Agenda Packets - Board - 2010-09-23•
Costa Sax, , d ta X .�p District
... an Independent Special District
Robert ®oten
Vice President
James Ferryman
Director
AGENDA
Arlene Schafer
President
Gary Monahan
Secretary
Arthur Perry
Director
Public Comments. Any member of the public may address the Board. Speakers 'on agenda items should
identify themselves to -the Clerk before the meeting so that their input can beIprovided at the time the item is
considered. Speakers on non - agenda items will be heard under Public Comments. Pursuant to State law, the
'Board may not discuss or take, action on non - agenda items except under special`; circumstances. Speakers must
limit their remarks to three minutes or as decided upon by the Presiding Officer: The Presiding Officer reserves
the right to declare any speaker out of order:
Obtaining Material
g enda g s: The public is entitled to copies of all documents that are made part of the
:agenda packet. If any document or other writing pertaining to an agenda item is distributed to all or a majority; of
the Board after the packet is- prepared, a copy, of'that writing may be obtained'at "the District offices at 628 W.
19'" Street, Costa Mesa, California. The Clerk of the District may be contacted at (949) 645 -8400, ext.'223.
In Compliance with: ADA::,Contact. Joan Revak, :(949) :645 -8400, 48 hours prior to. 'meeting "if. assistance, is
needed (28 CFR' 35.102.35.104 ADA Title ll).
Regular Meeting - Thursday, September 23, 2010
RECOMMENDED
ACTION
CALL TO ORDER — 5:30 p. M. — 628 W. 19'h Street, Costa Mesa
II. PLEDGE OF ALLEGIANCE — Director Monahan
III. INVOCATION — Thomas Fauth
IV. ROLL CALL (If absences occur, consider whether to deem those absences
excused based on facts presented for the absence — such
determination shall be the permission required by law.)
V. Announcement of Late Communications
NOTE: Unless directed otherwise by the Board of Directors, all actions shall be based
on /memorialized by the latest document submitted as a late communication.
Protecting our community's health d y providing solid waste and sewer collection services.
www.crosdcagov
Costa Mesa Sranita.-rN District
AGENDA
•
VI.
i
September 23, 2010
Page 2
RECOMMENDED
ACTION
CONSENT CALENDAR - All matters listed under the Consent Calendar are
considered to be routine and will be enacted in one motion in the form listed below.
There will be no separate discussion on these items prior to the time the Board votes
on the motion, unless members of the Board request specific items to be removed
from the Consent Calendar for discussion, in which event the item will be removed
from the Consent Calendar and considered in its normal sequence on the agenda.
Reports
A. Minute Approval
1. Sewer System Committee Meeting —August 17, 2010
2. Regular Board of Directors Meeting — August 26, 2010
B. Operations Manager's Reports
1. CMSD Occurrences FY 2000 -2010
2. Refunds
3. Occupancy Report and payment to Costa Mesa Disposal —August 2010
4. Waste Diversion Report —August 2010
5. Contract Payment to CR Transfer for Recycling Services & Disposal
for August 2010
6. Ordinance Enforcement Officer's Report
C. Engineer's Reports
1. Project Status Report
2. Howard S. Wright Contractors Invoice in the amount of $27,820.85
D.. Treasurer's Reports
1. Financial Reports as of August 31, 2010
2. Investment Report as of August 31, 2010
3. Warrant Register for the month of August 2010 in the amount of
$602,008.54
4. Directors' Compensation and Reimbursement of Expenses for the
.Month of August 2010
0 ------------------------------------- - - - - -- -END OF CONSENT CALENDAR
Accept Report
No Refunds
Approve
Receive & File
Ratify Payment
Receive & File
Receive & File
Ratify Payment
Approve
Approve
Ratify Payments
Approve Compensation
& Ratify Expenses
Protecting our community's health and the environment by providing solid waste and sewer collection services.
www.crosdcagov
'Costa Mesa Samitaq District
September 23, 2010
AGENDA Page 3
RECOMMENDED
ACTION
VII. WRITTEN COMMUNICATIONS
VIII. PUBLIC COMMENTS
IX. GENERAL MANAGER'S REPORTS
A. Budget Adjustment — Transfer of Six OCSD Lines in the Amount of Approve Budget
$27,065. Adjustment
B. Annexation of Four Islands within the CMSD Service Area Approve Annexations &
Appropriate $3,200 for
OC LAFCO Annexation
Fees
X. RECYCLING COMMITTEE
A. Monday, September 20, 2010, 10:30 a.m. Accept Report
CMSD Board Room, 628 W. 19th Street, Costa Mesa
(Directors Ooten and Perry)
Note; The Recycling Committee will meet on the above date and time to
discuss the matters on a separate agenda which is posted and made a
part of this agenda. Members of the public should refer to that separate
agenda for the items discussed and to be discussed. The Board may
take action on any of those items on this agenda.
XI. ENGINEER'S REPORTS
A. Project No. 168 — Irvine Pumping Station Relocation Accept Improvements,
File Notice of Completion
Exonerate Bonds
B. Project No. 183 -2 — Bristol Street North of Randolph Bid Opening Award Construction to
Lowest Qualified Bidder
XII. SEWER SYSTEM COMMITTEE
A. Tuesday, September 14, 2010, 10: 30 a.m. Accept Report
CMSD Board Room, 628 W. 19th Street, Costa Mesa
(Directors Monahan, Ooten and Perry)
Note: The Sewer System Committee will meet on the above date and time
to discuss the matters on a separate agenda which is posted and made a
part of this agenda. Members of the public should refer to that separate
agenda for the items discussed and to be discussed. The Board may take
• action on any of those items on this agenda.
Protecting our community's Health and the environment by providing solid waste and sewer collection services:
www.crosdcaov
Costa Mesa Sanita-rS District
September 23, 2 010
AGENDA Page 4
RECOMMENDED,
ACTION
XIII. TREASURER'S REPORTS
A. Investment Oversight Committee Meeting, Thursday, September 23, 2010,
5:00 p.m. (President Schafer and Director Perry)
XIV. ATTORNEY'S REPORTS
XV. CLERK OF THE DISTRICT REPORTS
A. Joint Meeting with Midway City Sanitary District Consider
XVI. LOCAL MEETINGS (REMINDER: In accordance with AB 1234 (Gov. Code § 53232.5),
a report is required to be given by a Director for any meeting for which expense
reimbursement of any kind is provided. Note: For meetings for which the per diem
compensation is sought, the Operations Code provides that such compensation is
authorized for each day's service rendered as a Director at the request of the Board (not to
exceed six days in one month), and certain meetings are specified as being eligible as set
forth in District Operations Code § 3.01.030. For meetings not so listed, the Board must
approve the service for it to be eligible for the per day compensation.)
A. Orange County Sanitation District (OCSD) (Director Ferryman) Accept Report
B. Santa Ana River Flood Protection Agency (SARFPA) Accept Report
(Director Perry)
C. Independent Special Districts of Orange County (ISDOC) Accept Report
(President Schafer)
Quarterly Meeting on September 30, 2010 Consider Attendance
D. Local Agency Formation Commission ( LAFCO)
Accept Report
(President Schafer)
E. California Special Districts Association (CSDA)
Accept Report
(President Schafer)
F. California Association of Sanitation Agencies (CASA)
Accept Report
G. Other Meetings Qualifying for Reimbursement under CMSD
Report on Matters
Ordinance No. 55, Operations Code Section 3.01.030
Pertaining to CMSD
XVII. OLD BUSINESS
XVIII. NEW BUSINESS
A. LAFCO Payment in the amount of $18,880.76 Ratify Payment
ORAL COMMUNICATIONS AND DIRECTOR COMMENTS
XX. ADJOURNMENT
Protecting our community's health and the environment by providing solid waste and sewer collection semices.
wuw.crosdcagov
•
•
Meetin Date Item Wmbet
08/23/10 1 VI. A.1.
COSTA MESA SANITARY DISTRICT
MINUTES OF SEWER SYSTEM COMMITTEE MEETING
AUGUST 17, 2010
CALL TO ORDER Board members of the Costa Mesa Sanitary District
met in Committee session on August 17, 2010 at
10:30 a.m. at 628 W. 19th Street, Costa Mesa.
Director Monahan called the meeting to order at
10:30 a.m.
DIRECTORS PRESENT: Gary Monahan, Art Perry, Jim Ferryman
STAFF PRESENT: Scott Carroll, General Manager; Sherry Kallab,
Administrative Manager; Rob Hamers, District
Engineer; , Yefim Tsalyuk, Senior Engineer; Karl
Dulake, Maintenance Supervisor; Paul Guzman,
Inspector; Joe Limon, Inspector
OTHERS PRESENT:
MONTHLY SSO STATISTICS
Mr. Hamers reported no new spills since last month.
OVERSIGHT OF PRIVATE PUMPING STATIONS
Board directed Staff to assemble a private pump station program. A brochure and maintenance
program information form have been developed and provided in the Committee packet. The
form will allow Staff to document discussions with private pump station owners or their
maintenance personnel. Staff provided an updated list of thirty private pump stations. Mr.
Hamers reported the new In -N -Out Burger, replacing Kaplans on Harbor Blvd., will be installing a
pump station. This addition will bring the total number of private stations to thirty one. Mr.
Carroll would like to invite these owners, with their maintenance personnel, to the office to
introduce the program and hopefully obtain voluntary compliance. Mr. Hamers believes CMSD is
the first agency providing this type of program.
COSTA MESA SANITARY DISTRICT
MINUTES OF BOARD OF DIRECTORS SEWER SYSTEM COMMITTEE MEETING
AUGUST 17, 2010
snoeais' -�l'`, PAGE 2
CMSD PUMPING STATIONS
Scott has arranged quarterly meetings to discuss the District's pumping station needs. The
Committee was provided with.a list of the District's pumping station and related discharge points
in the event of a sewer spill. This document provides Staff with sensitive points to check first in
the event of a spill. The meeting will include discussion on issues like corrosion of values and
the amount of time required for preventive maintenance. Director Perry asked if Staff sands and
paints valves and noted those were his duties when he worked a summer job for Moulton Niguel.
Mr. Hamers stated that has not been past practice. Rob noted with the sewer crew the District
now has the manpower to do so. Mr. Hamers agreed the valves look better when they are
painted and they also last longer.
POTENTIAL DIG ALERT REQUIREMENT
Mr. Hamers reported there is a national push to require owners of sewer systems and storm
drains to mark sewer mains, laterals and storm drains as part of the Dig Alert. Currently those
items are exempt, with only force mains being marked. The organization is being funded by
horizontal drilling companies trying to minimize their exposure of drilling through sewer laterals
and will require legislation in Sacramento. Staff provided two handouts and meeting minutes for
review. Mr. Carroll will keep a watch for upcoming legislation. Mr. Hamers stated there have
been a few times gas companies drilled lines through sewer laterals.
SSO ENFORCEMENT OPTIONS AND COMPLIANCE AUDITS •
Jim Fisher, Office of Enforcement, one of the authors of the WDR, has now moved over to
compliance. Mr. Hamers provided a snapshot out of a PowerPoint presentation prepared by Mr.
Fisher reviewing items enforcement will look into. Mr. Hamers brought to the Committee's
attention four categories of collection system audit selection criteria. Mr. Hamers stated the
District looks good in all four of the categories. Mr. Carroll reported District documents are being
assembled into a Library per a list prepared by Mr. Hamers. Mr. Hamers recommended bringing
portions of the document back to the pumping station committee for discussion.
SAN FRANCISCO BAYKEEPER'S LEGAL ACTIONS
The Committee received a printout of the Baykeepers website lawsuit page. Mr. Hamers
reported Baykeepers, and other similar organizations, can sue, under the EPA for sewer spills.
The court can put the agency under consent decree forcing the agency to comply by a certain
date to mitigate the problem. Mr. Hamers noted many agencies' sewer systems are in such bad
shape they would have a difficult time complying.
NEW GREASE TREATMENT METHOD
A truck wash owner in Barstow is taking grease from restaurants and making it disposable so
there is no effect on the sewer system. The system binds solids together to be used as fuel or
for composting and the liquids will be treated and used in the truck wash. Staff is always on the
lookout for new methods to mitigate grease problems. •
J
•
-4 COSTA MESA SANITARY DISTRICT
MINUTES OF BOARD OF DIRECTORS SEWER SYSTEM COMMITTEE MEETING
AUGUST 17, 2010
PAGE 3
`,..!,�r�rGE ATEr9•
#171 IRVINE PUMPING STATION FORCE MAIN REHABILITATION - ADDITIONAL
DISCUSSION
Mr. Hamers provided a proposal from his firm with cost not to exceed $41,286. Mr. Hamers re-
capped when the project was first reviewed, replacement of the pipe was considered, then Staff
met with no -dig contractors and received a cost estimate of under $190,000. There are over
3000 linear feet of sewer line to be re -lined and seven excavations will be required. Mr. Carroll
added he provided the proposal to OCSD Engineer, Jim Herberg, for review. Director Ferryman
questioned if Bruce Mattern still served as reviewer for engineering proposals. Mr. Hamers noted
the percentage for the proposal looks high but the same amount of work is involved as with pipe
replacement. Pipe replacement would cost $1,000,000 and the review work required would be
four percent of construction costs. Normally consultants shoot for around ten percent. The cost of
the liner is so inexpensive it is difficult to obtain the normal percentage. Mr. Carroll stated he is
comfortable with the proposal. The item is on the agenda for the regular Board Meeting.
#185 SYSTEM WIDE SEWER REPAIR — GRADE 5 REPAIRS
The Committee discussed Mr. Hamers proposal for engineering services. for approximately
$60;000 for the first $1,000,000 of grade 5 repairs..The engineering services proposal is less
than six percent of construction costs. The proposal is broken down into hours per location. The
proposal allows nine hours per segment to convey all the necessary information to the
• contractor. Director Ferryman requested the District work with the City of Costa Mesa schedule
regarding moratoriums. Mr. Hamers acknowledged Staff is already checking on moratoriums.
The proposal is also on the regular Board Agenda. Mr. Carroll stated he will have Jim Herberg or
someone Jim recommends to review the proposal to provide backup documentation. Mr. Carroll
noted a typical engineer's rate is around $150 per hour and Mr. Hamers' rate is very reasonable.
Mr. Hamers recommended review by an independent engineer.
CMSD PROJECTS:
PROJECT #101 — WESTSIDE PUMPING STATION ABANDONMENT
OCSD held a kick -off meeting for the project. Staff met the OCSD project manager, reviewed
documentation and went out into the field to review conditions where the OCSD sewer line will
go. Staff is in the process of copying documents to provide to OCSD. OCSD will be meeting with
the City of Newport Beach, as well. The City of Newport Beach will be abandoning their station
on Walk -About Circle. CMSD requested to be named in OCSD's EIR. There is a nice looking
alignment for the OCSD line 19th Street extension. The City of Newport Beach has a water line,
easement and power poles there already. Once OCSD reaches the Santa Ana River they could
go south and tie into District facilities or another option is placing a siphon under the river and
then come up in Plant Two. OCSD will conduct alignment studies and put two or three in the EIR.
OCSD estimates two years for the environmental and around one year for construction.
PROJECT #183 -2 — BRISTOL STREET NO RANDOLF
• The project is out to bid. The bid open is September 7, 2010.
COSTA MESA SANITARY DISTRICT
MINUTES OF BOARD OF DIRECTORS SEWER SYSTEM COMMITTEE MEETING
AUGUST 17, 2010
PAGE 4
PROJECT #187— DISTRICT YARD
Mr. Hamers reported there is an issue with agreements for phone service at the District Yard.
