 06/18/2009 Liquid Waste Fund Systm Wide Repair Prog. #183 Robin B. Hamers & Assoc., Inc. 3,590.00 Check Total: 39,661.00 AP - Checks feproval ( 07/06/2009 - 3:35 PM) P40 Check Nut Check Fund Name Account Vendor 06/18/2009 Date 6419 Name Name Amount 06/18/2009 Liquid Waste Fund 6419 06/18/2009 6416 06/18/2009 Liquid Waste Fund Sewer Maint - Material /Supplies Home Depot Credit Services 38.01 6416 06/18/2009 Liquid Waste Fund Sewer Maint- Material /Supplies Home Depot Credit Services 159.89 6416 06/18/2009 Liquid Waste Fund Sewer Maint - Material /Supplies Home Depot Credit Services 99.29 6417 06/18/2009 Solid Waste Fund 6417 06/18/2009 Liquid Waste Fund 6418 06/18/2009 Liquid Waste Fund 6419 06/18/2009 Liquid Waste Fund 6419 06/18/2009 Liquid Waste Fund 6419 06/18/2009 Liquid Waste Fund 6419 06/18/2009 Liquid Waste Fund 6419 06/18/2009 Liquid Waste Fund 6419 06/18/2009 Liquid Waste Fund 6420 06/18/2009 Liquid Waste Fund 6420 06/18/2009 Liquid Waste Fund 6421 06/18/2009 Liquid Waste Fund 6422 06/18/2009 Solid Waste Fund 6422 06/18/2009 Liquid Waste Fund 6423 06/18/2009 Solid Waste Fund 6424 06/18/2009 Solid Waste Fund Benefits Admin Costs Benefits Admin Costs Sewer Maint- Water Pumps Misc Swr Wk#164 -Cont Svc Misc Swr Wk#164 -Cont Svc Misc Swr Wk#164 -Cont Svc Misc Swr Wk#164 -Cont Svc Misc Swr Wk#164 -Cont Svc Misc Swr Wk #164 -Cont Svc Horizon Health EAP Horizon Health EAP Irvine Ranch Water District ITT Water & Wastewater U.S.A. ITT Water & Wastewater U.S.A. ITT Water & Wastewater U.S.A. ITT Water & Wastewater U.S.A. ITT Water & Wastewater U.S.A. ITT Water & Wastewater U.S.A. Sewer Maint -Pump Stn Contract Jimni Systems, Inc Sewer Maint -Pump Sm Contract Jimni Systems, Inc Sewer Lateral Program #186 Judith Meng Public Info /Ed/Community Promo King Badge & Button Comp Public Info /Ed/Community Promo King Badge & Button Comp Large Item Pick -up Building Maintenance LITCO Lloyd Pest Control Check Total: Check Total: Check Total Check Total: Check Total: Check Total: Check Total: Check Total: 297.19 1.40 12.60 14.00 7.50 7.50 3,977.01 23,675.75 4,004.46 2,144.41 705.98 111.78 34,619.39 525.22 567.01 1,092.23 1,800.00 1,800.00 3.78 34.06 37.84 4,725.19 4,725.19 7.00 AP - Checks for Approval ( 07/06/2009 - 3:35 PM ) Page 10 Check Number Check Date Fund Name Account Name Vendor Name Amount 6424 06/18/2009 Liquid Waste Fund Building Maintenance Lloyd Pest Control 63.00 Check Total: 70.00 6425 06/18/2009 Liquid Waste Fund Small Tools /Equipment Lab Safety Supply Inc. 283.31 Check Total: 283.31 6426 06/18/2009 Solid Waste Fund District Manager Donald McIntyre 3,150.00 6426 06/18/2009 Liquid Waste Fund District Manager Donald McIntyre 5,850.00 Check Total: 9,000.00 6427 06/18/2009 Solid Waste Fund District Manager Donald McIntyre 173.25 6427 06/18/2009 Liquid Waste Fund District Manager Donald McIntyre 321.75 Check Total: 495.00 6428 06/18/2009 Liquid Waste Fund Sewer Maint- Water Pumps Mesa Consolidated Water Dist 15.00 Check Total: 15.00 6429 06/18/2009 Solid Waste Fund Office Supplies Noack Awards Engraving & Promo 3.10 6429 06/18/2009 Liquid Waste Fund Office Supplies Noack Awards Engraving & Promo 27.89 Check Total: 30.99 6430 06/18/2009 Solid Waste Fund Public Info /Ed/Community Promo Norseman Plastics 527.28 Check Total: 527.28 6431 06/18/2009 Solid Waste Fund MultiMed/Blueprint/Copies /Sub The Orange County Register 4.28 6431 06/18/2009 Liquid Waste Fund Multi Med/Bl ueprints/Copies/Sub The Orange County Register 38.52 Check Total: 42.80 6432 06/18/2009 Liquid Waste Fund Due to OCSD Orange County Sanitation Distr 103,711.81 Check Total: 103,711.81 6433 06/18/2009 Solid Waste Fund Office Supplies Office Depot 10.34 6433 06/18/2009 Liquid Waste Fund Office Supplies Office Depot 93.10 6433 06/18/2009 Solid Waste Fund Office Supplies Office Depot -1.55 AP - Checks feproval ( 07/06/2009 - 3:35 PM) P* Check Nue Check Date Fund Name Account Name Vendor Name Amount 6433 06/18/2009 Liquid Waste Fund Office Supplies Office Depot -13.94 6433 06/18/2009 Solid Waste Fund Office Supplies Office Depot 6.03 6433 06/18/2009 Liquid Waste Fund Office Supplies Office Depot 54.22 6433 06/18/2009 Solid Waste Fund Office Supplies Office Depot 8.75 6433 06/18/2009 Liquid Waste Fund Office Supplies Office Depot 78.77 6433 06/18/2009 Solid Waste Fund Office Supplies Office Depot 18.63 6433 06/18/2009 Liquid Waste Fund Office Supplies Office Depot 167.72 6433 06/18/2009 Solid Waste Fund Office Supplies Office Depot 32.95 6433 06/18/2009 Liquid Waste Fund Office Supplies Office Depot 296.51 Check Total: 751.53 6434 06/18/2009 Liquid Waste Fund Sewer Lateral Program #186 Pattrick Ayres 1,800.00 Check Total: 1,800.00 6435 06/18/2009 Liquid Waste Fund Sewer Lateral Program #186 Patricia Foster 2,384.00 Check Total: 2,384.00 6436 06/18/2009 Solid Waste Fund Building Maintenance Pacific Building Care, Inc. 45.38 6436 06/18/2009 Liquid Waste Fund Building Maintenance Pacific Building Care, Inc. 408.37 Check Total: 453.75 6437 06/18/2009 Liquid Waste Fund Misc Swr Wk #164 -Cont Svc Santa Ana Blue Print 33.00 6437 06/18/2009 Liquid Waste Fund Systm Wide Repair Prog. #183 Santa Ana Blue Print 29.39 Check Total: 62.39 6438 06/18/2009 Liquid Waste Fund Sewer Maint - Electric Pumps Southern California Edison 1,592.18 Check Total: 1,592.18 6439 06/18/2009 Solid Waste Fund Public Info /Ed /Community Promo Matt Scheafer 522.00 Check Total: 522.00 6440 06/18/2009 Liquid Waste Fund Sewer Lateral Program #186 Scott Liolios 397.50 Check Total: 397.50 6441 06/18/2009 Liquid Waste Fund Sewer Lateral Program #186 Sonja Trefethen 800.00 AP - Checks for Approval ( 07/06/2009 - 3:35 PM ) Page 12 Check Number Check Date Fund Name Account Name Vendor Name Amount Check Total: 800.00 6442 06/18/2009 Solid Waste Fund Sharps Program Stericycle 238.11 6442 06/18/2009 Solid Waste Fund Sharps Program Stericycle 228.27 6442 06/18/2009 Solid Waste Fund Sharps Program Stericycle 167.30 6442 06/18/2009 Solid Waste Fund Sharps Program Stericycle 725.72 6442 06/18/2009 Solid Waste Fund Sharps Program Stericycle 125.39 Check Total: 1,484.79 6443 06/18/2009 Liquid Waste Fund Deferred Compensation - 457 VantagePoint Transfer Agents 305.00 Check Total: 305.00 6444 06/18/2009 Liquid Waste Fund Deferred Medical -RHS- Employee VantagePoint Transfer Agents 277.05 6444 06/18/2009 Liquid Waste Fund Deferred Medical -RHS- Employee VantagePoint Transfer Agents 206.57 6444 06/18/2009 Liquid Waste Fund Deferred Medical - RHS - Employee VantagePoint Transfer Agents 70.48 Check Total: 554.10 6445 06/18/2009 Solid Waste Fund Cellular Service Verizon Wireless 35.21 6445 06/18/2009 Liquid Waste Fund Cellular Service Verizon Wireless 569.93 Check Total: 605.14 6446 06/18/2009 Liquid Waste Fund Sewer Lateral Program #186 Jacoby WM 469.50 Check Total: 469.50 Report Total: 739,942.56 AP - Checks fproval ( 07 /06/2009 - 3:35 PM) PO Costa Mesa Sanitary District Expense Reimbursem* Form for Directors Name I. Attach all receipts. T i DATE OF EVENT PURPOSE OR OCCASION LOCATION TRAVEL* TRAVEL* MEAL EXPENSE OTHER + .' �� [ r- T, + `Gan be used for private auto as well as taxi, limo and air fare. � Qj- Y -1 1 10 1 II. Calculation 1. miles at 55.0 cents per mile (Current Rate) 2. Total meals 3. days attendance at $ 221.00 per day (per Board poNCy) 4. Meeting 5. Other _ Conference/Event: Location: Per Ordinance No. 55, "Board members shall provide brief reports on meetings attended at public expense at the next regular Board meeting." (Operations Code, Section 3.01.035) Total= $ 103-24-00 Significant points learned of benefit to the District and its ratepayers: Costa Mesa Sanitary District Expense Reim bursemie Form for Directors Name: L2)oc I. Attach all receipts. DATE OF EVENT PURPOSE OR OCCASION LOCATION TRAVEL* MEAL EXPENSE OTHER 10 1q1,09 nn ) k(( U (-1 c 14J LV`5 ��u&J (� YVS „ v �_ t to 1 - (� 10D L -z c, I- (�, G c -A; 'Can be used for private auto as well as taxi. limo and air fare. II. Calculation 1. - miles at 55,0 cents per mile (Current RaW 2. Total meals 3. %o days attendance at $ 221.00 per day (per Board oollcv) 4. Meeting 5. Other Conference/Event: Location: Per Ordinance No. 55, "Board members shall provide brief reports on meetings attended at public expense at the next regular Board meeting." (Operations Code, Section 3.01.035) (rev, 111A)9) 7- r ., Total = $ 13 Z C, Significant points learned of benefit to the District and its ratepayers: U1 �\ C d - aC A„ A V-- &I,w CCK �A'Ji ^ I.4cck L, Director Signature: az LA - _ -- - Costs Mesa Sanitary District ­Expense Reimbursement Form for Directors lame: Attach all receipts. DATE OF EVENT PURPOSE OR OCCASION LOCATION TRAVEL* MEAL EXPENSE OTHER An be used for private auto as well as taxi. limo and air fare. Calculation 1. miles at 55.0 cents per mile l U_, (Curreni Rate) 2. Total meals 3. days attendance at $ 221.00 per day (per Board Dollcv) 4. Meeting 5. Other onference/Event: C� (e il- ovation: er Ordinance No. 55, "Board members shall provide brief reports n meetings attended at public expense at the next regular Board ieeting." (Operations Code, Section 3.01.035) CI Total = $ q 4� Significant points learned of benefit to the District and its ratepayers: (.7 r 77,� C T v, - 1 "^4' Deo'r Signature: Costa Mesa Itary District Expense Reimburset Form for Directors Name: Gary Monahan I. Attach all receipts. DATE OF EVENT PURPOSE OR OCCASION LOCATION TRAVEL* MEAL EXPENSE OTHER 6/8/09 Special Meeting CMSD 6/10/09 LEED "Yard" Committee Meeting CMSD 6/23/09 Sewer System Committee Meeting CMSD 6/24/09 Regular CMSD Board Meeting CMSD *Can be used for private auto as well as taxi, limo and air fare. ll. Calculation 1. miles at 55.0 cents per mile (Current Rate) 2. Total meals 3. 4 days attendance at $ 884.00 per day (per Board policy) 4. Meeting 5. Other Conference /Event: Location: Per Ordinance No. 55, "Board members shall provide brief reports on meetings attended at public expense at the next regular Board meeting." (Operations Code, Section 3.01.035) Total= $884.00 Significant points learned of benefit to the District and its ratepayers: (rev, 1/1/09) Director Sign Q 0 Expense Reelmb At Form for Directors 1. attach all receipts. qkq- �ro- "*r3 ATE OF EVENT PURPOSE OR 000MIO N LOCATION � TRAVEL MEAL EXPENSE 07HEFI C c 14 `r L w {� �( o AV-19 rc ? �- C ✓I� S 'Can be used for prlveft auto as well as IsA, fto and air fare, il. Calculati on Ln 1. miles at 55.0 cents per mile (Cuuft Rote) 2. Total meals C 3. days attendance at $ 221.00 per day EB cm► ��r) Q 4. Meeting 0 5. 01her B v Location: n; Per Ordinance No. 55, `Board members shall provkla brlel reports on meetings attended at pubile exWee at the next regular Board meeting." (Operations Code, Section 3.01.035) I 06 Total Significant points seamed of benefit to the Ditoftd and Its ratepayers: DlrGctar Suture; m a m CD N I n I Costa Mesa San* District - - Ppense Reimbursement Form for Directors m a t,� Attach all receipts. ti a F- A Q Q N d W .o a' LO o N N 0 N ATE OF EVENT PURPOSE OR OCCASION LOCATION TRAVEL' MM EXPENSE OTHER " �` -a- i 3 N 8 2 3- v° - IJE72 C �� 91 _ H a 'Can be used for private auto as well as taxi, limo and air (are. 11. Calculation 1. miles at %.0 cents per mile (Current Rate) 2. Total meals 3. ��_ days attendance at $ 221.00 per day 0, P,08.] poky) 4. Meeting 5. Other won erence van U 1 _Q j � Q o m D ra B Uo - Total= $ n4y 40 Significant points learned of benefit to the District and its v Location: ratepayers: Per Ordinance No. 55, "Board members shall provide brief m reports on meetings attended at public expense at the next CD reu far Board meeting," (Operations Code, Section 3.01.035) t � z o ti s..,. V, M? Director Signature: b r� 0 N 3 T 3 N DD W W I WRITTEN COMMUNICATIONS Do not place this sheet in binder -- Return to Joan • 0 Robert Dickson 314 Ogle St., Apt. G Costa Mesa, CA 92627 (949) 574 -1946 June 30, 2009 Costa Mesa Sanitary District 628 W. 19th Street Costa Mesa, CA 92627. Dear CMSD: RECEIVED JUL - i zoos COSTA MESA SANIMRYOISTRICT 1 am writing to share a compliment and express a concern. First, I would like to compliment you on your website, which is easy to use, visually appealing and packed with information. The website also is the source of my concern, as the Calendar tab is very much out of date and incomplete. Please send me a schedule of upcoming 2009 CMSD Board meetings, along with the agenda for the next board meeting. Please immediately update the CMSD website to include all 2009 CMSD meeting agendas and provide a schedule of upcoming CMSD meetings. Please also include all available 2008 and 2009 CMSD meeting minutes. It is my understanding that CMSD intends to raise rates again, yet no notice is provided on the website, nor any information on how to comment on the proposed rate increase. Without this information readily available, the public is not able to participate in the activities of the CMSD. I appreciate your public outreach and recycling efforts, and look forward to learning more about the vital functions the CMSD performs. Please let me know when you intend to have the requested information available on your website. Thank you, Robert Dickson nct u0sta MumUn Sanitaq Dist aii Imoepe.11oew. Speclof D1stiwl. Board o/ Directors Ar/olu SehuJ� -� Ri)hc rl Owen Gn - atr�nuh"�i; July 8, 2009 Arl/ m, J0j?I(S Fe rrti man Q4 fat r,,,,<<</,»> Protecting Our Cor+11rn4nit�'s tje -affb 6� I)rovibing solib waste amb sewer collect.imi services. n Mr. Robert Dickson Ph nc 314 Ogle Street, Apt. G Costa Mesa, CA 92627 ,'tall, Robin B. Han r' Dear Mr. Dickson �9rrtihcr Joan Revak Board Secretary/Program Manager /Clerk of the District 941); 6 , i Thank you for your letter of June 30, 2009. Please accept the District's apology with regard to the website not being up to date and let me assure you the issue is being addressed. Ihnmrrs ,�. l�u�nh - 1.i".irn� A1rrtu,L<r As requested, the following dates of upcoming Board of Directors meetings are provided. The agenda for the next meeting, July 23, 2009, has not been finalized, however, I will place it in the mail to you on Thursday, July 16, 2009. �s171 ;7/<7T 11 !1 1(111Ui']" E lrrl </ �hr Uirlri t July 23 Von R Buln% August 27 ` "I'd ` ` llwoi September 17 October 22 Ile I/( u., /). 1)(i I ;� O; November 16 December 17 Q4 fat r,,,,<<</,»> Protecting Our Cor+11rn4nit�'s tje -affb 6� I)rovibing solib waste amb sewer collect.imi services. n Sincerely, Ph nc Joan Revak Board Secretary/Program Manager /Clerk of the District t rldr.SS 92o-`71, 710 Q4 fat r,,,,<<</,»> Protecting Our Cor+11rn4nit�'s tje -affb 6� I)rovibing solib waste amb sewer collect.imi services. n r pY 4 z 4 > k coo p aoa Mesa SanitarN District f r pORKI ... an Inbe� enbent Special DiStyict Board of Directors Arlene Schafer Robert Ooiern Gar Monahan Arthur Perri- James Ferr.ymun Staff Robin B. Hamers Manager District Engineer- (949) 631 -17.31 Thomas A. Faith Assistant Manager Joan Revak 0 o Roard Secretory gram Manager Clerk of the District Alan R. Burns Legal Counsel Marcus D. Davis T reasurerlDi.rector of Finalce Phone (949) 645 -8400 Fax (949) 650 -2253 Address 628 W. 19th Street Costa. Mesa, CA 0 92627 -2716 July 1, 2009 OEO Applicant 628 W. 19'' Street Costa Mesa, CA 92627 Dear Applicant, Thank you for submitting an application for the Ordinance Enforcement Officer position. We appreciate your interest in employment with Costa Mesa Sanitary District and the time you took to apply. The Board of Directors has directed Staff to postpone the selection of the Ordinance Enforcement Officer and consider additional options. Therefore we regret to inform you that the District will not be continuing in the selection process at this time. Should we receive direction to continue the selection process within the fiscal year we will contact you at that time. If you have any questions, please direct them to me at (949) 645 -8400 extension 230. Sincerely, Sherry Kallab Management Analyst 41er %4P Primed on Protecting our communitN's 6ealtb 6 N providing sofib waste and sewer collection services. Recycled Paper www.crosbca.gov 9 0 • SEINER SYSTEM COMMITTEE AGENDA July 21, 2009,10:30 a.m. Costa Mesa Sanitary District 628 W. 19th Street Costa Mesa, California Directors Monahan, Ooten and Ferryman I. Monthly Spill Statistics A. Charging FOG Permittees for Extra District Costs — 6 -29 -09 II. Statewide Sanitary Sewer Overflow Reduction Program — Annual Compliance Report — May 2009 A. 2008 Annual Ocean and Bay Water Quality Report — OCHCA B. Laguna, Newport Top '08 Beach Closures — OC Register — 7 -8-09 III. AB 1366 — OCSD Water Softeners Support Letter 4 -22 -09 IV. OCSD Offer of Area 7 Sewers Update V. CMSD Line Maintenance Cleaning — NPSI Agreement — Addendum 1 Completed; Addendum 2 Preparation VI. Uniform Construction Cost Accounting Act Bidding (Pump Stations, Manhole Rehab, offsets) VII. Clearinghouse Location for Educational Materials — SARBS FTP — Update Vlll. Transfer of Sewer Lines from OCSD to CMSD — Requires $1 Million in Repairs — Update IX. Costa Mesa Sewer Fees to Spike — Again — Daily Pilot — 6 -30 -09 X. CMSD Projects: A. Project #129 — Bristol Street Sewer — Update B. Project #164 — Miscellaneous Sewer Work — Manhole Adjusters — 23 Manholes C. Project #168 — Irvine Pumping Station Relocation — Update on Damage to Adjoining Property D. Project #170 — Major Emergency Response Plans for Pumping Stations — Project Completed E. Project #171 — Irvine Pumping Station Force Main Rehabilitation F. Project #175 — OCSD Grant — Televising CMSD Sewer Lines — 03/09 Completion G. Project #182 — Analysis of CCTV Results H. Project #183 — System -Wide Sewer Repair — New Project on Bristol Street I. Project #186 — Sewer Lateral Assistance Program — Update 1. Root Intrusion Repair Coordination with Costa Mesa City Sidewalk/Curb /Gutter Repairs 2. City of Huntington Beach Allots $500,000 More for Sewer Repair — OC Register — 7 -11 -09 J. Project #187 — District Yard Update XI. Other XII. Public Comments Dated: July 14, 2009 Clerk of the District BOARD OF DIRECTORS • �gP SANII;q�� h S TA F F REPO R T '�0 �^T� °�9 DATE: July 14, 2009 SUBJECT: ORANGE COUNTY SANITATION DISTRICT (OCSD) SEWER TRANSFER TO COSTA MESA SANITARY DISTRICT (CMSD) AGREEMENT BETWEEN OCSD AND CMSD PREPARED BY: ROBIN B. HAMERS, PE JOSEPH P. SINACORI II, PE 4 SUMMARY: The project involves the sewer lines proposed for transfer by OCSD to CMSD • located in the City of Costa Mesa per attached Exhibit "A ". The CMSD staff reviewed the video inspection and reports for these areas prepared in March 2008 by Performance Pipeline Technologies to assess the condition of the sewer lines and manholes. Based on the CMSD evaluation, a report was prepared in September 2008 summarizing the deficiencies in these lines with recommendations for repair. The OCSD prepared a rough cost estimate in February 2009 to mitigate these deficiencies based on the report prepared by CMSD. Refer to the table below for the location and summary of costs for each transfer area. • In June 2009, the CMSD engineering and operations staff reviewed in detail the cost estimate prepared by OCSD to mitigate deficiencies in sewer lines proposed for transfer. Based on this review, Costa Mesa Sanitary District LOCATION: kmi , . - �, ,ary ,. I CSD COST �ESTO S 1 Avenue of the Arts 170,964.74 2 Park Center Drive and Anton Boulevard 267,345.01 3 Bear Street 108,965.86 4 Smalley Road, San Leandro Lane, Wakeham Park 304,332.71 5 Sunflower Avenue Easement, South Coast Drive 169,542.08 6 Fairview Road to Adams Avenue 54,526.99 Total Budget Range 1,075,677.39 1.0 M to 1.3 M In June 2009, the CMSD engineering and operations staff reviewed in detail the cost estimate prepared by OCSD to mitigate deficiencies in sewer lines proposed for transfer. Based on this review, Costa Mesa Sanitary District BOARD OF DIRECTORS Staff Report it was concluded that the OCSD cost estimate was conservative since it was rough order magnitude. The cost estimate included a fifty -four percent (54 %) mark -up on each item for contingency. The cost estimate provided a range for the total from $1.0 to $1.3 million dollars. The CMSD staff agreed that the $1.3 million dollar estimate (high end) more accurately represents the deficiency areas because the OCSD did not include in the estimate a few key items as follows: TRANSFER AREA- DEFICIENCY NOT Il�tCLUDED , .; F "_ COST ESTIMATE-TO" MITIGATE DEFICIENCIES 1 N/A N/A 2 N/A N/A 3 N/A N/A 4 Easement in Wakeham Park (Engineering & Mgmt) 20,000 5 Sag in South Coast Drive (Under Estimated) 100,000 5 CCTV line in Sunflower Easement (Not Included) 1,000 5 Replace cast iron manhole cover (38" Diameter) 500 5 Adjust frame and cover to grade 1,500 5 Repair 2' deep sink hole (5' wide x 8' long) 2,000 6 Easement in Private Property (Engineering & Mgmt) 20,000 Overall Prepare Engineering Plans & Specs @ 10% 130,000 Total 275,000 CONTRACT INFORMATION: The CMSD first requested that the OCSD repair the deficiency areas prior to the transfer. However, OCSD then requested a five (5) year window after the transfer to perform the repairs. Subsequently, OCSD asked if CMSD would take the sewer lines in current condition along with reimbursement to mitigate deficiencies per the cost estimate discussed herein. It appears this would be a one time payment with CMSD assuming the risk that the payment would cover the cost for repairs. The CSMD engineering and operations staff agreed that it is acceptable to take the sewer lines in current condition along with reimbursement from OCSD for $1.3 million dollars to implement the repairs and bring the sewer lines up to CMSD standards. RECOMMENDED ACTION: The CMSD staff recommend that the Board of Directors: • Setup an agreement with OCSD for transfer of sewers and payment of $1.3 million dollars to mitigate deficiencies in the sewer lines proposed for transfer to CMSD. • Authorize CMSD staff to implement the repairs of the deficiency areas in the sewer transfer lines utilizing the 1.3 million dollars in payment from OCSD. I Costa Mesa Sanitary District • • • • 7 f ; , yi SANTA ANA •4 SUNFLOWER f� „ INTERC MEW- .4 ,-•.< i :. •. ,' a SS71 !le t y M1 .� 'TT iq I � 741", ua?� �v Cn m a.f p „-� • .1 t � a � Mfr" �����1 .- ti l�• i. L _ =4I�17 fs:n .:. /'y W�4A� � I, LL 1 N � l . 14' CoNeBe Ave PS '' � _• •' ,. , • ___� .• i �.,_.1- ..... .._.»...•.+..__„e...„,m.. -w., ._..••..Am, � :. � .y6 .i�' "7 r4{►....- �:�._ .s�..�...- .- 405,F Wy @ - UNINCORPORATED r 1 tub / i�!4iEr G(SLER- REDHILL INTERCEPTOR , t4` 1 �. -+ e r , Je y ? * •', :. a • - F y ^$ ,. rye • 4 ' {... _ F �` t COSTA MESA T r ` : ^i.r ry►. {j w, �`5.., ii ' t, b f eo` �' �< Wr, I4` -r • ^plc ,> , � ` 5. .,c �• •.d. � •., �a� .: i •."` �� � � f � a1': _ III Yd:., "� _ �`- ,,,r f r _ •; .i+.F ., ..' •.a 1 a fir.+_ �i' �!# is:, _ � y T S'� ; . z �. - '1 . ♦., ,� 1 .•" '° ''« � {�jq j{ - . I BAKER W BAKER ST }1 LL lar •.d p..i aS i. f 1 - , A _. . r C w.w '. d `+r. _. r F • 1.. i �,t ' r} , _ ,• k ,.�'~ r��'�� Y" ��,;�'�� �, •�.�� =- �`� �- G - -_ �- •�' - °._. �,: .� INTERCEPTOR' A, f.._.,.yy, �. '• � � ♦. t _ •- - �- j • _.. a �(1y�.,.4L^ � � ` e : Y f �,�' Q� \� •�..� :'r t � . r - —' � .f. �.� T-�i• fir+ S '� s. i•• a•-i s ..,,.� { i t.; _ 9.' r 1,, l►i. 4, ' iy I i _a r „T : ' ti_3r y� :.-�sl i1•ie?! F 4 �' t is S 1 ,• . fi+ r d .L ,4•s n''a✓ :$ YJ� -�1j' � �i.t i x'Yr i r''-r. �-i. °s �,> � . � lJ��+ , i(f � _ i..,,. 1 . u, }r T �)fr 1Iyj�FS �6 >� • • }yam #f yJi` {+ Ar { 1 �•d►'w1. <•i• -• i •.cWrto�4y ;s 4°� ��'a�' r�';; y f f f 1 /. G r A O CMSD ® CMSD -Proposed 0 OCSD Sewers Transfer CMSD CMSD - Proposed OCSD City Boundary ®Costa Mesa D Santa Ana l� Unincorporated Pump Station PS OCSD FM /4 Ti''a •.l le,— A t-e- S VIMt , 1 #- , fey $ .: ice° �• .. �f � a ' �` F , li • vim} I I ; s 7v ® Orange County Sanitation District/Costa Mesa Sanitary District Sewer Transfer Prepared By; A. Nazaroff Exhibit A Date May 2008 Transfer Area Rev 1 CMSD Sewer Transfers_May 2008_v01.mxd ' �S�gAPo1Pq�6 en -FT ct cosla M�evsa santars Dst r .. an Inbepenbent Special District 4cy % a Printed on Protecting our communitN's healtb 6N providing sof id waste and sewer cof f ection services. Recycled Paper www.crosbca.gov July 16, 2009 Board of Directors Arlene Schafer Robert Ooten Gary Monahan Arthur Perry James Ferryman Los Angeles Times 1375 Sunflower Avenue Costa Mesa, CA 92626 staff i sf RE: Major Sewer Transfers — OCSD to CMSDrPh "ase IV Robin B. Kamers Dear: Manager � District Engineer, (949) 631 -1731 Please be advised the Orange County Sanitation District (OCSD) has been transferring various sewers to the Costa,�Mesa Sanitary District (CMSD) over Thomas A. Fauth the last few years with Phase IV upcoming this year.t Assistant Manager Y The purpose of the transfers iswto have smaller #local sewers owned by the local agency rather than the regiohA"'kSewer agency. Attached is a list of the Joan Revak Board secretary r> main reasons for the transfers plus a rnaprshowing theysewers being ogram Manager transferred. dF4"'' Clerk of the District ` = Certain p rope rtiesr'connectedtto these "sewers will now be subject to yearly CMSD sewer fees as the CM, will be ;responsible for the long term n, Alan R. Burns cleaning, maintenance ;repair;rehabilitation and replacement of the lines. Legal counsel PleaseFnote`'tle�iCMSD could have been charging the properties subject to this notice these same.yearly charges sin °ce the property was first connected. Marcus D. Davis The CM SD's connection-;chargrftcould also have been collected. Enclosed TreasnreriDireetor of. please finda5achedule ofhthe 200$ -2009 yearly sewer charges and please Finance note the District's fiscal year is from July 1 to June 30. The property identified under Los Angeles Times ownership is shown below Phone along with the 2008" #2009 charge, had it been in effect. (949) 645- 8400 " Fax 1375 Sunflower Avenue: $4,875.95 (949) 650 -2253 Yearly sewer charges collected by the CMSD are shown as a separate line item on the Orange County property tax bill. The transfer is expected to be completed by March 2009. Rather than collect a pro -rata share of the 2008 - Address 2009 charges, the District will place the first charge on the 2009 -2010 fiscal 628 W. 19th street year property tax bill. The CMSD adheres to the provisions of Proposition Costa Mesa, CA 218 when considering and determining sewer charges. 92 62 7 -2 71 6 • 4cy % a Printed on Protecting our communitN's healtb 6N providing sof id waste and sewer cof f ection services. Recycled Paper www.crosbca.gov Major Sewer Transfers OCSD to CMSD Phase IV October 28, 2008 Page 2 Thank you for your consideration in this matter. Please call me at (949) 631 -1731 if you have any questions. Sincerely, &rilffl Robin B. Hamers Manager /District Engineer • Transfer of Sewers from OCSD to CMSD - Phase IV Reasons for the Transfer 1. OCSD is a large regional sewer agency that owns wastewater treatment plants in Fountain Valley and Huntington Beach. OCSD also owns trunk sewers as large as 96" in diameter (8 -feet inside diameter.) 2. OCSD has a policy whereby small sewers that serve only one jurisdiction are more appropriately owned by the local sewer agency. OCSD usually only owns sewers that serve two or more agencies or are very large. The sewers to be transferred are small, ranging from 10 " -18 ", and only serve the Costa Mesa Sanitary District. The CMSD has confirmed it can properly own and maintain these sewers. 3. Similar transfers between OCSD and CMSD have occurred with the Arlington • sewer rehabilitation and transfer, the Watson sewer transfer, and the California sewer transfer. 4. The CMSD has been assisting OCSD in monitoring these lines, requiring sewer capacity studies when necessary and working with developers to understand how to connect to these lines. 5. Transfer of the sewers will eliminate an extra processing step that developers, owners, engineers and contractors currently have to follow as it will remove one agency from the approval process. 6. Transfer of the sewers will simplify the state mandated fats, oils, and grease (FOG) control program as restaurants and food service establishments connected directly to these lines will be under local control. • 9/15/08 Page 1 0 SEWER LATERAL AND CLEAN OUT FINAAL ASSISTANCE PROGRAM - CMSD #186 2008 -2009 Fiscal Year Updated: - 06/22/09 Work Performed: ' 1 2184 Rural Place Gary Monahan 9/548 -0099 6/10/2008 Completed IT, C, CO, V $ 375.00 7/31/2008 2 3 923 Cedar Place 929 Cedar Place Terri Gist - Queener Terri Gist - Queener 9/646 -4048 9/646 -4048 6/26/2008 7/3/2008 Completed $ 1,800.00 Completed C, SR $ 387.50 7/15/2008 7/15/2008 4 3036 Garfield Avenue Ran Malouf 909- 374 -8640 7/312008 Completed JT, CO, V, SR $ 1,325.00 7/31/2008 5 2379/2381 Elden Avenue Elden Street Partners LP 9/230 -5426 702008 Completed $ 830.00 7/31/2008 6 1035 Presidio Drive Kamal Pepic 7/957 -2983 7/8/2008 Completed IT, C, V $ 326.42 7/31/2008 257 E. 16th Place John Steed 9/697 -5652 7/14/2008 In Progress 3144 Sicily Avenue Christopher Oeding 7/751 -2008 7/16/2008 In Progress 20232 Spruce Avenue Brad Larkins 19/244 -3465 17/21/2008 1Completed IT, C, CO, V $ 1,750.00 3/12/2009 341 Cherry Tree Ln. Brien Bohler 7/349 -2960 7/23/2008 In Progress 2170 Pacific Avenue A,B,C David D. Coe 9/548 -5131 7/23/2008 lCompleted CO, V ? $ 1,800.00 8128/2008 327 E. 21 st Street Leslie Marler 7/545 0442 7/28/2008 Com leted C. RC, CO, V, SR $ 1,800.00 9/25/2008 820 Towne Street lBrad Edwards 9/874 -9212 7/28/2008 Completed T, CO, V, NL S 1,471.001 11/20/2008 974 W. 19th Street Alfredo Maciel 9/548 -0600 7/31/2008 In Progress 360 Ramona Way Jill Johnson 9/887 -4145 7/31/2008 lCompleted R j $ 1,800.00 10/22/2008 2229.2231 Orange Ave. Brad Allred 7/580 -6058 8/4/2008 Completed $ 1,800.00 1 8/28/2008 2905 Redwood Avenue lWayne Distro 7/557 -4084 8/4/2008 lCompleted VC, ;{ $ 160.00 9/11/2008 776 Joann Street Alfyson Ebert 9/945 -8578 815d2008 In Progress 1916 Sumba Circle Ferne Young 7/556 -0049 8/6/2008 Completed CO, V ': $ 690.00 8/28/2008 Azure, N.B. Joseph Bell 9/852 -9569 8/8/2008 Com leted T, C, CO, V. R $ 1,800.00 9/25/2008 234 Hanover Drive Richard Al quire 7/549 -1075 8/1212008 Completed C, V, SR ;` $ 725.73 8128/2008 2962 Ceylon Drive Richard Mithoff 7/641 -7002 8/12/2008 Completed T, C, V, NL $ 1,800.00 9/25/2008 300 Cutter Way Robert Kaessner 9/294 -5663 8/14/2008 Co m leted $ 1,800.00 10/22/2008 2030 Pomona Avenue Mark Hardt 7/654 -4270 8/18/2008 Completed T, V, NL $ 1,800.00 614/2009 2563 Oxford Lane Dave -Doyle 7/319 -2522 8/18/2008 Completed CO, V, SR $ 1,251.00 9/25/2008 3148 Sumatra Place Brian Leung 7/754 -1133 8/19/2008 Corn leted 'RC, CO, V $ 1,471.50 10/22/2008 979 Congress Street Margarita Garcia 9/548 -7805 8/21/2008 Com leted $ 1,075.00 10/9/2008 804 Con ress Wes Courvoisier 9/646 -1832 8/2512008 Completed $ 800.00 9/11/2008 7 11 12 13 14 15 16 17 18 19 2012382 21 22 23 24 25 26 27 28 2912291 Elden Avenue Debbe Hau 9/200 -9916 8/27/2008 Completed T, C CO V R $ 1,800.00 9/11/2008 30 338 Cher Tree Lane N.B. Jeff Tanner 7/308 -8114 8/28/2008 Completed T, V, NL $ 1,800.00 4/2312009 31 1721 Paloma Dr., N.B. Bruce Gray 9/294 -0534 9/2/2008 Completed T, C, V $ 352.00 9/11/2008 32 447 Elmhurst Lane Cara Carlton 9/350 -7178 9/3/2008 Completed T, CO, V $ 1,400.00 12/18/2008 33 34 35 36 1956 Pomona Ave 664 Surf Avenue 3097 Yukon Avenue 352 Princeton Drive David Bartholomew Kate Medina George Berg Barbara Davie 9/510 -4462 9/642 -0782 7/557- 7785 7/751 -7472 9/8/2008 9/8/2008 9/10/2008 9/15/2008 Completed T, CO, V, NL $ 1,048.35 In Progress In Progress ICompleted $ 1,507.74 10/9/2008 1/15/2009 37 443 Elmhurst Lane Jeffrey Gray 7/608 -0404 9116/2008 ComE d T, C, CO, V $ 1,250.00 9/25/2008 38 39 236 Walnut Street 1723 Samar Drive Lori Connolly Lb Bennett 9/646 -3577 9/17/2008 Co d $ 925.00 7/979 -6906 9/17/2008 Cod $ 525.00 10/ 9/2008 10/22/2008 40 41 42 43 2227 Holly Lane 150 Rochester 2070 Federal Street 2725 Gannet Drive Brian Weiss John Steed John Uffelman James Bo osian 9/933 -7011 9/18/2008 Completed IT, CO, V, NL $ 1,800.00 9/697 -5652 9/24/2008 In Progress 9/650 -7949 9/28/2008 In Progress 1310-463-3593110/7/2008 ICompleted IT, V, NL $ 1,475.00 10/22/2008 11/20/2008 44 45 46 1929 Federal Street 2245 Heather Lane - N.B. 291 Esther Street IDavid Martinez David Fletcher IDeanna Rankin 9/642 -8506 9/433 -8433 9/422 -4776 10/1312008 10113/2008 10/14/2008 ICompleted $ 1,800.00 In Progress ICompletE d $ 462.50 1 10/22/2008 10/22/2008 4712803 Portola Drive IRobert Goldin 7/641 -9210 10/17/2008 Completed T, CO, V $ 187.65 11/20/2008 48 20431 CvDress St., S.A.H. James Candelmo 9/370 -8699 10/21/2008 Com leted $ 1,800.00 10/23/2008 4912002 Bella Place Stanle Rodri uez 7/557 -5170 10/20/2008 Com leted T, C, CO, SR $ 852.50 1116/2008 50 51 52 53 1662 Iowa Street 20121 Orchid Street 20382 Cypress St., N.B. 2317 Colgate Drive IStephen Foster Chris Jenkins Mike Moinfar Roberrt Ashton 7/662 -0858 7/345 -9371 619/572 -6561 7/850 -0211 10/21/2008 10/21/2008 10/21/2008 10/22/2008 lCompleted $ 1,800.00 In Progress In Progress Com leted $ 484.19 11/6/2008 11/20/2008 54 55 56 368 Genoa Lane Heinz Borisch 9/650 -6063 10/23/2008 Completed T, C, SR $ 600.00 11/6/2008 3232 Clay Street Jack Bailey 7/968 -5518 10/28/2008 In Progress 271 Lilac Lane IGina Shafonsk 9/212 -1588 10/28/2008 ICompleted s 1 623.86 11/20/2008 Updated: - 06/22/09 Page 2 SEWER LATERAL AND CLEAN OUT FINANCIAL ASSISTANCE PROGRAM - CMSD #186 Last Updated: 2008 -2009 Fiscal Year 06/22/09 57 58 180 E. 19th Street John Sndegar 9/500 -1220 10/30/2008 Waiting for revoew, video & recpts. 