The agreements are one -sided in the vendor's favor. Mr. Carroll agreed it has been challenging
and the District cannot receive certificate of occupancy until the fire alarm system is connected to
the phone lines and tested. The decision was made to go with Bay Alarm, the current provider
for security service at the District headquarters. Bay Alarm's contract is somewhat better than
other vendor's contracts, but even their contract is one - sided. The Committee agreed to move
forward with the agreement. Mr. Carroll reported Khanh Nguyen, City of Costa Mesa Building
Official, agreed to allow 300 compost bins be delivered for storage at the District Yard. One
pallet of bins will be kept at District Headquarters for resident pick up. Joe Limon reported the
Wilson Street Rehab project is out to bid. Mr. Hamers noted we should receive notification from
USGBC by late November or mid December if we received "LEED Platinum" for the Yard
Building.
Project #101 - WESTSIDE PUMPING STATION ABANDONMENT
Mr. Hamers put a small budget together for the first year participation in conjunction with the
OCSD project to attend meetings, studies etc. Mr. Hamers will contact OCSD to find out when
they will name the engineer on the project.
PROJECT #189 — REHABILITATION OF SIX SEWERS TRANSFERRED TO CMSD
Mr. Hamers reported the plans are complete and turned in to the City for plan check.
CMSD SEWER CLEANING PROGRAM - UPDATE
Mr. Hamers reported the last phase of the prior year is almost complete. When the 09 -10
cleaning is complete Staff hopes to have National Plant begin the fiscal year 10 -11 cleaning right
away so they can plug and seal manholes before the rainy season, saving District Staff
additional work.
SSC MEETING SCHEDULE
The next meeting is scheduled for Tuesday, September 14, 2010 at 10:30 a.m.
PUBLIC COMMENTS
There were no public comments.
ADJOURNMENT
Director Monahan adjourned the meeting at 9:45 a.m.
SECRETARY
PRESIDENT
•
C]
s�
•
1-1
11
Meeting Dete_ _ Iterri_Numb6F I
1 09/23110 VI. X 2.
COSTA MESA SANITARY DISTRICT
MINUTES OF BOARD OF DIRECTORS REGULAR MEETING
AUGUST 26, 201.0
CALL TO ORDER The Board of Directors of the Costa Mesa
Sanitary District met in regular session on
August 26, 2010 at 5:30 p.m. at 628 W. 19th
Street, Costa Mesa.
PLEDGE OF Director Ferryman led the Pledge of
ALLEGIANCE Allegiance.
INVOCATION Mr. Fauth gave the invocation.
ROLL CALL DIRECTORS PRESENT: Arlene Schafer, Robert Ooten, Gary
Monahan, James Ferryman, Art Perry
DIRECTORS ABSENT:
STAFF PRESENT: Scott Carroll, General Manager; Joan Revak,
Office Manager /Clerk. of the District; Robin B.
Harriers, District Engineer; Alan Burns, Legal
Counsel; Tom Fauth, Operations Manager;
Jacque Rogers, Acting Treasurer; Sherry
Kallab, Administrative Manager
OTHERS PRESENT Jim Fitzpatrick
449 Broadway
Costa Mesa, CA 92627 -2318
Mike Scheafer
3327 California St
Costa Mesa, CA 92626 -2012
COSTA MESA SANITARY DISTRICT PAGE 2
MINUTES OF THE BOARD OF DIRECTORS REGULAR MEETING
HELD AUGUST 26, 2010
Scott Williams
3465 Santa Clara Circle
Costa Mesa
Paul Rellis, Dean Ruff ridge &
George Lazaruk — CR &R, Inc.
ANNOUNCEMENT OF LATE COMMUNICATIONS
Ms. Revak reported there were no late communications.
CONSENT CALENDAR
Ms. Revak announced a correction to the Minutes of the Regular Board Meeting held July
22, 2010 on page 4, paragraph two removing the word "concessions" and inserting
"expenses ".
Director Ferryman requested the Investment Report under Item D.2. be pulled. Director
Ooten requested pulling item C. 1.
Director Monahan moved to approve the Consent Calendar with the exception of the puller
items. Director Ooten seconded the motion. Motion passed 5 -0.
Director Ferryman questioned the Investment Report of July 31, 2010 and the -loss of
$373,000 and noted there are things to do to minimize that loss by other investments.
Ms. Rogers reported the decrease to the market value was only $40,000 and the remainder
decrease was the adjustment for the outstanding checks. The $40,000 decrease to the
market value translates to a $40,000 paper gain on the value of investments. Director
Monahan moved to approve Item D. Motion was seconded by Director Ooten.
Director Ooten requested discussion of Item C, Engineer's Reports under the Consent
Calendar and requested an Engineer's estimate be included in the data under the
Project Status Report and Staff agreed. Director Ooten moved to approve Item C under
the Consent Calendar. Director Monahan seconded the motion. Motion carried 5 -0.
General Manager Scott Carroll brought up the proposed grand opening of the District Yard
and a tentative date. A date for the grand opening was discussed and a decision to hold
the open house on Saturday, October 30, 2010 at 2:00 p.m. was made.
Director Monahan moved to approve the Consent Calendar with the appropriate revisions.
Director Ooten seconded the motion. Motion carried 5 -0.
0
•
COSTA MESA SANITARY DISTRICT .
MINUTES OF THE BOARD OF DIRECTORS REGULAR MEETING
HELD AUGUST 26, 2010
REPORTS
MINUTE APPROVAL
Minutes of Sewer System Committee
Meeting —July 13, 2010
PAGE 3
The Minutes of the Sewer System Committee
Meeting of July 13, 2010 were approved as
distributed.
Minutes of Recycling Committee Meeting The Minutes of the Recycling Committee
—July 19, 2010 Meeting of July 19, 2010 were approved as
distributed.
Minutes of Regular Board Meeting — July The Minutes of the Regular Board Meeting of
22, 2010 July 22, 2010 were approved with the revision
as noted by Ms. Revak.
Refunds
There were no refund requests for the
month of July 2010.
Occupancy Report and Payment of The Trash Occupancy Count documented
$196,914.34 to Costa Mesa Disposal — no increase for the occupancy report for
July 2010 solid waste collection as of August 1, 2010.
Therefore, the total for July is 21,508 and
the payment of $196,914.34 was ratified.
Monthly Spill Report to State Water The Monthly Spill Report to the State Water
Resources Control Board Resources Control Board (SWRCB) for
August 2010 was accepted as submitted.
Waste Diversion Report for July 2010 The Waste Diversion Report dated .
July 2010 was accepted as submitted.
Contract Payment of $177,818.52 to The contract payment of $177,818.52 to
CR Transfer —July 2010 CR Transfer for recycling services and
disposal for.the month of July 2010 was
ratified as submitted.
Contract Payment of $10,874.81 The contract payment of $10,874.81 to CR
to CR Transfer — Santa Ana Transfer for recycling services and disposal
Heights /Newport Beach — July 2010 for Santa Ana Heights /Newport Beach for .
the month of July 2010 was ratified as
submitted.
COSTA MESA SANITARY DISTRICT
MINUTES OF THE BOARD OF DIRECTORS REGULAR MEETING
HELD AUGUST 26, 2010
Ordinance Enforcement Officer's
Report
ENGINEER'S REPORTS
Project Status Report
Howard S. Wright Contractors Invoice
in the amount of $40,522.77
TREASURER'S REPORTS
Financial Report as of July 31, 2010
Treasurer's Report as of July 31, 2010
Warrant Register for the month of July
2010 in the amount of $1,294,937.75
Directors Compensation &
Reimbursement of Expenses for the
month of July 2010.
PAGE 4
The Ordinance Enforcement Officer's Report
dated August 16, 2010 was accepted as
submitted.
The Project Status Report dated July 2010
was accepted as submitted.
The Howard S. Wright Invoice for work
performed through July 31, 2010 in the
amount of $40,522.77 was ratified as
submitted.
The Financial Report as of July 31, 2010
was accepted as submitted.
The Treasurer's Report as of July 31, 2010
was accepted as submitted.
Warrant Resolution #CMSD 2011 -2 was
approved, authorizing the President and
Secretary to sign the warrant ratifying the
payment of certain claims and demands, and
specifying the funds out of which the same
were paid in the amount of $1,294,937.75
Director Compensation and Expense
Reimbursements for the month of June
2010 were approved and ratified as
follows:
President Schafer: $1,326.00 + $15.00
Vice President Ooten: $1,326.00 +
$575.00
Director Monahan: $442
Director Ferryman: $1,105.00 + $7.50
Director Perry: $1,326.00
END OF CONSENT CALENDAR
is
•
0
COSTA MESA SANITARY DISTRICT PAGE 5
MINUTES OF THE BOARD OF DIRECTORS REGULAR MEETING
HELD AUGUST 26, 2010
WRITTEN COMMUNICATIONS
Ms. Revak reported there were no written communications..
PRESENTATION BY CR &R ON CONVERSION TECHNOLOGY
CR &R representatives were present to give a report on CR &R conversion technology and
Mr. Paul Relis, a former California Integrated Waste Management Board member, gave a
PowerPoint presentation on converting the biodegradable portion of the solid waste
stream to bio -gas. The process is biological and essentially emission free. Mr. Relis
reported good progress has been made since his last update to the CMSD Board.
PUBLIC COMMENTS
President Schafer requested any public comments. Mr. Scott Williams presented a
document requesting the matter of compensation and benefits be placed on the
November 2010 regular Board meeting agenda. Mr. Carroll stated he would respond to
the letter and the item would be placed on the November agenda.
• Mr. Fitzpatrick requested the current agendas and Staff reports be made available on the
District website. Mr. Carroll responded that Staff is in the process of upgrading the
website in an effort to provide that information.
Mr. Fitzpatrick addressed the fact the CMSD Recycling Committee meeting for August
was cancelled and would like a greater lead time if meeting are cancelled. Mr. Carroll
responded the meeting cancellation was posted in accordance with Brown Act
requirements. President Schafer commented the Board of Directors were at a conference
in Monterey and other Staff members were not available for the scheduled meeting.
Mr. Scheafer stated he made the decision to run for a seat on the CMSD Board of
Directors. He also commented he has heard some disparaging comments on the
District's website, however, he visited the site and found it very easy to navigate over the
last couple of weeks. Mr. Scheafer perused the Strategic Plan and complimented the
Board and Staff on the excellent job. As a former CMSD Board member, Mr. Scheafer
stated he feels he has some unfinished business with the CMSD and feels he can bring a
lot to the welfare of the District. As a resident of Costa Mesa, Mr. Schaefer praised all
five of the Board members for their diligence in making sure the money in Costa Mesa is
spent wisely and hopes he will have the opportunity to be a part of that in the future.
•
COSTA MESA SANITARY DISTRICT PAGE 6
MINUTES OF THE BOARD OF DIRECTORS REGULAR MEETING
HELD AUGUST 26, 2010 .
GENERAL MANAGER'S REPORTS
EMERGENCY OPERATIONS PLAN
Mr. Carroll reported Staff has developed an Emergency Operations Plan (EOP) to comply
with state and federal mandates under the Standardized Emergency Management
System (SEMS) and the National Incident Management System (NIMS) and to become
eligible for state and federal reimbursements of response related expenses.
Mr. Carroll reported Senate Bill 1841, in 1993, established the Standardized Emergency
Management System (SEMS) to improve the coordination of state and local emergency
response in California. SEMS is intended to standardize response to emergencies
involving multiple jurisdictions or multiple agencies. It requires agencies to use basic
principles and components of emergency management including Incident Command
System (ICS), multi- agency or inter - agency coordination, the operational area concept
and established mutual aid systems.
Mr. Carroll reported all forms of government in California, including special districts, .come
under the provisions of SEMS and, therefore, must use SEMS in order to be eligible for
state reimbursements for response - related expenses. In 2003, after Hurricane Katrina,
the federal government established the National Incident Management System (NIMS) to
provide a consistent nationwide template that will enable all forms of government along
with the private sector and non - profit groups to work together and cohesively during
domestic incidents. Because California is usually the trend setter for much of the country,
NIMS was established based on the same strategy as SEMS. Local governments,
including special districts, must use NIMS in order to be eligible for federal
reimbursements for response - related expenses.
Mr. Carroll stated it was brought to his attention that in the Emergency Operations Plan
for Field Use Only under the ICS Structure Chart, page 85 the following should be
removed from the chart: Air Operations Branch, Air Support Group and Air Tactical
Group.
Staff recommends adoption of the EOP and direct Staff to begin its implementation. Mr.
Carroll further stated this item supports achieving Strategic Element No. 6.0
Personnel /Organizational Management and Strategic Goal No. 6. 1, Enhance Existing
Safety Plan.
Director Ooten expressed his opinion that when the Board approves the plan and the
District takes it on, Staff needs to be prepared to act on it, follow through and implement
it. Director Ooten stated it is an excellent plan.
Director Ferryman moved to adopt the EOP and to direct Staff to begin its
implementation. Director Perry seconded the motion. Motion carried 5 -0.
•
COSTA MESA SANITARY DISTRICT RAGE 7
MINUTES OF THE BOARD OF DIRECTORS REGULAR MEETING
HELD AUGUST 26, 2010
AGREEMENT WITH THE CITY OF COSTA MESA FOR FLEET MAINTENANCE SERVICES
Mr. Carroll stated on April 22, 2010, the Board of Directors directed Staff to negotiate an
Agreement with the City of Costa Mesa to allow the City to maintain the District's fleet.
District Staff met with City Staff on several occasions in which both sides have come to
terms with an agreement.
Mr. Carroll stated, currently, District fleet is maintained by Nextruck, a private company
located in Costa Mesa at a labor rate of $110.00 an hour. The City of Costa Mesa has
agreed to a labor rate of $73.20 an hour. Under the terms of the Agreement, the City
agrees to perform preventive maintenance and repair work, transmission and cooling
system services, maintain records for Biennial Inspection of Terminals (B.I.T.)., and
inspect all auxiliary equipment. In addition,.the City will provide District Staff with PM
notifications. where the City will notify the District when vehicles are due for service. Mr.
Carroll stated this is important so the District fleet does not fall behind in routine
maintenance procedures and ensures the fleet is operating in peak performance. The
City will also provide the District with computerized maintenance management reports
such as work history and downtime history per vehicle.
Mr. Carroll stated this item supports achieving Strategic Element No. 3.0, Partnership,
• and Strategic Goal No. 3.2 Strengthen our ties with the Cities of Costa Mesa, Newport
Beach and the County of Orange.
Director Ooten moved to approve the Agreement.with the City of Costa Mesa for Fleet
Maintenance. Director Perry seconded the motion. Motion carried 5 -0.
PURCHASING ORDINANCE
1. Resolution No. 2010-789' Electing to Become Subject to the California
Uniform Public Construction Cost Accounting, Act
Mr. Carroll stated the Board directed Staff to produce a revised purchasing ordinance
and a resolution for conforming to the California Uniform Public Construction Cost
Accounting Act (UPCCAA). Mr. Carroll presented CIMSD Resolution No. 2010 -789 —
Electing to Become Subject to the California Uniform Public Construction Cost
Accounting Act.
Director Ferryman moved to adopt Resolution No. 2010 -789. Director Ooten
seconded the motion. Motion carried 5 -0.
•
COSTA MESA SANITARY DISTRICT PAGE 8
MINUTES OF THE BOARD OF DIRECTORS REGULAR MEETING
HELD AUGUST 26, 2010 •
2. Ordinance No. 78 — Repealing Chapter 4.05 from the Operations Code &
Establishing a new Ordinance for Competitive Bidding and Purchasing.