2812 Europa Boger Ransom 9/632 -0943 110/30/2008 IT, V $ 156.69 11/6/2006 59 1065 Tulare Drive James Herrin 7/549 -7903 11/3/2008 Completed IT, C. CO, V, R $ 1,800.00 1 11/20/2008 60 443 Flower Street Barbara Beck 9/548 -6393 11/3/2008 ICompleted IT, C, CO, V. R $ 1,800.00 11/20/2008 61 62 63 2384 Cornell Drive 2234 Orange Avenue 964 W. 19th Street Jean Femling James Thomas Suzi Wexler - Agent 7/549 -2493 9/646 -0459 7/915 -1899 11/4/2008 11/6/2008 11/10/2008 ICompleted In Progress Completed IT, C, CO, V T, CO, V, NL $ 1.162.50 S 1,800.00 12/4/2008 1214/2008 64 287 Cabrillo St. tri- lex Richard or David Kalish 818/957 -0050 11/10/2008 Com leted T, V, NL S 1,173.00 1/29/2009 65 283 Flower Street John Hoffman 9/645 -7323 11/12/2008 Com letd T, C, V, R $ 1,800.00 12/18/2008 66 282 Knox Hal Schlegel 7/283 -1414 11/12/2008 ICompleted $ 1,800.00 1 12/4/2008 1992 Orange Avenue Thomas Fox 9/200 -7401 11/17/2008 In Progress 539 Hamilton Street (Margo Sanchez 17/381 -8884 111/19/2008 Completed $ 1,800.00 4/23/2009 2301 Anniversary Lane Jill Lindsay 7/269 -1234 11/20/2008 In Progress 3166 Barbados Place Sherry Eaton 17/437 -7365 111/25/2008 (Completed T, C, r(3;1i7 "° $ 11344.88 1/15/2009 900 Joann Street Tim Sandefer 9/548- 0503 11/25/2008 Completed FAY k:- $ 1,800.00 1/29/2009 925 Paularino Ave. Julie Thomas 7/540 -1781 12/812008 In Progress 2649 Orange Ave. Nick Amoroso 7/840 -1700 112/11/2008 (Completed IT, C, V, NL $ 1,800.00 1/6/2009 110 Lexington Lane Georgia Fox 7/878.6309 12/1012008 In Progress 340 Villa Nova Road Alfredo Juan 9/278 -1110 12111/2008 Completed $ 507.50 1/6/2009 1610 Baker Street Jeff Urbaniec 17/540 -0353 112/12/2008 lCompleted T, C, CO, V $ 1,141.50 1/6/2009 2087 Balmoral PI. Antoinette Winders 9/646 -9171 12/16/2008 In Progress 1135 Aviemore Terrace C.B. Nanda 7/920 -8810 12/18/2008 ICompleted $ 256.25 1 1/6/2004 1201 McCormack Lane Susan Hayworth 341 - 660 -7262 12/22/2008 In Progress 1910, 12, 14 Fullerton Ave. Marilyn Alexander 9/675 -7009 12/22/2008 In Progress 920 Cedar Place IJeannette Bond 91632 -6371 112/2312008 CCompleted $ 1,800.00 1/15/2009 1661 Oahu Place Doug Stewart 7/393 -0345 12/29/2008 In Progress 2290 Waterman Way Jay Adler 9/645 -7468 12/30/2008 Completed T, C, CO, V $ 1,750.00 1/29/2009 341 Bordeaux Lane Deboah Patterson 7/655 -3963 12/30/2008 Completed T, C, CO, V $ 1,171.38 1/29/2009 2728 San Juan Lane James Doody 7/504 -0420 12/31/2008 Completed $ 422.50 1/29/2009 2126 Westminster Ave. Frank Krieg 9/200 -9038 1/6/2009 In Progress 1976 Fullerton Ave. Bruce McAllister 1909/730 -1238 1/7/2009 lCompleted $ 1,800.00 1 1/29/20 -0,9 3141 Bray Lane Angela O'Connor 9/350 -7681 1/8/2009 In Progress 508 Orange Ave. Randy Strodel 19/645 -4820 1/8/2009 lCompleted IT, C, CO, V $ 1,800.00 4/9/2009 2749 Gannet Drive Frank Grafton 7/444 -1325 1/8/2009 In Progress 136 Monte Vista Icarrol Kennedy 7/342 -6383 1/12/2009 lCompleted $ 1,600.00 2/12/2000 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 545 W. Hamilton I Richard Cardenas 9/233 -2874 1/13/2009 Com leted T, C, CO, V, R $ 1,800.00 2/12/2009 93 1965 Tustin Don Hunt 9/548 -9519 1/16/2009 Com leted $ 11800.00 1/29/2009 94 2449 Nap o1I Way John Francis 9/271 -5121 1/20/2009 Completed IT, C, CO, V $ 1,171.00 2/12/2009 95 2862 Stromboli Road Joan Thomas (Rebel Ely) 1824 1/2 Viola Place Lee Naqvi 3018 Samoa Robin Leffler 970 Governor Robin Leffler 371 W. Wilson Predraq Vasirevic 917/617 -6995 9/642 -1793 7/546 -1452 7/546 -1452 9/874 -6560 1/20/2009 1/21/2009 1/21/2009 1/21/2009 1/23/2009 Completed In Progress In Progress Completed ICompleted IT, CO, V. NL $ 1,80000 276.25 IT, C, V, R $ 1.600,00 2/12/2009 3/12/2009 3/12/2009 96 97 98 99 100 101 102 700 W. 20th A, B, C David Bartholomew 9/510 -4462 1/26/2009 ICompleted IT, C. CO. V $ 1,866.50 6/4/2009 1185 Dorset Lane Todd Brown 7/556 -0703 1/27/2009 Completed T, V $ 227.50 5/21/2009 2010 Baltra Place I Annamaria Kovacs 7/957 -1376 1/28/2009 IComp letd T, RC, CO, V, R $ 1.800.00 4/9/2009 1790 Crestmont Place John Foreman 9/631 -4578 1/28/2009 Completd T, G V, R $ 1,800.00 4/9/2009 3483 Santa Clara Circle Javier Orozco 7/481 - 0072 211/2009 In Progress 661 Cove Street Rick Nasca 9/631- 1449 2/312009 In Progress 20352 S.W. Lane jJames Cypress Richard Lehman Contractor 9/706 -3034 2/5/2009 Completd T, V, NL $ 1 �.50 3/26/2009 654 W. 18th Street, Unit A Shawn Chang 626/395 - 0600 2/9/2009 In Progress 3254 Washinaton Avenue Scott TerDstra 9/294 -0761 2/17/2009 lCompleted IT, CO, V, R, Is 1,800.00 1 5/21/2009 103 104 105 10 108 109 110 111 112 113 1841 Orange Avenue 379 Santa Isabel 2846 Tobago Place 269 20th Street I Fred Revely Ken & Christine Ryder Bob Ooten Lisa Stanton 7/596 -5395 7/384 -4311 7/338 -9896 9/650 -7447 2/18/2009 2/26/2009 3/2/2009 3/3/2009 ICompleted Completed In Progress ICo m leted IT, C, CO, V is 1,009.00 T, V, NL $ 1,179.66 IT, C, V, R, NL s 1,800.00 4/9/2009 3/12/2009 3/26/2009 114 1386 Galway Lane Mary Humphrey 7/557 -1656 3/312009 lCompleted IT, CO, V, R, SP $ 1,800.00 3/26/2009 9 0 0 Page 30 SEWER LATERAL AND CLEAN OUT FINAL ASSISTANCE PROGRAM - CMSD #186 2008 -2009 Fiscal Year 115 380 University Michael Steiner 9/642 -9666 3/6/2009 Completed T, C, V, R $ 1,800.00 5/21/2009 _116 870 Congress Noemy Serpas 9/910 -0888 3/10/2009 Completed T, V $ 137.50 5/7/2009 117 1935 Anaheim Street Patricia Foster 9/642 -3322 3/10/2009 Completed IT, C, V $ 2,384.00 See Teresa 118 2437 Orange Ave. ISkip Spengler 9/225 -6268 3/18/2009 lCompleted IT, V, R $ 1,800.00 4/9/2009 119 2508 Holly Lane Steven Melillo 7/357 -6998 3/23/2009 In Progress - T.I. 120 1003 Oak Street David Harrison 9/631 -1448 3/24/2009 Completed T, V $ 137.00 4/23/2009 121 2033 Balearic Drive Ronald Hackleman 9/212 -9334 3/24/2009 ComipeW RC, CO, SR CO.. SR $ 937.50 4/9/2009 122 202 - A Monte Vista Lane Doris Lee 7/557 -2691 3/24/2009 Com feted $ 1,800.00 4/9/2009 123 2011 Paloma Drive ITefford Cotton 9/645 -1878 3/24/2009 ICompleted C, R $ 1,800.00 4/9/2009 124 3157 Bray Lane Nadine Sturdy 7/751 -3934 3/25/2009 In Progress 125 2200 Windward Lane Rosalind Hanaway 9/650 -1094 3/30/2009 Completed T, CO, V, NIL $ 1,800.00 4/9/2009 126 999 Mission Drive Roy Rogers 7/593 -6110 3/30/2009 In Progress 127 276 Albert Place Dianne Leathers 9/548 -9797 3/30/2009 Completed T, H, CO, V, SR $ 625.00 5/21/2009 128 3473 Windsor Court Brenda Fujimoto 7/309 -5262 3/31/2009 Completed T, CO, V $ 1,044.34 5/21/2009 129 1160 Gleneagles Terrace I Pau I Abels 19/642 -0794 4/3/2009 (Completed T, RC, CO, V, SR $ 1,310.00 5/7/2009 130 432 Hamilton Street Salvador Jiminez 9/500 -1430 4/3/2009 Completed T, C, V $ 350.00 5/21/2009 131 338 Reims Lane Susan & Neal Leiman 9/642 -3216 4/3/2009 In Progress 132 2132 Orchard Drive Joseph Jones 9/756 -9126 4/8/2009 In Progress 133 3017 Royce Lane Ray & Julianna Skinner 7/556 - 2677 4/8/2009 In Progress 134 2297 Redlands, N.B. IRobert Mulvihill 9/650 -3615 4/9/2009 Completed IT, C, CO, V $ 1,313.00 6/4/2009 135 2069 National Avenue ITim Cama na 9/642 -2518 4/9/2009 lCompleted T, C, CO, V $ 400.00 5/21/2009 136 1306 Watson Avenue I Bob Houle 7/751 -3322 4/20/2009 Completed $ 1,800.00 1 5/7/2009 137 333 E. 18th Street Gerry Giannini 9/683 -4952 412112009 Completed CO, SR $ 425.75 5/21/2009 138 468 Abbie Way Matthew Boone 19/642 -1288 14/23/2009 ICompleted IT, V $ 162.50 1 5/21/2009 139 163 Magnolia Street Neva Duyndam 9/631 -3646 4/28/2009 In Progress 140 2637 Elden Ave. Steven Kettner 7/438 -3237 4/28/2009 In Progress 141 493 Abbie Way Jane Caldwell 9/631 -0159 4/29/2009 Completed T, V $ 214.50 5/21/2009 142 1905 Lanai Drive IBill Jacob 7/658 -9482 5/1/2009 ICompleted IT, C, V I $ 469.50 See Teresa 143 1930 Swan Drive ISteven Fink 7/435 -0204 5/5/2009 lCompleted IT, CO, V, R 1 $ 1,775.00 5/21/2009 144 2201 Pacific Avenue Jerry Peek 818/247 -4344 5/11/2009 In Progress 145 1992 Kornat Drive Mary Martineau 7/435 -1083 5/11/2009 ICompleted IT, CO, V, SR $ 1,634.50 6/4/2009 146 266 Virginia Place Dominick McGrail 9/646 -8764 5/11/2009 Completed R, SR $ 1,800.00 5/21/2009 147 2407 Sierra Vista, N.B. Debra Cowles 9/697 -1219 5/12/2009 In Progress - T. I. 148 3484 San Marino Circle Ivan Lafoon 17/241 -9060 15/14/2009 (Completed IC, CO, NIL $ 1,800.00 6/4/2009 149 3105 Dublin Street Diane Keegan 7/435 -9348 5/19/2009 In Progress 150 2063 State Ave Sonja Trefethen 909/645 -1270 5/20/2009 lCompleted IT, C, CO, V $ 800.00 See Teresa 151 3101 Fernheath Lane Thomas Mulryan 7/540 -7589 5/21/2009 ICompleted IT, C, CO, V, R I $ 1,800.00 6/4/2009 152 157 Del Mar Avenue H.M. Hargrove 7/296 -2177 5/27/2009 In Progress 153 3206 Michigan Ave. Lynn Faulkner 7/957 -1209 5/27/2009 In Progress 154 3202 Michigan Ave. Clint Brown 7/381 -7110 5/27/2009 In Progress 155 1976 Pelican Place Patrick Ayres 7/751 -0285 6/1/2009 Completed T, C, V, R $ 1,800.00 See Teresa 156 2924 Baker Street John Townsend (son) 17/427 -5920 16/1/2009 (Completed IT, C, V, R, SR $ 1,800.00 See Teresa 157 1730 Centella Place Scott Liolios 9/290 -6360 6/8/2009 Completed T, C, V $ 397.50 See Teresa 158 1921 Diana Lane John & Alex Hawkinson 9/548 -4738 6/9/2009 In Progress 159 3250 Washington Ave. (Judith Meng 17/549 -4147 16/10/2009 (Completed IT, C, V, R $ 1,800.00 See Teresa 160 2964 Andros Street Peter & Ashley Arent 71754 -7156 6/15/2009 In Progress 161 1959 Federal Ave lKristen Van Allen 9 -631 -0579 6/22/2009 lCompleted T,C,CO,R,V $ 1,800.00 Lateral Assistance Reimbursements Total: $ 145,313.14 Completed (No fill) 111 In Progress 49 Waiting for Review 0_ 160 Identified Root Cutting as at least a part of the issue 40 CALCIUM Televised, C Cleaning, RC Root Cuffing, CO Clean out Installed, V Video Provided to CMSD, R Rehab, SR Spot Repair, (NL) New Lateral Apdated: 06/22/09 # • 7/15/2009 SEWER LATERAL ASSISTANCE PROGRAM -CMSD FY 2008 -2009 20 18 16 14 cm 12 U CL 10 a 0 8 6 4 2 0 Jun- Jul -08 Aug- Sep - 08 08 08 Oct- Nov- Dec- Jan- Feb- Mar- Apr- May- Jun - 08 08 08 09 09 09 09 09 09 MonthNear • FMFY 08 -09 The Orange County Register ORANGE COUNTY Saturday, July ll, 2009 I Local 13 City allots $500,000, more for sewer repair Huntington Beach has already spent $1.4 million but is responding to more claims over damaged lines. By JAIMEE LYNN FLETCHER THE ORANGE COUNTY REGISTER HUNTINGTON BEACH • Surf City is earmarking another $5100,000 for a new sewer repair program after re- ceiving more than 550 claims in four months from residents over damaged lines, officials said. The city has already tagged about $1.8 million and spent about $1.4 million to fix sewer lines just out- side homeowners' proper- ties, but officials say they need the extra funding to cover demands for the rest of the fiscal year, which ends Sept. 30. City Council members this week approved appro- priating $500,000 from the sewer services fund for the program. The council in November 2007 approved a 20 percent sewer fee increase to help cover the sewer lateral re- pair and maintenance pro- gram, which had previously been paid for by the city. The increase came to an ex- tra $1.42 a month for single - family residences. The program went into effect January 2008 and was expected to draw $1.4 million in 2008-09 to fix lines branching from the city's main line, through the public right -of -way, up to the private property line. However, in March city officials noted there would not be enough funding to cover repairs for the rest of the current fiscal year be- cause of the volume of claims filtering into the city. More than 550 claims were filed from January to April. November topped the chart with 70 claims filed. The public works direc- tor transferred $375,000 into the fund, and in May, the originally budgeted $1.4 million ran out. Utilities Manager Ho- ward Johnson said about 98 ANA VENEGAS, THE ORANGE COUNTY REGISTER A ficus tree like the one pictured caused plumbing damage to Karen Klaess' home in Huntington Beach. The city received more than 550 claims in four months from residents over damaged lines. percent of the claims cite damage caused by tree roots infiltrating sewer lines. Huntington Beach is re- sponsible for maintaining 350 miles of sewer piping and has a list of about 100 trees that need to be re- moved because of root problems, city officials said. A handful of ficus trees in various neighborhoods have been cut down in re- cent months because resi- dents have complained about problems with their sewer systems. City officials will consid- er various options for next year's program to ensure there is sufficient funding to cover the claims, which could include adjusting Huntington Beach is responsible for maintain- ing 350 miles of sewer piping and has a list of about 100 trees that need to be removed because of root problems, city officials say. monthly sewer fees or de- veloping a waiting list for residents. CONTACT THE WRITER: 949-553 -2932 or jfletcherLPocregister.com • 0 • COSTA MESA SANITARY DISTRICT RECYCLING COMMITTEE AGENDA June 25, 2009 12:00 p.m. Costa Mesa Sanitary District 628 W. 19" Street Costa Mesa, California (Directors Ooten and Schaffer) I. Recycling Committee Goals for 2009 -2010 II. Orange County Waste & Recycling Sub - Regional Meetings and Grant Program A Regional Recycling and Waste Diversion Grant Fiscal Year 2008/09 III. CR &R Report on Other Agencies Recycling Programs IV. Disposal of Residential Grease in CMSD Trash Collection Program V. Composting Workshop at San Juan Capistrano — May 21, 2009 VI. Presentations A. Career Day at Estancia High School —June 3, 2009 VII. Tours A. College Park Elementary School Tour of MRF & Landfill Friday, June 12, 2009 B. Special Education Class (Costa Mesa High School Annex) Tour of Landfill — Wednesday, June 17, 2009 VIII. Newport -Mesa Unified School District Elementary Science Advisory Committee IX. CMSD Signage at Estancia High School & Costa Mesa High School X. Signs for Orange Coast College Recycling Center XI. Large Item Collection Program XII. Report on Other CMSD Recycling Programs XIII. Public Comments Dated: June 18, 2009 Clerk of the District • • COSTA MESA SANITARY DISTRICT ICT RECYCLING COMMI'lC`IC]E]E AGENDA July 22, 2009 12:00 p.m. Costa Mesa Sanitary District 628 W. 19" Street Costa Mesa, California (Directors Ooten and Monahan) I. Recycling Committee Goals for 2009 -2010 II. Orange County Waste & Recycling Sub - Regional Meetings and Grant Program A. Regional Recycling and Waste Diversion Grant Fiscal Year 2008/09 III. CR &R Report on Other Agencies Recycling Programs IV. Tours V. Signs for Orange Coast College Recycling Center VI. CMSD Signage at Estancia High School & Costa Mesa High School VII. Large Item Collection Program VIII. Report on Other CMSD Recycling Programs IX. Public Comments Dated: July 15, 2009 Clerk of the District C� Rlecycling Committee Goa! for 2009 and 2010 Calendar Years I. Encourage Recycling Projects by Non - Profit Organizations � page Ad in City of Costa Mesa Publication 0 $100 awards given to non - profit organizations that complete recycling projects 0 Utilize $500 Recycling Support from Costa Mesa Disposal 0 Create two projects in 2009 and 2010 0 Contact Girls Club and Boys and Girls Scouts Past Participants include: Girl Scouts, Boy Scouts, Cub Scouts, Boys and Girls Club Potential Participants include: Schools, Sports Teams Status: II. Research Food Recycling 0 Continue Research from 2007 -2008 0 Consider CR &R Wet Recycling Method 0 Provide updates to Board in late 2009 and 2010 . III. Participate in special days and events: such as: 0 National Environmental Education Week - April 12 -18 0 Earth Day - April 22 0 International Composting Awareness Week - May 3 -9 0 Kids Day - August 2 0 California Coastal Clean -Up Day - September 19 0 America Recycles Day - November 15 0 Waste Free Lunch Day (any day) Status: Career Day at Estancia High School held June 3, 2009 IV. New District Video 0 Discuss Distribution Strategy Status: On Hold V. Educate Residents Educate Residents on One - Container Mixed Trash Recycling Program 0 Include articles in newsletter and other publications 0 Educate Residents on Achieving 85% Recycling rate 0 Educate Residents on HHW and other proper disposal. 0 CRT- Conducted Seminars 0 Junk Mail Alternatives 0 Signs for OCC Recycling Center 0 Concept of Zero Waste 0 Disposal of Residential Grease 0 Utilize all opportunities 0 Create 'New Resident" packages w/recycling and source reduction information Status: VI, Continue School Recycling Programs 0 Telephone Book Recycling Program 0 Plastics Presentations 0 Vermi-Composting 0 Composting 0 Waste-Free Lunch Day 0 Sewer Science 0 Actively promote programs with new flyer and attempt to hold presentations continuously throughout 2009 & 2010 school years Status: Plastics presentations at TeWinkle School held on February 4, 2009 Recycling presentation at Paularino School held March 26, 2009 VII Continue to host fours of CRT, OC Landfill and 005[) for Costa Mesa residents including students and social service groups 0 Continue tours of CRT, OC landfills & OCS[), 0 Tour of OCSU Groundwater Replenishment Facility, a Tours of LEER Gold Yard Status: 0 Tour with UCI students held March 5. 2009 0 Tour with College Park Elementary School students held June 12, 2009 a Tour with Costa Mesa High School Special Education students to landfill 0 on June 17, 2009 V111. Water Conservation 0 Encourage reduction in water usage 0 Promote use of waterless urinals 0 Research available products for low water usage 0 Refer residents to Mesa Consolidated Water District website 0 Meet with MCWO Staff in mid-2009 and 2010 to obtain appropriate message to residents and businesses. Disseminate at every opportunity. Status: CMSD ad placed in Costa Mesa Recreation & Community News Summer publication. Protectijy the Environment by Increasing Recychng andAuureness wrww.ansikagoy 07115109 2 A 3 • IX. Source Reduction Goals a Distribute CMSD Flyers a Post information on Website a Promote OCC Recycling Center as One -Stop Recycling Center a Continue source reduction outreach and education Add Source Reduction Goals to website in 2009 and Summer- 2009 newsletter a Provide 250 Earth Machine composting bins by the end of 2010 Status: X. Invite the following individuals to Recycling Committee meetings: • Mike Carey, OCC Recycling Center (March 2007 meeting) • Melanie Eustice, City of Costa Mesa Management Analyst & Mike Balliet • Maria Kakutoni, CIWMB Status: Trisha Throop of CR &R attends meetings on regular basis XI. Pursue Grant Funding Pursue OC Waste and Recycle Grants Other Grants a Provide monthly reports on regular meeting agenda Status: Received Grant funds from OC Waste & Recycling XII. Other Recycling Programs and Events Used Tire Roundup a Emergency Services Expo a Sharps Program Increase Pharmacy participation a Add one pharmacy in 2009 and one in 2010 subject to budget limitations a Status: Costa Mesa Compounding Pharmacy & Shareourselves Pharmacy are joining the Sharps Program - Curbside, Inc. is preparing agreements XIII. Staff Training Programs and Events a Attend Conferences Status: Staff attended Composting Workshop in San Juan Capistrano on May 21, 2009 a Training on Giving Presentations Status: Staff training session on March 17, 2009 • Protecting the Environment by Increasing RecrycCrng andAulareness VAIM.crosdca. O7115109 CosTA MESA SANiTAxy DisTRicT Memorandum To: Board of Directors and Staff ... an Independent Specia(District From: Teresa Gonzalez, Accountant4 Date: July 14, 2009 Subject: Pharmacy Sharps- Pharmaceuticals Collections Program Meetings BACKGROUND: CMSD Staff is pursuing adding both pharmaceutical collections from pharmacies and adding pharmacies to the current list of five supported pharmacies. The five current sharps collection only pharmacies are White Front Pharmacy, Steven's Pharmacy, Ramsay Rexall Drugs, Rite Aid Pharmacy and CVS Pharmacy. DISCUSSION: On July 14, 2009 Denise Gilbert, Teresa Gonzalez and Bill Anderson from Curbside, Inc. met with the pharmacists in charge at two local pharmacies expressing interest in the District's sharps collection program. Mr. Bill Anderson explained the Curbside Inc. sharps program and pharmaceutical program to both Mike Shah with the Costa Mesa Compounding Pharmacy and Mary Ann Huntsman with Share Our Selves Clinic. Mike Shah expressed the need for his patrons to dispose of the sharps and pharmaceuticals properly and agreed to participate in the District's programs. Mary Ann Huntsman also expressed a tremendous need for patients of the free medical clinic to dispose of the sharps and pharmaceuticals properly and also accepted to participate in the programs. Due to the anticipated high amounts of sharps disposals at the clinic, it was determined that the large sharps drop box will be needed at this location. The costs of the sharps and pharmaceutical programs are variable. The District Staff plans to purchase rather than rent the drop boxes up front for a purchase price of $1495 for each of the regular sharps and pharmaceutical drop boxes and $1940 for the large sharps drop box. The purchase vs. rental analysis showed the break - even point of costs would be twenty months. Due to the Districts intended long -term commitment to the programs, Staff recommends purchasing the boxes as the more cost effective option, plus the purchase allows for the transfer of the boxes to a different location if necessary. The pick -up cost per stop will be $95 for the sharps box and $75 for the pharmaceutical box plus $4.50 per pound of pharmaceutical material. Based upon information obtained from Curbside Inc. the estimated cost Protecting our community's health by providing solid waste and sewer collection services. crosdcagov 1 per pharmaceutical box for a typical pharmacy location will range from $250 to $375 per month. The estimated sharps box cost will range from $95 to $300 per month. This translates to a cost range of $345 -to -$675 /month per pharmacy versus the current average cost of $200 /month per pharmacy for sharps collections only. In reviewing CMSD's adopted budget for FY09 -10, the costs of the pharmaceutical boxes can be paid out of the funds appropriated for the household hazardous waste program and the costs for the added sharps collection boxes can be paid out of the already appropriated sharps program funds. Due to the unanticipated additional costs, it will be necessary to review the sharps program costs at mid -year to determine if a budget adjustment is necessary to transfer funds. The addition of the two pharmacy locations to the sharps program and to the new pharmaceutical program is an excellent opportunity for the District to continue with its recycling goals. The District staff will be reviewing the expansion of the sharps and pharmaceutical programs to other locations, while taking into account the budget limitations. Security concerns, at this time, prevent extending the programs to the OCC Recycling Center. In the following days Bill Anderson will contact Mike Shah and Mary Ann Huntsman to make all the arrangements necessary to begin the sharps collection and pharmaceutical programs at each of their pharmacies. The District General Counsel is on target to review the proposed Curbside, Inc. Agreement during the week of July 20, 2009. RECOMMENDATION: Staff recommends the Board of Directors approve the addition of the two pharmacies (Costa Mesa Compounding Pharmacy and Share Our Selves Clinic) to the Sharps program and add the pharmaceutical collection program at both facilities in addition to planning to change all pharmacies to the Curbside, Inc. program during FY 09 -10 from Stericycle. • 2 TAY,YDISTRICT C O S TA M E S A$� I Memorandum To: Board of Directors ... an Independent Special District From: Joan Revak, Board Secretary/Program Manager /Clerk of the District Date: July 15, 2009 Subject: Large Item Collection Program - 2009 The Large Item Collection Program began on June 22 and will conclude on August 21, 2009. As of July 10, 2009, 124.63 tons were landfilled at a total cost of $2,775.17. Recyclable White Goods collected during this period totaled 28.43 tons, for a credit of $1,421.00 ($50.00 /ton) amounting to a net credit to -date of $1,354.17. The weekly progress of the collection is illustrated on the attached chart. 0 Attachment 1�1 Protecting our community's health by providing solid waste and sewer collection services www.crosdcagov 0 0 l +_ COSTA MESA SANITARY DISTRICT LARGE ITEM COLLECTION PROGRAM - 2009 Landfilled Tonnage 52.31 36.17 36.15 124.63 Cost $1,181.07 $795.74 $798.36 $2,775.17 Recycled White Goods 12.20 8.57 $7.66 28.43 Credit $610.00 $428.00 $383.00 $1,421.00 Net Cost $571.07 $367.74 $415.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,354.17 07/15/09 jr Vol* F W - �-w o0 t-v SiHo O(d 3 H 0 , m g 0:1 �- � N - 1,--ij N n • • July 5, 2009 Board of Directors Costa Mesa Sanitary District 628 W. 19th Street Costa Mesa, CA 92627 Atten: Joan Revak, Board Secretary/Program Manager Subject: Independent Review 2009 -10 CIP Report Honorable Board of Directors: (:E IN/ E1) JUL 012009 ,W OISIRV I have completed my review of the District's 2009 -10 Capital Improvement Program (CIP) report dated March 30, 2009 as revised June 1, 2009. I have enclosed my independent review report as requested by the District Engineer in his letter dated June 1, 2009. I also reviewed my 2008 -09 Independent Report, the Fiscal Year 2009 -10 Line Item Budget information provided and the various Districts meeting minutes from April and May 2009. Since the majority of the 2009 -10 CIP projects were basically the same as the 2008 -09 projects my review was limited to potential or identified changes and amount of fund allocations. I also noted that three of the 2008 -09 CIP projects had been moved to the Operation and Maintenance budget which I find to be appropriate. I noted the addition of two new projects 4187 and #188; however it would appear that #188-Purchase Standby Pump would fit in the O&M portion of the budget but I didn't see a line item for this project. I continue to believe the District's management and financial ability to plan for the future, conduct day to day operations as well as responding to requirements from outside agencies to be an outstanding feature of the District's overall operation. Thank you for giving me the opportunity to serve the District as Alternate District Engineer. Sincerely, 4�pF ESSIpg, Bruce D. Mattem, � Alternate District Engineer Co 9388 bdmga,socal.rr.com c.7 M 714 - 962 -1136 �� Epp D D FAWork \CMSD\2009- 10\Ltr Transmit 2009 -10 Ind Review 070509F.doe TF 0 • ,Bruce Nattern Co�aalt,��nt Independent Review Costa Mesa Sanitary District Capital Improvement Program Fiscal Year 2009 -2010 3 Proiect #101 / Westside Pumping Station Abandonment This is an ongoing long term project to eliminate six (6) pumping stations on the Westside of the District. The District has informed the OCSD of the District's commitment and • financial ability to participate in the project. OCSD has started the planning stage and has budgeted $12 million for the project with an anticipated construction date of 2012. The District has updated its 1989 cost estimate (District share for the gravity line work) which is estimated at $2 -$3 million. lJ There have been no changes from the 2008 -09 CIP Report review and no additional comments are warranted at this time. This year's appropriation is $250,000 and is in keeping with last year's report. 4 Proiect #149 / Sinking Fund For Future Sewer Relacement This is the 15th year (project was initiated in the 1995 -96 fiscal year) that funds have been set aside for future replacement or reconstruction of sewer lines as they reach life expectancy. This year's allocation will add $100,000 to the fund. The only change from the 2008 -09 CIP Report is Project #149 has been moved from the CIP Program to the Operations and Maintenance (O &M) budget. Since this set aside is not a capital improvement project it is appropriate to place it in the O &M portion of the budget. No additional comments are warranted at this time. Independent Review CMSD CEP Report 2009 -10 July 5, 2009 Page 2 of 3 0 Project #159 / Televising Sewer Lines This is an ongoing program to insure that the Districts' facilities are functioning properly and is being done in conjunction with and support of the District -wide televising Project #175. This year's allocation is $25,000. The only change from the 2008 -09 CIP Report is Project #159 has been moved from the CIP Program to the Operations and Maintenance (O &M) budget. Since this set aside is not a capital improvement project it is appropriate to place it in the O &M portion of the budget. No additional comments are warranted at this time. 4 Project #164/ Miscellaneous Sewer Work And Manhole Adiustment This project provides funding for a continuing program to perform the following: 1. Reimburse other agencies for work that they either do or have done on District facilities. 2. Purchase of manhole rings and covers and for adjusting District sewer manholes to • grade. 3. Pumping station and small sewer line repairs that need to be handled immediately. 4. Emergency repair work for force main and gravity line problems 5. Roach control in sewer manholes. The only change from the 2008 -09 CIP Report is an increase in the appropriation from $125, 000 to $279,600. The increase is based actual cost analysis and the information provided appears reasonable. No additional comments are warranted at this time Project #171 / Irvine Pumping Station Force Main Rehabilitation (Phase D This project was fully reviewed and commented on in the 2008 -09 CIP Report. There appears to be no other changes; therefore no additional comments are warranted. The appropriation for 2009 -10 is $440,000 which appears reasonable and in keeping with last year's report. Project #180 — Fats, Oils and Grease (FOG) Control Program The only change from the 2008 -09 CIP Report is Project #180 has been moved from the CIP Program to the Operations and Maintenance (O &M) budget. Since this set aside is not a capital improvement project it is appropriate to place it in the O &M portion of the budget. No additional comments are warranted at this time. • The recommended appropriation of $100,000 appears reasonable. r� Independent Review CMSD CEP Report 2009 -10 July 5, 2009 Page 3 of 3 f? Proiect #183 — System Wide Sewer Repair Program This is the second year on the CIP program for this project. This project was fully reviewed and commented on in the 2008 -09 CIP Report. There appears to be no other changes; therefore no additional comments are warranted. The appropriation for 2009 -10 is $700,000 which appears reasonable and in keeping with last year's report. 4 Project #186 — Sewer Lateral Assistance Program This is the 3rd year (project was initiated in the 2007 -08 fiscal year) that funds have been set aside to help and insure proper private property sewer lateral service. The District has recognized that: 1. many private properties do not have sewer clean outs 2. that repairs to old house laterals can be expensive 3. that repairs requiring street cuts may create an undue burden on the property owner 4. some sewering agencies already have lateral programs This project was fully reviewed and commented on in the 2008 -09 CIP Report. There appears • to be no other changes; therefore no additional comments are warranted. The appropriation for 2009 -10 is $150,000 which appears reasonable. Q Project #187 — District Yard The District has acquired the necessary property for a new maintenance yard and has been going through the planning and architectural phase in preparation of constructing the new yard. The District has $2.0 million set aside but the most recent estimate including building construction, furnishings and equipment is $2.35 million. This year the District has allocated $400,000 which appears reasonable. Project #188,— Purchase of 2nd By -Pass Pump The District has two standby diesel generators but only one standby pump. The District historically had two standby pumps but they became non - operational. The first replacement pump was purchased in 2006. It makes sense to have a second pump for emergency coverage as one pump may be in service at another station or out of service for regular maintenance. The appropriation of $75,000 appears reasonable. It appears that this purchase would be listed in the O &M budget as it was not listed under the CIP portion of the budget. However it didn't appear to be listed in the O &M portion either. 0 FAWork\CMSD\2009- 10\2009 -10 CIP Report 070509F.doc • REPORT ON EMERGENCY OR NON -BID SEWER WORK For June 2009 Regular Board Meeting Authority Public Contract Code Section 20806 states a sanitary district is authorized to dispense with competitive bidding of public works jobs when there is an emergency. Public Contract Code Section 22050 authorizes the Board to delegate the authority by ordinance so that action may be taken provided it is reported at the next board meeting the reasons justifying the emergency will not permit the delay resulting from competitive bidding and why the action is necessary. Authority was given to the Manager /District Engineer pursuant to District Operations Code Section 4.05.010(b). The law also requires reports at successive Board meetings stating the justification for continuing with the emergency work and the approval by a 4/5 vote of the Board of Directors. Also, District Operations Code Section 4.05.020(b) allows the Manager/ District Engineer to authorize sewer work for projects with a dollar value less than $15,000 and requires the Manager /Engineer to report on the work at the following Board meeting. District Operations Code 4.05.030 allows an exception from competitive bidding whenever the public's interest may best be served by dispensing with the bidding procedure provided the Board discloses on the record and in the minutes of the meeting how the public interest was best served. Santa Ana Pumping Station — Emergency Repair 6/8/09 The Santa Ana Pumping Station recently experienced the following problems: The impeller and volute on Pump No. 1 become worn to the point of pumping too small of a volume; Pump No. 2 is almost worn to the same point; the base 90- degree elbows on both pumps are extremely worn and no longer seat the pumps properly; the ball check valves sometimes do not close completely; and the steel discharge piping in the wet well is wearing and has a very thin pipe wall. The problems were just discovered during an inspection of the pumps and the portion of the equipment that operates below the water surface. Because the problems were cumulative and represented an imminent threat of pump and piping failure that could result in a large sewer spill if the repair was delayed by preparing plans and specifications and placing the work out to bid, the District Engineer declared an emergency condition. One of the District's emergency contractors, Schuler Engineering, was hired to by -pass the flow and install new pumps, bases, piping and valves, at a cost of $46,615. Schuler Engineering began the work on June 8, 2009 and was assisted as necessary by CMSD field crews. It is recommended the Board of Directors ratify the actions taken by the District Engineer by a 4/5 vote. Rev. 6/29/09 • • N ROBIN B. HAMERS & ASSOC., INC. CIVIL ENGINEERS • PLANNERS • SURVEYORS ... since 1981 • Revised June 28, 2009 May 26, 2009 Board of Directors Costa Mesa Sanitary District 628 W. 19a' Street Costa Mesa, CA 92627 RE: Engineering and Inspection Budget Beginning July 1, 2009 Dear Board Members: 234 E. 17TH ST., SUITE 205 COSTA MESA, CA 92627 Phone 949/548 -1192 Fax 949/548 -6516 Enclosed please find the forthcoming labor distribution beginning July 1, 2009 in accordance with the regular meeting held May 20, 2009. At the meeting, the Board restored the total plan check and inspection budget, including the sewer lateral assistance program, for RBH. Inc., to $200.000. At the previous level of $120,000, there were insufficient funds to properly cover the volume of work (for example, inspection was limited to six hours per day, thereby requiring the Maintenance Supervisor to • perform two hours per day of inspection.) TOTALS - with revised total allocation of $200.000: Engineer - Plan Check 8.75 hrs /wk @ $96.50/hr = $ 43,907.50 per year Engineer - Sewer Lateral Assistance 1.00 hrs /wk @ $96.50/hr = 5,018.00 Inspection 45.00 hrs /wk @ $64.50/hr = 150,930.00 Total $199,855.50 per year Please note. the draftsman hours for updating the Sewer Atlas, which was last updated in October 2006, were removed from the budget, but a separate proposal for the work was provided to the Assistant Manager as requested. The undersigned appreciates the Board's decision to restore the plan check and inspection budget to a workable level that protects the District. Sincerely, Robin B. Hamers, PE President TREASURER'S REPORTS COSTA MESA SAN, TAXYDISgRICT Memorandum To: Board of Directors ... an Independent Special District From: Marc Davis, Treasurer /Director of Finance Date: July 13, 2009 Subject: Statement of Investment Policy for Fiscal Year 2009 -10 Recommended Action Adopt Resolution No. 2009 -769 adopting a Statement of Investment Policy for fiscal year 2009 -10 and delegating certain investment functions to the District Treasurer. 0 Executive Summary • Enclosed for consideration is the Statement of Investment Policy (Policy) for the 2009- 10 fiscal year. Although a statement of investment policy is no longer required by the California Government Code to be adopted by the Board, Section 53646 of the Code allows the treasurer of a local agency to submit such an annual statement to the Board for consideration and review. Although no longer required, Staff believes it is prudent to continue to do so. The Policy was reviewed with the Investment Oversight Committee at their meeting of May 20, 2009. There were no significant changes proposed to the Policy. Attachment 2 includes a red -lined version of the Policy so the Board can review the proposed changes. Attachments: Attachment 1 — Resolution No. 2009 -769 Attachment 2 — Statement of Investment Policy Protecting our community's Health by providing solid waste and sewer collection services. crosdcagov Attachment 1 RESOLUTION NO. 2009 -769 to A RESOLUTION OF THE BOARD OF DIRECTORS OF THE COSTA MESA SANITARY DISTRICT ADOPTING A STATEMENT OF INVESTMENT POLICY FOR FISCAL YEAR 200910, AND AUTHORIZING THE TREASURER TO INVEST AND REINVEST IDLE MONIES OF THE COSTA MESA SANITARY DISTRICT IN ACCORDANCE WITH THE STATEMENT OF INVESTMENT POLICY, AND FURTHER AUTHORIZING THE SAID TREASURER TO DELEGATE TO A DEPUTY THE CARRYING OUT OF ANY SUCH TASKS. WHEREAS, Government Code Section 53601 et seq. sets forth the investments that the District may lawfully make; and WHEREAS, Government Code Section 53646(a)(2) sets forth that the District's Treasurer may annually render to the Board of Directors a Statement of Investment Policy at a public meeting for the Board to consider; and WHEREAS, The Board has reviewed the Statement of Investment Policy; and WHEREAS, Government Code Section 53607 allows the Board to delegate the authority to make investments and to sell or exchange securities for a one year period to the Treasurer, provided that monthly reports are thereafter made of the status of said transactions. NOW, THEREFORE, THE BOARD OF DIRECTORS OF THE COSTA MESA SANITARY DISTRICT DOES HEREBY RESOLVE AS FOLLOWS: 1. That the Statement of Investment Policy for fiscal year 2009 -10 is approved. 2. That the Treasurer is authorized to make investments consistent with said Policy and is required to report to the Board on a monthly basis and to the Investment Oversight Committee on a quarterly basis on the status of those transactions. The Treasurer is hereby given all of the authority provided by Government Code Section 53607, including the power to invest and reinvest and the power to sell or exchange securities, consistent with the District's policy. 3. That the Treasurer may delegate some part of these duties to a deputy provided that the Treasurer remains responsible for such decisions and provides oversight. • 1 • PASSED AND ADOPTED this AYES: NOES: ABSTENTIONS: ABSENT President of the Board STATE OF CALIFORNIA) COUNTY OF ORANGE ) SS CITY OF COSTA MESA ) Attachment 1 day of 2009, by the following vote: Secretary of the Board I, Joan Revak, Clerk of the Costa Mesa Sanitary District, hereby Y certif that the above and foregoing Resolution No. 2009 -769 duly and regularly passed and adopted by said Board of Directors at a regular meeting thereof held on the day of 2009. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of the Costa Mesa Sanitary District, this day of 2009. Clerk of the Costa Mesa Sanitary District 2 Attachment 2 COSTA MESA SANITARY DISTRICT Statement of Investment Policy Fiscal Year 02 09 -10 - - Deleted: 2008 -09 PURPOSE This statement is intended to formalize the various policies and procedures for the prudent investment of temporarily idle cash for the Costa Mesa Sanitary District (District). It outlines the investment - related activities, which comprise good cash management. In concert with these activities there are many facets of an appropriate secure short-term investment program, which will enhance the economic condition of the District while safeguarding its assets. II. INVESTMENT SELECTION OBJECTIVE The District strives to maintain the level of investment of all idle funds as near 100% as possible. All temporarily pooled idle cash is invested under the "Prudent Investor Standard," Government Code §53600.3, which states, in part: "...When investing, reinvesting, purchasing, acquiring, exchanging, selling, or managing public funds, a trustee shall act with care, skill, prudence, and diligence under the circumstances then prevailing, including, but not limited to, the general economic conditions and the anticipated needs of the agency, that a prudent person acting in a like capacity and familiarity with those matters would use in the conduct of funds of a like character and with like aims, to safeguard the principal and maintain the liquidity needs of the agency..." This affords the District a broad spectrum of investment opportunities as long as the investment is deemed prudent and is allowable under current legislation of the State of 00 California Government Code Section 53600 et seq. and the Costa Mesa Sanitary District Statement of Investment Policy. The District Treasurer, after meeting the legality, safety, liquidity and diversification criteria, will attempt to obtain the highest yield possible. The criteria for selecting investments, in order of priority are: 1. Legality - The District's investments must conform to federal laws, state statutes, District ordinances and internal policies and procedures. The District has established internal controls to ensure that investment activities comply with all applicable statutes, ordinances and policies. 2. Safe - The safety and risk associated with an investment refers to the potential loss of principal, interest or a combination of these amounts. The District only operates in those investments that are considered very safe. 0 Attachment 2 COSTA MESA SANITARY DISTRICT Statement of Investment Policy Fiscal Year O2 09 -10 - ------ - - - - -- - - - - Deleted: 2008 -09 3. Li uidi - This refers to the ability to "cash in" at any moment in time with a minimal chance of losing some portion of principal or interest. The District's investment portfolio will remain sufficiently liquid to enable the District to meet all operating requirements as well as unanticipated needs for funds. 4. Diversification - The District's investment portfolio will be sufficiently diversified to avoid incurring unreasonable risks resulting from saturation of assets in specific security types, maturities or individual financial institutions. 5. Yield - Yield is the potential dollar earnings an investment can provide, and sometimes is described as the rate of return. The basic premise underlying the District's investment philosophy is to ensure that funds are always safe and available when needed. The District does not buy stocks, speculate or deal in futures or options. Any investment extending beyond a five -year period requires prior District Board approval. III. AUTHORIZED INVESTMENTS The District limits its investments to the following vehicles: US Treasury Bills US Treasury Notes Federal Agency Issues - Examples include: • Federal Intermediate Credit Bank Debentures (FICB) • Federal Farm Credit Bank (FFCB) • Federal Land Bank Bonds (FLB) • Federal Home Loan Bank Notes and Bonds (FHLB) • Federal National Mortgage Association (FNMA) • Federal Home Loan Mortgage Corporation (FHLMC) Banker's Acceptances Certificates of Deposit (CD) Negotiable Certificates of Deposit Commercial Paper Medium Term Corporate Notes Money Market Mutual Funds Passbook Savings Account Local Agency Investment Fund (LAIF) • Attachment 2 COSTA MESA SANITARY DISTRICT Statement of Investment Policy Fiscal Year O2 09 -10 _ - Deleted: 2008 -09 IV. DELEGATION OF AUTHORITY The District's Board of Directors (Board) hereby delegates its authority to invest surplus District funds to the Treasurer /Director of Finance (Treasurer). Delegation of the investment function by the Board is limited to a one -year period. Failure to delegate deems the Board to be trustee and fiduciary, therefore subject to the prudent investor standard. V. INTERNAL CONTROLS A system of internal control shall be established and documented in writing. The controls shall be designed to prevent loss of public funds arising from irregularities, employee error, misrepresentation of third parties, unanticipated changes in financial markets, or imprudent actions by employees and officers of the District. Controls deemed most important include: control of collusion, separation of duties, custodial safekeeping, clear delegation of authority, confirmation of transactions, minimizing the number of authorized investment officials, documentation of transactions and strategies, and code of ethics standards. VI. REPORTING The Treasurer shall submit a monthly investment report to the Board. This report will list the type of investment, institution, date of maturity, amount of deposit, rate of interest, current market value of securities with maturities in excess of 12 months, source of • market valuations, and statement of compliance. Also provided shall be a schedule of market values maturing by date and type, and such other data as required by the Board. VII. LEGAL CONSTRAINTS Surplus funds must be deposited in state or national banks, state or federal savings associations or federal credit unions within the State of California. These deposits cannot exceed the amount of the institution's paid -up capital and surplus. The bank or savings and loan must secure public funds deposits with eligible securities having a market value of 110% of the total amount of the deposits or first trust deeds having a value of 150% of the total amount of the deposits. A third class of collateral is a 105% letter of credit drawn on the Federal Home Loan Bank. The Treasurer may waive security for that portion of a deposit, which is insured pursuant to Federal law. Currently, the first $100,000 of a deposit is federally insured. Deposits over $100,000 are collateralized as indicated above. 1�1 Attachment 2 COSTA MESA SANITARY DISTRICT Statement of Investment Policy Fiscal Year 0,2 09 -10 - - i Deleted: 2008-09 VIII. DERIVATIVES The term derivative is a commonly used name that describes a variety of securities whose values are "derived from" the value of another asset, a reference rate or an index. Investment in derivative instruments is limited to securities that have periodic increases, or step -up interest rate adjustments that provide an increased yield. Investment in callable securities is also allowed, but must comply with other restrictions as specified in this Investment Policy. Derivative securities known as inverse floaters, structured investment vehicles and other such securities that produce higher yields when purchased but have the possibility of producing low or no return through the life of the security, are not allowable. IX. BOND PROCEEDS When investing bond proceeds, the District will adhere to this Investment Policy (Policy) when determining appropriate instruments for placing monies. If the bond's trust agreement is more restrictive than this Policy, then the trust agreement supersedes this Policy. The District may delegate it's responsibly to the fiscal agent to ensure compliance with the bond covenants when managing bond proceeds on behalf of the District. Borrowing money solely for the purpose of investing and earning arbitrage is specifically prohibited. X. GRANDFATHER PROVISIONS The District's investment strategy is to buy and hold investments until maturity. As legislation and the District's Policy change, certain investments may become prohibited. Under Section 53601.6 of the California Government Code, the District may hold prohibited investments until their maturity to avoid incurring a loss. This allows the District to "grandfather" in securities purchased prior to the effective date of new legislation. When selling securities prior to maturity, losses are only acceptable if the proposed swap /trade can clearly enhance yield (value) over the life of the new security on a total return basis, or to prevent the further loss of principal. Sufficient written documentation to facilitate the audit of the transaction must be maintained. In the event that an issuer's rating is downgraded from when the security was purchased, the Treasurer's awareness is heightened and the security will be closely monitored to determine if credit risk has been significantly increased. The Treasurer will evaluate the need to sell the security prior to maturity. 4 • Attachment 2 COSTA MESA SANITARY DISTRICT Statement of Investment Policy Fiscal Year 009-10 Deleted: 2008 -09 XI. BANKS AND SECURITIES DEALERS The District shall transact business only with banks, savings and loans, and "primary" or "regional" registered investment securities broker /dealers with offices located in the State of California. Any broker /dealer or financial institution wishing to provide services must complete the District's questionnaire and be approved by the Treasurer. The number of broker /dealers authorized to transact business with the District is one broker /dealer for every $3,000,000 of portfolio size. XII. SAFEKEEPING AND CUSTODY Securities should be held in a third party custodian /safekeeping account. Said securities shall be held in a manner that establishes the District's right of ownership pursuant to Government Code Sections 53601 and 53608 et seq. All securities owned by the District should be held by a third party except the collateral for time deposits in banks and savings and loans, which is held by the Federal Home Loan Bank or an approved Agent of Depository. The collateral for time deposits in banks should be held in the District's name by the bank's Trust Department, or alternately, by the Federal Reserve Bank pursuant to Government Code Sections 53656 and 53657 et seq. XIII. INDEMNIFICATION Any authorized investment personnel acting with prudence and in accordance with the District's Policy, will not be held personally liable for any investment losses. Through surety bonds the District is indemnified against any investment personnel acting with malfeasance, misfeasance or nonfeasance. XIV. CONFLICT OF INTEREST Any firm proposing to provide any type of investment service to the District shall acknowledge their familiarity with and agree to abide by any Federal and State laws or regulations pertaining to contractual conflicts of interest or contributions by such firms, their employees, spouses or agents. Any persons, firms, dealers, brokers and advisors providing investment services or bond issue assistance shall disclose to the Treasurer all fee sharing and commission arrangements with other entities or persons prior to the District agreeing to buy an investment or issuing bonds. • Attachment 2 COSTA MESA SANITARY DISTRICT Statement of Investment Policy Fiscal Year 2009-10 09 -10 - - - - Deleted: 2008 -09 -------- - - - - -- - • XV. POLICY REVIEW The Treasurer shall be responsible for reviewing and modifying this Policy annually for Board approval to ensure its consistency with the overall objectives of safety, preservation of principal, and liquidity, and its relevance to current law and current financial and economic conditions. XVI. SUMMARY The basic premise underlying the District's investment philosophy is conservative, and will continue to be, to ensure that money is always safe and available when needed. Attachments: Investment Guidelines and Strategy Investment Procedures — Internal Control Guidelines Cash Controls Segregation of Treasury Functions Glossary of Investments • is Attachment 2 COSTA MESA SANITARY DISTRICT Statement of Investment Policy Fiscal Year 009 -10 ___________________________ _ __ Ueleted:2008 -o9 XV. POLICY REVIEW The Treasurer shall be responsible for reviewing and modifying this Policy annually for Board approval to ensure its consistency with the overall objectives of safety, preservation of principal, and liquidity, and its relevance to current law and current financial and economic conditions. XVI. SUMMARY The basic premise underlying the District's investment philosophy is conservative, and will continue to be, to ensure that money is always safe and available when needed. Attachments: Investment Guidelines and Strategy Investment Procedures — Internal Control Guidelines Cash Controls Segregation of Treasury Functions Glossary of Investments • • Attachment 2 COSTA MESA SANITARY DISTRICT Investment Guidelines and Strategy Fiscal Year O2 09 -, o ------------------------------ Deleted: 2005 -09 I. GUIDELINES Guidelines are established to direct and control activities in such a manner that previously established goals are achieved. 1. Investment Transaction: Every investment transaction must be authorized and reviewed by the Treasurer. 2. Pooled Cash: Whenever practical, cash is consolidated into one bank account and invested on a pooled concept basis. Interest earnings are allocated quarterly to each fund according to fund actual month -end cash balances. 3. Competitive Bids: Purchases and sales of securities are made on the basis of competitive offers and bids when practical. 4. Cash Forecasting: The cash flow for the District is projected with the receipt of revenues and maturity of investments scheduled so that adequate cash will be available to meet disbursement requirements. 5. Investment Limitations: Security purchases and holdings are maintained within statutory limits imposed by the California Government Code. The District's current limits are: 7 • District Policy Government Code Permitted Investments /Deposits Percent Maturitv Percent Maturity US Treasury Bills and Notes *US Government Securities Unlimited Unlimited 5 years 5 years Unlimited Unlimited 5 years 5 years Certificates of Deposit 25% 1 year Unlimited 5 years Bankers' Acceptances (1) 25% 180 days 40% 180 days Commercial Paper (1) 25% 270 days 25% 270 days Negotiable CDs (1) 25% 5 years 30% 5 years Medium Term Notes (1) 20% 5 years 20% 5 years LAIF $40 million n/a $40 million n/a Shares of Beneficial Interest (2) 20 %_ years 0% - - - = 5 years _ _ _ - Deleted: 25% Time Deposits _ _ _ Unlimited _ _5 5 years _ _ Unlimited 5 years Deleted: unlimited (1) Further limited to 10% in any single issuer (2) Includes CaITRUST, money market funds and money market mutual funds 6. Li uidi : The marketability of a security is considered at the time of purchase, as the security may have to be sold at a later date to meet unanticipated cash demands. 7 • Attachment 2 COSTA MESA SANITARY DISTRICT Investment Guidelines and Strategy Fiscal Year O ------------------------------ Deleted: 2008 -09 _0 7. Diversification: The portfolio should consist of various types of securities, issuers, and maturities. 8. Evaluate Certificates of Deposit: a) Certificates of Deposit shall be evaluated in terms of FDIC coverage. The District does not purchase Certificates of Deposit in excess of $100,000. b) Negotiable Certificates of Deposit shall be evaluated in terms of the credit worthiness of the issuer, as these deposits are uninsured and uncollateralized promissory notes. STRATEGY Strategy refers to the ability to manage financial resources in the most advantageous manner. 1. Economic Forecasts: Economic forecasts are obtained periodically from economists and financial experts through bankers and brokers to assist with the formulation of an investment strategy for the local agency. 2. Implementing Investment Strategy: Investment transactions are executed which conform to anticipated interest rate trends and the current investment strategy plan. 3. Rapport: A close working relationship is maintained with large vendors of the District. The objective is to pinpoint when large disbursements will clear the District's bank account. It is essential for good cash control that such large expenditures be anticipated, estimated as to dollar amount, and communicated to the Treasurer for liquidity planning purposes. 4. Preserve Portfolio Value: Standards are developed in order to maintain earnings near the market and to preserve the value of the portfolio. III. AUDIT Annually, the District's external auditors review the District's portfolio and perform limited procedures related to compliance. Additionally, they review that purchase price, market value and maturity date for financial statement purposes. This review is included as part of the annual audit of the District. • Attachment 2 COSTA MESA SANITARY DISTRICT Investment Procedures — Internal Control Guidelines Fiscal Year OZ Q9_1 - - Deleted: 2008 -09 I. OBJECTIVES OF INTERNAL CONTROL Internal control is the plan of organization and all the related systems established by management's objective of ensuring, as far as practical: • The orderly and efficient conduct of its business, including adherence to management policies; • The safeguarding of assets; • The prevention or detection of errors and irregularities; • The accuracy and completeness of the accounting records; and • The timely preparation of reliable financial information. II. LIMITATIONS OF INTERNAL CONTROL No internal control system, however elaborate, can by itself guarantee the achievement of management's objectives. Internal control can provide only reasonable assurance that the objectives are met, because of its inherent limitations, including: • Management's usual requirement that a control be cost - effective; • The direction of most controls at recurring, rather than unusual, types of transactions; • Human error due to misunderstanding, carelessness, fatigue or distraction of functions; and • The potential for a person responsible for exercising control abusing that responsibility. Frequently, a member of management is in a position to override controls which management has set up. III. ELEMENTS OF INTERNAL CONTROL Elements of a system of internal control are the means by which an organization can satisfy the objectives of internal control. These elements are: 1. Orqanization: Specific responsibility for the performance of duties should be assigned and lines of authority and reporting clearly identified and understood. 2. Personnel: Personnel should have capabilities commensurate with their responsibilities. Personnel selection and training policies, together with the quality and quantity of supervision, are thus important. 9 Attachment 2 COSTA MESA SANITARY DISTRICT Investment Procedures — Internal Control Guidelines Fiscal Year O0 ------------------------------ Deleted. 2008 -09 01 3. Segregation of Functions: Segregation of incompatible functions reduces the risk that a person is in a position both to perpetrate and conceal errors or irregularities in the normal course of duty. If different people handle two parts of a transaction, collusion is necessary to conceal errors or irregularities. In particular, the functions that should be considered when evaluating segregation of functions are authorization, execution, recording, custody of assets, and performing reconciliations. 4. Authorization: An appropriate responsible individual should authorize all transactions. The responsibilities and limits of authorization should be clearly delineated. The authorization for a specific transaction or granting general authority for transactions should be to a position commensurate with the significance of the transactions. Delegation of authority to authorize transactions should be handled very carefully. 5. Controls Over an Accounting System: Controls over an accounting system include manual and computerized procedures carried out independently to ascertain that transactions are complete, valid, authorized and properly recorded. 10 �J • Attachment 2 COSTA MESA SANITARY DISTRICT Cash Controls Fiscal Year 009 -10 ___________________________ _ __ �ereced:2ooa -os -� PROCEDURES PERFORMED BY AUDITORS WITH RESPECT TO CASH RECEIPTS District procedures and controls are reviewed. Some of the system strengths are: a. Receipts are controlled upon receipt by proper registration devices; b. Receipts are reconciled on a daily basis; c. Amounts are deposited intact; d. All bank accounts are authorized by the Board; e. Cash counts are done by two or more individuals; f. Bank reconciliations are reviewed; g. The posting of cash receipt entries in books is prompt; h. Receipt forms are prenumbered, accounted for, and physically secured; i. Proper approval required for write -off's of customer accounts; j. Checks are restrictively endorsed upon receipt; k. Adequate physical security over cash; I. Individuals who handle cash do not post account records or process billing statements; and m. Adequate supervision of financial operations. 2. Significant revenues are confirmed directly with payor and compared with District books to make sure amounts are recorded properly, or reviewed on an anaytical basis by year over year comparisons. 3. Cash balances are substantiated by confirming account balances. Bank reconciliations are reviewed for propriety and recalculated by the auditor. All significant reconciling items on bank reconciliations are verified as valid reconciling items by proving to subsequent bank statements. 