Director Monahan moved to adopt Ordinance No. 78 — Repealing Chapter 4.05
from the Operations Code & Establishing a new Ordinance for Competitive
Bidding and Purchasing. Director Ooten seconded the motion. Motion carried 5 -0.
UPDATE OPERATIONS CODE
Mr. Carroll noted the Board adopted new Ordinances and revised existing Ordinances in
the last six months and in the past six months along with some additional recommended
revisions. The updated version of the Operations Code include
Ordinance No. 75 — Plan Check, Inspection, Permit and Annexation Fee
Ordinance No. 76 — Fixture Fees
Ordinance No. 77 — Administrative Citation System
Ordinance No. 78 — Purchasing
Mr. Carroll gave an analysis of the updated Operations Code.
Discussion was held on the recommended changes to the Operations Code, including •
special procedures to avoid conflicts in engineering decisions.
Ms. Rogers read a statement from District Treasurer, Marc Davis: "I strongly disagree
with the changes to Operations Code sections 3.01.090(e), 3.01.090(g), 3.02.040,
4.01.010, 4.01.040, and 4.05.020. The proposed changes to these sections moves
functional responsibility from the Treasurer to the General Manager. The types of
responsibilities moved include the ability to open bank accounts, approve warrants for
payment in advance of Board approval, and serve as a signatory on the checking
account. These are all clear functions that are normal and customary for a Treasurer to
perform. As a partner in a national CPA firm that audits numerous municipalities and
special districts, and the firm's technical expert in internal control audits, I have never
seen these types of treasury functions performed by a General Manager in my 25+ years
of experience. When the District broke away from the Qity, it put into place several critical
internal control components. These were necessary as the District is a very small
organization with limited staffing. The purpose of these internal control measures is to
provide adequate checks and balances so that no one individual has too much authority
to effect a transaction from beginning to end. With the reorganization, one of these
internal control components was eliminated. The eliminated internal control component
was for the Treasurer to review the invoices and payroll once they were entered into the
system and prior to payment to ensure they were properly supported, budgeted and
correctly classified. With the reorganization, this function was moved to the
Administrative Manager, whose workload is such that there is often times not adequate
time to perform a quality review. Eliminating internal controls directly increases risk of
loss. These proposed changes to the Operations Code will further erode the few checks
•
COSTA MESA SANITARY DISTRICT PAGE 9
MINUTES OF THE BOARD OF DIRECTORS REGULAR MEETING
HELD AUGUST 26, 2010
and balances that are in place for such a small organization, and greatly increase the risk
of theft, fraud and abuse due to a lack of adequate segregation of duties. Internal
controls are put into place to help minimize these risks. I recommend that the Board not
approve the proposed changes for these 6 sections of the Operations Code. Should the
Board elect to approve these changes, then it needs to be clearly comfortable with the
increased exposure it is creating."
Mr. Carroll stated he spoke with Mr. Davis on these matters and agrees there must be
checks and balances in place and intends to consult with the auditors on these changes.
Director Monahan questioned the need to vote for approval of the new Code at this time.
The Board requested the revised Operations Code be brought back to the Board at the
September 2010 meeting.
REFUSE RECYCLING COLLECTION STUDY
Mr. Carroll reported Staff -has been meeting with City of Costa Mesa officials to discuss
refuse /recycling collection services, specifically, franchise fees; wear and tear on Costa
Mesa streets caused by heavy -duty sanitation vehicles; having one exclusive franchise
hauler for both residential and commercial services; rates and competitive bidding. City
• and District Staff agreed a study conducted by an outside professional consultant on the
current refuse /recycling collection services will.be beneficial and can assist both agencies
plan for the future in solid waste collection services. Mr. Carroll stated the Staff
recommendation is to hire a professional consultant to conduct a study on
refuse /recycling collection services and appropriate $75,000 from the Solid Waste
Reserves.
Director Ferryman stated $75,000 is a lot of money to conduct a survey financed by the
District and is against appropriating funds for this purpose without City participation in the
cost. Director Monahan expressed the opinion the City would not be inclined to
participate in the cost of a survey and moved to continue the item to the CMSD
September 2010 meeting and direct the General Manager to work with the City of
Newport Beach on a joint study.. Director Perry seconded the motion. Motion carried
5 -0.
CR &R EVALUATION REPORT
Mr. Fauth reported on the Contractor Performance Evaluation for CR &R and noted
improvements from last year, specifically in last year's evaluation there were 4 "excellent"
ratings and this year there are eight. Trash Revenue Accounting is an area where CR &R
is expected to provide accounting of recycling revenue in .a timely manner and validate
the CMSD has the Most Favorable Rate for comparable collections and processing.
The evaluation noted missed collection complaints were below three per month for all
months; response to CMSD correspondence by CR &R staff improved this fiscal year, with
the exception of occupancy and additional barrel revenue reporting. Documentation
COSTA MESA SANITARY DISTRICT PAGE 10
MINUTES OF THE BOARD OF DIRECTORS REGULAR MEETING
HELD AUGUST 26, 2010 •
deliveries including weight tickets has been satisfactory, however, invoices required
correction. Contractor and District liaison representatives have effectively and efficiently
interacted to resolve many issues before they became problems and in support of special
requests.
Mr. Burns noted the agreement with CR &R, Inc., paragraph 34 provides that Contractor
shall make available to District its audited financial statement which shall include internal
trail reports, such financial statements shall show revenue derived from all recycled
materials. Such financial statements shall not become public record and District will use
best efforts to protect that information from competitors.
RECYCLING COMMITTEE
The meeting of Monday, August 23, 2010 was cancelled.
ENGINEER'S REPORTS
PROJECT #171 IRVINE FORCE MAIN REHABILITATION - PROPOSAL TO BEGIN DESIGN PHASE
Mr. Hamers presented a proposal for Engineering Design Services for rehabilitating the
existing 14" ductile iron (DIP) force main by inserting a 12" high density polyethylene
(HDPE) pipe inside the 14" line. Director Perry moved to approve the proposal to begin
design phase of Project #171, Irvine Force Main Rehabilitation. Director Monahan
seconded the motion. Director Ooten requested Mr. Hamers to check with the
Metropolitan Water District and coordinate with Mesa Consolidated Water District.
Director Perry moved to add these suggestions to the motion. Director Monahan
seconded the revised motion. Motion carried 5 -0.
PROJECT #185 SYSTEM WIDE SEWER RECONSTRUCTION PHASE .I - PROPOSAL FOR
ENGINEERING DESIGN SERVICES
Mr. Hamers presented a proposal for Engineering Design Services for preparing plans
and specifications and placing the project out for formal bids for reconstructing the first 64
Grade 5 sewer deficiencies. Director Ooten moved to approve the proposal for
Engineering Design Services for Project #185 System Wide Sewer Reconstruction
Phase I. Director Ferryman seconded the motion. Motion carried 5 -0.
SEWER SYSTEM COMMITTEE
Director Monahan reported on the Sewer System Committee meeting held on Tuesday,
August 17, 2010. No sewer spills occurred in the reporting period. Brochures on
oversight of private pumping stations were provided. Potential Dig -Alert requirement to
mark sewer mains and private laterals was discussed. SSO Enforcement Options and
Compliance Audits were discussed and Mr. Hamers reported a WDR "Library" has been
prepared to ensure the District is in compliance in the event of an audit.
r�
U
COSTA MESA SANITARY DISTRICT PAGE 11
MINUTES OF THE BOARD OF DIRECTORS REGULAR MEETING
HELD AUGUST 26, 2010
CMSD Projects were disussed and an update on the CMSD sewer cleaning program was
provided. The next meeting of the Sewer System ommittee is September 14, 2010 at
10:30 a.m.
TREASURER'S REPORTS
Ms. Rogers presented a communication from Auditors, Diehl, Evans & Company, LLP
stating they are engaged to audit the financial statements of the Costa Mesa Sanitary
District for the year ended June 30, 2010 and disclosed their responsibilities under U. S.
Generally Accepted Auditing Standards. The audit will begin on approximately
September 20, 2010 and the report will be issued approximately November 30, 2010.
ATTORNEY'S REPORTS
HUB V. CITY OF COMPTON
Mr. Burns reported on a case on campaign contribution supports.conviction related
to trash franchise. The Court noted: "The fact that persons or entities make
• campaign contributions to officials who favor a particular position or who support
the donee does not prove illegality. But.illegality is proven if there is an
understanding that a payment is made in anticipation of political favor or on
account of favors given and then only if the political act.was made on account of
the payment or agreement to pay. This may be, but rarely is, shown by direct
evidence of a scheme to repay an official's award of a public contract through
campaign contributions made by the contracting entity. It also may be shown by
circumstantial evidence."
GOVERNMENT CODE SECTION 53065.5
Mr. Burns made the Board and Staff aware of the obscure law that requires an
annual listing of every expense reimbursement of $100 or more for an "individual
charge" such as for transportation, registration, meal or lodging bill. This law only
applies to special districts. It applies to both the governing body and any
employee. It is satisfied by an annual listing in a public agenda. Mr. Burns
provided a copy of Government Code Section 53065.5
CLERK OF THE DISTRICT REPORTS
LARGE ITEM COLLECTION PROGRAM - 2010
Ms. Revak presented the final report on the 2010 Large Item Collection Program.
The program concluded on August 20, 2010. The landfill tonnage totaled 295..96
tons at a total cost of $8.343.93. Recyclable White Goods collected totaled 50.50
tons, amounting to a credit of $2,050.94 ($40.61 /ton) and a net cost to the District
COSTA MESA SANITARY DISTRICT PAGE 12
MINUTES OF THE BOARD OF DIRECTORS REGULAR MEETING
HELD AUGUST 26, 2010
of $6,292.99. Ms. Revak provided a weekly progress report of the 2010 collection
as well as a historical perspective of the program from 1997 through 2010.
ELECTION - NOVEMBER 2, 2010
Ms. Revak reported the filing date for the November 2, 2010 closed. There are
four candidates for the three open seats in the Costa Mesa Sanitary District.
Incumbents Arlene Schafer and Robert Ooten are running as well as Jim
Fitzpatrick and Mike Scheafer. Ms. Revak provided election information and
Candidate Statements for each of the four candidates.
LOCAL MEETINGS
ORANGE COUNTY SANITATION DISTRICT (OCSD)
Director Ferryman reported the OCSD meeting was held August 25, 2010. Mr.
Ruth has reorganized and fine -tuned the hierarchy in the management team at
OCSD.
SANTA ANA RIVER FLOOD PROTECTION AGENCY (SARFPA)
Director Perry stated there was not a meeting of the Santa Ana River Flood
Protection Agency this month.
INDEPENDENT SPECIAL DISTRICTS OF ORANGE COUNTY (ISDOC)
President Schafer attended a Board meeting on August 3, 2010 and a nominating
committee was appointed on July 29, 2010. The next quarterly meeting will be
held on September 30, 2010 and the election will be held at the meeting.
LOCAL AGENCY FORMATION COMMITTEE ( LAFCO)
President Schafer reported LAFCO held a strategic planning meeting on
August 11, 2010 at the Ebel[ Club in Santa Ana.,A closed session evaluation of
the Executive Director, Joyce Crosswaite was held.
CHAMBER OF COMMERCE
President Schafer reported on a meeting held on July 7, 2010 with State, Council,
Utilities and CMSD where discussion with all representatives occurred.
•
COSTA MESA SANITARY DISTRICT PAIGE 13
MINUTES OF THE BOARD OF DIRECTORS REGULAR MEETING
HELD AUGUST 26, 2010
CALIFORNIA SPECIAL DISTRICTS ASSOCIATION (CSDA)
President Schafer reported on CSDA meetings she attended on August 1,0 and
August 12 -13. President Schafer will be attending a Fiscal Committee meeting on
August 27, 2010. President Schafer continues to work with the Sacramento office
on the Annual Conference in September 2010 at the Newport Beach Marriott.
WACO
The WACO meeting was held on August 6, 2010 and President Schafer gave a
report on CSDA.
CALIFORNIA ASSOCIATION OF SANITATION AGENCIES (CASA)
President Schafer, Directors Ooten, Ferryman and Perry and General Manager
Scott Carroll attended the CASA Annual Conference in Monterey. The CMSD
received Honorable Mention for its submittal. of the Telephone Book Recycling
Program for Schools.
OLD BUSINESS
• NEW BUSINESS
There was no new business.
ADJOURNMENT
President Schafer adjourned the meeting at 8:05 p.m.
Secretary
•
President
I
Meetin Date I Item Number
09/23/10 1 VI. B.
COSTA MESS SAN, Y,Y s9� 7aD IZICz
Memorandum
To: Board of Directors
... an Independent Special District
Via: Scott Carroll, General Manager
From: Thomas A. Fauth, Operations Manager cl;"
Date: September 23, 2010
Subject: Operations Manager's Report
Summary
This report summarizes major points for six operations topics covering Sanitary Sewer
Overflows, Refunds, Occupancy, Waste Diversion, CR Transfer Contract Payment,
® CMSD Ordinance Enforcement Officer's Report, Composting Presentation at the OC
Fairgrounds Silo Building and Operations Adjustments Due to Personnel Changes.
Staff Recommendation
The Board of Directors takes the following action:
• Approve Analysis Item 3.
• Ratify Analysis Item 4.
• Receive and file Analysis Items 1, 2, 5, 6, 7 and 8.
Analysis
1. Monthly Public SSO Report to State Water Resources Control Board: One
Sanitary Sewer Overflow (SSO) occurred during this reporting period. The
total number of Public SSOs for CY 2009 remained at 4 and there are 4
Public SSOs in CY 2010. The last SSO occurred on August 29, 2010 when
two SCE power transformers failed at the Sea Bluff PS causing 100 gallons
of sewage to spill from a public manhole cover, but it was fully contained
when 50 gallons were vactored and returned to the sanitary sewer and 50
gallons soaked into the ground near Sea Bluff. Pump Station. No effluent
• entered the storm drain or state surface waters. In summary, there were 4
Protecting our. community's health and the environment by providing soW waste andsewer collection services.
www.crosdcagov
Board of Directors
September 23, 2010
Page 2 of 4
Public SSOs in CY 2009 and 7 Public SSOs in CY 2008 continuing the
downward trend. Reviewed at the 9 -14 -10 Sewer System Committee.
2. Refunds: No Refunds for August 2010. Reviewed at the 9 -20 -10 Recycling
Committee Meeting.
3. Occupancy Report and payment to Costa Mesa Disposal — August 2010:
Trash Occupancy Count totals 21,516 for August 2010, an increase of 8
from July 2010. The rate of $9.1554 per unit results in a payment of
$196,987.58 to be ratified on the October 2010 warrant list. Reviewed at the
9 -20 -10 Recycling Committee Meeting.
4. Waste Diversion Report — August 2010: Of 3,423.73 Total Tonnage CR &R
collected from the City of Costa Mesa, part of Newport Beach and
unincorporated areas of Orange County within the District, 1,726.74 tons
(50.43 %) were diverted (recycled) and 1,696.99 tons were landfilled. Note
the diversion rate remained nearly consistent throughout the calendar year.
Reviewed at the 9 -20 -10 Recycling Committee Meeting.
5. Contract Payment to CR Transfer for Recycling Services & Disposal for July
2010: Payment of $52.22/Ton for 3,423.73 Total Tonnage collected from the
District results in a Total Payment of $178,787.17 for August 2010. The total
tonnage of refuse collected in August 2010 represents a decrease of 159.70
tons from the 3,613.43 tons collected in July 2010. Reviewed at the 9 -20 -10
Recycling Committee Meeting.