11 C-7 12 • Attachment 2 COSTA MESA SANITARY DISTRICT Segregation of Treasury Functions Fiscal Year O� 09 -10 - - Deleted: 2008 -09 The District's treasury function is segregated as follows. Function Responsibilitv Authorization of investment transactions: A) Formal investment policy Prepared by Treasurer Reviewed by Investment Committee Adopted by Board B) Investment transactions approved by Treasurer C) Monthly Investment Report: Prepared by Treasurer Reviewed by Board Execution of investment transactions Treasurer Recording of investments in Treasurer's records Treasurer Recording of investments in accounting records Accountant Accounting records approved by Treasurer Verification of investment and confirmation of Treasurer's records Accountant Bank reconciliation: Prepared by Accountant Approved by Treasurer Execute wire transfers Treasurer Callback verification of wire transfer Bank Annual review of investment portfolio External Auditors 12 • Attachment 2 COSTA MESA SANITARY DISTRICT Glossary of Investments Fiscal Year 2009-10 ------------------------------ Deleted: 2008 -09 is Bankers' Acceptances — Short-term credit arrangements to enable businesses to obtain funds to finance commercial transactions. They are time drafts drawn on a bank by an exporter or importer to obtain funds to pay for specific merchandise. By its acceptance, the bank becomes primarily liable for the payment of the draft at its maturity. An acceptance is a high -grade negotiable instrument. Acceptances are purchased in various denominations for 30, 60, or 90 days, but no longer than 180 days. The interest is calculated on a 360 -day discount basis similar to Treasury Bills. The District may not invest more than 25% of its surplus money in Bankers' Acceptances with each issuer limited to 10 %. Certificates of Deposit (CD) — Time deposits of a bank or savings and loan. They are purchased in various denominations with maturities ranging from 30 to 360 days. The District does not purchase Certificates of Deposit that are not FDIC insured. The interest is calculated on a 360 -day, actual day month basis and is payable monthly. The District may invest up to 25% of its surplus money in insured CD's with maturities of one year of less. Commercial Paper — Short-term unsecured promissory notes issued by a corporation to raise working capital. These negotiable instruments are purchased at a discount to par value or at par value with interest bearing. Commercial Paper is issued by corporations such as General Motors, IBM, etc. Local agencies are permitted by State law to invest in Commercial Paper of the highest ranking or of the highest letter and numerical rating as provided by Moody's Investor's Service, Inc., or Standard and Poor's Corporation. Purchases of eligible Commercial Paper may not exceed 270 days maturity, nor exceed 25% of the District's surplus funds. The District may not purchase more than 10% of any single issuer. Federal Agency Issues — Guaranteed directly or indirectly by the United States Government. All agency obligations qualify as legal investments and are acceptable as security for public deposits. Agencies usually provide higher yields than direct Treasury issues with all of the same advantages. An unlimited amount of funds may be invested in Federal Agency issues with maximum maturities of less than five years. The Board must expressly authorize any investment with a maturity greater than five years. Examples include: Federal Intermediate Credit Bank Debentures (FICB) — Loans to lending institutions used to finance the short-term and intermediate needs of farmers, such as seasonal production. They are usually issued monthly in minimum denominations of $3,000 with a nine -month maturity. Interest is payable at maturity and is calculated on a 360 -day, 30- day month basis. Federal Farm Credit Bank (FFCB) — Debt instruments used to finance the short and intermediate term needs of farmers and the national agricultural industry. They are 13 • Attachment 2 COSTA MESA SANITARY DISTRICT Glossary of Investments Fiscal Year 0,� 09 -10 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ne►eted: 2008 -09 issued monthly with three and six -month maturities. The FFCB issues larger issues (one to ten years) on a periodic basis. These issues are highly liquid. Federal Land Bank Bonds (FLB) — Long -term mortgage credit provided to farmers by Federal Land Banks. These bonds are issued at irregular times for various maturities ranging from a few months to ten years. The minimum denomination is $1,000. They carry semi - annual coupons. Interest is calculated on a 360 -day, 30 -day month basis. Federal Home Loan Bank Notes and Bonds (FHLB) — Issued by the Federal Home Loan Bank System to help finance the housing industry. The notes and bonds provide liquidity and home mortgage credit to savings and loan associations, mutual savings banks, cooperative banks, insurance companies and mortgage - lending institutions. They are issued irregularly for various maturities. The minimum denomination is $5,000. The notes are issued with maturities of less than one year and interest is paid at maturity. The bonds are issued with various maturities and carry semi - annual coupons. Interest is calculated on a 360 -day, 30 -day month basis. Federal National Mortgage Association (FNMA) — Used to assist the home mortgage market by purchasing mortgages insured by the Federal Housing Administration and the Farmers Home Administration, as well as those guaranteed by the Veterans Administration. They are issued four times a year with maturities from a few months to eight years. The minimum amount is $10,000 and carry semi - annual coupons, with interest computed on a 360 -day, 30 -day month basis. Federal Home Loan Mortgage Corporation (FHLMC) — A government- sponsored corporation established to develop the secondary market for conventional home mortgages. Mortgages are purchased solely from the Federal Home Loan Bank System member lending institutions whose deposits are insured by agencies of the United States Government. They are issued for various maturities and in minimum denominations of $10,000. Interest is paid semi - annually and is calculated on a 360 -day, 30 -day month basis. Government National Mortgage Association (GNMA) — Established to monitor compliance with requirements for the structuring of securities backed by pools of mortgages guaranteed by the Federal Housing Administration, the Farmers' Home Loan Administration and the Veterans' Administration. All mortgages in the pool must carry the same interest rate and, when possible, the same maturity. Interest and principal on the mortgage pools is "passed through" to investors monthly after the deduction of service and guarantee fees. 14 0 Attachment 2 COSTA MESA SANITARY DISTRICT Glossary of Investments Fiscal Year 02 09 -10 - - - - - Deleted: 2008 -09 _Student Loan Marketing Association (SLMA) — Established by the Education Amendments Act of 1972 by the US Congress to increase funds into student loans. SLMA is a for - profit, stockholder -owned corporation with the specific purpose of providing a secondary market for the federally sponsored student loans. Discount notes are issued on a daily basis to mature in one year or less with a minimum denomination of $100,000. Six -month floating rate notes are issued monthly with a minimum denomination of $10,000. Longer term fixed rate and floating rate securities are issued as needed. All loans are guaranteed by either the federal government or by a state or private agency. Investment Trust of California (CaITRUST) — A joint powers authority established by local agencies in the State of California for the purpose of pooling and investing local agency funds. A Board of Trustees supervises and administers the investment program. The Board is comprised of experienced investment officers and policy- makers of the public agency members. CalTRUST invests in fixed income securities eligible for investment pursuant to California Government Code §53601 et seq. The District is not limited as to the number of deposits and withdrawals in any given month for the short-term account within CaITRUST. The district is limited to one transaction per month in the medium -term account within CaITRUST. See also Shares of Beneficial Interest. Local Agency Investment Fund (LAIF) — A special fund in the State Treasury which local agencies may use to deposit funds for investment. There is no minimum investment period and the minimum transaction is $5,000, in multiples of $1,000 above that, with a maximum balance of $40,000,000 for any agency. The District is restricted to 15 transactions per month for each LAIF account. LAIF offers high liquidity because deposits can be converted to cash in 24 hours with no interest lost. Interest is distributed to those agencies participating on a per share basis determined by the amounts deposited and the length of time they are deposited. Interest is paid quarterly. The State retains a portion for administrative costs, not to exceed one - quarter of one percent of the earnings. The pooling of the State's surplus cash with the participant's surplus cash creates a multi - billion dollar money pool and allows diversified investments. In a high interest rate market, the District does better than LAIF however, in times of low interest rates, LAIF's yields are higher. The District invests in the Local Agency Investment Fund whose Investment Policy allows investments in securities not specifically authorized by the District's Investment Policy, but allowable under the California Government Code. Medium Term Corporate Notes — Unsecured promissory notes issued by a corporation organized and operating in the United States. These are negotiable instruments and are traded in the secondary market. Medium Term Corporate Notes can be defined as extended maturity 15 Attachment 2 COSTA MESA SANITARY DISTRICT Glossary of Investments Fiscal Year O� 09 -10 - - 4 Deleted: 2008 -09 44 Commercial Paper. Local agencies are restricted by the Government Code to investments in corporations rated in the top three note categories by a nationally- recognized rating service, five year maximum maturity and may not exceed 20% of surplus funds. The District's restrictions are a maximum term of five years to maturity and total investments in Medium Term Corporate Notes may not exceed 20% of the District's surplus funds. The District may not purchase more than 10% of any single issuer. Negotiable Certificates of Deposit — Unsecured obligations of the financial institution, bank or savings and loan, bought at par value with the promise to pay face value plus accrued interest at maturity. They are high -grade negotiable instruments, paying a higher interest rate than regular certificates of deposit. The primary market issuance is in multiples of $1,000,000, the secondary market usually trades in denominations of $500,000, and smaller lots are occasionally available. As a matter of practice, only the ten largest US banks, where there is a secondary market established for continued liquidity, are considered for investment. Purchases of Negotiable Certificate of Deposit may not exceed 25% of the District's surplus funds and five years to maturity. The District may not buy more than 10% of any single issuer. Passbook Savings Account Demand Deposit — Interest bearing active deposits placed at state or national banks, state or federal savings and loan associations, state or federal credit unions and federally insured industrial loan companies. Monies placed in a savings account earn short-term interest. Deposits are FDIC insured up to $100,000, and may be in any amount. Shares of Beneficial Interest — Also referred to as money market mutual funds. CaITRUST, which has previously been defined, is classified as shares of beneficial interest. Shares of beneficial interest must consist of highly -rated short-term debt instruments. The management companies shall either (1) attain the highest ranking or the highest letters and numerical rating provided by not less than two of the three largest nationally recognized rating services, or (2) have an investment advisor registered with the Securities and Exchange Commission (SEC) with not less than five years experience investing in the securities and obligations as authorized above and with assets under management in excess of five hundred million dollars ($500,000,000) and (3) follow regulations specified by the SEC under the Investment Company Act of 1940 (15 U.S.C. Section 80a -1, et seq.). The purchase price of shares for beneficial interest shall not exceed 2T% of the District's portfolio_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Deleted: 5 US Treasury Bills — Direct obligations of the United States Government issued weekly with maturity dates up to one year. They are issued and traded on a discount basis with interest calculated on a 360 -day basis and actual invested days. They are issued in amounts of $10,000 and up, in multiples of $5,000. They are a highly liquid security. An unlimited amount may be invested in US Treasury Bills. Attachment 2 COSTA MESA SANITARY DISTRICT Glossary of Investments Fiscal Year 009-10 _ _ , - oersted: 2008 -09 US Treasury Notes — Direct obligations of the United States Government with original maturities of 1 to 10 years. They are generally available in minimum denominations of $5,000 for two and three -year maturities, and $1,000 denominations for all other maturities. Notes are actively traded in a large secondary market and are very liquid. An unlimited amount of funds may be invested in US Treasury Notes with maximum terms of five years. The term may be extended if authorized by the District Board. J 17 is COSTA MESA SAWIT-ART(DISTRICT Memorandum ... an Independent Specia[ District To: Board of Directors From: Marc Davis, Treasurer /Finance Director Date: July 13, 2009 Subject: Budget Adjustment for Construction of District Yard Building Recommended Action Approve budget adjustment in the amount of $2,403,362 for the construction of the District Yard building. 0 Executive Summary • At the Board of Director's meeting of June 24, 2009, the Board approved several contracts for the construction of the building located at the District Yard. The total estimated cost for construction and furnishing of the building is detailed in Attachment 1. Adequate funds are available from the Facilities Revolving Fund, supplemented by the funds budgeted in the Sewer Fund for fiscal year 2009 -10. The proposed budget adjustment to provide funding for the construction and furnishing of the District Yard is as follows: Account Account Number Increase Decrease District Yard 30- 200887 -4300 $2,403,362 Retained Earnings 30- 000000 -2990 $2,003,362 Residual Fund Transfer 30- 000000 -3995 400,000 (Protecting our community's Fieafth by providing solid waste andsewer coffection services. crosdca.gov ATTACHMENT 1 7/13/2009 COSTA MESA SANITARY DISTRICT ESTIMATE OF OVERALL CONSTRUCTION PHASE COSTS Fstimated Cost District Yard Office Area Furniture: (Sewer Maintenance Supervisor /Inspector /Emergency Office) Work Stations, Chairs, Tables (3) File Cabinets (3) Guest Chairs (4) Bookcases (2) Conference Table (1) /Chairs (6) Kitchen Table/ Chairs (4) $ Plumbing fixtures Office Wastebaskets (4) Office Equipment: Software - Microsoft Office Backup System Computers (3) and Printers (2) Copiers (1) Fax Machine (1) Shredder (2) Phone System (4) File Cabinets (3) Fire Extinguishers (included in bid) Kitchen: Coffeemaker Wastebasket (1) Refrigerator /Microwave (included in bid) Total District Yard Office Area Warehouse Area 40 Cubic Yard Storage Container Forklift Propane Fire Lockers (2) Air Compressor Spill Containment Platforms Drum Trucks /Cradles Aerial Imaging Pallet Truck Hoist Installation Outside Picnic Bench Eyewash Station Medical Kit Material Data Safety Sheet Set -Up Clock Racking /Bin Cabinets Tool Storage Cabinet Shop Welder Steam Cleaner 91 30,000.00 4,662.90 40.00 8,000.00 8,000.00 300.00 500.00 3,700.00 2,700.00 70.00 35.00 58,007.90 5,000.00 10, 000.00 2,454.00 3,853.00 700.00 256.00 1,654.48 530.00 10,000.00 1,000.00 500.00 200.00 300.00 40.00 6,598.00 600.00 3,000.00 4,700.00 0 L� I� y ATTACHMENT 1 7/13/2009 COSTA MESA SANITARY DISTRICT ESTIMATE OF OVERALL CONSTRUCTION PHASE COSTS Office Equipment: Estimated Cost District Yard Office Area 10,000.00 Furniture: (Sewer Maintenance Supervisor /Inspector /Emergency Office) 2,454.00 Work Stations, Chairs, Tables (3) 8,000.00 File Cabinets (3) 8,000.00 Guest Chairs (4) 300.00 Bookcases (2) 500.00 Conference Table (1) /Chairs (6) 3,700.00 Kitchen Table/ Chairs (4) $ 30,000.00 Plumbing fixtures 4,662.90 Office Wastebaskets (4) 40.00 Office Equipment: 5,000.00 Software - Microsoft Office 10,000.00 Backup System 2,454.00 Computers (3) and Printers (2) 8,000.00 Copiers (1) 8,000.00 Fax Machine (1) 300.00 Shredder (2) 500.00 Phone System (4) 3,700.00 File Cabinets (3) 2,700.00 Fire Extinguishers (included in bid) 1,000.00 Kitchen: 500.00 Coffeemaker 70.00 Wastebasket (1) 35.00 Refrigerator /Microwave (included in bid) - Total District Yard Office Area 58,007.90 Warehouse Area 40 Cubic Yard Storage Container 5,000.00 .Forklift Propane 10,000.00 Fire Lockers (2) 2,454.00 Air Compressor 3,853.00 Spill Containment Platforms 700.00 Drum Trucks /Cradles 256.00 Aerial Imaging 1,654.48 Pallet Truck 530.00 Hoist Installation 10,000.00 Outside Picnic Bench 1,000.00 Eyewash Station 500.00 Medical Kit 200.00 Material Data Safety Sheet Set -Up 300:00 Clock 40.00 Racking /Bin Cabinets 6,598.00 Tool Storage Cabinet 600.00 Shop Welder 3,000.00 Steam Cleaner 4,700.00 6 ATTACHMENT 1 7/13/2009 COSTA MESA SANITARY DISTRICT ESTIMATE OF OVERALL CONSTRUCTION PHASE COSTS Estimated Cost Electrified Breaker 1,400.00 Hydraulic Press 5,000.00 Spoolmatic 1,275.00 Plasma Cutter 2,850.00 Torch Set 1,000.00 Belt Grinder 1,762.00 Bench & Pedestal Grinder 1,201.76 Wet/Dry Vacuum /Office Vacuum 952.00 Drill Press 1,307.00 Battery Charger 450.00 Die Grinder 248.13 Band Saw 3,216.82 Cut -Off Saw 1,853.00 Ratchet Wrench 168.81 Impact Wrench 723.26 Pneumatic Maint Drill & Grip Drills 450.00 Beed Blaster 1,500.00 Bench Lathe 7,313.00 Vertical Milling package 8,600.00 Sandblasting System 2,525.75 Scotsman Ice Machine 3,000.00 • Flag Pole 3,500.00 Lighting 1,500.00 Total Warehouse Area 103,182.01 LJ Building Construction Enovity 29,465.00 Construction Contractor 2,099,006.00 Architect 18,820.00 Engineer 26,884.00 GEO -ETKA, Inc 7,600.00 Legal 5,000.00 MCWD Capacity Charges 13,417.00 OCSD Charges (N /A) - Subtotal Building Construction 2,200,192.00 2% Construction Contingency 41,980.12 Total Building Construction 2,242,172.12 Total Estimated Cost of District Yard $ 2,403,362.03 3 �. � ,r + � . /A ORDINANCE NO. 73 AN ORDINANCE OF THE BOARD OF DIRECTORS OF THE COSTA MESA SANITARY DISTRICT ADDING MEETINGS WHICH QUALIFY FOR A DAY'S SERVICE COMPENSATION WHEREAS, Health and Safety Code Section 6489 sets forth that members may be paid for each day's attendance at meetings and for each day's service rendered at the request of the Board; and WHEREAS, the Board has set forth the meetings which qualify for such per diem compensation in District Operations Code Section 3.01.030; and WHEREAS, the Board does hereby desire to expand the list of qualifying meetings to include those with Mesa Consolidated Water District, Irvine Ranch Water District, City of Newport Beach, and Costa Mesa Sanitary District/Mesa Consolidated Water District/Costa Mesa liaison meetings; NOW, THEREFORE, the Board of Directors of the Costa Mesa Sanitary District does hereby ORDAIN as follows: Section 1. That Section 3.03.050 is hereby amended to the Costa Mesa Sanitary District Operations Code to read as follows: "3.01.030 Compensation. Pursuant to the provisions of Health and Safety Code Section 6489, compensation is set for each day's attendance at a Board meeting, or for each day's service rendered as a Director at the request of the Board, the sum of two hundred twenty -one dollars per day, not to exceed a total of six days in any calendar month. The following meetings shall be eligible for such per diem service: 1. Board meetings 2. Advisory committee meetings such as subcommittees 3. Approved conferences or organized education activities 4. Orange County Sanitation District (OCSD) meetings 5. Santa Ana River Flood Protection Agency (SARFPA) meetings 6. Independent Special Districts of Orange County (ISDOC) meetings 7. Orange County Local Agency Formation Commission (LAFCO) meetings 8. California Special Districts Association (CSDA) meetings 9. California Association of Sanitation Agencies (CASA) meetings 10. Orange County Council of Governments (OCCOG) meetings 11. WACO meetings 12. Costa Mesa Chamber of Commerce meetings 13. Educational outreach and presentations 14. City of Costa Mesa Council meetings 15. Mesa Consolidated Water District meetings 16. Irvine Ranch Water District meetings 17. City of Newport Beach meetings 18. Costa Mesa Sanitary District/Mesa Consolidated Water District/Costa Mesa liaison committee meetings The Board member shall also be entitled to his reasonable expenses incident thereto." Section 2. Should any part, clause or section of this Ordinance be declared by any Court of competent jurisdiction to be invalid, the remaining provisions of this Ordinance shall nevertheless be and remain in full force and effect and the Board of Directors of the Costa Mesa Sanitary District of Orange County, California, hereby declares that each and every section, clause, provision or part of this Ordinance would have been adopted and made a part of this Ordinance without the adoption of any portion thereof and that the invalidity of any part or provision hereof shall not in any way affect the validity or enforcement of the remaining provisions of this Ordinance that may stand on their own. Section 3. Pursuant to Health and Safety Code Sections 6490 and 6491.3, the Clerk shall cause this ordinance or a summary thereof to be published in a newspaper of general circulation printed and published in the District according to law. 0 PASSED and ADOPTED this day of Secretary 2 President 2009. r r , LA • STATE OF CALIFORNIA) COUNTY OF ORANGE ) SS CITY OF COSTA MESA ) I, JOAN REVAK, Clerk of the Costa Mesa Sanitary District, hereby certify that the above and foregoing Ordinance No. 73 was duly and regularly passed and adopted by said Board of Directors at a regular meeting thereof, held on the 23rd day of July 2009 by the following vote: AYES: NOES: ABSENT: ABSTAIN: IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of the Costa Mesa Sanitary District, this 23rd day of July 2009. Clerk of the Costa Mesa Sanitary District 3 From: Associate District Counsel Date: June 25, 2009 Re: Pass Through of Costs of District's Independent Contractors RIVERSIDE / SAN BERNARD W O (95 1) 674-0698 Occasionally District's independent contractors, such as the attorney, treasurer and engineer, will perform work on behalf of the District regarding a project proposed by a private developer. This memo is meant to offer a method of recovering those costs from the developer. A public agency may charge a regulatory fee to pay for the cost of a public program necessary to • regulate a business or other activity. Use of the revenue is generally unrestricted; however, regulatory fees are limited to covering the cost of the regulatory program. For example, public agencies may impose a fee for the cost of providing building inspection and planning application processing fees. Such regulatory fees do not constitute a charge on property ownership and, therefore, are not required to go through the same procedural hurdles as a monthly sewer charge. Rather, fees for building and use permits, zoning variances, building inspections, planning services, and water or sewer connections are simply required to not exceed the reasonable cost of providing the service. (Gov. Code §§ 66013, 66014.) In the case of sanitary sewer connection fees specifically, the Government Code provides that "when a local agency imposes fees for water connections or sewer connections, or imposes capacity charges, those fees or charges shall not exceed the estimated reasonable cost of providing the service for which the fee or charge is imposed" unless approved by two- thirds vote of the electorate. (Gov. Code § 66013.) Therefore, the District is entitled to impose a fee, provided the fee does not exceed the estimated reasonable cost of providing the service. In the case of District projects that require involvement from the District's independent contractors, the reasonable cost of providing the service would be the actual bills submitted by the independent contractor; in addition to the standard fee that includes District's costs for in- house personnel and overhead. Therefore, the cost of the independent contractor's services • should be passed through to the project applicant. This is known as a "time in motion" fee. LAW OFFICES OF HARPER & BURNS LLP A 1,9Ar F.DLIA9II.rrY PARTTJERSHIP 1NC1.I0040 A PROFESSIONAL CORPORATION 453 S. GLASSELL STREET IOHN R. HARPER' ORANGE, CALIFORNIA 92966 ALAN R. BURNS COLA R. BURNS (714)771 -7729 OF COUNSEL FAX (714) 7443350 IUDI A. CURTIN' MICHAEL MONTGOMERY- THOMAS W. ALLEN •A PROFESSIONAL O0RR7RATN]N To: District Manager From: Associate District Counsel Date: June 25, 2009 Re: Pass Through of Costs of District's Independent Contractors RIVERSIDE / SAN BERNARD W O (95 1) 674-0698 Occasionally District's independent contractors, such as the attorney, treasurer and engineer, will perform work on behalf of the District regarding a project proposed by a private developer. This memo is meant to offer a method of recovering those costs from the developer. A public agency may charge a regulatory fee to pay for the cost of a public program necessary to • regulate a business or other activity. Use of the revenue is generally unrestricted; however, regulatory fees are limited to covering the cost of the regulatory program. For example, public agencies may impose a fee for the cost of providing building inspection and planning application processing fees. Such regulatory fees do not constitute a charge on property ownership and, therefore, are not required to go through the same procedural hurdles as a monthly sewer charge. Rather, fees for building and use permits, zoning variances, building inspections, planning services, and water or sewer connections are simply required to not exceed the reasonable cost of providing the service. (Gov. Code §§ 66013, 66014.) In the case of sanitary sewer connection fees specifically, the Government Code provides that "when a local agency imposes fees for water connections or sewer connections, or imposes capacity charges, those fees or charges shall not exceed the estimated reasonable cost of providing the service for which the fee or charge is imposed" unless approved by two- thirds vote of the electorate. (Gov. Code § 66013.) Therefore, the District is entitled to impose a fee, provided the fee does not exceed the estimated reasonable cost of providing the service. In the case of District projects that require involvement from the District's independent contractors, the reasonable cost of providing the service would be the actual bills submitted by the independent contractor; in addition to the standard fee that includes District's costs for in- house personnel and overhead. Therefore, the cost of the independent contractor's services • should be passed through to the project applicant. This is known as a "time in motion" fee. District Manager • Pass Through of Costs of District's Independent Contractors Page 2 of 2 June 25, 2009 It is, therefore, recommended that District impose the actual cost of independent contractor services on developers seeking to connect to the District's system. The foundation for imposing such fees should include an ordinance allowing the District to pass through the costs. The procedure for adopting an ordinance levying a new fee is provided in Government Code sections 66016 et seq. and requires a notice and public hearing. A sample provision is attached for your review. It is recommended that after an ordinance is adopted, future developers seeking to connect to the District's system be required, in addition to paying a connection fee that defrays in- housee staff time, to submit a deposit to cover the costs incurred for District's independent contractors. 4� Colin Burns Associate District Counsel • 0 • Chapter 3.24 CHARGES FOR LEGAL SERVICES Sections: 3.24.010 Purpose. 3.24.020 Charges imposed. 3.24.010 Purpose. The city council finds that at times requests have been made by both residents of this city and by nonresidents to have the city attorney prepare legal documents to bring a property or use thereof in compliance with this code or with other applicable laws or to perform other legal services at the behest of a private person, but which relates to city matters_ The city council declares that the legal fees and costs paid to the city attorney for such services shall be recouped from the person, firm., corporation or organization at whose behest such services were rendered. (Ord_ 942 § 1 (part), 1982) 3.24.020 Charges imposed. Whenever legal services are requested of the city attorney by a person, firm, corporation or other organization or entity to bring a property or use in compliance with this code or with other applicable laws or for any other reason related to city business, the amount paid to the city attorney pursuant to the terms of his then current contract shall be billed and charged to such person, firm, corporation or other organization or entity. Notice of the provisions of this chapter shall be given to the party requesting the legal services before the services are rendered. (Ord. 942 § I (part), 1982) • 3.24.010 99 City of Fountain Valley Municipal Code DEPOSIT REQUIRED: The Board of Directors of the District shall have the right to require any person liable to pay any charge herein fixed, to make reasonable deposit with the District to insure collection of those charges. Persons applying for new development shall be required to deposit processing fees in an amount as may be determined by the Manager, but not less than five hundred dollars ($500.00), and shall pay to the District its actual processing costs according to the following schedule: 3 (a) Engineer's fees — actual + 25% (b) Attorney's fees — actual + 25% (c) Manager's fees $62.50 per hour (d) Inspections at $62.50 per hour (e) Other extraordinary cost LE 2. SEWER CONSTRUCTION. ANNEXATION AND REQUIREMENTS: As a condition precedent to annexation to the District, the owners of property requesting annexation shall pay to the District the following sums: (a) Processing Costs. The actual cost of preparation of maps, legal descriptions, publication charges, and any and all other charges applicable to the annexation. (b) Annexation Fees. Front footage fees, lot fees, acreage fees, or other fees constituting a condition of annexation shall be prescribed by the Board of Directors in each proceeding based upon the facts involved. (See Government Code Section 53702.) (e) Deposit of Estimated Processing Costs. As a matter of policy, the Board of Directors will not act favorably upon any annexation proposal unless the proponents have deposited with the District the estimated cost of an adequate investigation by the District. Accordingly, the proponents should deposit with the District, prior to initiation of annexation proceedings, the estimated amount of the processing costs referred to in Section 600(a). ADJUSTMENT OF COSTS & FEES The District Board reserves the right to adjust the above costs and fees or provide for additional terms and conditions at or before any meeting or public hearing on any annexation. Home Gardens Sanitary District 14 Operations Code .J s LAW OFFICES OF HARPER & BURNS LLP A LIMITED LiA6RdrY PARTNERSHIP INCLUDING A PROFCSSONAL CORPORATION •A PROFESSIONAL CORPORATION To: Honorable President and Board of Directors From: District Counsel Date: June 26, 2009 RIVERSIDE I SAN BERNARDJNO (951) 674 -0698 Re: District Manager Newsletters and Other "One -Way" Communication to the Board Here is a trap to avoid. You may remember that in Wolfe v. City of Fremont (2006) 50 Cal.Rptr.3d 524, there was an issue about whether a city manager's one -on -one communications with council members violated the Brown Act. Government Code section 54952.2 was enacted thereafter to overrule Wolfe and to establish what is a permissible communication by a city manager (or other person) to the legislative body. That section provides as follows: (1) A majority of the members of a legislative body shall not, outside a meeting authorized by this chapter, use a series of communications of any kind, directly or through intermediaries, to discuss, deliberate, or take action on any item of business that is within the subject matter jurisdiction of the legislative body. (2) Paragraph (1) shall not be construed as preventing an employee or official of a local agency, from engaging in separate conversations or communications outside of a meeting authorized by this chapter with members of a legislative body in order to answer questions or provide information regarding a matter that is within the subject matter jurisdiction of the local agency, if that person does not communicate to members of the legislative body the continents or position of any other member or members of the legislative body. As you can see, one -way communications are now statutorily authorized so one -way manager newsletters and other communications are lawful; however, as written, the Brown Act provides that the manager or other person communicating cannot communicate the comments or position of any other member of the legislative body. Therefore, the District Manager cannot mention that "the President would like to establish a subcommittee" because he would have disclosed one board member's opinion on a subject. We actually received a challenge in one of my client organizations on this basis so watch out for this technical issue. aL Alan R. Burns District Counsel 453 S. GLASSELL STREET JOHN R. HARPER • ORANGE, CALIFORNIA 92866 ALAN R. BURNS COLIN R. BURNS (714) 771 -7728 FAX (714) 744 -3350 OF COUNSEL JUDI A. CURTTN• www.hupelbums.COi11 MICHAEL MONTGOMERY' THOMAS W. ALLEN •A PROFESSIONAL CORPORATION To: Honorable President and Board of Directors From: District Counsel Date: June 26, 2009 RIVERSIDE I SAN BERNARDJNO (951) 674 -0698 Re: District Manager Newsletters and Other "One -Way" Communication to the Board Here is a trap to avoid. You may remember that in Wolfe v. City of Fremont (2006) 50 Cal.Rptr.3d 524, there was an issue about whether a city manager's one -on -one communications with council members violated the Brown Act. Government Code section 54952.2 was enacted thereafter to overrule Wolfe and to establish what is a permissible communication by a city manager (or other person) to the legislative body. That section provides as follows: (1) A majority of the members of a legislative body shall not, outside a meeting authorized by this chapter, use a series of communications of any kind, directly or through intermediaries, to discuss, deliberate, or take action on any item of business that is within the subject matter jurisdiction of the legislative body. (2) Paragraph (1) shall not be construed as preventing an employee or official of a local agency, from engaging in separate conversations or communications outside of a meeting authorized by this chapter with members of a legislative body in order to answer questions or provide information regarding a matter that is within the subject matter jurisdiction of the local agency, if that person does not communicate to members of the legislative body the continents or position of any other member or members of the legislative body. As you can see, one -way communications are now statutorily authorized so one -way manager newsletters and other communications are lawful; however, as written, the Brown Act provides that the manager or other person communicating cannot communicate the comments or position of any other member of the legislative body. Therefore, the District Manager cannot mention that "the President would like to establish a subcommittee" because he would have disclosed one board member's opinion on a subject. We actually received a challenge in one of my client organizations on this basis so watch out for this technical issue. aL Alan R. Burns District Counsel • r- -1 LJ From: Associate District Counsel Date: June 29, 2009 Re: Charging FOG Permittees for Extra District Costs RI VERSIDF /SAN BERNARDIN 1 (951) 674 -0698 FSE inspections are conducted by EEC. Most permittees are found by EEC to be in compliance, and those that are not in compliance generally remedy any substandard condition prior to the next EEC inspection. Some permittees, however, are uncooperative and require numerous follow -up visits in order to obtain compliance. You have asked whether the District may impose a fine /citation program to address uncooperative offenders. It is our opinion that the District may impose administrative or criminal fines for violations of District's ordinances. This memo explores several methods of enforcement and cost recovery: criminal, administrative fine, and correction. Pursuant to the Sanitary District Act of 1923, a sanitary district may enact ordinances. (Health & Safety Code § 6491.3.) A violation of a district ordinance is a misdemeanor punishable by imprisonment in the county jail not to exceed 30 days, a fine not to exceed $1,000, or both. (Health & Safety Code § 6523.) Violations are prosecuted by the District Attorney's office. (Health & Safety Code § 6492.) The fine is split among the court, county and district. The benefits of the criminal system are that criminal prosecution avoids attorney fees because it is handled by the district attorney and often obtains rapid compliance. The downside is that, in the absence of an egregious violation, the district attorney is unlikely to give such matters a priority, and the district only recovers a small fraction of the fine. Alternatively, a sanitary district may, by ordinance, make any violation of its ordinances subject to a non - criminal, administrative fine, much like a parking ticket. (Gov. Code § 53069.4.) The ordinance must provide for an administrative procedure that governs the imposition, enforcement, collection, and administrative review of the fines and penalties. (Gov. Code § 53096.4(a).) The offender would be entitled to a hearing, if requested, including an appeal to the superior court. (Gov. Code § 53069.4(b), (c).) The benefit of this system is that the district is entitled to recover 100 percent of the fine, which can potentially generate substantial revenue. The downside, however, is that if a citation is appealed, the district would incur attorney fees fighting the appeal which could negate revenues generated from previous administrative fines. LAW OFFICES OF HARPER & BURNS LLP A I.WITF.DI.IABILrTY PARTNERSHIP INCLUDING A PROFESSIONAL CORPORATION 453 S. GLASSELL STREET IOHN R HARPER• ORANGE, CALIFORNIA 92866 ALAN R BARNS COLIN R BURNS (714)771-77U OFCOUNSEL FAX (714) 744 -3350 IUDI A. CURTIN* MICHAEL MONTGOMERY' THOMAS W. ALLEN 'A PROFF.SSRINAL CORPORATION To: District Manager • r- -1 LJ From: Associate District Counsel Date: June 29, 2009 Re: Charging FOG Permittees for Extra District Costs RI VERSIDF /SAN BERNARDIN 1 (951) 674 -0698 FSE inspections are conducted by EEC. Most permittees are found by EEC to be in compliance, and those that are not in compliance generally remedy any substandard condition prior to the next EEC inspection. Some permittees, however, are uncooperative and require numerous follow -up visits in order to obtain compliance. You have asked whether the District may impose a fine /citation program to address uncooperative offenders. It is our opinion that the District may impose administrative or criminal fines for violations of District's ordinances. This memo explores several methods of enforcement and cost recovery: criminal, administrative fine, and correction. Pursuant to the Sanitary District Act of 1923, a sanitary district may enact ordinances. (Health & Safety Code § 6491.3.) A violation of a district ordinance is a misdemeanor punishable by imprisonment in the county jail not to exceed 30 days, a fine not to exceed $1,000, or both. (Health & Safety Code § 6523.) Violations are prosecuted by the District Attorney's office. (Health & Safety Code § 6492.) The fine is split among the court, county and district. The benefits of the criminal system are that criminal prosecution avoids attorney fees because it is handled by the district attorney and often obtains rapid compliance. The downside is that, in the absence of an egregious violation, the district attorney is unlikely to give such matters a priority, and the district only recovers a small fraction of the fine. Alternatively, a sanitary district may, by ordinance, make any violation of its ordinances subject to a non - criminal, administrative fine, much like a parking ticket. (Gov. Code § 53069.4.) The ordinance must provide for an administrative procedure that governs the imposition, enforcement, collection, and administrative review of the fines and penalties. (Gov. Code § 53096.4(a).) The offender would be entitled to a hearing, if requested, including an appeal to the superior court. (Gov. Code § 53069.4(b), (c).) The benefit of this system is that the district is entitled to recover 100 percent of the fine, which can potentially generate substantial revenue. The downside, however, is that if a citation is appealed, the district would incur attorney fees fighting the appeal which could negate revenues generated from previous administrative fines. District Manager CMSD Charging FOG Permitees for Extra District Costs Page 2 of 2 June 29, 2009 As a final alternative, a sanitary district may, after notice and an opportunity for a hearing, (l ) terminate service for failure to comply with district ordinances (Health & Safety Code § 6523.2) or, (2) after obtaining a warrant, correct the violation and assess the cost of the correction on the next sewer bill (Health & Safety Code § 6523.3). The benefit of this system is that it results in either termination of service, which prevents further inflow of FOG, or anything else, to the District's system, or obtains compliance and cost recovery for the correction. The downside is that the district must fund the termination or correction and must thereafter attempt to recover the funds from the property owner. The criminal prosecution, termination and correction options are currently available to the District. The administrative fine option would require an ordinance. Please let us know if you would like us to prepare an administrative citation ordinance. Colin Burns Associate District Counsel cc: Honorable President and Board of Directors Assistant District Manager 40 Why are modifications needed to the current CMSD FSE Inspection Enforcement Response? During 2008/2009, approximately 350 CMSD FSE inspections have been conducted by EEC. Non - compliance with CMSD FOG Program requirements warranting follow -up compliance inspections were identified at 52 CMSD FSEs (a total of 98 compliance inspections conducted). Of these, 27 FSEs were very cooperative and were found to be in- compliance during the I" follow -up inspection. The other 25 facilities were less cooperative and required multiple follow -up inspections to resolve the non - compliance. Multiple inspections were required at some locations to resolve a single on -going issue and others were required to resolve recurring issues. A total of 71 compliance inspections were associated with these 25 facilities. Modifications to the current FSE inspection enforcement response are needed to reduce the burden of FSEs such as these. How do other agencies /districts address FSE Inspection Enforcement? The table below provides a comparison of FSE Inspection Enforcement Responses /Strategies that other agencies /districts have employed; Costa Mesa Washington Suburban Sanitary Commission (WSSC) Santa Ana La Habra IRWD FSE Inspection Enforcement Res onse Repeated Initial Follow -up Repeat Non - Non- Non- Follow -up Continued Compliance 2008/2009 Compliance Compliance Non- Non - Compliance (over 12- . Enforcement Compliance month Period Issue Permit 2 warning None None revocation Site Visit with None letters issued warning letter CMSD Staff (Sweet Basil, Lab Administrative Citation Citation Order /Civil Citation/ None $250 $500,$760, Litigation /Injunction/ Administrative ?? $1,000 Termination of Order Service 23$100 Citations None Citation Citation Citation $100,$200 3$200 $100 $200 $500 $500 Citation Citations 0$600 Citations None None Issue Letter /Conduct Issue Letter /Conduct Site None No letters Site Visit Visit issued 2 wamings Warning letter letters None None issued after 2- $1,000 Re- $1,000 Re- issued; no re- 3 failures to inspection fee inspection fee inspection comply fees assessed Page 1 of 1 / •Alan R. Burns rSr7� Y From: <Bobbyooten @aol.com> To: <arbums @harperburns.com> Sent: Friday, April 17, 2009 2:00 PM Subject: FOG Compliance costs Re: Possible Fog Ordinance Revision. Yesterday at the Sewer System Subcmte meeting we had a discussion concerning charging Food Service establishments that require EEC and /or staff extra time or visits to get them in compliance. Rob task Jim Kolk with coming up with other agency ordinances or fee structures for extra work required to gain compliance with the CMSD FOG Ordinance. Join Christian Mingle.com® FREE! Meet Christian Singles in your area. Start now! 4/17/2009 • Page 1 of 2 0 Alan R. Bums From: "Alan R, Bums" <arbums@harperbums.com> To: <Bobbyooten@aol.com> Cc: "Arthur Perry" <apeny @nmusd.us >; "James Ferryman" <ferry54 @msn.com >; "Gary Monahan" <monahanclan @ca.rr.com >; "Arlene Schafer" <acschafer @ca.rr.com> Sent: Monday, April 20, 2009 1:26 PM Subject: Re: Charging FSE permittees for extra District costs Thank you for the memo advising me that the Sewer System Subcommittee had asked Jim Kolk to research other ordinances or fee structures for FSEs that cause the District extra work. I believe we have some existing authority for this. If the facility does not have a grease interceptor, the District Operations Code provides that one of the exemptions from the requirement for an interceptor is "that other methods of grease control will be utilized and enforceable assurances have been provided to protect the public health, safety and welfare." We therefore can require that additional costs be paid as a condition of getting the exemption. This need only be called out in the condition of the permit. If they have an interceptor and they are not cleaning in accordance with their prescribed schedule, we are in a different position. If there is a spill, we can collect for all our costs; however, if there is no spill but we are simply nervous about their maintenance, we may have less options. The violation would be a crime (misdemeanor) as the person would have allowed grease to accumulate "so as to substantially contribute to the possibility of a sewage overflow." (7.09.041) He should have had a permit so we could also have included the conditions in the permit, so I am assuming this is a permit already issued for an FSE with a grease interceptor and we did not impose'this as a condition of the permit. (7.09.060) We also have the authority to order a retrofit if there are spills and there is a substantial chance of recurrence. (7.09.060) If they are violating the ordinance in any way, we have the authority to terminate service after a due process hearing. (7.09.070) Having come into this with probably half the facts, I do not want to speculate too widely on the problem and need for a new solution. I assume that we would have started with our existing ordinance and somehow it has not provided the tools to effect compliance. Maybe I should be at a meeting when this is discussed, and I assume Rob will bring me in on this soon. I also was unable to review what our current permit looks like, and that may need to be re- worked. In observance of our Operations Code, I will copy the rest of the Board. (3.01.100) Thank you for bringing this to my attention. Alan R. Bums I Harper & Burns LLP 453 South Glassell Street I Orange, California 92866 Office: (714) 771 -7728 ( Facsimile: (714) 744 -3350 1 arburns(dharberbu- rns.com Any tax advice contained in this e-mail is not intended to be used, and cannot be used, by the recipient for the purpose of avoiding penalties that may be imposed under the Internal Revenue Code or applicable state or 4/20/2009 MEETIN Gs Santa _Ana liver Tfi)od- c'rotection _Agency Outive Director Full Agency Committee Meeting Minutes Donald J. Martinson Date /Time: Thursday, June 25, 2009 4:00 p.m. Location 300 N. Flower, Room 720 1. Call to Order Santa Ana CA 92702 -5000 Meeting was called to order by Chairman Wahner at 4:05pm. He announced that former Chairman Frank Fry is seriously ill and is in the hospital. 2. Review and consideration for approval of proposed budget for Fiscal Year 2009 - 2010 Don Martinson presented the proposed budget for FY 2009 -10 prepared by County of Orange staff. It was noted that it is different from the budget approved by the Executive Committee because of an addition of $3,000 to the line item "1900 Professional and Special Services" to cover the anticipated costs of future audits. Don Martinson also noted that the Executive Committee, by action taken at the Executive Committee Meeting on March 26, 2009, increased the monthly compensation of Mr. McConnell from $500 to $790. By motion of Jim Ferryman, seconded by Cathy Green and unanimously carried the modified budget was approved. Page 1 of 3 Location: Orange County Water District Members City of Anaheim 18700 Ward Street City of Buena Park Fountain Valley, CA City of Cypress City of Fountain Valley City of Fullerton Meeting Attendees: City of Garden Grove Don Martinson, SARFPA City of Huntington Beach City of Irvine Art Perry, Costa Mesa Sanitation District City of Newport Beach Nadeem Majaj, County of Orange City of Orange City of Placentia Kathryn Barr Orange Count Water District y g y City of Santa Ana Herb Nakasone, County of Orange City of Seal Beach City of Stanton Jeremy Yamaguchi, City of Placentia City of Tustin Gordon Shanks, City of Seal Beach City of Westminster Cathy Green, City of Huntington Beach City of Yorba Linda County of Orange Jan Debay, Orange County Water District Costa Mesa Sanitary District John Collins, City of Fountain Valley 0 C Sanitation District 0 C Flood Control District Jim Ferryman, Orange County Sanitation District 0 C Water District Phil Anthony, Orange County Water District Nancy Gardner, City of- Newport Beach Address Doug Stack, City of Tustin P. 4048 Teresa "Tita" Smith, City of Orange Santa Ana, CA 92702.4048 Mark Vukojevic, City of Anaheim Phone Matthew Harper, Board of Supervisors, 1s' District (714) 834 -5142 Lance Natsuhara, County of Orange Fax: Jim Wahner, County of Orange (714) 834 -4572 Location 300 N. Flower, Room 720 1. Call to Order Santa Ana CA 92702 -5000 Meeting was called to order by Chairman Wahner at 4:05pm. He announced that former Chairman Frank Fry is seriously ill and is in the hospital. 2. Review and consideration for approval of proposed budget for Fiscal Year 2009 - 2010 Don Martinson presented the proposed budget for FY 2009 -10 prepared by County of Orange staff. It was noted that it is different from the budget approved by the Executive Committee because of an addition of $3,000 to the line item "1900 Professional and Special Services" to cover the anticipated costs of future audits. Don Martinson also noted that the Executive Committee, by action taken at the Executive Committee Meeting on March 26, 2009, increased the monthly compensation of Mr. McConnell from $500 to $790. By motion of Jim Ferryman, seconded by Cathy Green and unanimously carried the modified budget was approved. Page 1 of 3 Santa-Ana River F'koocf(Protection - Agency • John Collins requested that the subject line item show a more detailed breakdown of the categories. Don Martinson will request County staff to add the following changes to categories in the line item in question. 1900 Professional & Special Services FY 2008 — 09 Budget FY 2009 — 10 Budget Executive Director 25,500 25,500 Washington DC Advocate 6,000 9,500 Audits - 3,000 Totals 31,500 38,000 3. Review and consideration for approval of proposed slate of officers for Fiscal Year 2009 -2010 Chairman Wahner noted that the proposed Slate of Officers and Executive Committee Members for FY 2009 -10 was included in the agenda material. By motion of Jan Debay and seconded by Kathy Green and unanimously carried the Slate of Officers and Executive Committee members were approved. 0 4. Overview of the current status of the Santa Ana River Mainstem Proiect and the Prado Dam proiect, and what is needed to complete these projects Lance Natsuhara, Manager of the Santa Ana River Mainstem Project, gave a power point presentation as outlined in the enclosed exhibits. A general discussion was held among the members regarding the specific locations of the various elements of the project and the proposed timing of construction. A copy of the presentation is included with these minutes. 5. Status of Federal and State funding It was noted that the 2010 President's budget includes $52.2 million and the American Recovery and Reinvestment Act 2009 includes $26 million. The proposed President's budget will need the approval of Congress. How these funds will be used for the construction of the various features of the project is included in the exhibits presented by Mr. Natsuhara. In regard to State Funding, Don Martinson reported that the state subvention funds received to date are $175 million and that an additional $52 million has been approved for payment by the State but has not as yet been funded by the State. Discussion was held regarding the future of the State Subvention Program, and the need for these funds for the Page 2 of 3 t Santa-Ana Wver 2;'lood'(Protection - Agency 0 purchase of lands for the expansion of the reservoir area of Prado Dam which would allow for the subsequent raising of the existing spillway at Prado Dam. 6. Prado Dam Field Trip — July 17, 2009 RSVP's were handed out for the proposed event, and were also mailed to all members. An approximate count needs to be obtained so that adequate transportation can be arranged and to make proper lunch arrangements at the Green River Golf Club. 7. Video of 1938 flood Phil Anthony finally had his long standing request granted for the viewing of this video. Copies of the DVD can be obtained upon request to the SARFPA secretary, Nilda Avina by contacting her at 714 - 834 -5618 or Nilda.avina(d-)ocpw.ocgov.com. 8. Public and representative comments The issue regarding the proposed legislation that would mandate 200 year flood protection for areas below dams or adjacent to levees and require flood insurance for areas not suitably protected was discussed. Herb Nakasone commented that the proposed • legislation is now on hold but needs to be carefully tracked in the future. • 9. Adjournment Meeting was adjourned after 5:00pm. Page 3of3 INDEPENDENT SPECIAL DISTRICTS OF ORANGE COUNTY (ISDOC) Saundra Jacobs President ,r. Drear in Re view A Look a 1 Location: MWDOC / OCWD Joint Board Room 18700 Ward Street, Fountain Valley, CA 92708 Lunch: $16 (advance payment required) or $20 at the door Please make checks payable to 'ISDOC':.. and mail to Joan Finnegan at 258 Sherwood Street, Costa Mesa, CA 92627 RSVP: Joan Finnegan at (949) 548 -3690 by Friday, July 24, 2009 18700 Ward Street • Fountain Valley, CA 92708 • (714) 963 -3058 • (714) 964 -5930 fax • 2009 CSDA Annual Conference &Exhibitor Showcase "l value the breakout sessions and the information received during the presentations. They give me the opportunity to not only hear the presenters' views on the various topics, but also hear what problems and solutions other districts are �1 LJ • dealing with." FORTY YEARS AND GROWING STRONGER... r�o The California Special Districts Association (CSDA) was formed in 1969 to ensure the continued existence of local, independent spe- J YEARS; CSDA Corrferencej cial districts. For 40 years we have been providing our members C_ with advocacy on behalf of special districts, cost - effective benefit programs, information sharing services and educational opportunities for board members and staff. The CSDA Annual Conference & Exhibitor Showcase is the only statewide associa- tion event representing all types of independent special districts including: airport, cemetery, community service, fire, harbor, healthcare, irrigation, library, mosquito and vector control, police protection, sanitation, water, utility and waste management. — Gregory Harmon - General Manager /Chief of This premier event not only provides additional education and training, but allows Police, Kensington Police Protection and CSD special district board members and management staff the opportunity to network with other districts and CSDA business affiliates. Over 500 special district leaders attend the Annual Conference each year. The 2009 conference is a celebration of our 40th Anniversary and promises to be the best ever. WHY YOU CAN'T AFFORD TO MISS THIS CONFERENCE The CSDA Annual Conference and Exhibitor Showcase is an educational opportunity specifically designed for special district management and operations. Personnel who benefit from this conference include: directors, trustees, general and assistant managers, financial managers, supervisors, board secretaries and other special district staff members. Attendees will benefit by: • Interacting with industry experts • Hearing success stories from colleagues • Learning about challenges and solutions from special district case studies • Being the first to hear about industry trends • Gaining knowledge from nationally recognized speakers • Attending specialized workshops and sessions designed to address the needs of today's special district • Meeting one -on -one with industry suppliers who understand your needs • Attending numerous networking opportunities • Making new contacts and maintaining key relationships • Earning Credit Incentive Points (CIPs) from the Special District Risk Management Authority • Learning how to think strategically in changing and difficult times Nigress CONFERENCE • MONDAY, SEPTEMBER 21, 2009 TUESDAY, SEPTEMBER 22, 2009 8:30 -11:00 a.m. CSDA Board of Directors Meeting ' 9:00 a.m. - 4:00 p.m. Pre-Conference Workshop: Governance Foundations Training CSDA's h; � (Module 1: Special District Leadership ■ ■ ■ ■ Academy) 9:00 -10:30 a.m. Opening Keynote Presentation and Continental Breakfast - "Rapid Execution As Your Competitive Advantage" - Dr. Peter Johnson Join us for this dynamic opening keynote address when Dr. Pete Johnson, known as the Strategy Execution Guru and Transformational Leadership Expert, discusses how strategic execution is all about how to leverage As the core of CSDA's Special District Leader- the use of your critical resources. ship Academy, this workshop serves as the "foundation" for the series on the effective governance of special districts. We will discuss the three critical dimensions of governance: Special District Trustees as Policy Leaders, The Effective Special District Board and The Board's Responsibilities and Roles in Special Districts. At this workshop, attendees will learn how to: Develop unity of purpose on their board, understand and work ithin the board's role in the district, build a strong, positive operational culture on the board and organize the formal structure of the board. If you are a special district profes- sional, you must include this training in your schedule. 9:00 a.m. - 4:00 p.m. Pre-Conference Workshop: Grant Seeking - The Fundamentals for Special Districts 1 ` ` presented by Hun= ee anvseivr & CPS Human Resource Services In this ever - changing economy, it is critical that organi- zations seek new and innovative funding sources. This workshop exposes participants to the world of private and government grants. This class provides an overview of the steps needed for an organization to become prepared to seek grants. In addition, participants will learn what makes an organization competitive in the grant seeking process, the resources available to find grants, and the most com- mon reasons grants are not awarded. Noon - 5:00 p.m. CSDA Golf Tournament at the Indian Wells Golf Resort 0-00 - 8:00 p.m. CSDA Conference Kickoff Reception honoring Business Affiliates (all attendees welcome) 11:00 -12:00 p.m. - New Revenue Options? A Briefing on Special Assessments & Taxes - Reaching Out to the Public: Communication Strategies that WORK! - SDRMA/PreventionLink Online Safety Training Program - New Enhancements - SDRMA C/P Points - Practical Approach to Modern Asset Management - The Brown Act: Updates & Ensuring Compliance - SDRMA C/P Points n - Required AB 1234 Ethics Training (Part One) - SDRMA C/P Points 12:30 - 2:00 p.m. Exhibitor Showcase Grand Opening & Lunch 12:30 - 7:00 p.m. Exhibitor Showcase open ............... 2 :00 — 3 :00 p.m. (SUPER SESSION) "Work for a Living and Still be Free to Live" - Ms. Eileen McDargh Make no mistake - everyone works - whether for free or fee! Listen to Eileen McDargh explain how you can work smarter and live happier. 3:30 - 4:30 p.m. - Must Have Communication Protocols for District Staff and Board Members - C/P Points - Practical Budgeting Processes and Tools - Tips, Tools & Legal Requirements for General Manager Evaluations - Public /Private Partnerships: Making it a Win -Win - Investing Your District's Dollars in Today's Market - What You Need to Know - Required AB 1234 Ethics Training (Part Two) - SDRrAA C/P Points 5:00 - 7:00 p.m. President's Reception at the Exhibitor Showcase .......................... rf` ass "As a general manager, I have found the CSDA conference to be three full days of education, information and legalities that greatly assist me in my responsibilities." is — David Aranda - General Manager, Stallion Springs Community Services District I ■ WEDNESDAY, SEPTEMBER 23, 2009 8:00 - 9:00 a.m. 3:00 - 4:00 p.m. (SUPER SESSION) Coffee with the Exhibitors "Keeping Up in a Down Economy: How a Culture of Recognition Can Improve Focus and Performance in Your 8:00 a.m. - 3:00 p.m. Organization Today" -Bob Nelson, Ph. D. Exhibitor Showcase open Bob Nelson, Ph.D., will expand your thinking of what recog- nition means and how you can better and more frequently 8:00 - 9:00 a.m. recognize those you work with -- even with little time, Chapter Presidents Roundtable Meeting resources or budget. 9:00 -10:45 a.m. 5:30 - 7:00 p.m. SDRMA Breakfast, Chapters Reception (all attendees welcome) INsr <rY �f /ylC Keynote Session and Safety Awards 7:00 -10:00 p.m. CSDA Awards Banquet and Entertainment Sponsored by SDRMA Presentations: Innovative Program Award - Exceptional Disney Institute - Change Leadership Public Outreach Award - William Hollingsworth Award Listen as an experienced speaker from the Disney - 2009 SDLF District of Distinction Accreditations and Institute shares valuable insights on when and why Certifications - 2009 SDLF Special District Administrator an organization should change and the role of the leader in shaping a positive, sustainable change. Live music by Tonic Sol -fa - the musical group referred to by the New York Times as 'A vocal kaleidoscope... unique to the human voice." 