6. Ordinance Enforcement Officer's Report: Isidro Gallardo continued
enforcing proper trash container storage along with the City of Costa Mesa
Code Enforcement Officers. Isidro summarized his courtesy notice
distributions for first -time and second -time notices by major one -third District
subdivisions. The subdivisions are South of Wilson St, Wilson St to Adams
Ave. and Adams Ave. to Sunflower Ave. From January 2010 to July 2010,
the District OEO and the CCM CEOs have issued 1038 1St Courtesy Notices
and 295 2nd Courtesy Notices with 0 Courtesy Letters and 0 citations. (The
District OEO Notices alone are 714 and, 131 respectively.) The OEO
followed the CMSD Operations Manager developed "Administrative
Guidelines" for a CMSD Enforcement Official to encourage voluntary
compliance with the District Operations Codes through a three -step process
prior to issuing a citation. Further, since the release of the CMSD "Summer
Newsletter July 2010 ", several residents called in to report scavengers in
and around the following streets:
a.
Federal Avenue,
b.
Gibraltar Avenue,
c.
Killybrooke Lane,
d.
Broadway Avenue, and
e.
Corona Lane.
•
.J
•
Board of Directors
August 26, 2010
Page 3of4
• The OEO increased surveillance in these areas to deter scavenging, but a
large percentage of the scavenging is performed very early in the morning.
This suggests a better approach might include advertising to residents to
place their trash containers out the same morning of collection rather than
the night before to help decrease the scavenging. The District OEO placed
extra attention to multi - family residences on Wilson Street for voluntary code .
compliance regarding standardized container storage on non- collection
days. Reviewed at the 9 -20 -10 Recycling Committee Meeting.
7. OC Fairgrounds Silo Building Composting Presentation: Dr Francene Kaplan
presented a Composting Workshop to 65 residents at the Orange County
Fairgrounds Silo Building on 9- 14 -10. at 7:30 p.m. in support of the
Gardeners' Club and the $143,256 OC Waste & Recycling Composting
Grant. Your Operations Manager distributed 15 Earth Machines at the
evening event and Staff will provide free worm bins to those interested in
vermicomposting. Reviewed at the 9 -20 -10 Recycling Committee Meeting.
8. Operations Adjustments Due to Personnel Changes: The General Manager
is working with the Operations Manager and Personnel Manager to hire a
Lead Maintenance Worker to assist with the duties the Maintenance
Supervisor vacated upon his resignation on 9- 14 -10. The Operations
Manager assumed responsibility for all day -to -day, operations, CMSD Yard
finalization, vehicle maintenance through the City of Costa Mesa,
acquisitions, First- Responder duties for SSOs and direct field crew
supervision. The District Engineer assumed full responsibility for Sewer
Lateral Assistance Program CCTV reviews, evaluations and customer
feedback in addition to scheduling newly found and necessary repairs to the
CMSD sewer system. Field Crewmen accepted greater responsibility in
maintaining the pump stations and main sewer lines through Operations
Manager's Work Assignment Forms. The General Manager and Personnel
Manager assumed contract preparations for vehicle maintenance, small
sewer repairs and consulting services.
Strategic Plan Element & Goal
Not applicable.
Legal Review
None.
Financial Review
The cost to Costa Mesa Disposal for collecting refuse within District boundaries is
$196,987.58. Funds for this expenditure and encumbrance are within the Approved
FY 2010/11 Budget.
Board of Directors
September 23, 2010
Page 4 of 4
The cost to CR Transfer for recycling services is $178,787.17. Funds for this
expenditure and encumbrance are within the Approved FY 2010/11 Budget.
Committee Recommendation
Analysis Items 2, 3, 4, 5, 6 and 7 are ongoing solid waste operations topics and were
reviewed at the Recycling Committee Meeting on September 20, 2010. Any comments
and /or recommendations from the committee will be brought forward to the Board for
discussion at tonight's meeting.
Public Notice Process
Copies of this report are on file with the entire agenda packet at District Headquarters.
Alternative Actions
1. Refer the matter back to Staff for more information.
Financial Reviewed by:
b C
Sherry Kallab
Administrative Manager
•
r1
LJ
•
•
OPR: CMSD, Thomas A. Fauth
714- 393 -4433
•
CMSD Occurrences CY00 -10
•
Prepared 9 -3 -30
12/30/2008
Date
Sanitary Sewer Overflow Occurrence Report Summary, CY2008
SSO EVENT ID
Private District Est Total Spill Completely
Event Line Line # Gallons Contained ?
Uncontained
Est # Private
Gallons Spilled
into Storm drain
Uncontained
Est # Public
Gallons Spilled
into Storm drain
1/2/2008
PRIVATE Pum p Station Failure,151 Kalmus Dr, Copper Tree Bus Park;
80025
90244
2,000
N
1600
100
1/20/2008
Sea Bluff PS Air Bubbler Failure; 30 Sea Terrace Lane;
80575
113
N
113
1/28/2008
Roots Blocked Main Line, CCM Cleaned Site, 1939 Sanderlin Ctr;
81341
20
Y
21712008
FOG Blocked Main Line Siphon on Paularino. 3012 -3036 Enterprise.
81171
55
N
5
2/26/2008
Debris & Roots Blocked Main Line, 2040 President Place;
90919
81613
450
Y
3/18/2008
Grease blocked PRIVATE Lateral - Yardhouse - 1875A Newport Blvd
82152
2,100
N
1800
3/18/2008
Roots/Debris Blocked PRIVATE Lateral, 700 W 16th St
82153
37
N
37
4/312008
President PS -SCE Transformer, 2034 President PI, PS MH to Park
93619
82546
360
Y
510
5/512008
PRIVATE Above Ground Clean Out Broken - AMTEK, 960 W 16th St
83276
20
N
20
7/25/2008
Roots Blocked PRIVATE Lateral - Uncapped CO - 674 Park Drive
85433
20
N
10
7/26/2008
Grease /Debris Blocked PRIVATE Lateral 3400 Ave of Arts-Heritage
85463
100
N
10
8/22/2006
PRIVATE Pump Stabon Failure, 151 Kalmus Dr, Copper Tree Bus Park; Repeat;
86141
85
Y
9/4/2008
Roots/Debris - PRIVATE SSO - Uncapped CO - 1010 Valencia St
86477
2
1,050
N
52
10/24/2008
FOG & Rock Debris in Private Lateral - The Camp 2937 Bristol St
87699
1,275
N
75
12/23/2008
FOG Blocked Main Line Drop Manhole. 2752 San Juan Lane;
89101
30
Y
12/26/2008
FOG Blocked Lateral Line - May Gardens - 1400 Bristol St: Repeat:
89158
690
Y
12/30/2008
Unknown Debris Blocked Main Line - 1895 Swan Circle
6
89253
10
Y
Total # Gallons
1,476
760
1 5301
186
Percentages
KEY:
51.49%
1 35.91%
1 12.60%
GREASE
6
4
2
ROOTS
5
3
2
PUMP STN
2
2
OTHER
1 4
3
1
TOTALS
1 17
10
7
Total # Gallons
8,4151
4,693
3.6041
118
Percenta es
100.00%
1 55.77%
1 42.83%
1 1.40%
10/20/2009
Date
Sanitary Sewer Overflow Occurrence Re port Summary, CY2009
SSO EVENT ID
Private District Est Total Spill Completely
Event Line Line # Gallons Contained ?
Uncontained
Est # Private
Gallons Spilled
into Storm drain
Uncontained
Est # Public
Gallons Spilled
into Storm drain
1/1112009
Irvine PS Failure/SW - SCADAIann Did Not Call - 2149 Anniversary Lane:
90244
t00
N
100
1/1612009
FOG Debris Blocked Main - Increased Hotspot -1 /mo. Bristol St & 55 Freeway,
90383
86
N
86
1/26/2009
FOG Blocked Main Line near 2831 Bristol St: Italian Restaurant Upstream.
90785
10
Y
1/29/2009
Irvine PS Failure/SW - SCADAIann Did Not Call - 2149 Anniversary Lane,
90922
50
Y
1/30/2009
PRIVATE Septic Tank Failed -Moon River Massage Parlor -2138 Newport Blvd;
90919
20
Y
3/31/2009
PRIVATE CO - Chicken Koop Restaurant - Sal: 9/645 -6086 - 432 Hamilton St;
92681
90
Y
4/21/2009
FOG blocked PRIVATE Lateral - Clean Out - FSE Strip Mall - 570 W Wilson St.
93618
10
Y
4/21/2009
Dia er & Debris blocked PRIVATE lateral - 327 West Wilson St;
93619
510
N
510
7/11/2009
Paper Products blocked PRIVATE lateral - 3190 Harbor Blvd - Chevron Station
94946
300
N
20
10/20/2009
Grease Blocked GI at 7 -11, RoundTable, FlameBroiler - 204 E 17th St
97151
300
Y
KEY:
GREASE
4
2
2
ROOTS
1
1
PUMP STN
2
2
OTHER
3
3
TOTALS
10
6
4
Total # Gallons
1,476
760
1 5301
186
Percentages
100.00%
51.49%
1 35.91%
1 12.60%
of 7
N
w=
1
CD
O
m
rD
�3
Z
C
3
c
OPR: CMSD, Thomas A. Fauth CMSD Occurrences CY00 -10 Prepared 9 -3 -10
714 - 393 -4433
8/29/2010
Date
Sanitary Sewer Overflow Occurrence Report Summary, CY201
SSO EVENT ID
Private District Est Total S ill Completely
Event Line Line # Gallons Contained ?
Uncontained
Est # Private
Gallons Spilled
into Storm drain
Uncontained
Est # Public
Gallons Spilled
into Storm drain
5/11/2010
FOG Debris Blocked Main Line - Fully Contained & Vactored - 1616 Iowa St
102953
15
Y
0
7/1512010
FOG Debris Blocked Main Line - Fully Contained - 2037 National Ave
103995
104377
40
435
Y
Y
0
0
=Power
105307
100
Y
KEY:
GREASE
2
2
ROOTS
0
PUMP STN
0
OTHER
2
2
TOTALS
4
0
4
Total # Gallons
590
590
0
0
Percentages
i 100,00%
100.00%
0.00%
0.00%
0 0 Wf7
Meetinq Date Item Number
08/23/10 Vi. B. 2.
SANIT�gy
COSTA TAJZY
MESA
f
DisTRxT
... an Independent Special District
Memorandum
To:
Board of Directors
From:
Debbie Bjornson
Date:
September 1, 2010
Subject:
REFUND REQUEST FOR BOARD APPROVAL
There are no refund requests for the month of August 2010.
•
Debbie Bjornson
Permit Processing Specialist
Protecting our community's health by providing solid waste and sewer collection services
costamesasanitarydutrict.org
Board of Directors
Arlene Schafer
Robert Ooten
Gary Monahan
Arthur Perry
Junes Ferryman
Staff
Scott C. Carroll
General Manager
Robin B. Hamers
District Engineer
(949) 631 -1731
Joan Revak
fce Manager
of the District
Meeting Date Item Numb @r
09/23/10 VI. B. 3.
Costa ML1.0a Sanitaq asunct
... an Inbepenbent Special District
September 1, 2010
Board of Directors
Costa Mesa Sanitary District
628 W. 19th Street
Costa Mesa, CA 92627 -2716
SUBJECT: TRASH OCCUPANCY COUNT
Dear Board of Directors:
There has been an increase of 8 units for the occupancy report for solid waste
collection as of September 1, 2010; therefore, the total occupancy count for
September 1, 2010 is 21,516
Staff recommends the following:
1. The Board of Directors accepts the occupancy count as presented
Alan R. Burns using 21,51.6 as the correct number of units.
Legal Counsel
2. The Board of Directors directs staff to prepare a warrant to Costa Mesa
Marcus D. Davis Disposal for September collection based on this occupancy report so long as the
Treasurer contractor fulfills the obligations of the agreement. Said payment in the
amount of $196,987.58 to be ratified on the October, 2010 warrant list.
Phone
(949) 645 -8400
Fax
(949) 650 -2253
Address
628 YV. 19th Street
Costa Mesa, CA
92627 -2716
4rs
4 Printed on
Recycled Paper
Sincerely,
d4doC14A#-
Thomas A. Fauth
Operations Manager
cc: Costa Mesa Disposal
Debbie Bjornson.
Permit Processing Specialist
Protecting ow wwnuoutV s " and the environment &N prumdTMfl solid waste and sewer cofeMon services.
www.crosbea.gov
OCCUPANCY CHANGES
August, 2010
EXISTING'
A.P.N. No. ADDRESS STATUS CHANGE NEEDED
CHANGED OCCUPANCY
422 - 103 -34 527 Bernard St. new service 4 units Aug -10 4
422 - 103 -33 531 Bernard St. new service 4 units Aug -10 4
Total for August
8
is 0 Is
r CR Transfer
•
•
To: Joan Revak
From: CR Transfer Inc.
Jurisdiction: Costa Mesa Sanitary District (9)
MonthNear: Aug -10
Recycling Report
** Note: This material includes food / small particulate
and inert material.
Total Tonnage
Recycled Tonnage
Landfill Tonnage
County &
Rec cle
Tons
Commodity
Percentage
Recycled
1640.81 85.93
1726.74
1613.82 83.17
Newspaper
7.88%
256.47
Cardboard
6.42%
208.85
Mixed Paper
5.13%
166.86
Glass
2.80%
91.11
PET.
0.59%
19.12
HDPE
0.45%
14.62
Aluminum Cans
0.33%
10.87
Non - Ferrous Metal
.0.44%
14.25
Tin/Metal
0.65%
21.00
Greenwaste
9.78%
318.34
Organic / Fines **
12.67%
412.45
Wood
1.41%
45.74
Concrete/Asphalt
1.88%
61.12
Drywall
0.00%
0.00
Totals
50.41%1
1640.81
** Note: This material includes food / small particulate
and inert material.
Total Tonnage
Recycled Tonnage
Landfill Tonnage
County &
Newport Bch
TOTAL
3254.63 .169.10
3423.73
1640.81 85.93
1726.74
1613.82 83.17
1696.99
Mee Un Q Date Item NUM- b
1 09/'23/10 VI. a. 4.
CR Transfer 0
To: Joan Revak
From: CR Transfer Inc.
Jurisdiction: Costa Mesa Sanitary District Santa Ana Heights (11)
MonthNear: Aug -10
Recycling Report
** Note: This material includes food / small particulate
and inert material.
Total Tonnage 169.10
Recycled Tonnage 85.93
Landfill Tonnage 83.17
•
•
Recycle
Tons
Commodity
Percenta
Recycled
Newspaper
10.19%
17.22
Cardboard
6.65%
11.25
Mixed Paper
7.63%
12.9
Glass
3.30%
5.57
PET
0.78%
1.32
HDPE
0.44%
0.75
Aluminum Cans
0.51%
0.86
Non - Ferrous Metal
0.27%
0.46
Tin /Metal
0.96%
1.63
Greenwaste
1.30%
2.19
Organic / Fines
11.67%
19.73
Wood
5.17%
8.75
Concrete/Asphalt
1.95%
3.3
Drywall
0.00%
0
Totals
50.81%
85.93
** Note: This material includes food / small particulate
and inert material.