11:00 a.m. -12:00 p.m. Financing Options in Challenging Economic THURSDAY, SEPTEMBER 24, 2009 Times (CSDA Finance Corporation consultants) - Special Districts & LAFCO: Trends, Changes and 8:30 -10:30 a.m. Updates Required Harassment Prevention Compliance Training - SDRMA CIP Points - Return on Investment: HR as a Strategic Collaborator, Measuring Impact and Success 8:30 - 9:30 a.m. Effective Governance & Leadership: Tools - Practical Budgeting Processes and Tools (repeat) for Special District Directors/ - Special Districts & LAFCO: Trends, changes and updates (repeat) Trustees - SDRMA CIP Points - New Revenue Options ?: A Briefing on Special Assessments & Taxes (repeat) - Strategies for Achieving Excellence in Financial Reporting 9:30 -10:30 a.m. - SDRMA Claims Management for Public - Special District Grant Writing: Tips & Examples on How to Get that Next Grant Agencies - SDR,MA CIP Points - Effective Governance &Leadership: Tools for Special District Directors/ Trustees (repeat) - SDR11A CIP Points 12:30 - 2:00 p.m. - Meeting the GASB 45 Requirements: Keeping Your District in Compliance CalBomia Women Lead 10:30 -12:00 California Women Lead Luncheon (ticketed a.m. p.m. Closing Keynote Program & Brunch - Ralph Heim event) or Lunch on Your Own "Understanding the State's Fiscal Issues and What's Next for Special Districts" 2:00 - 2:45 p.m. Ralph Heim will give attendees the most up -to -date infor- Break and dessert with the Exhibitors mation on the state of the state budget and special district revenues. ................................................................................................................................................................................................................................. 2009 CSDA ANNUAL CONFERENCE A EXHIBLI'OR SHOWCASE ............................... - ............ .............................................................................................. ............... ....... 5 an Independent Speda(D&trict Date: July 15, 2009 Subject: CSDA 2009 Annual Conference The CSDA 2009 Annual Conference is being held in Indian Wells from September 21 -24, 2009, and there are many worthwhile workshops for District Staff to attend and gain SDRMA CIP points. These workshops include Grant Seeking — The Fundamentals for Special Districts; The Brown Act Updates & Ensuring Compliance; AB 1234 Ethics Training; SDRMA Claims Management for Public Agencies and, Harassment Prevention • Compliance Training. The workshops will prove to be beneficial to Staff in their job performance as well as provide CIP points that lessen the District's insurance costs. • Presentation of the 2009 SDLF District of Distinction Accreditation and Certification to the CMSD will also occur at the Awards Banquet. Board approval for Joan Revak and Sherry Kallab to attend the conference is requested. This expenditure is in the 2009 -2010 budget. Also, President Schafer, Directors Ooten and Ferryman plan to attend the conference and Director Perry plans to attend the Awards Banquet. Board approval for their attendance is also required. Protecting our community's health by providing solid waste and sewer collection services. www.crosdcagov CASA A to 54 Annual Gofe ce Ensuring Clean Water for California August 12-15,2009 Mission Bay Hilton 1775 East Mission Bay Drive r �t San Diego, CA 92109 Phone: 619.276.4010 Toll free: 800.445.8667 (central reservations) www.sandiegoresort.hilton.com Our Mission Statement The mission of the Caldomia Association of Sanitation Agencies is to provide leadership, advocacy and information to our members, legislators, and the public, and to promote partnerships on clean water and beneficial reuse issues that protect public health and the environment. President's Message Dear CASA Members: I look forward to welcoming you to the CASA 54th Annual Conference scheduled for August 12 -15, at the Mission Bay Hilton in San Diego. This conference offers a compre- hensive educational program designed for governing officials and professional staff of public wastewater agencies. The committee chairs have developed sessions on the latest : information about clean water and beneficial reuse sources that protect both public health and the environment. The program schedule has been reformatted to accommodate additional meetings and events. Wednesday evening we will officially kick off the conference with a Icebreaker Reception. After committee meetings on Thursday morning, delegates will be briefed on current activities of the Executive Board and the Association at the conference opening luncheon. You won't want to miss the program sessions on Thursday and Friday, which feature updates about our core services regarding technical, regulatory, leg- islative and legal activities. I would also like to personally invite you to attend the President's Reception on Friday evening I hope to see you in San Diego for our An- nual conference where we can network with fellow colleagues and share information about your local clean water agency. Until then, best regards and please don't hesitate to call the CASA office with questions about the conference Sincerely, Harry T. Pfce, CASA President Hotel Information CASA Annual Conference August 12 -15, 2009 Please make your reservations as soon as possible. Mission Bay Hilton 1775 East Mission Bay Drive San Diego, CA 92109 Phone: (619) 276A010 Guest fax: (619) 275 -8944 Toll free: (800) 445 -8667 (central reservations) www.sandiegoresort.hilton.com Room Reservations • CASA Room Rate: $253.24 for Single /Double Occupancy with tax • Cut -Off Date for Hotel Reservations: Thursday, July 9th. • Check -in: 4:00 p.m. Check -out: 12:00 noon. • Complimentary Parking for overnight guests. • 15% Discount on Spa Services for guests. • Early Departure Fee $50: Guests who check out prior to the reserved checkout date, the Hotel will add an early checkout fee of $50 to the guest's individual account. The Hilton San Diego Mission Bay is conveniently located off Interstate 5, just 10 minutes from the International Airport and right in the center of many popular attrac- tions. All rooms feature: a private terrace or patio, telephones and voice mail, high speed internet access, television, plus a refrigerator, and coffee maker. Hotel Waiting List The CASA office maintains a "Waiting List' for members that are not able to obtain a room reservation at a conference hotel. It is very important that any member can- celing a reservation contact Debbie at the CASA office before contacting the hotel, so that she can re- assign your reservation to another member on the list Registration Late Cancellation Policy CASA initiated a Late Cancellation Policy because of the large number of cancel- lations in the final days approaching each conference. Our contractual obligations with the hotel hold the Association liable when we do not meet our room guarantees Please note CASA's Late Cancellation Policy on the bottom of the registration form. you cannot attend, send a colleague in your place by notifying the CASA office. • $25 Cancellations fee on or before Friday, July 31 • No Refund for Late Cancellations after July 31 • If you cannot attend, please send a colleague and notify the CASA office Overflow Hotel For special rates for hotels in close proximity to the Mission Bay Hilton please con- tact San Diego Concierge. Contact: Michael Hall Phone: (800) 979 -9091 www- sandiegoconcierge. com . V • • • 9:00 a.m. - 2:30 p.m. CSRMA Training Seminar ...................... ............................... 10:45 a.m - 3:45 p.m. Golf Tournament Balboa Park Golf Course ...................... ............................... 12:00 p.m - 5:00 p.m. Registration ......... ............................... 2:00 p.m. - 5:00 p.m. Executive Board Meeting ......... ............................... 6:00 p.m. - 7:00 p.m. Icebreaker Reception THURSDAY August 13, 2009 8:00 a.m. - 4:00 p.m. Registration 8:00 a.m. - 9:00 a.m. Continental Breakfast 8:00 a.m. - 8:45 a.m. State Legislative Committee Work Group Chair Tim Anderson, Sonoma County WaterAgency .............................. ............................... 9:00 a.m. - 10:00 a.m. Federal Legislative Committee Work Group Chair Sharon Green, Sanitation Districts of Los Angeles County .............................. ............................... 10:00 a.m. - 10:30 a.m. New Member Orientation 10:00 a.m. - 11:30 a.m. Joint Directors and Managers Meeting - Trim the Sail and Chart a Sustainable Course - Directors Chair Jeff Moorhouse, Carpinteria Sanitary District - Managers Chair Michael Abramson, Napa Sanitation District - -- < Douglas C. Robinson, x= Investment Advisor and Co- author BOOM OR BUST - UNDERSTANDING AND PROFITING FROM A CHANGING CONSUMER ECONOMY No one will ever be able to predict every twist and turn in the economy or in the financial markets. But BOOM over the medium and long terms, the economy is surprisingly predictable. -° By studying demographics and other key factors, accurate forecasts can be made for individual in- dustries, real estate markets, and entire econo- mies. These predictions can be used for the great- er good so that investors and government entities can more effectively plan and invest. Armin Munevar, Senior Technologist, CH2M Hill INCREASE YOUR AGENCY'S ROBUSTNESS AND RELIABILITY TODAY... CLIMATE CHANGE RISK ASSESSMENT FOR WASTEWATER UTILITIES Climate change is inherently uncertain, and the fu- ture will require successful planners and decision makers to accept, and even embrace, this uncer- tainty. Increased heat waves, and decreased sea ice and snow cover are already happening and will be more frequent as the years pass. Stakeholders are demanding sustainable solutions for effective resource management. How do we incorporate this understanding into our day -to -day planning? Small steps do count. If not us, who? If not now, when? 11:30 a.m. - 1:00 p.m. CONFERENCE OPENING LUNCHEON President's Welcome and Executive Board Report Leadership Recognition 1:15 p.m. -4:30 p.m. TECHNICAL SESSIONS 1:15 p.m. - 2:15 p.m. WATER ISSUES MEETING Chair Ben Horenstein, East Bay Municipal Utility District • New Policy Proposed by EPA: Sediment Quality Objectives SQOs Lisa Haney, Marine Biology Laboratory, Los Angeles County Sanitation Districts . ................. ............................... 2:30 p.m. - 3:30 p.m. I AND ISSUES FORUM Chair Michael Sullivan, Sanitation Districts of Los Angeles County Vice Chair Ruben Robles, Sacramento Regional County Sanitation District • Biosolids Update • New Technologies /installations .............. ............................... 3:45 p.m. - 4:30 p.m. AIR ISSUES FORUM Chair Lisa Rothbart, Orange County Sanitation District • Green House Gas Emissions from Wastewater Treatment Plants 5:30 p.m. — 7:30 p.m. CSRMA Executive Board Meeting 7:30 a.m. — 9:00 a.m. CSRMA Board of Directors Meeting 8:00 a.m. — 9:00 a.m. Continental Breakfast ................... ............................... 8:00 a.m. — 3:00 p.m. Registration 9:00 a.m. — 12:00 p.m. GENERAL SESSION 9:00 a.m. — 9:15 a.m. Introduction of Executive Board Nominees Kamil Azouty Nominations Committee Chair 9:15 a.m. — 9:45 a.m. 2009 Achievement Award Recipients Kathleen Werner, Awards Chair 9:45 a.m. — 10:30 a.m. Federal Legislative Report Eric Sapirstein. CASA Federal Legislative Advocate 10:30 a.m. — 10:45 a.m. Break 10:45 a.m. — 11 :30 a.m. State Legislative and Regulatory Affairs Reports - Mike Dillon, CASA State Lobbyist Roberta Larson, CASA Director of Legal & Regulatory Affairs 11:30 a.m. — 12:00 p.m. Private Sewer Lateral Task Force Report Chair David Williams. East Bay Municipal Utility District 11:00 a.m. — 2:00 p.m. Communications Committee Meeting Chair Michele McKinney Underwood, Western Municipal Water District ................. ... ......I ... ...... I ...... ..__.... 12:00 p.m. — 1:00 p.m. L unch On Your Own ........................ ............................... 12:00 p.m. — 1:00 p.m. Associates Committee Meeting Chair Pervaiz Anwar, Brown and Caldwell 12:00 p.m. — 4:00 p.m. Attorneys Meetings . Chair Mark Cornelius, Law Offices of Mark Cornelius 1:15 p.m. — 4:30 p.m. GENERAL SESSION 1:15 p.m. — 2:00 p.m. Property Tax What's on the Horizon? Marianne O'Malley, Principal Fiscal & Policy Analyst, Legislative Analyst's Office (invited) 2:00 p.m. — 3:15 p.m. Cost- Effective Energy Conservation Projects Moderator. -Mark Cornelius, CASA Attorneys Committee Chair, Law Offices of Mark Cornelius Panel: Jon Fortune, PE., Manger, Energy Advisory Service E. J. Shalaby, General Manager, West County Wastewater District Cameron Weist, Bond Counsel, The Weist Law Firm Sophie Akins, Counsel. Best Best & Krieger LLP 3:15 p.m. — 3:30 p.m. Break 3:30 p.m. — 4:30 p.m. Timely Table Topics for Agency Outreach - Media Prep, Branding & Social Media Marketing Presentation by the CASA Communication Committee Chair, Michele McKinney Underwood. Senior Public Affairs Representative, Western Municipal Water District 4:45 p.m. — 5:30 p.m. Get Fit Fun Run/Walk Led by Roland Williams, GM, Castro Valley Sanitary District 4:45 p.m. — 5:30 p.m. Program Planning Meeting Chair Paul Bushee, Leucadia Wastewater District 6:00 p.m. — 7:00 p.m. President's Reception SATURDAY August 15, 2009 7:30 a.m. — 9:00 a.m. Executive Board Meeting ................... ............................... 8:00 a.m. — 10:30 a.m. Closing Breakfast and General Session - 8:00 a.m. — 9:00 a.m. Breakfast - 9:00 a.m. — 11:00 a.m. General Session Council Meeting • Executive Director's Report • 2009/2010 Election of Officers and Directors -At -Large • Adoptions of Proposed 2010 Membership Dues • Committees Reports • Last Order of Business - Passing of the Gavel • Closing remarks by President • N EW BUSINESS % • RESOLUTION NO. 2009 -770 A RESOLUTION OF THE GOVERNING BODY OF THE Costa Mesa Sanitary District FOR THE ELECTION OF DIRECTORS TO THE SPECIAL DISTRICT RISK MANAGEMENT AUTHORITY BOARD OF DIRECTORS WHEREAS, Special District Risk Management Authority ( SDRMA) is a Joint Powers Authority formed under California Government Code Section 6500 et seq., for the purpose of providing risk management and risk financing for California special districts and other local government agencies; and WHEREAS, SDRMA's Sixth Amended and Restated Joint Powers Agreement specifies SDRMA shall be governed by a seven member Board of Directors nominated and elected from the members who have executed the current operative agreement and are participating in a joint protection program; and WHEREAS, SDRMA's Sixth Amended and Restated Joint Powers Agreement Article 7 - Board of Directors specifies that the procedures for director elections shall be established by SDRMA's Board of Directors; and WHEREAS, SDRMA's Board of Directors approved Policy No. 2007 -06 Establishing Guidelines for Director Elections specifies director qualifications, terms of office and election requirements; and WHEREAS, Policy No. 2007 -06 specifies that member agencies desiring to participate in the balloting and election of candidates to serve on SDRMA's Board of Directors must be made by resolution adopted by the member agency's governing body. NOW, THEREFORE, BE IT RESOLVED that the governing body of the Costa Mesa Sanitary District selects the following candidates to serve as Directors on the SDRMA Board of Directors: (continued) OFFICIAL 2009 ELECTION BALLOT SPECIAL DISTRICT RISK MANAGEMENT AUTHORITY is BOARD OF DIRECTORS VOTE FOR ONLY FOUR (4) CANDIDATES Mark each selection directly onto the ballot, voting for no more than four (4) candidates. Each candidate may receive only one (1) vote per ballot. A ballot received with more than four (4) candidates selected will be considered invalid and not counted. All ballots must be sealed and received by mail or hand delivery in the enclosed self- addressed, stamped envelope at SDRMA on or before 5:00 p.m., Thursday, September 10, 2009. Faxes or electronic transmissions are NOT acceptable. ❑ ROBIN A. PRIDEAUX Board Secretary, Cuyama Community Services District ❑ JEAN BRACY, SDA Director of Administrative Services, Mojave Desert Air Quality Management District ❑ ED GRAY Board Member, Chino Valley Independent Fire District ❑ DAVID ARANDA (INCUMBENT) General Manager, Stallion Springs Community Services District ❑ VINCENT C. FERRANTE Commissioner, Moss Landing Harbor District ❑ MURIL N. CLIFT, CPCU, CLU Director, Cambria Community Services District ❑ ALLISON VOIGT HAMAKER Finance Director, El Dorado Hills Community Services District ❑ JOHN C. YEAKLEY (INCUMBENT) General Manager, Bear Valley Community Services District ADOPTED this listed by name: AYES: NOES: ABSTAIN: ABSENT: day of , 2009 by the APPROVED: ATTEST: Official Election Ballot o SDRMA Board of Directors Page 2 of 2 following roll call votes L � F ELECTION INSTRUCTIONS FOR SDRMA'S BOARD OF DIRECTORS Notification of nominations for four (4) seats on the Special District Risk Management Authority's (SDRMA's) Board of Directors was rnailed to the membership in March 2009. Nominations were received for eight (8) candidates by the June 10, 2009 filing deadline. SDRMA's Election Committee reviewed and confirmed that all eight (8) candidates' met the qualification requirements and submitted nomination docurnents in accordance with SDRMA's Policy No. 2007 -06 Establishing Guidelines for Director Elections. Enclosed is the Official Election Resolution Ballot along with a Statement of Qualifications as submitted by each candidate. Election instructions are as follows: 1. The enclosed combined Official Election Resolution and Ballot must be used to ensure the integrity of the balloting process. 2. After selecting up to four (4) candidates, your agency's governing body must approve the enclosed Official Election Resolution Ballot. 0 3. Resolution ballots containing more than four (4) candidate selections will be considered invalid and not counted. • 4. Signed resolution ballots MUST be sealed and received by mail or hand delivery at SDRMA's office on or before 5:00 p.m. on Thursday, September 10, 2009. Faxes or electronic transmissions are NOT acceptable. A self- addressed, stamped envelope is enclosed to return the Election Resolution Ballot: Special District Risk Management Authority Election Comrrlittee 1112 "1" Street, Suite 300 Sacramento, California 95814 5. The four -year terms for newly elected Directors will begin on January 1, 2010 and terminate on December 31, 2013. 6. Important balloting and election dates are: September 10, 2009 — Deadline for members to return completed ballots September 11, 2009 — Ballots are opened and counted September 14 - 18, 2009 - Election results are announced and candidates notified September 23, 2009 — Newly elected Directors are introduced at the SDRMA Annual Meeting /Breakfast to be held in Indian Wells at the CSDA Annual Conference January 2010 — Newly elected Directors are seated and Board officer elections are held Please do not hesitate to call SDRMA's Chief Executive Officer Jinn Towns loll -free at 800.537.7790 if you have any questions regarding the election and balloting process. An alliance committed to servtnf; California Special Districts Associatiun CSDA Finance Corporation Calironwis Independent special districts 1112 1 Street. Suite 200 1112 1 Street, Suite 200 u~- w4v.allspedaidr,tru_.ts.can Saciamento. California 95814 -2865 Sacramenln, California 9581•; -28(35 ioHJ,ee 877.924.CSDA (2732) Toll -lie.e 877.924.CSDA (2732) Fax 916.442.7889 Fax 916.442. 7889 z 5 e:lal District Risk 1112 1 Street, Suite 300 Mn nagernentAuthority Sacramento, California 95814 -2865 SDRMA T 916.231..4141 Maximizing Protection, F 916.231.4311 Mlnimizing Risk, T01 -free 800.537.7790 wvvw.sdt i-na.org ELECTION INSTRUCTIONS FOR SDRMA'S BOARD OF DIRECTORS Notification of nominations for four (4) seats on the Special District Risk Management Authority's (SDRMA's) Board of Directors was rnailed to the membership in March 2009. Nominations were received for eight (8) candidates by the June 10, 2009 filing deadline. SDRMA's Election Committee reviewed and confirmed that all eight (8) candidates' met the qualification requirements and submitted nomination docurnents in accordance with SDRMA's Policy No. 2007 -06 Establishing Guidelines for Director Elections. Enclosed is the Official Election Resolution Ballot along with a Statement of Qualifications as submitted by each candidate. Election instructions are as follows: 1. The enclosed combined Official Election Resolution and Ballot must be used to ensure the integrity of the balloting process. 2. After selecting up to four (4) candidates, your agency's governing body must approve the enclosed Official Election Resolution Ballot. 0 3. Resolution ballots containing more than four (4) candidate selections will be considered invalid and not counted. • 4. Signed resolution ballots MUST be sealed and received by mail or hand delivery at SDRMA's office on or before 5:00 p.m. on Thursday, September 10, 2009. Faxes or electronic transmissions are NOT acceptable. A self- addressed, stamped envelope is enclosed to return the Election Resolution Ballot: Special District Risk Management Authority Election Comrrlittee 1112 "1" Street, Suite 300 Sacramento, California 95814 5. The four -year terms for newly elected Directors will begin on January 1, 2010 and terminate on December 31, 2013. 6. Important balloting and election dates are: September 10, 2009 — Deadline for members to return completed ballots September 11, 2009 — Ballots are opened and counted September 14 - 18, 2009 - Election results are announced and candidates notified September 23, 2009 — Newly elected Directors are introduced at the SDRMA Annual Meeting /Breakfast to be held in Indian Wells at the CSDA Annual Conference January 2010 — Newly elected Directors are seated and Board officer elections are held Please do not hesitate to call SDRMA's Chief Executive Officer Jinn Towns loll -free at 800.537.7790 if you have any questions regarding the election and balloting process. An alliance committed to servtnf; California Special Districts Associatiun CSDA Finance Corporation Calironwis Independent special districts 1112 1 Street. Suite 200 1112 1 Street, Suite 200 u~- w4v.allspedaidr,tru_.ts.can Saciamento. California 95814 -2865 Sacramenln, California 9581•; -28(35 ioHJ,ee 877.924.CSDA (2732) Toll -lie.e 877.924.CSDA (2732) Fax 916.442.7889 Fax 916.442. 7889 Special District Risk Management Authority Board of Directors Candidate's Statement of Qualifications This information will be distributed to the membership with the ballot, "exactly as submitted" by the candidates - no attachments will be accepted. No statements are endorsed by SDRMA. Nominee /Candidate ROBIN A PRII)EAUX District/Agency CUYAMA COMMUNITY SERVICES DISTRICT Work Address Work Phone P 0 BOX 77 NEW CUYAMA, CA. 93254 -0077 Home Phone (661)766-2626 Why do you want to serve on the SDRMA Board of Directors? (Response Required) Mir name is Robin Prid aux and T would 1i Ige to b- CQnsidpred fgr the vacancy position on the board. I am qualified in that I am currently serving as Secretary on the Cuyama Community Services District Board and the other members of our board unanimously chose me to represent our township on the Risk Management Board; I would be honored to serve. .Having been in several diverse management and ownership positions in the past, I realize how important it is to be aware and prepared for various tuations that may arise. a representative I could not only add my experience, enthusiasm and analytical input, but bring back with -me helpful and forward- thinking ideas for cautionary procedures from the .other members and guests. What Board or committee experience do you have that would help you to be an effective Board Member? (SDRMA or any other organization) (Response Required) My 1 11,=4 n -mac -. ma'na,rramanl-. awnari t-ncp_ and nublic service work has led' me to apply for .this challenging an interesting position. In .addition, nave a ZTegree from Rl Camino college with an-emphasis in ps.yc o ogy: o mar: ing..:an con inue inter. isc_i.p inary s u ies.o psyc q ogy. an3 consumer.. behavior at, Cal ate ni.versi y_ ominguez gills. My. - - minor was'in the arts and I soon became. involved in professional `ensemble groups culminating with a nomination to the Student C-o-u-n-c=1 as Commissioner of Fine Arts. During my two semesters in office one of my significant accomplishments w.as to commission a bronze statue for the ar patio that still stands o ay entit.led it r: o0 I was the student representative to the calendar committee and helped �ecide on term lengths and holidays for the collegeI taught drehes.tra 'to children in Lo.s Angeles elementary schools <and chorus for the Manhattan:;Rec: Dept.` I also was chairman of public re a ions o e first festival del camino for benefit that successfully ended with a profit. .Page 1 of 2 March 2009 Special District Risk Management Authority Board of Directors i Candidate's Statement of Qualifications What special skills, talents, or experience (including volunteer experience) do you have? (Response Required) FOR MANY YEARS I WAS A BUS DRIVER FOR SANTA BARBARA METRO.- Quick decisions had--to be made constantly involving the well -being of my passengers. Many risk prevention measures were used to avoid encountering accidents or injury wring that time.Being alert and aware as well as handling every situation independently and safely, kept me from injury or lawsuit as I operated my own delivery businesses. My arnrloyees were taught ?SAFETY FIRST ". I am currently donating time assisting with the Cuyama C mmunity Services District as a secretary and board member. I am also working with the Cuyama Recreation Department in their fourth of July cele ra General Comments / Statements (Response Optional) ,.r; 4-1-N ion. I am semi - retired and woula welcome cne upy t,uiaivi 1 - - -- educated and confident decisions while asking the hard questions that need to be asked. Thank you in advance for your time and consideration is for my nomination to the`SDRMA Board of DirectorO, I certify that I am a Board member or a full -time management employee for the agency from which I have been nominated. I further certify that I am willing to serve as a director on SDRMA's Board of Directors. I will commit the time and effort necessary to serve. Please consider my application for nomination/candidacy to the Board of Directors. • R �r} Candidate Signature ( +� I A-14 �� Date C�� �I C March 2009 Page 2 of 2 Special District Risk Management Authority Board of Directors Candidate's Statement of Qualifications This information will be distributed to the membership with the ballot, "exactly as submitted" by the candidates. No statements are endorsed by SDRMA. Nominee /Candidate Jean Bracv, SDA District/Agency Moiave Desert Air Quality Management District Work Address 14306 Park Avenue yctorville CA 92392 Work Phone 760- 245 -1661 Home Phone 760- 946 -1882 Why do you want to serve on the SDRMA Board of Directors? I believe I can complement the current board composition with a representative perspective from the regulatory community. The regulatory community has specific risk issues that vary among agencies whose primary mission is delivery of important community services. For nearly 20 years, I've worked for public agencies. My approach to organizational management is drawn from a wide variety of experience. During my career I have been responsible to conduct the business of the agency in a manner that measures and manages risk. I've worked closely with SDRMA for several years, and I am attracted to its aggressive and positive mission. ant to contribute my experience to SDRMA's overall function to further strengthen and enhance the lines of rvices provided by SDRMA. What Board or committee experience do you have that would help you to be an effective Board Member? (SDRMA or any other organization) As the Director of Administrative Services for the Mojave Desert Air Quality Management District, I am the staff representative to the Governing Board Budget and Personnel Committees. I am a member of and have chaired the California Air Pollution Control Officers Association (CAPCOA) statewide committees for Fiscal and Human Resource officers. I represent the District on the Mobile Source Emissions Reduction Committee evaluating proposed projects for grant awards. I organized and currently chair the Alternate Fuel Task Force for the Mojave Desert air basin; I represent the District in the Antelope Valley Clean Cities Coalition. While employed with the City of Victorville, I served as the City representative to the Technical Advisory Committee for the Victor Valley Transit Authority and as the City representative and officer on the Executive Committee of the Regional Economic Development Authority. I volunteered four years on the Board of Directors of the Victor Valley Federal Credit Union. For six years, I worked as an adjunct professor at Victor Valley Community College teaching Public Works Administration. I have worked on the statewide Resolutions Committee for the California Baptist Convention and served as the regional representative for developing statewide women's programs. I am actively involved in a local community service organization and for many years in that capacity have been involved with a wide range of 4�Periences in designing organizational growth, strengthening the core structure, long term and vision planning, Vvelopment of staff and volunteers, and resource and program management. Page 1 of 2 Mardi 2009 Special District Risk Management Authority Board of Directors Candidate's Statement of Qualifications What special skills, talents, or experience (including volunteer experience) do you have? As professional and as a volunteer, I have a wide range of experiences with organizational structures, long term and vision planning, development of staff and volunteers, and resource and program management. My experience of leading organizational activities and implementing change for growth includes bringing together intergenerational and multicultural groups to achieve common goals. I am an effective manager with expertise in efficient and productive management implementing process improvements in finance, human resources, risk management, and a wide variety of related administrative and organizational functions. I have led highly skilled teams to support the achievement of overall agency goals and objectives. In the two years since I last ran for office, I have earned the prestigious Special District Administrator designation and completed course work for the CALPELRA Masters Certification in Labor Relations. I was accepted into the graduate program at California State University, San Bernardino and by the end of 2009 I expect to graduate with a Masters in Public Administration. General Comments / Statements I believe in SDRMA's stated mission. My agency is a strong supporter of the risk pool concept and particularly SDRMA. From our claims experience I presented the topic, "The Good, The Bad, The Ugly. Leadership: A Management Case Study, " at the CSDA Annual Conference in September 2006, where I was able to demonstrate our agency's positive experience with SDRMA's expert management of our claims. I am attracted to the passion and energy expressed by SDRMA staff and Board in their aggressive and confident approach to the mission of SDRMA. I want to contribute to SDRMA's objective and its future. I certify that I am a Board member or a full -time management employee for the agency from which I have been nominated. I further certify that I am willing to serve as a director on SDRMA's Board of Directors. I will commit the time and effort necessary to serve. Please consider my application for nomination /candidacy to the Board of Directors. .7 Candidate Signature Date - 0 40 Page 2 of 2 March 2009 Special District Risk Management Authority Board of Directors Candidate's Statement of Qualifications This information will be distributed to the membership with the ballot, "exactly as submitted" by the candidates. No statements are endorsed by SDRMA. Nominee/Can District/Agenc Work Address Work Phone Why do you want to serve on the SDRMA Board of Directors? ring served as a Governing Board Member of the Chino Valley Independent Fire District and having served !r 28 years as a law enforcement professional, I would bring to SDRMA the experience and knowledge that I ieve would add value to the organization as it continues to develop innovative programs to assist its' What Board or committee experience do you have that would help you to be an effective Board Member? (SDRMA or any other organization) have been an elected member of the Chino valley Independent Fire District since 2004.1 have served as Board 'resident, Vice - President and served on the Districts Finance, Planning, and Emergency Medical Services .ommittees. I have also served as Chair of the Chino Valley Public Agencies Committee and been District Liaison o the cities of Chino and Chino Hills to the 4th.District County Supervisor. also serve on the Citizens Oversight Committee of the Chino Valley School District and the Citizens Advisory .ommittee of the California Department of Corrections California Institute for Men. also am a member of our local Lions Club and serve as a Director. Page 1 of 2 Apr" 2007 Special District Risk Management Authority Board of Directors Candidate's Statement of Qualifications What special skills, talents, or experience (including volunteer experience) do you have? Having spent my entire professional life in the public sector I understand the importance of working effectively with others so an organization may achieve positive results. I believe I am an "effective listener" which gives me he ability to understand an issue and then make an informed decision. I am a proponent of team work and ettina stakeholders involved in issues. General Comments / Statements Should I be fortunate enough to be chosen to join the Board of the SDRMA, I can pledge to you I will work to continue the great service that SDRMA has been providing its' members and take any opportunity that could further enhance member benefits. • • 1 certify that 1 am a Board member or a full -time management employee for the agency from which i have been nominated. l further certify that I am willing to serve as a director on SDRLIA's Board of Directors. I will commit the time and effort necessary to serve. Please consider my application for nomination /candidacy to the Board of Direct Candidate Signature Date 'TZ/ c �O'a'9 • Aprfl2OD7 Page 2 of 2 Special District Risk Management Authority Board of Directors Candidate's Statement of Qualifications This information will be distributed to the membership with the ballot, "exactly as submitted" by the candidates - no attachments will be accepted. No statements are endorsed by SDRMA. Nominee /Candidate District/Agency Work Address Work Phone Home Phone !✓ (� -C7C� " S 1 Why do you want to serve on the SDRMA Board of Directors? (Response Required) What Board or committee experience do you have that would help you to be an effective Board Member? (SDRMA or any other organization) (Response Required) Page 1 of 2 March 2009 Special District Risk Management Authority Board of Directors Candidate's Statement of Qualifications What special skills, talents, or experience (including volunteer experience) do you have? (Response Required) S General Comments / Statements (Response Optional) w � I certify that 1 am a Board member or a full -time management employee for the agency from which I have been nominated. I further certify that 1 am willing to serve as a director on SDRMA's Board of Directors. I will commit the time and effort necessary to serve. Please consider my application for nomination /candidacy t d of ' ectors. Candidate Signature Date —� Page 2 of 2 Mach 2009 • Special District Risk Management Authority Board of Directors Candidate's Statement of Qualifications This information will be distributed to the membership with the ballot, "exactly as submitted" by the candidates. No statements are endorsed by SDRMA. Nominee /Candidate Vincent C. Ferrante District/Agency Moss Landing Harbor District Work Address 7881 Sandholdt Road Work Phone 831.633.5417 Home Phone 831.449.2409 Why do you want to serve on the SDRMA Board of Directors? I have been involved in Special District fiscal planning and risk management and have an interest and desire to support sound fiscal policies and promote quality risk management services to special districts throughout the state. What Board or committee experience do you have that would help you to be an effective Board Member? (SDRMA or any other organization) Board of Commissioners since 2003. This requires constant budgeting vigilance and action responsive to constituent needs. I have served as Chair of the MLHD Liveaboard Committee, Vice Chair of the MLHD Budget Committee and Property Improvement Committee. In that capacity I gained in -depth knowledge of rules and regulations governing special districts as well as consensus - building among committee members. have served on the following California Special District Association: 1. Membership & Retention 2. Budget/Fiscal 3. By -Laws I was appointed to the Monterey County Overall Economic Development Commission by the County Board of Supervisors and serve as Vice Chair of its Grants and Finance Committee. By this appointment, the County Board has demonstrated confidence in my fiscal abilities, experience and insight. 1 am currently serving on the Monterey County Special District Association and was elected Secretary/Treasurer for 2009. regulations and reporting. Other committee involvement includes Vice Chair of the Salinas, California Page 1 of 2 Candidates- Statement- Of- Oualfications - 2009 Sister City Organization (of which I was named Member of the Year in 2005), Trustee of the Salinas, California Sons of Italy in America Lodge and Chair of the City of Monterey's annual Festa Italia Festival Parade. • Special District Risk Management Authority Board of Directors Candidate's Statement of Qualifications What special skills, talents, or experience (including volunteer experience) do you have? I have experience and /or training in project management report preparation public speaking strategic planning budget analysis and preparation risk management health benefits and retirement plans. Being on committees and working with others toward common goals requires a willingness to listen and exercise flexibility. My analytical skills are thorough and enable me to make informed decisions._ General Comments / Statements I have completed the CSDA Special District Governance Academy and have taken courses through the Institute for Local Government I am confident I will be a diligent and valuable member of the Board. will dedicate myself to the vision and goals of the SDRMA and I look forward to the opportunity to be a contributing member serving on this Board. I certify that I am a Board member or a full -time management employee for the agency from which 1 have been nominated. I further certify that I am willing to serve as a director on SDRMA's Board of Directors. I will commit the time and effort necessary to serve. Please consider my application for nomination /candidacy to the Board of Directors. Candidate Signature: Date: Vincent C. Ferr me Page 2 of 2 Candidates - Statement -Of- Qualifications - 2009 • Special District Risk Management Authority Board of Directors Candidate's Statement of Qualifications This information will be distributed to the membership with the ballot, "exactly as submitted" by the candidates — no attachments will be accepted. No statements are endorsed by SDRMA. Nominee /Candidate Muril N. Clift, CPCU, CLU District/Agency Cambria Community Services District Work Address PO Box 1799, Morro Bay, CA 93443 -1799 Work Phone 805 772 -6101 Home Phone 805 927 -7124 Why do you want to serve on the SDRMA Board of Directors? (Response Required) I desire a position on the SDRMA Board because I see it as an expansion of my commitment to Special Districts and commitment to the concept of member controlled risk management services. I believe current California legislation makes it very difficult for any new city to incorporate. As a result, I believe the Special District will become the dominate model for local governing bodies. The degree to which any organization can bring a diversified service to the public is often controlled by the availability of insurance protection and risk management services. SDRMA is uniquely situated and qualified to provide the services Special Districts need to provide for their constituents. I look forward to Ding part of the member support organization needed by an expanding world of Special Districts. For 38+ years I have been involved in the commercial insurance marketplace. A marketplace characterized by the competing interests of the insurance sellers, consumers and insurance companies. Brokers whose major concern is commission income. Consumers whose major concerns are availability and price. Companies whose major concerns are premium volume and profitability. Lacking in all areas is a commitment to loyalty. SDRMA as a member organization starts with the commitment of loyalty to its members, mitigating the competitive forces driving the commercial insurance market. I find this commitment of loyalty between the members and service providers a healthy solution to the cyclic problems inherit in meeting insurance needs. It is my desire to encourage this type of solution to the risks faced by Special Districts by serving on the Board of SDRMA What Board or committee experience do you have that would help you to be an effective Board Member? (SDRMA or any other organization) (Response Required) Currently serving as a Director of Cambria Community Services District, serving on the Finance Committee, Governmental Relations Committee and Forest Service Committee. Current term expires 12/2012. Previous elected Board experience includes: (1) Elected Trustee of Kern County High School District. District composed of 17 high schools at the time. (2) Elected Director of Santa Maria Public irport District. District administered a 2200 acre airport, industrial and agriculture facility. Served as strict President and member of many committees. Pane 1 of 9 March 2009 Special District Risk Management Authority Board of Directors Candidate's Statement of Qualifications What special skills, talents, or experience (including volunteer experience) do you have? (Response Required) I bring 38+ years of insurance experience in personal and commercial lines insurance. I understand the risks faced by community organizations and the insurance needs of employees. I hold advanced insurance degrees of Chartered Property and Casualty Underwriter and Chartered Life Underwriter. Additionally I have completed over 1000 hours of continuing education in the insurance field. 1 am experienced in the political field and understand how elected bodies think and act. I have been elected to three different boards in my career and served on several appointed advisory committees. I have served on political action committees representing the positions of the insurance company. I have authored insurance code legislation and managed the bill through the California legislature, spending many hours "walking the halls" of the California Assembly and Senate. General Comments / Statements (Response Optional) I believe I would bring a diverse background to the SDRMA Board of Directors. First, I have a strong commitment to the Special District as the ultimate form of local control of community functions. Second, with experience on three different types of Special Districts, a school district, an airport district and a multi -task community service district I believe I can represent the diversity of districts that make up SDRMA. Third, my experience in the general insurance market place provides a unique understanding of the needs of organizations and their employees. My extensive experience in marketing insurance could be helpful in representing the benefits of SDRMA to potential members. Fourth, I understand and have experience with the political influences that affect the insurance marketplace. Finally, I have the desire and time to serve and believe a position on the Board of Directors of SDRMA would be an opportunity to put to use my experiences. I certify that I am a Board member or a full -time management employee for the agency from which I have been nominated. I further certify that t am willing to serve as a director on SDRMA's Board of Directors. I will commit the time and effort necessary to serve. Please consider my application for nomination /candidacy to the Board of Directors. Candidate Signature Date Pono 7 of 7 March 2009 • Special District Risk Management Authority Board of Directors Candidate's Statement of Qualifications Nominee /Candidate Allison Voiqt Hamaker District/Agency El Dorado Hills Community Services District Work Address 1021 Harvard Way, El Dorado Hills, CA 95762 Work Phone (916) 614 -3207 Home Phone (916) 388 -1938 Why do you want to serve on the SDRMA Board of Directors? The SDRMA influences the activities and safety of the public. By serving on the Board, I will be able to keep abreast of the current issues affecting both my agency and others served by SDRMA while advancing the mission of my agency and the sister agencies we represent. What Board or committee experience do you have that would help you to be an effective Board Member? (SDRMA or any other organization) I've held positions on several boards and committees, both small and large: Landscaping and Lighting Assessment District Oversight Committee at CRPD, coordinator American Society of Women Accountants Sacramento Valley Chapter ten years, past president Committee Chair four years for Troop 40 and Troop 941 of the Boy Scouts of America • Faculty Curriculum Committee at American River College, student representative Accounting Society CSUS three years, past president Committee chair of my congregation's Activities Committee and president of Children's Primary What special skills, talents, or experience (include volunteer experience) do you have? I bring organizational skills, preparation in the topics to be discussed, interest in my fellow committee members, a sense of humor, and the ability to distill the essence of the conversation to clarify and summarize the ideas of the group. General Comments✓Statements: It was my responsibility as a staff member at a past employer to manage liability claims, write liability claim staff reports for the Board of Directors, and to prepare the agency for the risk management pool representatives' annual visit. I enjoy this work and this topic, and look forward to being a part of SDRMA. I certify that I am a Board member or a full- time - management employee for the agency from which I have been nominated. I further certify that I am willing to serve as a director on SDRMA's Board of Directors. I will commit the time and effort necessary to serve. Please consider my application for nomination /candidacy to the Board of Directors. ` • Candidate Signature Date �3fl Special District Risk Management Authority Board of Directors Candidate's Statement of Qualifications This information will be distributed to the membership with the ballot, "exactly as submitted" by the candidates. No statements are endorsed by SDRMA. Nominee /Can District/Agenc Work Address Work Phone Why do you want to serve on the SDRMA Board of Directors? have served on the SDRMA Board since March of 1999. 1 have served as vice president since January, 2002. during that time, I have seen SDRMA expand significantly. In 1999, SDRMA had 238 members in its property iability program and SDWCA had 73 members in its Workers Comp program. In July, 2003 SDWCA merged with ')DRMA and the combined organization now has 429 members in the property liability program and 339 nembers in the workers comp program. During the same period, assets have increased from $20 million to i 116 million. Retained earnings have increased from $7 million to $32 million. Over that time, SDRMA has also )ranched out into the area of employee health benefits (2006) and currently has 51 agencies (approx 1200 employees) enrolled in that program. A very visible result of this growth is SDRMA's purchase in 2004 of its own )uilding in downtown Sacramento. SDRMA currently occupies most of the third floor, rents the remainder of thi )uilding and realizes approximately $400,000 annually in rental income. I am very proud to have been a part of his dramatic growth. I am also proud to have been a part of the board which recently made the decision to educe rates by 15% for the 200912010 program year. I would be honored to have the opportunity to continue erving on this board. What Board or committee experience do you have that would help you to be an effective Board Member? (SDRMA or any other organization) ,s previously mentioned, I have ten years of experience on the SDRMA board of directors. I have also served for :)urteen years on the Tehachapi Water Availability Preservation Committee, seven years on the Greater ehachapi Fire Safe Council, and have served on ACWA's Groundwater Committee and Safe Drinking Water Sub - ommittee. General Manager of the Bear Valley CSD, I regularly assist the board of directors in the administration of sever riding committees and have (as required or requested) organized and administered ad hoc committees of the and and /or of citizens of the district. Page 1 of 2 AprO 2007 Special District Risk Management Authority Board of Directors Candidate's Statement of Qualifications What special skills, talents, or experience (including volunteer experience) do you have? ubstantial military and civilian experience in general management, contract administration /negotiation, project ianagement, energy and environmental issues. Licensed professional engineer in California and Oregon. ertified Special District Administrator and CSDA recognition in Special District Governance. I was a member of -ie working group appointed by the Senate Committee on Local Government to rewrite the laws affecting ommunity Services Districts in 2004 (SB 135). As General Manager for the Bear Valley CSD, I am responsible for providing services relating to: water, wastewater, solid waste, roads, drainage, police, park & recreation, mail /postal services, mosquito abatement and pine bark beetle control. General Comments / Statements i years, United States Navy Construction Forces including combat construction (Seabees), base maintenance, id construction management. Vietnam veteran. Enlisted in 1967, retired in 1993 as a Lieutenant Commander, vil Engineer Corps. Took employment with Bear Valley CSD shortly after retiring. 5 (Diesel Technology) Oregon Technical Institute 1967 Mechanical Engineering) University of Washington 1976 Business and Management) University of Maryland 1980 (Petroleum Engineering) University of Texas 1981 ►rganizations: oastmasters International, Veterans of Foreign Wars, Fleet Reserve Association, Vietnam Veterans of America, lational Rifle Association, California Rifle and Pistol Association obbies & Interests: ishing, firearms, judo, scuba, cribbage, outdoors and fitness 62; married 38 years, reside in Bakersfield with wife, daughter and grandkids (ages 16,14, 7, 2, and 1). 1 certify that I am a Board member or a full-time management employee for the agency from which I have been nominated. I further certify that I am willing to serve as a director on SDRMA's Board of Directors. I will commit the time and effort necessary to serve. Please consider my application for nomination /candidac a Board of Directors. Candidate Signature Date `� G rO 9 Page 2 of 2 Apnl 2007 • LJ • • � 1 County of Orange S4 INVOICE NO: IGA 00049 Auditor - Controller ; P.O. Box 567 {�, ' s'c,, DATE: 7/1/2009 Santa Ana, California 92702 SOLD TO: NAME Costa Mesa Sanitary District rence this number ADDRESS P.O. Box 1200 our remittances for Mer Costa Mesa, CA 92628 -1200 credit. PHONE S.S. # ACCOUNTING CODE r Check this box if Government FUND DEPT BUD CONTROL UNIT REV SUB -REV DEPT REV OBJ SUB -OBJ DEPT OBJ BSA SUB BSA DEPT Job Number Amount Agency ACCT BSA 770 V770 770 9000 7590 $ 13,865.26 P.O. /M.A. # THIS INVOICE PREPARED BY: Ati Viskul (714)8 -4346 Quanti Description Price Amount Allocation of FY 2009 -2010 LAFCO costs $ 13,865.26 Pursuant to AB2838 (Chapter 761 /Statutes of 2000) Government Code Section 56381 Total Due: $ 13,865.26 Personal checks must be Imprinted with • name, address and telephone number. Drivers license number is also requested. • Costa Mesa Chamber of Commerce Thursday July 16'f' Speaker: Matthew Boggs- Success Consultant and Life Coach Main Topics: "Mastering the Law of Attraction " - The Success Code 1. 3 ways top performers think 2. "Successful people do what other people don't do" 4j . Question- What do you want? & - Why don't you have it yet? 4. Your thinking — Controls the quality of everything you want. 5. Seek out people who think at a higher level. 6. Develop the following individual faculties A. Intuition B. Perception- Ability to see the world beyond what you normally see. C. Will- Ability to focus - "Act as if" Attended by Art Perry & Tom Fauth J�'� o —• Oq9� o c U m 0941 Ov, Date: July 23, 2009 Quarter: (Check One) x 4`h (Apr -Jun) ❑ 1 st (July -Sept) o 2nd (Oct -Dec) ❑ 3rd (Jan -Mar) Name of Organization: Costa Mesa Sanitary District and the City of Costa Mesa Contact Person: Thomas A. Fauth or Patrick Bauer �c Address: 628 West 19` St, Costa Mesa, CA 92627 and 77 Fair Drive PO Box 1200, Costa Mesa, CA 92626 Email: tfauth @crosdca..izov ; pbauer @ci.costa- mesa.ca.us ; Phone: (949) 645 -8400, x222 or (714) 754 -5024 Project/Program Title: Costa Mesa Sanitary District and City of Costa Mesa Recycling and Waste Diversion Grant Program Project/Program Goals: 1. Increase public outreach education to the public on recycling benefits and methods. 2. Provide local methods and locations to dispose of household hazardous waste. 3. Promote residential composting. 4. Promote need -based e -waste events. Project/Program Start Date: April 2008 Project/Program Status: Cumulative Accomplishments: 1. The Costa Mesa Sanitary District and the City of Costa Mesa delivered composting and vermicomposting demonstrations on October 18, and November 15, 2008 at the Neighborhood Community Garden, Costa Mesa, CA. Thomas Fauth and CMSD Staff presented the composting workshops, distributed composting and recycling literature and sponsored Earth Machines for backyard composting. 2. The Costa Mesa Sanitary District Staff delivered a vermicomposting presentation on October 20, 2008 to Newport Mesa Unified School District teachers to educate teachers on methods do divert green waste (kitchen waste). 3. Delivered a vermicomposting presentation on November 14, 2008 at St Joachim's Elementary School Cub Scouts to explain the method for diverting Kitchen waste (green waste) from the waste stream. 4. Ongoing: Coast Community College District (CCCD) Board of Trustees signed the "Agreement for AB 939 Regional Recycling and Waste Diversion Grant Funded Recycling Services" August 8, 2008. This three -party agreement finalized the foundation for a multi -year, grant funded recycling program between the District, City and CCCD. The agreement specified the District and City will fund the collection and recycling of household batteries, fluorescent tubes, compact fluorescent tubes (CFLs) and incandescent bulbs collected at the Orange Coast College (OCC) Recycling Center with no cost to the CCCD. 5. The District and City finalized the agreement with Curbside, Inc. to collect the waste specified in 2. above from CCCD's OCC Recycling Center. 6. November 6, 2008: Ordered an additional 50 Earth Machines and 52 two - gallon Kitchen Buckets for District and City residential customers. This continues the pilot program distribution of bins to residents desiring to participate in backyard composting. The program will continue with the purchase and distribution of larger quantities of the Earth Machines, vermicomposting bins and presentations at local park events. 7. January 15, 2009: Ordered an additional 50 Earth Machines and 78 two - gallon Kitchen Buckets for District and City residential customers. 8. Coordinated agreement to collect Fats Oils & Grease from CCCD's OCC Recycling Center to keep the FOG out of the solid and the liquid waste streams. 9. During March, 2009, Patrick Bauer (714- 754 -5633) replaced Melanie Eustice as the City of Costa Mesa Contact. 10. April 9, 2009, April 23, 2009, May 9, 2009, May 21, 2009: Ordered 200 additional Earth Machines and 234 two - gallon Kitchen Buckets for District and City residential customers. 11. May 7, 2009: Published Composting Advertisement in Everything Green, Zn promoting Earth Machine backyard composting. 12. June 18, 2009: Ordered and distributed 20 double sided Recycling Signs promoting recycling at CCCD's OCC Recycling Center. 13. June 2009: Published Article Advertising Backyard Composting in the Summer 2009 City of Costa Mesa `One Person's Trash' paper. Project/Program Units of Measurement (please report on any delivered units of measurement, whether it is pounds diverted, containers purchased, outreach_ mailers, etc.): 1. During this period (April 1, 2009 through June 31, 2009), Curbside, Inc., collection activities from OCC Recycling Center, Costa Mesa Fire Prevention Bureau, Estancia High School and the.Costa Mesa Sanitary District Headquarters Building diverted the following household quantities, volumes or weights of household batteries, fluorescent tubes, CFLs and incandescent bulbs from illegal landfill disposal: a. Household batteries: 676 pounds (4- 9 -09); 693 pounds (5- 21 -09); Totaling 1,369 pounds; b. Fluorescent Tubes: 1,736 linear feet of four and eight foot tubes and 31 bulbs (4- 9 -09); 770 linear feet of four and eight foot tubes and 86 bulbs (5- 21 -09); Totaling 2,506 feet of four and eight foot tubes and 117 bulbs. 2. Total Program Collections to date: Curbside, Inc., collection activities from OCC Recycling Center diverted the following household quantities, volumes or weights of household batteries, fluorescent tubes, CFLs and incandescent bulbs from illegal landfill disposal: c. Household batteries: 3,888 pounds; d. Fluorescent Tubes: 6,063 linear feet of four and eight foot tubes; e. CFLs: 154. 3. Purchased 325 Earth Machines; 4. Purchased 364 two - gallon Kitchen Buckets; 5. Distributed 323 Earth Machines to residential customers; 6. Distributed 400 sets of composting, vermicomposting and recycling brochures; 7. Finalized two multi - organizational agreements. 8. Coordinated a Fats, Oils and Grease (FOG) Agreement with OCC Recycling Center. 9. Cumulative Funds expended through June 30, 2009: $25,249.33 (63.1% of $40,000.00) Other information: Comments: The CMSD and City of Costa Mesa Staff appreciate the grant opportunity, on behalf of our residents. Please submit form to: Christine Knapp at Christine.Knapp @iwmd.ocgov.com • Costa Mesa Chamber of Commerce Thursday July 16t" Speaker: Matthew Boggs- Success Consultant and Life Coach Main Topics: "Mastering the Law of Attraction " - The Success Code 1. 3 ways top performers think 2. "Successful people do what other people don't do" je. Question- What do you want? & - Why don't you have it yet? 4. Your thinking — Controls the quality of everything you want. 5. Seek out people who think at a higher level. 6. Develop the following individual. faculties A. Intuition B. Perception- Ability to see the world beyond what you normally see. C. Will- Ability to focus - "Act as if' Attended by Art Perry & Tom Fauth N ROBIN B. HAMERS & ASSOC., INC. 00 CIVIL ENGINEERS • PLANNERS • SURVEYORS since 1981 July 17, 2009 Board of Directors Costa Mesa Sanitary District 628 W. 19th Street Costa Mesa, CA 92627 RE: Project #129 - Bristol Street Sewer Construction Phase Proposal Dear Board Members: 234 E. 17TH ST., SUITE 205 COSTA MESA, CA 92627 Phone 949/548 -1192 Fax 949/548 -6516 This proposal is to provide construction phase services during construction of the new Bristol Street Sewer. The proposal includes contract administration, engineering, surveying and inspection. The contractor has a 50 working day period within which to construct the 2,100 lineal feet of new 15" VCP sewer main. All work will be completed at night and the Orange County Development Agency (OCDA), the redevelopment arm for the County of Orange, is reimbursing the Costa Mesa Sanitary District the construction costs and the construction phase costs shown below. I. Contract Administration Oversee and perform liaison with contractor; oversee CMSD inspectors, Caltrans inspectors, County of Orange inspectors, City of Newport Beach inspectors, City of Costa Mesa inspectors; process monthly contractor progress payments and change orders; provide advance notice to adjacent businesses and respond to public inquiry, etc. Estimated at Engineer 120 hrs @ $85 /hr. = $10,200 II. Engineering & Surveying Provide construction staking and engineering, review shop drawings, respond in writing to contractor requests, perform periodic site visits, as -built plans upon completion, etc. Estimated at Surveying 32 hrs @ $220/hr = $ 7,040 Engineer 120 hrs @ 85/hr = $10,200 • ROBIN B. HAMERS & ASSOC., INC. 234 E. 17TH ST., SUITE 205 CIVIL ENGINEERS • PLANNERS • SURVEYORS COSTA MESA, CA 92627 ... since 1981 Phone 949/548 -1192 Fax 949/548 -6516 III. Inspection Daily inspection for 10 hours maximum per day by CMSD Inspectors. Inspection 50 days x 10 hrs /day x $64.50/hr. = 32.250 Proposed not to exceed total $59,690 Please note the three -party agreement states the above services shall not exceed $114,712.50, however, it is proposed to provide these services at a not to exceed total of $59,690. Sincerely, Ro in B. Hamers, PE President RCE 31720 • Board of'Directors Arlene Schafer Robert Owen Ga.r)- Monahan Arthur Perry James Ferryman Sid ,' Robin B. HaMers Manager - District Engineer (949) 631 -1731 Thomas A. Fenah Assistant Manager Joan.Revok Board Secretary rain Manager 4C,!e,7qf the District Alan R. Burns Legal Counsel Marcus D. Davis TreasurerlDirecior of Finance Phone (949) 645 -8400 Fax (949) 650 -2253 Address 628 IV 19th Sireel Costa Mesa, CA 92627 -2716 r� Printed on Recycled Pager %,.,usia mesa Sanitand Distroct ... an In6epencbent Special District July 16, 2009 Board of Directors Costa Mesa Sanitary District 628 W. 19th Street Costa Mesa, CA 92627 RE: BID OPENING, PROJECT #129 Bristol Street Sewer Replacement Project From Autoplex to Birch Street Dear Board of Directors: The following bids were opened at the July 16, 2009 bid opening for said project: 1. Paulus Engineering $ 775,048.00 * Low Bid 2. Garcia Juarez $ 848,150.00 3. DLSB $ 856,900.00 4. Kana Pipeline $ 860,000.00 5. Palp (Excel Paving) $ 883,920.00 6. BNB Engineering $ 900,770.00 7. Miramontes $ 911,170.00 8. VasilJ $ 997,776.00 9. Dominguez $ 1,035,690.00 10. Ken Thompson $ 1,038,293.50 11. LH Engineering $ 1,044,280.00 12. VCI Telcom $ 1,070,185.00 13. Bali $ 1,197,820.00 14. Steve Bubalo $ 1,234,960.00 15. Kennedy Pipeline $ 1,369,085.17 All bids were reviewed by District staff to ensure the lowest responsive bid is in conformance with prevailing construction prices. All construction bids were compared to the engineer's estimate to ensure the bids are reasonable, cost effective, and competitive compared to standard construction rates. The construction of this project will be funded by the Orange County Development Agency (OCDA) up to $1,147,125 per the attached 3 -Party Agreement between the CMSD, City of Newport Beach, and the OCDA. The construction expenses total $939,760.50 including not to exceed CMSD administration and inspection ($114,712.50), City of Newport Beach inspection fees ($25,000), County of Orange inspection fees ($25,000), and construction per above low bid ($775,048.00). Protecting our communitN's hea[t� b� providing solid waste and sewer collection services. www.crosbea.gov �5�,5Ai�ITq�� ®�J a a o�o -�District 0 PoRhal ... am Iii6epeubeiit Special Distylct, The District Engineer recommends the Board of Directors award a construction contract for this project to Paulus Engineering in the amount of $775,048.00 as the lowest responsible and responsive bidder, with said construction costs to be funded by the OCDA. The District Engineer recommends the Board of Directors authorize District staff to execute the construction of this project and coordinate with the OCDA for reimbursement. Sincerely, � W--- Robin B. Hamers, PE District Engineer 0 • P- rotectlfig Oi2Y cOinmufiit�`s provibiiig solib waste afi(b sewer cof f ectiom seruices. www.crosbca.gov Engineer's Estimate & Bid Tabulation i t'Owner: COSTA MESA SANITARY DISTRICT T ject: CMSD 129 BRISTOL STREET SEWER REPLACEMENT Bid Date: July 16, 2009 Bid Time: 10:00 a.m. #1 #2 #3 #4 #5 #6 #7 #8 • Paulus Garcia Juarez DLSB; Inc. Kana Pipeline, Inc. Palo (Excel Paving)'" BNB Engineering N.Hramontes.ConsL Vasilj, Inc. Item Description p Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Pnce .. Unit Price Total Price Unit '" Price ..:. Total Price :"" ` ` Umt ." Pnce . Total ," _ .':Price': , Unit Price ,.:. Total Price.." :: Unit Price I Mobilization, demobilization, & cleanup 1 LS $18,000 $18,000 $25,000 $25,000 S'50`00 :. $50,000 $13,000 $13,000 $35,160 $35 100 $20 000 $20 000 $60,000 " $60 000 $50,000 2 Bonds, insurance, & permits 1 $15,000 $15;000 $10,000 $10,000 $15 000, $15;000 $21,000 $21,000 $23;000 $23 000 '" $60,000. $60000 $20,000 " $20;0(10 $30,000 3 Traffic control including preparation of plans for permit 1 LS $28+200 528+200 $15,000 $15,000 $50 000. $50 `000 $121,750 $121 750. " $70,000 $70,000 $90,000 $90 000 $30000 $30,000 $20,000 4 Geotechnical services during construction 1 LS $25;000 $25 000 $5,000 $5,000 $30,000 $30,000 $20,000 $20,000,1- $30,000 _ $30,000. $30,000 $30 000 $30 000 $30;000 $10,000 5 Sewage flow diversion (mobilization & setup) per detail below 1 LS $75;000 $75,000 $15,000 $15,000 $30,000 $30,000 $60,000 $60,000 $40,000 $40;000 $25,000 $25 000 $30,000 $30,000 $10,000 6 Install 15 -inch VCP sewer main 2,100 LF $137 5287,700 $250 $525,000 $200. $420;000 $206 $432,600 " $230 $483,000 $181 , . $392 700 $225 $472,500 $305 7 Install 6-inch VCP sewer laterals 4 EA $1,350 $5,400 $1,000 $4,000 $1,600 $4,000 $1,800 $7,200 $1,300 $5,200 $1,550 $6,200 $1,500- $6000 $1,500 8 Remove existing brick manhole and construct 72 -inch diameter concrete manhole 6 EA $9,400 $56,;400 $7,000 $42,000 $12,000 $72,000 $8,700 $52,200 ! $11,500 $69,000 $8;500 $51,000 $12,000 $72;000 $14,000 9 Pour new manhole base & channel. Core drill and patch manhole walls. 