Total Tonnage 169.10
Recycled Tonnage 85.93
Landfill Tonnage 83.17
•
•
0 .10 0 -
Vamp
9AMA@
9o`GW o
9 9
9
, I0 ° w—
City 1,513.79
1,435.51 1,723.89
City
3,002.68
2,847.42
3,419.43
3,325.48
3,026.43
3,546.84
3,405.18
3,254.63
County
179.37
178.37
205.54
158.48
189.95
232.40
208.25
169.10
Vamp
9AMA@
9o`GW o
9 9
9
, I0 ° w—
City 1,513.79
1,435.51 1,723.89
1,676.53
1,525.78
1,786.80
1,716.71
1,640.81
County 91.18
90.64 104.44
80.52
96.53
118.08
105.83
85.93
'A composite recycling percentage for
City & County based on new characterization
studies completed by CRT.
Waste Diversion 20101jr
09114/10
City 1,488.89
1,411.91
1,695.54
1,648.95
1,500.65
1,757.42
1,688.47
1,613.82
County 88.19
87.73
101.10
77.96
93.42
114.32
102.42
83.17
'A composite recycling percentage for
City & County based on new characterization
studies completed by CRT.
Waste Diversion 20101jr
09114/10
VIMM
City 3,405.18 3,254.63
County 208.25 169.10
. o 9�d3S 9 4 o 0 o a o
City 1,716.71 1,640.81
County 105.83 85.93
9 9 e o 0 0 0 0 0 0 M
City 1,688.47 1,613.82
County 102.42 83.17
`A composite recycling percentage for
City & County based on new characterization
studies completed by CRT.
Waste Diversion FY- 09 /10jr
09/14110
INVOICE
r IV
A/Vti FER
9900163077
BILL TO:
COSTA MESA SANI DIST AREA 9
628 W 19TH ST
COSTA MESA CA 92627
INVOICE #:
16307
MAIL
CR TRANSFER, INC.
R 0. BOX 125.
STANTON, CA 90680 -0125
TERMS: NET 10 DAYS
TO PAY BY CREDIT (/I�
CARD, PLEASE FILL
IN INFORMATION ON BACK
OF REMITTANCE
INVOICE DATE:
9/01/10
COSTA MESA SAKI DIST AREA 9
P.O. BOX 1200
COSTA MESA CA 92627
09- CUSTOMER #:2
PREVIOUS AMOUNT DUE PAYMENTS CURRENT CHARGES TOTAL DUE
195,423.30 177,818.52 152,351.99 169,956.77
Please detach here and return with your payment CHECK #
�.. -.� — .....,.... �..«�. •- — `--"" — .- ....�
—.M_— ...,...,... _...�..., _.,•.....- — ,�... a «a..� v �.......e..... .A .�_,,. _..,,_.. _ .. 4. o
CR TRANSFER, INC..
8/02/10
RESIDENTIAL.WASTE
16
178.5
52.220
9,324.93
8/03/10
RESIDENTIAL WASTE
14
144.0
52.220
7,521.25
8/04/10
RESIDENTIAL WASTE
13
131.0
52.220
6,845.52
8/05/10
RESIDENTIAL WASTE
15
151.1
52.220
7,890.44
8/06/10
RESIDENTIAL WASTE
13
140.2
52.220
7,324.38
RESIDENTIAL WASTE
1
3.3
52.220
173.37
1/07/10
/09/10
RESIDENTIAL WASTE
1Z...
5�.22P,.....;.::..
8,927 :53
$/10'/1 0
SI "I.. ..,.. •:..;:.;::
RESIDENTIAL WASTE
.
2.0;
::::'7 461: 19
8/11/10
RESIDENTIAL WAS
,2`0
6, 554 65
8/12/10
RESIDENTIAL WASTE : >.`'' <;`:::;:' = ;::::..::':
'::' ;::':::: ::.i::s.:`5.3..:.......
;5;.
':;;::::; r :.: :.......:..............::::..:
7 8 9 2.0 1
8/13/10
RESIDENTIAL WASTE
13
135.0
52.220
7,053.88
8/16/10
RE9,.I T .WA t :::.:............
16
172.2.
52.220
8,993.33
8/17/10
RF ,aDEF,'NTT�T:i ";`:.W�AST�''`;'
16;
153.3
.52: :220
8, 007.41
8/18/10
3
, RS TDENT��:�i > °WAST�;"
12
.121.'2
52..220
6,329.59
8/19/10
R14a* PEN TTAV YASTE-
14.
14 8...3
52.220
7,745.79
8/20/10
RESIDENTIAL ::. :..:. .::.:....: :::...
' .:: • .12.,
25 .5
52 .220
6, 556.74
8/23/10
RESIDENTIAL WASTE'1' ..� `` "+
'`:i6`
171:4
52.220
8,9S2.07
8/24/10
RESIDENTIAL WASTE
15
147.4
.52.220,
7,701.93
8/25/10
RESIDENTIAL WASTE
15
149.8
52.220
7,825.17
8/26/10
RESIDENTIAL WAS. T., E.,::. ........:....:.:.:.:::.. ..:..
3.�#...
1. 4�::,.._5.,.,,
52..,2.20
'.:5 0
7,393.31
6 972
8/27/10
RESIDENTIAL T� '..''' E': r;?:;;::';:; i;':':'::.,,.;:;' ::.:::........:....:.:..:...
.:.::`.;,;:..:..:...::..,.,:.::
' 2
, .41
8/30/10
RESIDENTIAL W?�. 5; �' N° �;';•:: :•; :;r "r•.::;,.•:.:.,;�.,:.....
..
,:,
....:...:..
52::'220
8,944.24
8/31/10
RESI DENT IAL' r -,-W— I' E':;.::.;.:: a`::;` :.::.:::..:.::`.`:i:`:`;;
::.,;:':i ?:• <'.::4 "..;::':::,:144:.,;,.$.,
..:,:.::::. °::.,,.:,.5.2:::220
7,565.
1 TOTALS 315 13254.61 169,956.77
nrr- ,wnne r nnii nn n-r r'1C 7LIIQ IAI\/(11 (`� PI F�.QF (�.QI I (714) 826 -9049
ir- I.vU cinvcnivI iivivw —u .,..... .. ,.,., - -
IOUS AMOUNT DUE PAYMENTS CURRENT CHARGES TOTAL DUE INVOICE TOTAL
195,423.30 077,818.52 152,351.99 L69,956.77 169956.771
CUSTOMER #; 09— 9 2 INVOICE .16307
P.O. BOX. 1200
OVERDUE AMOUNTS SUBJECT TO FINANCE CHARGE
9 Primtd on Rnydcd P.per
INVOICE
V �&WCORPCWATL
0 ®7500163083
INVOICE C
16308
MAIL PAY14ENT TO:
CR TRANSFER, INC.
P. O. BOX 125
STANTON, CA 90680 -0125
TERMS: NET 10 DAYS
TO PAY BY CREDIT °jrJi�I
CARD, PLEASE FILL
IN INFORMATION ON BACK
OF REM TTANCE
INVOICE DATE:
9/01/10
BILL TO: COSTA MESA SANI DIST -SA HGT
COSTA MESA SANI DIST -SA HGT P.O. BOX 1200
628 W 19TH ST COSTA MESA CA 92627
COSTA MESA CA 92627 09- CUSTOM jgq:8
PREVIOUS AMOUNT DUE PAYMENTS CURRENT CHARGES ^TOTAL DUE
11,951.46
10,874.81
7,753.75
8,830..40
CHECK #t
Please detach here and return with your payment
d.� �Il..i r..r 11..0 Y..d,�.tM le ®..lY �.® A d �..0 /r...P �l r..� M..r �..�r �..� Y.�1 s.r Y.le Y ^ �...� a.1.d r•..d r..Y d.R
o..r tm Yl..Y e.. m. wo r.r1
CR TRANSFER, INC.
•r
� � e r i
•
•
8./03/10
RESIDENTIAL WASTE
1
6.3
52.220
52.220
332.12
1,665.82
8/04/10
RESIDENTIAL WASTE
3
1
31.9
10.5
52.220
550.92
8/09/10
RESIDENTIAL WASTE
1
6.5
52.220
339.95
8/10/10
RESIDENTIAL WASTE
4
42.5
52.220
2,221.44
8/11/10
RESIDENTIAL WASTE I
4
42.4
52.220
2,217.7
8/18/10
RESIDENTIAL WASTE
2
21.2
5,2,..:22Q...
1,110,2
8/25/10
RESIDENTIAL WASTE
1
'�,
52..20,
392.17
8/31/10
RESIDENTIAL WASTE
{
i
I
{
j
L
I
{
TOTALS
169.1
8, 8 3 0.401
_
ANY PART OF THIS INVOICE, PLEASE
CALL:
( 714) 826-9049
IF YOU HAVE ANY QUESTIONS REGARDING
INVOICE IOTA
PREVIOUS AMOUNT DUE PAYMENTS CURRENT CHARGES TOTAL DUE _
11, 951.46 _ 10, 874 .81 � 7,753.75 J 8 830.40 8830.40
CUSTOMER #: 09 11 8 INVOICE # 16308
P.O. BOX 1200
OVERDUE AMOUNTS SUBJECT TO FINANCE CHARGE
RinuC wi hmyclrC Pn;�r
Meeting Date Item Numbef
1 09/23/10 VI. S: a.
COSTA MESASANiT�` DisTRicT
... an Independent SpeciafDistrict
Memorandum
To: Board of Directors
Staff
From: Isidro Gallardo, Ordinance Enforcement Officer
Date: September 16, 2010, 2010
Subject: Ordinance Enforcement Officer Monthly Report, August 2010
DISCUSSION: Since the publication and release of the Districts' "Summer Newsletter July
2010 ", several residents have called in to the District Office to report scavengers in and
around the following streets; Federal Ave.,.Gibraltar Ave., Killybrooke Ln., Broadway Ave.,
and Corona Lane. The District OEO _has. increased surveillance in these areas in an attempt
to deter scavenging. The District OEO will continue to patrol these areas in the upcoming
• weeks.
In addition, the District OEO placed extra attention to the area surrounding Wilson Street.
(Between Republic St. and Harbor Blvd.) The area is mostly comprised of multi - dwelling
residences. Residents in the area either leave there trash containers out on the curb or fail to
properly store them out of public view. Also, because the area is predominately Spanish
speaking, more time is spent explaining the Districts rules and regulations regarding graffiti
on the trash containers and keeping the trash containers out of public view.
•
A summary of the courtesy notice process for the District OEO is provided in the following
chart and demonstrates the effectiveness of a "1 s` Notice ":
August 1, 2010- August 31,
.2.0110.'
1�
Notice '
2
Notice
Courtesy
Letter
South of Wilson St.
28
9
0
Wilson St. to Adams Ave.
18
5
0
Adams Ave. to Sunflower Ave.
13
2
0
RECOMMENDATION: The CMSD Board of Directors accepts this August 2010 OEO Report.
Protecting our community's health by providing solid waste and sewer collection services.
crosdcagov
COSTA MESA AITARY DISTRICT
CAPITAL IMPROVEMENT PROGRAM
2010 -2011
PROJECT:
#101 West Side Pumping Station Abandonment
PROJECT MANAGER:
Rob Flamers, District Engineer
DESCRIPTION:
Abandon 6 CMSD pumping stations, abandon the CNB station in the CNB island on W. 19th Street,
and abandon the private pumping station on W. 18th Street by constructing new gravity lines. The
project would also alleviate the north half of the Banning Ranch
�_ - - - -- -
- --
START DATE:
-1-L - -- - - --
7/1/2012
COMPLETION DATE:
STATUS REPORT:
6/30/2013
;I
8126110 CMSD staff and two Directors met with OCSD staff on 8/4/10 to discuss the framework of the project. OCSD will be
constructing its own gravity sewer to accept the CMSD and CNB flows and send it under the Santa Ana. River to OCSD Plant No. 2.
OCSD
9/23/10 - OCSD was provided with plans, maps and flow figures for their review. OCSD will be hiring a consultant to prepare the
design for their facilities.
FINANCIAL STATUS throu h 8/31110:
Approved Proj
Budget
I
I
June 30, 2010
Accumulated Cost
Current Year
Expenditures
-
Account Number
Encumbrances
I Balance
#101
999,941
-
L— 999,941
—
--
20
_
_—
}—
I
I
Total
999,941
-
-
-
999,941
n3
i
0
v
m
m
a3
` z
r.
3
mr
cca
COSTA MESA SANITARY DISTRICT
CAPITAL IMPROVEMENT PROGRAM
2010-2011
PROJECT: 1#129
Bristol Street Sewer Improvements
Rob Hamers, District Engineer
PROJECT MANAGER. j
DESCRIPTION:
sewer size in Bristol Street Southbound between Irvine Ave and Birch Street. Phase 1
the first 1,400 L.F. and this phase will be the remaining 700 L.F. using pipe bursting. The
----L—dlncrease
jconstructed
Estimate is $461,758.
—Engineer's
START DATE: 10 -Aug
COMPLETION DATE: Mid 2011
STATUS REPORT:
--
9/23/10 -The design phase has started with survey work to identify water valves in the vicinity of the new sewer
line.
FINANCIAL STATUS:
/10: ,
FINANCIAL STATUS throw h 8/31
_q
June 30, 2010
Account Number Approved Proi
Accumulated
Current Year
Budget
Costs
Expenditures
Encumbrances
l i Balance
#183-2
1,580,192
1,077,023
503,169
20�_
---
-1-1
Total
i 1,580,192
1,077,023
_+
1 503,169
•
COSTA MESA SITARY DISTRICT
CAPITAL IMPROVEMENT PROGRAM
2010 -2011
0
PROJECT:
1#171 Irvine Pumping Station Force Main
PROJECT MANAGER:
Hamers District Engineer
DESCRIPTION:
(Rehabilitate the existing 3,000 L.F. of 14 " force main by inserting a 12" HDPE liner. The portion of 12"
PVC SDR 35 force main constructed with the pumping station to remain. The Engineer's Estimate is
START DATE:
10 -Aug
COMPLETION DATE:
i Mid 2011
- -- -
- - -- - -- -- 1
- - - -- - -
- - --
STATUS REPORT:
9/23110 - The design phase has started with survey work and aerial photogrammetric to prepare a base plan for design.
FINANCIAL STATUS through 8131/10:
a
Account Number Approved Proj
Budget
June 30, 2010r
Accumulated
Costs
Current Year
Expenditures
Encumbrances
- - -
Balance
--
�
# 171 � -
1, 360 000
, - - --
l
- - - - -I-
+ 204,447
-r - - -- - - - --
1,110
�
-- - --
�
-j
- --
- 1,154_,_444 _
20
,
Total
1,360,000
1 204,447
1,110
1,154,444
COSTA MESA SANITARY DISTRICT
CAPITAL IMPROVEMENT PROGRAM
2010 -2011
PROJECT: j
#183 -2 Bristol Street Sewer Replacement n/o Randolph
PROJECT MANAGER:
Rob Hamers, District Engineer
J�
-
DESCRIPTION:
istrict's Hot S p and will remove three large sags from a
The project is part of the D Spot Program
section of 8" sewer main on Bristol Street that serves the Camp and Lab developments
--
-
_
START DATE: - - - - -j
Falt 2010 - - --
'
Late 2010
COMPLETION DATE:
STATUS REPORT:
2/25110 - Existing gas company and SCE company lines have been found extremely close to the existing sewer, which is scheduled for removal
and replacement due to three large sags in the line. Meetings are being arranged with the utilities to discuss options for sewer construction.