2 EA $5,500 $11,000 $5,000 $10,000 ::-$3,000 $6,000 $5,600 $11,200 $6,500 $13,000 $2,500 $5;000 $6,000 $12;000 $8,000 10 Excavation and safety measures (trench shields & shoring) 1 LS $159,000 $159,000 $75,000 $75,000 $26;000 $26,000 $22,500 $22,500 $16,500 $16,500 $30,000 $30 1000 $35,000 " $35,000 $40,000 Bristol - Pavement 2" grind and overlay using Type DI -C3 -PG 64 -]0 41,800 SF $i 56 $65,208 $2.00 $83,600 $2:00 $83,600 $1.65 $68,970 $1.40 $58,520 $2:65. $110 770 $1:90 $79,420 $1.47 12 Bristol - Install pavement striping (thermo plastic) 1 LS $4200 $4,200 $5,000 $5,000 $40,000 '$40,000 $4,000 $4,000 $4 ;500 $4,500 $10;000. $10,000 .,, $25 000 $25;000 $4,000 13 Bristol - Replace traffic signal loops 14 EA $275 " $3850 $400 $5,600 $700 $9,800 $420 $5,880 $550 $7;700 $1,400 $19,600 $500 $7,000 $300 14 AutoPlex - Pavement 2" grind and overlay using Type 111 -C3 -PG 64 -10 4,000 SF $1.56 $6,240 $4.00 $16,000 $2.00 , $8;000 , _ • $1.65 $6,600 $1.40 $5,600 $3.00 .. .$12,000 $2.00 $8,000 $1.47 15 AutoPlex - Replace existing concrete curb & gutter 150 LF $26:00 " $3,900 $25.00 $3,750 $30.00. $4;500 $22.00 $3,300 $60.00 $9,000 $50.00 $7,500 $35.00 $5 250 $45.00 16 AutoPlex - Replace existing concrete sidewalk replacement 200 SF $16.00 $3,200 $6.00 $1 200 $1000 $2;000 $14.00 $2,800 $26.00 $5,200 $15:00 $3,000 $20.00 $4 000 $15.00 17 AutoPlex - Repair landscape, irrigation, and related surface improvements 1 LS $7,000 .$7,000 $5,000 $5,000 $5,000 $5;000 $6,000 $6,000 $7,800 $7,800 $25,000 _ $25,000 " $10,000 $10 000 $5,000 18 AutoPlex - Install pavement striping (conventional) I LS $750 „ $750 $2,000 $2,000 ; : $1 000 $1,000 $1,000 $1,000 :- $800 _ .. $800" $3,000 $3;000 �" $5;000 $5000 $ Total $775,048 $848,150 $856,900 $860,000 $883;920 " $900,770 :. $911,170 • Engineer's Estimate & Bid Tabulation �lient/Owner: COSTA MESA SANITARY DISTRICT Project: CMSD 129 BRISTOL STREET SEWER REPLACEMENT Bid Date: July 16, 2009 Bid Time: 10:00 a.m. #9 #10 #11 #12 #13 #14 #15 Nnungues, Gen.; Ken Thompson L H Engineering VCI Telecom, Inc. Ball Construction Steve Bubilo < Kennedy Pipeline z;s IDescription Total Utvt Total Unit Total Unit Total �Quantity Unit Total Unit Total Umt Total Unit Total Item Price Pricey, „ , ;Price, , Price Price Pricey , - °�Pnee„ ;;" Price Price Price Price ra Price �_ Price- Price 1 Mobilization, demobilization, &cleanup I $50,000 = $50 000$50 000 $29,500 $29,500 $50 000 %$50 000 $30,214 $30,214 $50,000 $50,000 Q9 000 $100 000 $64,919 $64,919 2 Bonds, insurance, & permits I LS $30,000 $50 000 $50 000 $5,800 $5,800$30 000 $30 000 $11,780 $11,780 $40,000 $40 000 s $15000 $15 000 $16,902 $16,902 , 3 Traffic control including preparation of plans for permit 1 LS $20,000 $25 000 $38,300 $38,300 x$50 000 r $50 000 $21,204 $25,000 $30,000 $30 000 $20 000 $20 000 $48,443 $48,443 4 Geotechnical services during construction 1 LS $10,000 ; $15000 �; $15000 $29,000 $29,000 $6Q 000 $60 000 $17,670 $15,000 $20,000 $20,000 $IS 000 $IS 000 $32,109 $32,109 s« 5 Sewage flow diversion (mobilization & setup) per detail below I LS $10,000 $25 000 $25 000 $35,600 $35,600 $100 000 $100 000 $29,450 $29,450 $20,000 $20 000 3 $15 000 $] 5000 $31,416 $31,416 6 Install 15 -inch VCP sewer main 2,100 LF $640,500 . $390 $609000, $311 $653,100 $215 $451 500 $346 $725,949 $385 $808 500 $400 $840000 $388 $814,800 7 Install 6-inch VCP sewer laterals 4 EA $6,000 ` $3,000 $12,000 $1,900 $7,600 $2500 $10000 $1,075 $4,301 $6,000 $24,000 $2,5,00 ' $10000 $4,701 $18,804 8 Remove existing brick manhole and construct 72 -inch diameter concrete manhole 6 EA $84,000 112,900 $72 000 $12,500 $75,000 $12 500 �' $75 000 $11,604 $69,624 $7,000 $42,000 , �: $11000 $66,000 $19,239 $115,434 9 Pour new manhole base & channel. Core drill and patch manhole walls. 2 EA $16,000 $3,000 $6 000 $11,800 $23,600 $9 500 $19000 $11,727 $23,454 $1,400 $2,800 $4 000 �$8 000 $11,453 $22,906 10 Excavation and safety measures (trench shields & shoring) 1 LS $40,000: $30 000 $30 000 $20,000 $20,000 $60 000 $60,000 $14,136 $14,136 $50,000 $50 000 ;' $25;000 $25,000 $60,483 $60,483 ;- 11 Bristol - Pavement 2" grind and overlay using Type III -C3 -PG 64 -10 41,800 SF $61,446 $1:80 $75,240 $1.70 $71,060 $2 50 $104 800 $1.90 $79,420 $1.40 $58,520 ' $1 70 ,-$71,060 $2.05 $85,690 12 Bristol - Install pavement striping (thereto plastic) 1 LS $4,000 = $25 000 $25 000 $4,640 $4,640 780 $3� $3 780 $7,975 $7,975 $5,000 $5 000 $4 000 $4 000 $5,824 $5,824 13 Bristol - Replace traffic signal loops 14 EA $4,200 $500 ., $7000 $348 $4,872 x.$350 ` �' $4 900 $528 $7,398 $600 $8,400 $i 000 , $14000 $924 $12,934 14 AutoPlex - Pavement 2" grind and overlay using Type Ill -C3 -PG 64 -10 4,000 SF $5,880 $1:80 $7 200 $1.69 $6,760 $3:50 $14 000 $1.65 $6,600 $1.40 $5 600 $1 70 $6 800 $3.27 $13,080 15 AutoPlex - Replace existing concrete curb & gutter 150 LF $6,750 ., $65:00 $9 750 $58.85 $8,828 $32.00 $4 800 $21.20 $3,180 $40.00 $6 000 $50 00 $7 500 $96.68 $14,502 ..: 16 AutoPlex - Replace existing concrete sidewalk replacement 200 SF $3,000 $3000 '$6;00, $36.57 $7,314 $600 $1 200 $27.03 $5,406 $10.00 $2 000 ` $10 00 $2 000 $18.13 $3,626 17 AutoPlex - Repair landscape, irrigation, and related surface improvements 1 LS $5,000 ' $10,000 -' $10 t" $15,000 $15,000 55 000 $5 000 $7,068 $7,068 $20,000 $20 000 $15 000 515 000 $5,459 $5,459 � , 18 AutoPlex - Install pavement striping (conventional) I LS $1,000", $1 500 $1 500 $2,320 $2,320 $600 $600 $4,229 $4,229 $5,000 $5 000 $600 6,, $600 $1,754 $1,754 Totals \a ' �$i,044,28U \\\ $997,776 $1,035,69ti $1,038,294 $1,070,185 $1,197,820 $1,23419" $1,369,085 • Engineer's Estimate & Bid Tabulation ''Owner: COSTA MESA SANITARY DISTRICT Pf' rect: CMSD 129 BRISTOL STREET SEWER REPLACEMENT Bid Date: July 16, 2009 Bid Time: 10:00 a.m. 570457 Bid Average EZIZption Quantity Unit Price Total Price I Mobilization, demobilization, & cleanup 1 LS $43,049 $43,049 2 Bonds, insurance, & permits I LS $24,232 $24,232 3 Truffle control including preparation of plans for permit 11S $43,860 $43,860 4 Geotechnical services during construction I LS $24,585 $24,585 5 Sewage flow diversion (mobilization & setup) per detail below 1 LS $36,098 $36,098 6 Install 15 -inch VCP sewer main 2,100 LF $272 $571,200 7 Install 6 -inch VCP sewer laterals 4 EA $2,178 $8,712 8 Remove existing brick manhole and construct 72 -inch diameter concrete manhole 6 EA $11,263 $67,578 9 Pour new manhole base & channel. Core drill and patch manhole walls. 2 EA $6,332 $12,664 10 Excavation and safety measures (trench shields & shoring) I IS $44,241 $44,241 AIM] Bristol - Pavement 2" grind and overlay using Type ID -C3 -PG 64 -10 41,800 SF $1.85 $77,330 12 Bristol - Install pavement striping (thermo plastic) 1 LS $10,195 $10,195 13 Bristol - Replace traffic signal loops 14 EA $586 $8,204 14 AutoPlex - Pavement 2" grind and overlay using Type III -C3 -PG 64 -10 4,000 SF $2.14 $8,560 15 AutoPlex - Replace existing concrete curb & gutter 150 LF $43.78 $6,567 16 AutoPlex - Replace existing concrete sidewalk replacement 200 SF $17.32 $3,464 17 AutoPlex - Repair landscape, irrigation, and related surface improvements l LS $9,888 $9,888 18 AutoPlex - Install pavement striping (conventional) 1 LS $2,037 $2,037 Total $1,002,464 • ATTACHMENT 2 CONSTRUCTION COST ESTIMATE •7/17/2009 COSTA MESA SANITARY DISTRICT Contract Duration: 2.5 Month(s) BRISTOL STREET SEWER REPLACEMENT 10 Week(s) PROJECT NO. 129 50 Day(s) 400 Hours (MO) (WK) (HR) ON, Y lf^..os 3j item iVo .,�1= G4`.:. �. 0 Q S" ! �. >✓YN'� 4,�� >a DNpdoa� a' o,3.Y...l.r•t:.�Rii'�. ','�id W��'E� Quaetityllnit Cost ` �Tota1 Cost: �- 1 Mobilization, demobilization, & cleanup 1 LS 45.000 45.000 2 Bonds, insurance, & permits 1 LS 25,000 25,000 3 Traffic control including preparation of plans for permit 1 LS 40,000 40,000 4 Geotechnical services during construction I LS 15,000 15,000 5 Sewage flow diversion (per detail below) I LS 100,500 100,500 6 Install 15 -inch VCP sewer main 2,100 LF 225 472.500 7 Install 6 -inch VCP sewer laterals 4 EA 7,500 30,000 8 Remove existing brick manhole and construct 72 -inch diameter concrete manhole 6 EA 15,000 90,000 9 Pour new manhole base & channel. Core drill and patch manhole walls. 2 EA 3,000 6.000 10 Excavation and safety measures (trench shields & shoring) I LS 16,800 16,800 I I Bristol - Pavement 2" grind and overlay using Type III -C3 -PG 64 -10 41,800 SF 2.75 114,950 12 Bristol - Install pavement striping (thereto plastic) I LS 5,000 5,000 13 Bristol - Replace traffic signal loops 14 EA 500 7.000 14 AutoPlex - Pavement 2" grind and overlay using "type III -C3 -PG 64 -10 4.000 SF 2.75 11.000 15 AutoPlex - Replace existing concrete curb & gutter 150 LF 75 11,250 16 AutoPlex - Replace existing concrete sidewalk replacement 200 SF 20 4,000 17 AutoPlex - Repair landscape, irrigation, and related surface improvements 1 LS 2,500 2.500 t8 AutoPlex Install pavement striping (conventional) 1 LS 1,000 1,000 m r 5", 1�+� J yi 'i VK+"' T Z E.i3 IiM A C .iit+vt/NS`TRIiCTii)N GY%ST ``€ x „3 e a y k3v 'I 77"x* ,+i . 'P"i { a '� "" „✓ .� - �W'r`(-�%YN�C,r�,'F�f�`g 'Y 1� 1 Yayt''�`) Oy �' i �4C ` , g rs w �, � 'J � � Y! 3�s•s °- a4V'j`3 h k,. �, 45-1, y J'k a r 99i;SflQ Y 1;�'. }u< `��:v *. i )t12" 11 1 i 5 Notes: 1) Sewer unit cost includes excavation, dewatering, pipe material & intallation, and trench restoration. 2) Fees may vary due to unknown information, codes, and requirements of governing agonies. 3) Construction labor hours and fees based on Caltrans night work and requirements. , �fiv Na '�'; 'L "rz jry ,�. $ Sewer Flow Dive taiisx a %. ., L Quauttty sUttitCost t�Total€ Cost S Sewage flow diversion (mobilization and setup) 1 LS 53,350 53,350 Bypass Pump company mobilization & setup I LS 28,350 28.350 Contractor excavation & installation of pump lines in trench (Bristol Street ) I LS 20,000 20,000 Contractor coordination & assistance to pump company for pipe installation I LS 5,000 5,000 Sewage flow diversion (rental and operation) 2.5 MO 18,860 47,150 Pump #I (centrifigal, self priming, trailer mounted (Q = 500 gpm = 1.12 cts) I MO 5,000 5,000 Pump 42 (centrifigal, self priming, trailer mounted (Q = 500 gpm = 1.12 cfs) I MO 5.000 5,000 - Discharge line (HDPE) assuming two bypass setups (meximum 1500' length each) - -- - - - ._.. - - - -- -- - - -- 1,500 FT /MO 2 3,000 -- - - - - Suction line (Steel) & valves - .. . I MO 1,000 1,000 Emergency phone dialer (cellular) & float system I MO 1,500 1.500 Fuel consumption (assume 24 hr operation at 2 gal/hr at $3.50/gal for diesel) I MO 3,360 3,360 • File: CMSD129 Construction Cost REV 090716.xls Worksheet: CMSD Engineer's Cost Estimate COSTA MESA SANITARY DISTRICT Print: 7/17/2009 r! AGREEMENT BETWEEN THE COSTA MESA SANITARY DISTRICT, ORANGE is COUNTY DEVELOPMENT AGENCY AND CITY OF NEWPORT BEACH REGARDING SEWER IMPROVEMENTS IN THE EAST SANTA ANA HEIGHTS REDEVELOPMENT AREA (Bristol Street Sewer Main) LL / This Agreement, is made and entered into this � day of 6G76 ,2007 by and among the COSTA MESA SANITARY DISTRICT (CMSD), a California sanitary district established pursuant to Health and Safety Code sections 6400 et seq., the ORANGE COUNTY DEVELOPMENT AGENCY (OCDA), a California redevelopment agency established pursuant to Health and Safety Code sections 33000 et seq., and the CITY OF NEWPORT BEACH (CNB or City), a municipal corporation and charter city. The CMSD, OCDA and CNB shall be hereinafter collectively referred to as the "Parties." The Parties enter into this Agreement with reference to the following facts: RECITALS WHEREAS, the East Santa Ana Heights area is an area formerly within the unincorporated area of the County of Orange that is currently in need of additional sewer service; and WHEREAS, the East Santa Ana Heights area is now located within the CNB, having been annexed to said city in July of 2003; and WHEREAS, the CMSD is a sanitary district that provides sewer service to the City of Costa Mesa but also provides services to portions of the unincorporated county area and the CNB with existing sewer facilities in place to serve said East Santa Ana Heights area; and WHEREAS, CMSD, CNB and OCDA, entered into Agreement No. D96 -162 on January 14, 1997, and an amendment thereto on October 24, 2000, specifying the need for CMSD to have expanded sewer facilities to serve the rezoned East Santa Ana Heights area, which area also is located in OCDA's Santa Ana Heights Redevelopment Project area. Under Agreement No. D96- 162, the Parties agreed to cooperate in the design and construction of specific sewer • 758\08 \317247.2 infrastructure improvements in the Santa Ana Heights area, including a new sewer pumping station known as the "South Bristol Street Pump Station "; and 0 WHEREAS, prior to the construction of the proposed South Bristol Street Pump Station envisioned in Agreement No D96 -162, the Manager District/Engineer for the CMSD prepared an Updated Sewer Flow Study & Cost Analysis in February 2003, attached hereto as Attachment 1 (hereinafter referred to as "2003 Updated Sewer Flow Study "). This study determined that the proposed sewer pumping station that was to be constructed under Agreement No. D96 -162 was no longer necessary due to the following: 1) CMSD's installation of improvements throughout the downstream portions of the existing sewer system; and 2) the planned replacement of the existing 8 -inch sewer line with a new 15 -inch gravity sewer main in South Bristol Street from Birch Street northwesterly approximately 2,140 feet. Said improvements and the reasons therefor are more thoroughly set forth in the 2003 Updated Sewer Flow Study; and WHEREAS, the CMSD Board of Directors approved the 2003 Updated Sewer Flow Study at its regular meeting on May 14, 2003, and again on December 10, 2003; and . WHEREAS, the newly identified scope of work for the South Bristol Street sewer improvements outlined in the 2003 Updated Sewer Flow Study represents a significant cost- saving alternative to the OCDA; and WHEREAS, the newly identified scope of work in the 2003 Updated Sewer Flow Study will no longer require construction of more than 4,000 feet of sewer main in Birch Street from Bristol Street northbound to MacArthur Boulevard, thus eliminating the need for the CMSD to conduct the cleaning, operation and maintenance activities on the proposed Birch Street sewer main that had been previously contemplated in Agreement No. D96 -162, as amended; and WHEREAS, pursuant to the 2003 Updated Sewer Flow Study, the CMSD will not be required to construct and maintain an additional sewer pumping facility, as contemplated in the previous Agreement No. D96 -162; and 758 \08\317247.2 2 • h � WHEREAS, the CMSD Manager/District Engineer prepared an updated cost analysis of ithe improvements recommended in the 2003 Updated Sewer Flow Study, which was dated August 2006 and is attached hereto as Attachment 2; and WHEREAS, the CMSD Board of Directors and the Orange County Board of Supervisors have each made the findings required by California Health & Safety Code section 33445 that the Agency payments for the Project (as defined below) are of benefit to the Santa Ana Heights Redevelopment project area, that there are no other means of funding the Project, that the Project will assist in eliminating one or more conditions of blight in the Santa Ana Heights Redevelopment Project Area and that the Project is contemplated by OCDA's implementation plan; and WHEREAS, all Parties will realize substantial savings from this Agreement and the public interest will be served thereby; and WHEREAS, CMSD will conduct such environmental analysis and make such findings as • are required by law and shall obtain an encroachment permit from the City to build the sewer improvements along the portions of the Project Area owned by the City or over which the City has a public right -of -way easement; NOW, THEREFORE, IT IS AGREED, by and between the Parties hereto that: 1. Incorporation of Recitals. The above - written Recitals provide the factual basis underlying and supporting the Parties' desire to enter into this Agreement. 2. Prior Agreements. The previous Agreement No. D96 -162, and the October 24, 2000 Amendment thereto, are hereby terminated and superseded by this Agreement. 3. Project. The Project consists of expanding the existing Bristol Street Sewer System, as outlined in the "2003 Updated Sewer Flow Study and Cost Analysis," attached hereto as Attachment 1 (hereinafter referred to as the "Sewer Improvements" or the "Project "). The 3 758 \08\317247.2 Sealer Improvements will be constructed along South Bristol Street and portions of Irvine Avenue on land that is within either the City's or the County of Orange's public right -of -way. 4. Duties of the CMSD. A. The CMSD agrees to provide design phase services, supervision of contract bidding and award, contract administration and building inspection services for the Project. CMSD agrees to provide said services in accordance with the following schedule: 1. CMSD shall complete the Project design within 270 days of the date that this Agreement is fully signed and delivered to the CMSD; 2. CMSD shall award the construction contract within 90 days of receiving the completed project design; 3. Construction of the Project shall be completed within 180 days of signing the construction contract and the posting of all required insurance and bonds. B. CMSD further agrees to prepare the plans, specifications and estimates for the proposed sewer improvements for an amount not greater than the balance remaining for design phase allocation in Agreement No. D96 -162. As of the time of execution of this Agreement, said balance is approximately $59,123. CMSD agrees to provide three sets of project plans and • specifications to OCDA for review and approval prior to advertisement for bid. C. CMSD shall be the lead agency for purposes of the California Environmental Quality Act (CEQA) and, in such capacity, shall conduct such environmental review as CEQA may require. CMSD shall be responsible for all CEQA costs and expenses. CMSD acknowledges and understands that OCDA has obligations as a responsible agency under CEQA. Consequently, OCDA's funding for the construction of the Project shall be conditioned upon OCDA being able to make the findings required under CEQA for a responsible agency. D. CMSD shall obtain all necessary permits for construction of the Project from federal, state and local authorities. CMSD shall be liable for the cost and expense of obtaining all necessary permits. E. CMSD agrees to obtain an Encroachment Permit from the City for work within the CNB right -of -way F. CMSD agrees to require that the contractor selected to construct the Project shall post a Faithful Performance Bond and a Labor and Materials Bond in an amount sufficient to cover the cost of completing the Project. 4 758 \08\317247.2 •G. Upon completion of the Project, CMSD shall assume the ownership, operation, and maintenance responsibility for the Sewer Improvements. 5. Duties of the CNB. The CNB agrees to be removed from the approval process for the contemplated sewer improvements upon signing of this Agreement. However, CMSD still must obtain an Encroachment Permit from the City, as outlined above. 6. Duties of the OCDA. Subject to the provisions of this Agreement, the OCDA agrees to provide funding for the services described in Paragraphs 3 and 4 above and the Project construction costs upon being provided with an invoice therefor. 7. Estimated Construction Cost. The estimated construction cost of the Project described in Paragraph 3 is $1,147,125. 8. CMSD Cost of Service. The costs for the construction administration and inspection services, including construction staking, for the Project shall not exceed $114,712.50. • CMSD costs shall be billed at the following rates: • a. Engineer $ 85.00 per hour b. Two - person survey crew $220.00 per, hour C. Three- person survey crew $295.00 per hour 9. Approval of Construction Contract Amount. As noted above, CMSD has estimated that the construction costs for the Project will be $1,147,125. CSMD will solicit bids for the construction of the Project. The award of the construction contract shall be subject to the approval of OCDA as follows: After soliciting bids, CMSD shall notify OCDA of the amount of the proposed construction contract. If the proposed contract is in excess of 5% above $1,147,125, OCDA shall notify CMSD to determine if it will fund the excess. Nothing in this Agreement obligates OCDA to agree to fund construction costs for the Project in excess of 5% above $1,147,125. If OCDA decides not to fund the excess, CMSD may agree to fund the excess. If not, then OCDA may terminate this Agreement. 758 \08 \317247.2 5 10. Award of Contract. Assuming OCDA has approved the construction contract 40 pursuant to Section 9 above and the funds to pay the construction costs have been committed by OCDA and, if necessary, CMSD, upon award of the construction contract by the CMSD Board of Directors, CMSD shall send a copy to the OCDA of the construction contract with a copy of the agenda report showing competitive bidding. The information submitted to the OCDA shall include a copy of the successful bidder's bid result and any relevant backup information. Should additional sums be required for change orders above 5% above the base contract amount, CMSD shall' be responsible for the additional sums necessary for the change orders. However, OCDA may provide additional funds for change orders, if CMSD submits a prior written request for approval of the change order to OCDA and OCDA determines, in its sole discretion, to fund the change order costs. If not approved by OCDA, CMSD may nevertheless implement any change order that does not materially change the Project so long as CMSD provides the funding for the change order work. 11. CMSD Contract Administration, Payment and Reimbursement. CMSD shall administer the contract and make progress payments to the contractor for its work. Upon review • and approval of invoices by the OCDA, OCDA shall reimburse the CMSD for all invoices within sixty (60) calendar days of receipt. The CMSD shall reimburse the OCDA for excess funds collected from the OCDA within 60 calendar days of recording the Notice of Completion. In addition, the CMSD agrees to submit to OCDA an accounting report containing the following: a. Copies of all construction progress payments made or invoices paid to contractors and/or consultants where applicable, with copies of construction administration and inspection service billings. b. Copies of all construction change orders approved and all backup documentation (including all change orders for work or bid items deleted from or credited to the project). C. All items shall be summed and totaled to equal the amount paid by OCDA, less any refund amount. 12. Mutual Indemnification. To the fullest extent permitted by law, CMSD and OCDA agree to save, indemnify, defend and hold harmless each other from any and all liability, claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses, or any injury or damage of any kind whatsoever, whether actual, alleged or threatened, actual attorney fees, court costs, interest, defense costs and expenses associated therewith including the use of experts and any other costs of any nature without 0 758 \08\317247.2 restriction incurred in relation to, as a consequence of, or arising out of, the performance of this Agreement, and attributable to the fault of the other or others. Following a determination of the percentage of fault and or liability by Agreement between the parties or a court of competent jurisdiction, the party or parties responsible for liability to the other or others will indemnify the other party or parties to this Agreement for the percentage of liability determined as set forth this section. 13. Indemnifications and Insurance Related to Construction. Notwithstanding said mutual indemnity obligation set forth in Section 12 above, CMSD agrees to ensure that the contractor selected for the Project obtains adequate insurance covering all risks associated with construction of the Project and that the contractor agrees to indemnify and defend OCDA, the County of Orange, the CNB and the CMSD (hereinafter collectively referred to as the "Indemnified Parties ") from any and all liability arising out of its work on the Project, save and except that caused by the active negligence of the Indemnified Parties. CMSD agrees to require that the contractor maintain Comprehensive General Liability insurance in an amount not less than two million dollar ($2,000,000) per occurrence for bodily injury, personal injury, and property damage, including without limitation, contractual liability. If commercial general liability insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement, or the general aggregate limit shall be at least twice the required occurrence limit. CMSD also agrees to ensure that the Contractor maintain automobile insurance covering bodily injury and property damage for all activities arising out of or in connection with work to be performed, including coverage for any owned, hired, non -owned or rented vehicles, in an amount not less than one million dollars ($1,000,000) combined single limit for each occurrence. In addition, the following provisions shall be required: A. OCDA, County of Orange, and CNB shall each be named as an additional insured on an endorsement to said policies. An additional insured endorsement evidencing that the City is an additional insured shall accompany the Certificate of Insurance. CMSD shall not allow contractor to commence work on the Project until such insurance and endorsements are obtained in accordance with the requirements of this section. B. All insurance policies required to be obtained by the contractor shall be primary insurance, and any insurance maintained by the City of Newport Beach and County of Orange shall be excess and non - contributing with insurance provided by these policies. An endorsement evidencing that the contractor's insurance is primary and non - contributing shall specifically accompany the Certificate of Insurance for the Commercial General Liability. 7 758\08\317247.2 14. Amendments. No alterations or variations of the terms of this Agreement shall be • valid unless made in writing and signed by the Parties hereto and no oral understanding or Agreement not incorporated herein shall be binding on any of the parties hereto. 15. Successors and Assigns. The terms and provisions of this Agreement shall be binding upon and inure to the benefit of the Parties hereto and their successors and assigns. 16. Entiret . This Agreement contains the entire agreement between the Parties with respect to the matters provided for herein. 17. SeverabilitY. If any part of this Agreement is held, determined or adjudicated to be illegal, void or unenforceable by a court of competent jurisdiction, the remainder of this Agreement shall be given effect to the fullest extent reasonably possible. 18. Binding Obligation. The Parties to this Agreement represent and warrant that this Agreement has been duly authorized and executed, and constitutes the legally binding obligation of their respective organization or entity enforceable in accordance with its terms. 19. Governing Law and Venue. This Agreement has been negotiated and executed in the State of California and shall be governed by and construed under the laws of the State of California. In the event of any legal action to enforce or interpret this Agreement, the sole and exclusive venue shall be a court of competent jurisdiction located in Orange County, California, and the Parties hereto agree to and do hereby submit to the jurisdiction of such Court, notwithstanding Code of Civil Procedure section 394. Furthermore, the Parties have specifically agreed, as part of the consideration given and received for entering into this Agreement, to waive any and all rights to request that an action be transferred for trial to another county under Code of Civil Procedure section 394. 758 \08\317247.2 C7 • :7 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by their officers thereunto duly authorized on the date first written above: APPRO D AS TO FORM: Y Aaron C. Harp, Asst. City Attorney ATTEST: By: // 1 - A4,4u, LaVonne Harkless, City Clerk APPROVE "S TO FORM: By: Alan R. Burns, ffistrict Counsel APPROVED AS TO FORM: Goldfarb and Lipman LLP Counsel for the Orange County Development Agency 758 \08\317247.2 CITY OF NEWPORT BEACH, A Mu ' C ration and Ch er City By: Steven Rosansky, Mayor E COSTA MESA SANITARY DISTRICT (CMSD) A Body Corporate and Polity By: \, ;' Presidellt By: Secretary ORANGE COUNTY DEVELOPMENT AGENCY A Body Corporate and Politic SIGNED AND CERTIFIED THAT A COPY OF THIS AGREEMENT HAS BEEN DELIVERED TO THE HAIRMAN OF THE BOARD By: {' lene J. Bloom Clerk of the Board of Supervisors of Orange County, California CALIFORNIA ALL - PURPOSE ACKNOWLEDGMENT State of California County of Orange ss. On September 13, 2007 before me, Joan R"Wa , Date Name end Trtle o Officer (e.g.. ane oe, o ery Public-) personally appeared Arthur Perry and Robert Ooten Name(e) of Signer(a) JOAN REVAK Commbslon # 1 525560 N01oy RAft - Ca" M40 Orange County My Comm. Expkss Doc 0, 2000 M personally known to me ❑ proved to me on the basis of satisfactory evidence to be the persono) whose name Ware subscribed to the within instrument and acknowledged to me that Ael`sM /they executed the same in his/her /their authorized capacity()e t4 , and that by h4eer /their signature son the instrument the persor( or the entity upon behalf of which the persores acted, executed the instrument. WITNESS my hand and official seal. gLti� P_z�� Place Notary Seat Above Signature of Notary Public OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(les) Claimed by Signer Signer's Name: ❑ Individual Top of thumb here ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ ,Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: 0 1999 National Notary ASe ialion - 9350 De Solo Ave., PO, Box 2402 - ChatawonR CA 91313.2402 - www.nalionalnotary.ortl Prod. No 5907 Reorder Cell Toll.Free 1800 - 87"827 • is