3/25/10 - The apparent conflict with the gas and sewer lines was resolved and the sewer replacement plans completed to 90 %. The soils
investigation contract and traffic engineering contract are being reviewed for signature. The project specifications are nearly complete. The plans
must be submitted to the City of Costa Mesa for plan check and approval prior to going out to bid.
4/22110 - The plans and specifications are 75% complete, and contracts for a soils engineering investigation and traffic control plans are being
finalized. When this work is complete, the p ans will be submitted to theme and other utilities for plan check.
------- - - - - -- - -- — — -- -- - - - -- - -- -- - - - - - - --
5/27/10 - The traffic control plan was prepared and the sewer plans and traffic control plans were submitted to the City of Costa Mesa for first plan
check. The soils investigation is underway. 6/21/10 The City has not completed nor returned first plan check comments. The soils report is being
_prepared.
6/21/10 The City has not completed nor returned first plan check comments. The soils report is being prepared. Due to other projects in the
vicinity of this project and the OC Fair, construction will occur after the OC Fair.
7/22110 The project is ready to be placed out to bid. Construction will begin after the Fair has been held.
8126/10 The project is out to bid and bid opening is 9/7/10. —
9123/10 The results of bid opening are on the agenda
as a separate item.
- --
FINANCIAL STATUS throu h 8/31/10:
I J
-�
- -- --
r
- - -
—
Approved Proj
-
r - June��8fa
i Accumulated
-- - -
Current Year
-�
- -�
--
'
-
Account Number
Budget
Costs
Expenditures
Encumbrances
Balance
--
#183 -2
--
J 158,017
-- -- 83
-- - 283
' 24
I 1,190
��
- -- -- -�-
�.-
� -- - - - - --
132,544
� -- --
_�
—
'_ -'
-
—
-
- -�i
--
Total
158,017
24,283
1 11190
132,544
01 0 . 0
COSTA MESA AITARY DISTRICT
CAPITAL IMPROVEMENT PROGRAM
2010 -2011
PROJECT: 1#185
System Wide Sewer Reconstruction - Phase 1
_
PROJECT MANAGER:
Rob Hamers, District Engineer
DE_ SCRIPTION:
Reconstruction of the Grade 5 sewer problems disclosed during the 2006 -2009 televising project. There
are 4 phases to the project with each phase reconstructing approximately 64 locations and the preliminary
Engineer's Estimate for each phase if $1 million.
START DATE:
j 10 -Aug
COMPLETION DATE:
Mid 2011
i
STATUS REPORT:
9123/10 - The design phase has begun and base maps and plans are being prepared.
FINANCIAL STATUS through 8/31_/10:
- June 30, 2010
-
Account Number Approved Proj Accumulated Current Year
Bud et Costs Expenditures Encumbrances
Balance
#185
1,086,000
-
_ -
j 1,086,000
2oi
Total
I 1,086,000
-
- --
COSTA MESA SANITARY DISTRICT
CAPITAL IMPROVEMENT PROGRAM
2010-11
PROJECT:
#187 District Yard
PROJECT MANAGER:
1Rob
—F
H_am_ers, District Engineer
DESCRIPTION: _ — __
t-# 1 V Construction of new District Yard at 174 W. Wilson Street, Costa Mesa
i
Sep ep-09
Early June 2010
START _ _64T IE
_CMP1lLE_Tl0__ 14-MATE:
T-7
STATUS — RE_ P__ —0 R T _-
—
2125110 - Construction is approximately 50% complete. HSW superintendent and project managers provide detailed advance review of all items
thereby insuring continuing successful progress.
3/25/10 - Construction is approximately 65% complete. Howard S. Wright superintendent and project managers provide detailed advanced review of all
items and coupled with detailed review by the project architect and CMSD staff, the construction continues to be successful. The project has already
achieved LEED Gold status with Platinum accreditation still possible.
4122110 -Construction is approximately 85% complete. The roof is now on the building and the interior walls are being constructed. Staff is considering
re-arranging HVAC equipment on the mezzanine level to maximize storage area.
5127/10 - Construction is approximately 95% complete. The doors and windows were installed on the building so the building is now secure. The
parking lot concrete.was installed. The City of Costa Mesa will be installing the street improvements as part of their Wilson Street rehabilitation project.
6/21/10 The Yard should be complete and a C of 0 issued by the end of June 2010. The City will not be installing the street improvements until mid
2011 so a temporary drive approach was constructed.
6121110 The Yard should be complete and a C of 0 issued by the end of June 2010. The City will not be installing the street improvements until mid
2011 so a temporary drive approach was constructed.
7/22/10 Construction is essentially complete, The District will learn the LEE D accreditation level in mid November or early December 2010. The City
street improvements will probably be constructed by then.
8126110 Construction is essentially complete, however, a delay in having phone lines installed is holding up the certificate of occupancy.
9123110 The certificate of occupancy had not been issued as of 9/6/10 but the furniture was delivered on 9/2/10 and the Open House is scheduled for
10/30/10.
FINANCIAL -STATUS through
8-/31/1-0:
Approved -05no—j-1
Budget
June 30, __
0,2010
Accumulated Cost
—Current Year
Expenditures
_F—Encumbrances
j Balance
Account Number
#1_87
3,976,949
3,330,030
56,878
1
0,040
301
L
, Total
3,976,949
3,330,030
56,878�
0 1 0 0
• COSTA MESA ATARY DISTRICT
CAPITAL IMPROVEMENT PROGRAM
2010 -11
PROJECT: _ _ _�
PROJECT MANAGER:
DESCRIPTION:
_
I
#188 Conversion of Sewer Atlas to GIS _
I Rob Hamers, District Engineer_
Conversion of hand -drawn sewer atlas to electronic GIS format; preparation of sewer cleaning
maps and schedule; preparation of Computerized Maintenance Management System (CMMS);
and preparation of Hydraulic Modeling program. �-
START DATE:
COMPLETION DATE:
1
126- Oct -09-
30- Sep -11
_
STATUS REPORT:
-
- - -� —�—
2/25/10 - 100% of the GIS sewer asset data has been updated /corrected based on CMSD's lateral at 40% of the data has been QA/QCd by CMSD; 100% of
the wastewater drainage water sheds have been created; and 100% of the pipe segments have been updated with their appropriate cleaning frequency. Laterals
are currently being created in the GIS.
3125/10 - EEC is continuing progress on finalizing sewer main and lateral information while developing cleaning zones with annual, bi- annual, and tri- annual
cleaning frequencies noted. The CMSD GM has requested the necessary parcel data from the County Assessor through a second public records request.
4/22110 - Phase I of the project is 90% complete, plus EEC has greatly assisted the District by preparing a District wide map showing the Grade 4 and Grade 5
pipe problems to support justification for using fixture fees to perform the necessary reconstruction.
5127110 - Phase I consisting of converting the atlas to GIS, developing CMMS, and producing cleaning maps for the sewer system is 95% complete. The CMSD
GM is working on obtaining the basic parcel data needed to complete the atlas.
_
6/21/10 Phase I will be completed when the District obtains the basic parcel data from the County. The District needs to authorize Phase II to begin by the end of
June 2010 to remain on schedule.
7122110 EEC requires the basic parcel data to complete Phase I. The notice to proceed on Phase II was given to EEC on 6/25/10.
8126/10 EEC is still waiting for the basic parcel data to complete Phase I along with a few sets of plans from the District Engineer to complete the update. The
sewer cleaning maps in Phase I were completed as well. Phase 11 (CMMS) is underway.
9/23/10 EEC has completed placing the last 3 years of construction plans into the GIS atlas while the General Manager is attempting to obtain the basic parcel
data for the GIS. EEC is working on the Phase II CMMS program
FINANCIAL STATUS through
8131110:
Account Number
Approved Pro*
Budget
June 30, 2010
Accumulated Cost
Current Year
Expenditures
Encumbrances
Balance
--
#188
194,875
62,703
-
-
132,172
- -
20
-- —
--
- -
--
I
Total
194,875
62,703
-
-
132,172
_
COSTA MESA SANITARY DISTRICT
CAPITAL IMPROVEMENT PROGRAM
2010-11
PROJECT:
#189 Rehabilitation of Six Sewers Transferred to CMSD
PROJECT MANAGER:— I
!Rob Hamers, District Engineer
DESCRIPTION:
I Rehabilitation of the Six Sewers Transferred to CMSD from OCSD. OCSD paid CMSD $1.
I
million for the work and plans and specs are being prepared.
START DATE:
February 1, 2010
-Mid-2-01-1 -------- -- - -----
COMPLETION DATE*
STATUS REPORT:
T
- -- ----------
4122/10 - Engineering staff has discussed the
sewers and deleted non-essential items from the project scope of work. Plans and specs are 5% complete.
_Harbor____
5/2ff1_6__- Proposals _ — - —w—ere obtained for —traffic engineering --a--n-d—so—ils investigation for for-r-e-m—o—vin—gthe sag in the sewer ew- eri nsou_thCos_tDri ve- easterly of
Blvd. Plans and specs are approximately 25% complete.
6/21110 -Traffic Control Plans are being completed for the South Coast Drive lane closure to allow drilling for the soils report. Progress on the project plans
is continuing.
7/22/10 - The design phase is continuing. The land closure plan was completed and drilling for the soils investigation on South Coast Plaza has occurred.
8/26/10 - The plans are ready for submittal to the City of Costa Mesa for 1 st plan check. Work is beginning on the specs. The scope of work on the project
was minimalized to save the District as much as possible of the $1.3 Million paid by OCSD.
9/23/10 - Additional investigation is occurring into the sag on South Coast Drive, which may be longer than first anticipated. Survey work is occurring and
staff will be recommending additional CCTV to final the plan_ s and lace the project out to bid.
FINANCIAL STATUS through 8/31/10: — ------
Approved Proj June 36, 2010 i Current Year
—'-
_Balance
A
Account Number Budget Accumulated Cost Expenditures Encumbrances I
17,112
12,77�7_1
.91,
20
,Ll
4-
48,800
12,777
1
1 18,911
0
•
•
•
HOWARD S. WRIGHT CONSTRUCTORS
GENERALCONTRACTORS
1901 Nancita Circle
Placentia, CA 92870
INVOICE
Costa Mesa Sanitary District
628 W. 19th Street
Costa Mesa, CA 92627
CMSD Corporate Yard New Bldg & Site Imp
174 W. Wilson Street
Costa Mesa, CA 92627
Billing for work performed through:
Contract Amount
C. O. Amount
Total Contract Amount
Work Completed To Date
Less Retention @ 5%
Less Previously Billed
TOTAL AMOUNT DUE
August 31, 2010
Approved By Date
Approved y X 8
GL Acct.
GI-Acct - QV
Meeting Date Item Numb @F_
09123/10 1 VI. C: 2.
Date: 8/30/2010
Invoice: 68519 -012
HSWCC Job #: 68519
2,161,546.00 /.
96,879.58 ✓
2;258,425.58 ✓
2,166,683.66 V/
108,334.18 ✓
2,058,349.47
2,030,528.62
27,820.85
• GKSp � r0�7
*!;z
AIA- PAYMENT APP
APPLICATION AND CERTIFICATE FOR PAYMENT
ARCHITECT:
By: Date:
This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named
herein. issuance, payment and acceptance of payment are without prejudice to any rights of the Owner
or Contractor under this Contract.
PAGE ONE OF PAGES
TO OWNER:
PROJECT:
APPLICATION NO.: 68519-012 Distribution to:
Costa Mesa Sanitary District
CMSD Corporate Yard New Bldg & Site Imp PERIOD TO: 08/31/10 X OWNER
628 W. 19th Street
174 W. Wilson Street
PROJECT #: 68519 O ARCHITECT
Costa Mesa, CA 92627
Costa Mesa, CA 92627
X CONTRACTOR
FROM CONTRACTOR:
VIA DISTRICT ENGINEER
CONTRACT DATE: 08/27/09
Howard S. Wright Constructors
Robin Harriers
1901 Nancita Circle
Costa Mesa Sanitary District
Placentia, CA 92870
628 W. 19th Street
Costa Mesa, CA 92626
CONTRACTOR'S APPLICATION FOR PAYMENT
The undersigned Contractor cen;fles diet to the best of the Cornractnrs knowledge, information and belief
Application is made for payment, as shown below, in connection with
the Contract-
the Work covered by this Application for Payment has been completed in accordance with the Contract
Continuation sheet. ALA Document G703, is attached.
DocumenW that ON amounts have been paid by the Contractor for Work for which previous Certificates for
/
Payment ware issued and payments received from the Owner, and that current payments shown harem
1. ORIGINAL CONTRACT SUM
2,161,546.00 r�
is now due.
2. Net change by Change Orden
96,879.58 {I
CONTRACTOR:
3. CONTRACT SUM TO DATE (Line 1 +l• 2) -
2,258,425.58 ✓
/r cxy
By: � C t Date: U
4. TOTAL COMPLETED 6 STORED TO DATE
2,166,683.66 ✓
_
State oF. California
(Column G on G703)
County of Orange
5. RETAINAGE:
Subscribed and sworn to before
a., 5 %, except Design @ 0% 108,334.18
me this day of
(Columns D + E on G703)
b. % to Stored Material $
(Column E on G703)
Notary Public:
Total Retainage (Line 5a + 5b or
My Commission expires:
Total In column I of 6703)
108,334.18 ✓
ARCHITECT'S CERTIFICATE FOR PAYMENT
S. TOTAL EARNED LESS RETAINAGE
2,058,349.47
In accordance with Contract Documents, based on on -site observation and the data comprising this '
(Line 4 less Line 5 Total)
✓
application, the Architect certifies to the Owner that to the Deal of the Archftest's knowledge. information
7. LESS PREVIOUS CERTIFICATES FOR PAYMENT
2,030,528.62
and belief the Work has progressed as indicated, the quality of the Work is in accordance with the
(Line 6 from prior Certificate)
Corwact Documents, and the Contractor is entitled to payment for the AMOUNT CERTIFIED.
S. CURRENT PAYMENT DUE f
Z7,82O.85 ✓
AMOUNT CERTIFIED $
9. BALANCE TO FINISH, INCLUDING RETAINAGE
(Attach explanation if amount certified ddrers from the amount sported for Ini6a1 ail figures on this
(Line 3 less Line 6) 200,076
Apprrcafion and on the Continuation Sheet that are changed toconform to the amount cer0ed.)
Page 1
0
ARCHITECT:
By: Date:
This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named
herein. issuance, payment and acceptance of payment are without prejudice to any rights of the Owner
or Contractor under this Contract.
CHANGE ORDER SUMMARY
ADDITIONS
DEDUCTIONS
Total changes approved in
previous months by Owner
$71,579.06
$0.00
Total approved this month
$25,300.52
$0.00
TOTALS
$96,879.58
$0.00
NET CHANGES by Change Order
$96,879.58
Page 1
0
CONTINUATION SHEET
APPLICATION NO: 68519 -012
CMSD Corporate Yard New Building & Site Improvements, APPLICATION DATE: 8/30 /2010
SCHEDULE OF VALUES PERIOD T0: 8/31/2010
ARCHITECTS PROJECT NO:
A'
B
C
D
E
F
G
H
t
J
K
L
ITEM
NO.
DESCRIPTION
SCHEDULED
VALUE
CHANGE
ORDERS
TO DATE
REVISED
VALUE
WORK COMPLETED
FROM PREVIOUS
APPLICATION
THlS
PERIOD
MATERIALS
PRESENTLY
STORED
(NOT IN
Fore
TOTAL
COMPLETED
ANDSTORED
TO DATE
+H
PERCENT
'COMPLETE
011
BALANCE
TO
FINISH
E4)
i
RETAINAGE
(5% of
1
Automatic Sliding Gates
18,287
18,287.00
16 287.00
0.00
0
18,287.00
100.00%
0.00
914.35
2
Earthwork
30,772
30 772.00
3.772.00
0.00
0
30 772.00
100.00%
0.00
1,538.60
3
Erosion & Sediment Control
5.913
5,913.00
V 5,913.00
0.00
0
5,913.00
100.00%
0.00
295.65
4
Underground Utilities
70,893
70 893.00
70 893.00
0.00
0
70 893.00
1DQ.00%
0.00
3,544.65
5
Pavement Markings
2,200
2 200.00
2,200.00
0.00
0
2,200.00
100.00%
0.00
110.00
6
Site Concrete
58,927
58,927400
58.92T00
0.00
0
58,927.00
100.00°/6
0.00
2,946.35
7
Landscape & Irrigation
18,610
18,610. D0
18 610.00
0.00
0
18,610.00
100.00%
0.00
930.50
8
Concrete & Rebar
92,344
92,344-00
92 344.00
0.00
0
92 344.00
100.00%
0.00
4,617.20
9
Block Masonry
183,535
183,535.00
J1 183 535.00
0.00
0
183,535.00
100.00%
0.00
9,176.75
10
Structural Steel
56,103
56,103.00
56 103.00
0.00
0
56 103.00
100.00'/0
0.00
2,805.15
11
Ornamental Metals
17,900
17,900.00
V 17,900.00
0.00
0
17,900.00
100.00%
0.00
895.00
12
Rough C try
118,800
118,800.00
j 116,800.00
0.00
0
118 800.00
100.000%
0.00
5,940.00
13
Finish Carpentry
12,100
12,IGG.00
12,100.00
0.00
0
12,100.00
100.00%
0.00
605.04
14
Buildina Insulation
23,450
23 450.00
if 23 450.00
0.001
0
23 450.00 1
100.00%
0.00
1,172.50
15
Sheet Metal] Siding
129,410
129 410.00
4, 54,012-00
0.00
0
54 012.00
41.74%
75,398.00
2,700.60
16
Membrane Roofing S tem
46,731
46 731.00
46 731.00
0.00
0
46 731.00
100.00%
0.00
2,336.65
17
Caulking .& Sealants
2,901
2,901.00
2,901.00
0.00
0
2,901.00
100.001/
0.00
145.05
18
Doors & Frames
15,290
15,290.00
It 15,290.00
0.00
0
15,290.00
100.0096
0.00
764.50
19
Coiling Doors
8,390
8,390.00
6,390.00
0.00
0
8,390.00
100.00%
0.00
419.50
20
Skylights
16,000
18 000.00
18,000.00
0,00
0
18,000.00
100.00%
0.00
900.00
21
Aluminum Entrances and Curtainwall
90,500
90,500.00
90 500.00
0.00
01
90,500.00
100..0%
0.00
4,525.00
22
Metal Studs and d II
79,500
79 500.00
79 500.00
0.00
0
79,500.00
1 100.00%
0.00
3,975.00
23
Acoustical Ceilings
9,850
9,850.00
9,850.00
0.00
0
9,850.00
100.00%
0.00
492.50
24
Resilient Flooring/Tile
27,569
27 569,00
1 27 569.00
0.00
0
27 569.00
100.DO%
0.00
1,378.45
26
Painting
15,300
15,300.00
15,300.00
0.00
0
15,300.00
100.00%
0.00
765.00
27
Si na a
13,000
13 000.00
J0,400.00
0.00
0
10 400.00
80.00%
2,600.00
520.00
28
Metal Lockers
3,000
3,000.00
J1 3,000.00
0.00
0
3,000.00
100.00%
0.00
150.00
29
Folding Partitions
9,000
9.000.00
V1 9,000.00
0.00
0
9,000.00
100.00%
0.00
t 450.00
301
Fire Extinguishers
3001
300jZ083
0.00
0.00
0
0.00
0.00%
300.00
0.00
31
Toilet Accessories
2,236
2.236.00
2,236.00
0.00
0
2,236.00
100.00%
0.00
111.80
32
Residential Appliances
3,175
3,175.00
3,175.00
0.00
0
3,175.00
100.00%
0.00
158.75
33
Fire Protection
17,763
17,76317
763.00
0.00
0
17 763.00
100.00%
0.00
888.15
34
Plumbing
81,995
81 99581
995.00
0.00
0,
81,995.00
100.00%
0.00
4,099.75
35
Fuel Tank
54,306
54,30664,306.00
0.00
0
54 306.00'
100.00%
0.00
2,715.30
36
HVAC.
120,174
12017420174.00
0.00
0
120,174.00
100.00%
0.00
6,008.70
37
Electrical
249,241
249,24149,241.00
0.00
0
249,241.00
100.00%
0.00
12,462.05
38
Photovoltaic Panels
83,028
83,028
028.00
0,00
0
83 028.00
100.00%
0.00
4.151.40
OCO#1
COP#1: Masonry biock/rebar submittal delays
8,128.04
8,128.04
$1, f 8,128.04
0.00
0
8,128.04
100.00%
0.00
406.40
COP#2 Increase food - retaining wall
7,562.60
7,582:60
Vt 7,562-60
0.00
0
7,562.60
100.00%
0.00
378.13
COP#3: Undocumented piping in street
2,503.73
2,603.73_
2,503.73
0.00
0
2,503.73
100.00%
0.00
125.19
COP#4: Demo unforseen septic, tank
1,448.85
1,448.85
1,448.85
0.00
0
1 448.85
100.00%
0.00
72.44
COP#5; Changes in Edison/tele honalcable
2 723.15
Z723.1 5
2,723.15
0.001
2
Z723.15
100.00%
0.00
136.16
COP/18: Value engineer rein switch
(2,592.38)
2 592.38
$1, 2,592.38)
0.00
0
(2,592,38)
100.00%
0.00
129.62
COP#7: Added expansion joint on interior slab
2,390.29
2 390.29
2,390.29
0.00
01
2,390.29
100.00%
0.00
119.51
68519412AUGIOAM PAGE # 1 OF 2
A
B
C
D
E
F
G
H
I
J
K
L
ITEM
NO.
OCO#2
DESCRIPTION
SCHEDULED
VALUE
CHANGE
ORDERS
TO DATE
REVISED
VALUE
WORK COMPLETED_
MATERIALS
PRESENTLY
STORED
(NOT IN
F or G )
TOTAL
COMPLETED
AND STORED
TO DATE
(C-H)
PERCENT
COMPLETE
(JIF)
BALANCE
TO
FINISH
(E -I
RETAINAGE
(5% of l)
_
FROM PREVIOUS
APPLICATION
f
THIS
PERIOD
COP#8b: Staff costs for 14 rein related delays
36,688.11
38 888.11
1 36,688.11
0.00
0
38 688.11
100.00%
0.00
1,834.41
COP#10: FC 1.3 relocation
8,626.66
8,826.66
V 8826.66
0.00
0
8,826.66
100.00%
0.00
441.33
COP#13: Airline size change
2,523.98
2,523.98
2,523.98
0.00
0
2,523.98
100.00%
0.00
126.20
COP#16: Anti-graffiti coating
137603
1,376.03
1 376.03
0.00
0
1,376.03
100,00%
0,00
68.80
OCOf13
COP#18: Paint one side of roll up door
541.53
541.53
0.00
541.53
0
541.53
100.00%
0.00
27.08
COP#19: Add paint to parapet coping
2,523.46
2,523-46
0.00
2,523.46
0
2.523.46
100.00%
0.00
126.17
COP#20: Remove efflorescence
4,465.43
4,485.43
0.00
4 465.43
0
4,465,43
100.00%
0.00
223.27
COP#21: Deliver and install existing hoist crane
9 310.33
0.00
9,310.33
0
9310.33
100.00%
0.00
465.52
COP#22: Monochem Dexcoat coaling to mezzanine floor
4 133.05
0.00
4 133.05
0
4133.05
100.00%
0.00
206.65
COP#23 Add protective mesh kick plates, box
1 100.82
0.00
1,100.82
0
1,100.82
100,00%
0.00
55.04
COP#25: Electrical changes for site conditions
2,116.20
0.00
2,116.20
0
2,116-20
100.00°/6
0.00
105.81
COP#26 Remove efflorescence from interior garage
Fli
1,109.70
0.00
1,109.70
0
1,109.70
100.00%
0.00
55.49
Subtotal
1,790,493
1,887,372.58
1,783,774.06
25,300,52
0
1,809,074:58
95.85%
78,298.00
90 453.73
39
General Requirements
52,883
52,883.00
50 037.89
650.47
0
50 688.36
95.85%
2,194.64
2,534.42
40
General Conditions
218,679
218 679.00
th 206,914.07
2,689.75
0
IfF, 209 603.82
95.85%
9,075.18
10,480.19
41
Sub Bonds
7,912
7,91Z00
7,912.00
0.00
0
7,912.O0
100.00%
0.00
395.60
42
Builders Risk
1,200
1,200.00
1,200.00
0.00
0
1200-00
100.00%
0.00
60.00
43
General Liability Insurance
23,818
23,818.00
23 818.00
0.00
0
23,818.00
100.00%
0.00
1,190.90
44
Overhead and Profit
52,388
52 388.00
49 569.53
644.37
0
50 213.90
95,85%
2,174.10
2.510.69
45
Performance and Payment Bond
14,173
14,173.00
14 173.00
0.00
0
of 14,173.00
100.00%
0.00
708.65
TOTAL CONTRACT SUM
2,161,546
,879.58
2,258,425. 1
2,137 398.55
29 285.11
0
166 683.66
95.94%
91 741.93
108,334.18
IV
2,166,683.66
91,741.92 1
108 334.18
Contract extension of 6 workdays (8 calendars) for COP #1
Contract extension of 8 workdays (10 calendars) for rain delays through December 2009
Rain related delays: 10113/09 - 10/16109
12/07109 - 12/06109
12/11/2009
12/30/2009
The Contract Time will be Increased by
14 work days
Date of Substantial Completion thru OCO#1
May 28, 2010
The Contract Time will be increased by
14 work days
per Rob Hamers e-mail did 5114/10;
Date of Substantial Completion, OCO 92
June 18, 2010
88514012 AUG10.xkx
RAGE #2OF2
a • •
;66s
t'
•
CONDITIONAL. WAIVER AND RELEASE UPON
PROGRESS PAYMENT
Upon receipt by the undersigned of a check from Costa Mesa Sanitary District in the sum
27,820.85 payable to Howard S. Wright Constructors, and when the check
has been properly endorsed and has been paid by the bank upon which it is drawn,
this document shall become effective to release any mechanic's lien, stop notice, or .
bond right the undersigned has on the job of
CMSD Corporate Yard New Bldg. & Site Imp
located at
174 W. Wilson Street
Costa Mesa, CA 92627
to the following extent. This release covers a progress payment for labor, services,
equipment or material furnished toCosta Mesa Sanitary District through
August 31, 2010
® only and does not cover any retentions retained before or after the release date;
extras furnished before the release date for which payment has not been received;
extras or items furnished after the-release date. Rights based upon work performed
or items furnished under a written change order which has been fully executed by
the parties prior to the release date are covered by this release unless specifically
reserved by the claimant in this release. This release of any mechanic's lien, stop
notice, or bond right shall not otherwise affect the contract rights, including rights
between parties to the contract based upon a rescission, abandonment, or breach
of contract, or the right of the undersigned to recover compensation for furnished
labor, services, equipment or material covered by this release if that furnished labor,
services, equipment or material was not compensated by, the progress payment.
Before any recipient of this document release on it, said party should verify evidence
of payment to the undersigned.
Date: �,;� Howard S. Wright Constructors
By: L
Title:
�l c.
•
r:
MeeUn Dete Item_N_U6ROI
1 09/23/0 VI. D: 1.
Coss MESA SANiTAJU DiSTRicT
Memorandum
To: Board of Directors
... an Independent Special District
Via: Scott Carroll, General Manager
From: Sherry Kallab, Administration Manager
Date: September 23, 2010
Subject: Financial Reports as of August 31, 2010
Summary
Staff is providing the Board with the Financial Reports as of August 31, 2010.
•. Staff Recommendation
1. Staff recommends the Board receive and file the Financial Reports as of August 31,
2010.
2._ Ratify payments for. the month of August 2010 in the amount of $602,008.54
3. Ratify Director's compensation and expense reimbursements for the month of August
2010 in the amount of $7,276.55
Analysis
The financial highlights for the month of August 2010 are as follows:
Revenues
As of August 31, 2010 the solid waste fund had revenues of $29,994 which were $5,294,006
under the budgeted revenues of $5,324,000. As of August 31, 2010 the liquid waste fund had
revenues of $9,903 which were $5,216,097 under the budgeted revenues of $5,226,000.
Revenues under budget are due to the first payment of the annual trash and sewer charges
scheduled for receipt until November 2010.
Expenditures
• As of August 31, 2010 the solid waste fund had expenditures of $670,832 leaving 87.39 %, or
$4,652,278 of the $5,323,110 budget available.
Protecting our community's health by providing solid waste and sewer coffection sen* -es
crosdcagov
Board of Directors
September 23, 2010
Page 2 of 3
As of August 31, 2010 the liquid waste fund operations and maintenance expenditures were 40
$313,831 leaving 90.90 %, or $3,133,129 of the $3,446,960 budget available.
Actual CIP expenditures were $14,762 of the $1,776,000 budget for fiscal year 2010 -11,
leaving $1,761,238 to be expended or carried forward to fiscal year 2011 -12. The final CIP
carryforwards from fiscal year 2009 -2010 are expected to be calculated by October 2010.
In summary the expenses over revenues were $640,838 and $318,690 for the solid waste
fund and liquid waste fund respectively.
Board members rep orted attendance at the follo ing meetings for
the month of
Board Member
Meetin s
Compensation
Mileage
President Schafer
ISDOC Board Mtg
$221
$5.00
WACO General Meeting
$221
$5.00
CASA Conference
$663
$505.74
CSDA Board Meeting
$221
Vice President
WACO General Meeting
$221
Ooten
CASA Conference
$663
OCSD Meeting
$221
CMSD Board Meeting
$221
Director Monahan
CMSD Board Meeting
$221
CMSD Sewer System
$221
Director Ferryman
CMSD Special Meeting
$221
CASA Conference
$884
$560.65
CMSD Board Meeting
$221
Director Perry
WACO General Meeting
$221
CASA Conference
$663
$454.26
CMSD Sewer System
- $221
CMSD Board Meeting
$221
Legal Review
None.
Financial Review
August 2010:
U
•
7
All
i
`1
4
•
C7
Board of Directors
September 23, 2010
Page 3 of 3
Revenues
Expenses
Revenues Over /(Under)
Expenditures
Revenues
Expenses
Expenses -CIP
Revenues Over /(Under)
. Expenditures
Solid Waste
Available/
Budget Actual (Over)
$ 5,324,000 $ 29,994 $5,294,006
$ 5,323,110 670,832 $4,652,278
$ .890 $ (640,838)
Liquid Waste
Available/
Budget
Actual
(Over)
$ 5,226,000.
$ 9,903
$5;216,097
$ 3,446,960
$ 313,831
$3,133,129
$ 1,776,000
$ 14,762
$1,761,238
$ 3,040 $ (318,690)
Committee Recommendation
Not applicable
Public Notice Process
Copies of this report are on file with the entire agenda packet at District Headquarters.
Alternative Actions
1. Refer the matter back to staff
Attachments
1. Director' compensation and expense reimbursement forms
2. Warrant Resolution No. CMSD 2011 -3
•
Meetinq Date Item Number
09/23/10 VI. D. 2.'
COST,X WES DISTRICT
Memorandum
To: Board of Directors
Via: Scott Carroll, General Manage
From: Marc Davis, Treasurer
Date: September 23, 2010
..... an Independent Speciaf District
Subject: Investment Report for the Month of August 2010
Summary
Attached is the Investment Report for the month of August 2010. As required by the
District's Statement of Investment Policy, the Investment Report delineates all
investment activity during the month.
Staff Recommendation
Approve the Investment Report for the month of August 2010.
Analysis
This report lists the types of securities held in the District's portfolio, the institutions from
which the securities were purchased, maturity. dates and interest rates as of August 31,
2010. The District's investments are in compliance with the Statement of Investment
Policy adopted by the Board at the June 21, 2010 regular meeting, as well as the
California Government Code. The market values in this report were provided by our
third party custodian, Bank of New York, except for the Local Agency Investment Fund
(LAIF). The market value of LAIF was provided by the State Treasurer's Office. It does
not represent the value of the underlying securities within the pool, but rather the par or
cost amount, which is the amount the District is entitled to withdraw. This reporting
practice is consistent with industry standard practices for similar funds.
Board of Directors
September 23, 2010
Page 2 of 2 •
The weighted average stated rate of return (current yield) for the District's investment
portfolio as of August 31, 2010, was 1.209 %. The yield to maturity of the portfolio was
1.235 %. The District's weighted average interest rate was 70 basis points (0.696 %)
above the daily effective yield of LAIF, which was 0.513% as of August 31, 2010. The
weighted average number of days to maturity for the District's total portfolio was 652
days (1.79 years). The average duration of the underlying securities in LAIF as of
August 31, 2010, which is the most current information available, was 194 days.
The District's investment portfolio is in compliance with its liquidity limitations, which
requires that a minimum of 20.00% of the portfolio must mature within one year. The
percentage of the portfolio maturing in less than one year as of August 31, 2010 was
60.08 %.
As of August 31, 2010, the District has adequate operating reserves necessary to meet
its obligations for the next six months.
Strategic Plan Element & Goal
Not applicable.
Legal Review
Legal review is not required.
Financial Review
The portfolio was budgeted to earn an average of 1.25% for the year ending June 30,
2011.
Committee Recommendation
Review by the Investment Oversight Committee is not required this month.
Public Notice Process
Copies of this report are on file with the entire agenda packet at District Headquarters.
Alternative Actions
1. Refer the matter back to staff
El
Active Accounts:
Bank of America
Reconciling Items
Total Active Accounts
COSTA MESA SANITARY DISTRICT
Treasurer's Report of Pooled Cash and Investments
August 31, 2010
Deposits Outstanding
Bank Balance In Transits Checks Book Balance
$ 78,707.19
231,157.04 $ (152,449.85)
78,707.19 231,157.04 (152,449.85)
Market Adiustment
Costa Mesa Sanitary District
Pooled Cash and Investments by Fund
August 31, 2010
CMSD Solid Waste Activities $ 4,070,914.92
CMSD Liquid Waste Activities 9,553,278.60
Total Pooled Cash & Investments $ 13,624,193.52
Marcus D. Davis
Treasurer /Director of Finance
•
1
8/14/10
Date
Market Value Increase
Decrease
Cost
.Investments:
Local Agency Investment Fund
$ 6,167,966.99 -
-
$ 6,167,966.99
Money Market/Sweep Account
2,108,676.38 -
-
2,108,676.38
Federal Agency Securities
5,535,693.75 -
35,693.75
5,500,000.00
Total Investments
13,812,337.12 -
35,693.75
13,776,643.37
Total Pooled Cash & Investments
$ 13,891,044.31 $ -
$ 266,850.79
$ 13,624,193.52
Costa Mesa Sanitary District
Pooled Cash and Investments by Fund
August 31, 2010
CMSD Solid Waste Activities $ 4,070,914.92
CMSD Liquid Waste Activities 9,553,278.60
Total Pooled Cash & Investments $ 13,624,193.52
Marcus D. Davis
Treasurer /Director of Finance
•
1
8/14/10
Date
COSTA MESA SANITARY DISTRICT
Investment Activity Summary
August 31, 2010
Total investments outstanding as of July 31, 2010 $ 14,509,125.63
Additions:
Gain on Sale of Investment:
Investment Purchases:
Deductions:
Investment Maturity /Sale Proceeds:
Loss on Sale of Investment:
Investments Called: (1,000,000.00)
Net increase (decrease) in Sweep Account 1,002,517.74
Net increase (decrease) in LAIF (735,000:00)
Total investments outstanding as of August 31, 2010 $ 13,776,643.37
•
•
K,
"Represents the LAIF daily rate at 8/31/10
1
3
•
•
COSTA MESA SANITARY DISTRICT
Investment and Investment Earnings
August 31, 2010.
Interest
CUSIP
Purchase
Maturity
Coupon
Investment
Earned at
Number
Investment
Date
Date
Rate
Cost
08/31/10 Comments
n/a
Local Agency Investment Fund
n/a
n/a
0.513% $
6,167,966.99
n/a
n/a
Bank of New York -Sweep Acct
n/a
n/a
0.010%
2,108,676.38
n/a
3136FMGJ7
Federal National Mortgage Assn
03%30/10
12/30/13
2.250%
1,000,000.00
3,812.50
3134G1AS3
Federal Home Loan Mortgage
05/18/10
05/18/15
3.000%
1,000,000.00
8,583.33
3134G1GZ1
Federal Home Loan Mortgage
07/07/10
07/07/15
2.750%
1,000,000.00
4,125.00
3136FMP24
Federal National Mortgage Assn
07/07/10
.07/07/15
2.370%
1,000,000.00
3,555.00
3133XYXS9
Federal Home Loan Bank
07/12/10
01/12/15
2.350%
1,000,000.00
3,198.61
3136FM3D4
Federal National Mortgage Assn
07/28/10
07/28/15
1.500%
500,000.00
-
Totals
$ 13,776,643.37
$ 23,274.44
"Represents the LAIF daily rate at 8/31/10
1
3
COSTA MESA SANITARY DISTRICT
Summary of Policy Limitations
August 31, 2010
Current %
of Market Value
Description
08/31/10
Maximum %
U.S. Treasury Bills
0.00%
Unlimited
U.S. Treasury Notes
0.00%
Unlimited
Federal Agency Issues:
FICB
0.00%
Unlimited
FLB
0.00%
Unlimited
FHLB
7.26%
Unlimited
FHLMC
14.56%
Unlimited
FNMA
18.26%.
Unlimited
FFCB
0.00%
Unlimited
Other "
0.00%
Unlimited
Banker's Acceptances
0.00%
25%(1)
25% •
Certificates of Deposit
0.00%
Negotiable Certificates of Deposits
0.00%
25%(1)
Commercial Paper
0.00%
25%(1)
Medium Term Corporate Notes
0.00%
20%(1)
LAIF (Local Agency Investment Fund)
44.66%
40,000,000
Shares of Benefical Interest
0.00%
20%
Money Market/Mutual Funds (Sweep Acct)
15.27%
10% per fund (2)
Total
100.00%
% of portfolio maturing under one year
60.08%
no less than 20%
% of portfolio maturing over one year
39.92%
100.00%
(1) Further limited to 10% in any single issuer
(2) Also limited to 20% in total.
`These securities are not considered for purchases:
SBA, GNMA, TVA and
SALLIEMAE
4
Description
Broker/Dealer
State Treasurer's Pool
LAIF
Total State Treasurer's Pool
Market
Money Market Mutual Fund
Bank of New York
Total Money Market Mutual Fund
Date
Federal Home Loan Bank
E.J. De La Rosa
Total Federal Home Loan Bank
Value
Federal Home Loan Mortgage
E.J. De La Rosa
Federal Home Loan Mortgage
E.J. De La Rosa
Total Federal Home Loan Mortgage
$ 6,167,966.99
Federal National Mortgage Association
E.J. De La Rosa
Federal National Mortgage Association
E.J. De La Rosa
Federal National Mortgage Association
E.J. De La Rosa
Total Federal National Mortgage Association
6,167,966.99
Total Investments
"Represents the LAIF daily rate at 8/31 /10
COSTA MESA SANITARY DISTRICT
Schedule of Investments by Instrument Type
August 31, 2010
Purchase
Maturity
Coupon
Investment
%of
Market
%of
Date
Date
Rate
Cost
Portfolio
Value
Portfolio
Comments
n/a
Continuous
0.513%
$ 6,167,966.99
$ 6,167,966.99
POOL
6,167,966.99
44.77%
6,167,966.99
44.66%
n/a
Continuous
0.010%
2,108,676.38
2,108,676.38
SWEEP
2,108,676.38
15.31%
2,108,676.38
15.27%
07/12/10
01/12/15
2.350%
1,000,000.00
1,002,187,50
FHLB
1,000,000.00
7.26%
1,002,187.50
7.26%
05/18/10
05/18/15
3.000%
1,000,000.00
1,005,312.50
FHLMC
07/07/10
07/07115
2.750%
1,000,000.00
1,005,850.00
FHLMC
2,000,000.00
14.52%
2,011,162.50
14.56%
03/30/10
12/30/13
2.250%
1,000,000.00
1,005,937.50
FNMA
07/07/10
07/07/15
2.370%
1,000,000.00
1,013,750.00
FNMA
07/28/10
07/28/15
1.500%
500,000.00
502,656.25
FNMA
2,500,000.00
18.15%
2,522,343.75
18.26%
$ 13,776,643.37 100.00% $ 13,812,337.12 100.00%
COSTA MESA SANITARY DISTRICT
Investment Portfolio
August 31, 2010
Total Investment Portfolio
Total Portfolio
Weighted Avg Interest Rate
Weighted Avg Yield to Maturity
Weighted Avg Days to Maturity
"Represents the LAIF daily rate at 8/31/10
1.209%
1.235%
652 Days
1.79 Years
Investment
Cost
$ 6,167,966.99
2,108,676.38
1,000,000.00
1,000,000.00
1,000,000.00
1,000,000.00
1,000,000.00
500,000.00
$ 13,776,643.37
•6 •
Investment
Purchase
Maturity
Days to
Coupon
Yield to
Broker /Dealer
Type
Date
Date
Maturity
Rate
Maturity
Local Agency Investment Fund
Pool
1
0.513% "
0.513%
Bank of New York
Sweep
1
0.010%
0.010%
E.J. De La Rosa
FNMA
03/30/10
12/30/13
1,217
2.250%
2.250%
E.J. De La Rosa
FHLM
05/18/10
05/18/15
1,721
3.000%
3.000%
E.J. De La Rosa
FHLM
07/07/10
07/07/15
1,771
2.750%
2.750%
E.J. De La Rosa
FNMA
07/07/10
07/07/15
1,771
2.370%
2.370%
E.J. De La Rosa
FHLB
07/12/10
01/12/15
1,595
2.350%
2.350%
E.J. De La Rosa
FNMA
07/28/10
07/28/15
1,792
1.500%
2.229%
Total Investment Portfolio
Total Portfolio
Weighted Avg Interest Rate
Weighted Avg Yield to Maturity
Weighted Avg Days to Maturity
"Represents the LAIF daily rate at 8/31/10
1.209%
1.235%
652 Days
1.79 Years
Investment
Cost
$ 6,167,966.99
2,108,676.38
1,000,000.00
1,000,000.00
1,000,000.00
1,000,000.00
1,000,000.00
500,000.00
$ 13,776,643.37
•6 •
COSTA MESA SANITARY DISTRICT
For all Maturities with Market Values
August 31, 2010
Purchase
Maturity
Intuition
Investment
Coupon
Investment
Market
Accrued
Date
Date
Broker /Dealer
Type
Par
Rate
Cost
Value
Interest
n/a
Continuous
LAIF
POOL $
6,167,966.99
0.513% ""
6,167,966.99
6,167,966.99
-
n/a
Continuous
Bank of New York
SWEEP,
2,108,676.38
0.010%
2,108,676.38
2,108,676.38
-
03/30/10
12/30/13
E.J. De La Rosa
FNMA
1,000,000.00
2.250%
1,000,000.00
1,005,937.50
3,812.50
05/18/10
05/18/15
E.J. De La Rosa
FHLMC
1,000,000.00
3.000%
1,000,000.00
1,005,312.50
81583.33
07/07/10
07/07/15
E.J. De La Rosa
FHLMC
1,000,000.00
2.750%
1,000,000.00
1,005,850.00
4,125.00
07/07/10
07/07/15
E.J. De La Rosa
FNMA
1,000,000.00
2.370%
1,000,000.00
1,013,750.00
3,555.00
07/12/10
01/12/15
E.J. De La Rosa
FHLB
1,000,000.00
2.350%
1,000,000.00
1,002,187.50
3,198.61
07/28/10
07/28/15
E.J. De La Rosa
FNMA
500,000.00
1.500%
500,000.00
502,656.25
-
Total Investments
"Represents the LAIF daily rate at 8/31/10
•
Net
Gain /(Loss)
5,937.50
5,312.50
5,850.00
13,750.00
2,187.50
2,656.25
$ 13,776,643.37 13,776,643.37 13,812,337.12 23,274.44 35,693.75
7
COSTA MESA SANITARY DISTRICT
Call Schedule
August 31, 2010
Type of
Purchase
Maturity
Coupon
500,000.00
Investment
Date
Date
Rate
Par Value
FNMA
03/30/10
12/30/13
2.250%
1,000,000.00
FHLMC
05/18/10
05/18/15
3.000%
1,000,000.00
FHLMC
7/710
07/07/15
2.750%
1,000,000.00
FNMA
07/07/10
07/07/15
2.370%
1,000,000.00
FHLB
07/12/10
01/12/15
2.350%
1,000,000.00
FNMA
07/28/10
07/28/15
1.500%
500,000.00
Investment
Cost Call Features
1,000,000.00
Callable 12/30/10 w /10 days notice
1,000,000.00
Callable 11 /18/10 w/5 days notice, thenafter 2,5,8,11
500,000.00
Callable 1/7/11 w /10 days notice
1,000,000.00
Callable 7/7/11 w /10 days notice
1,000,000.00
Callable 10/12/10 w/5 days notice and anytime after
1,000,000.00
Callable 7/28/11 w /10 days notice, thenafter 1.,4,7,10
Totals $ 5,500,000.00 5,500,000.00
i
• •
M.
COSTA (MESA SANITARY DISTRICT - MATURITIES DISTRIBUTION
August 31, 2010
------ - - - --- - - - - --- - - - - - -- - - -- - -- - -- —
Cost
60%
In Thousands
50 °i°
1 - 180 Days
$ 8,276
— ------ — ------- — ----- — ----- ---------------- 32 -.&7%
181 - 365 Days
-
40
1 - 2 Years
-
2 - 3 Years
-
20%
3 - 4 Years
1,000
7.261%
101/0
- -- ` — o.00 °i% o.00 °% ° �—
0.00%
4 - 5 Years
4,500
TOTAL
$ 13,776
1 -180 181 -365 1 -2 2 -3 3 -4 4 -5
Days Days Years Years Years Years
M.
3.00%
2.50%
2.00%
1.50%
1.00%
0.50%
Costa Mesa Sanitary District
Portfolio Interest Rate Information
as of August 31, 2010
—3 month T -Bil
—6 month T -Bill
2 year T -Note
—3 year T -Nate
-- -5 year T -Note
—CMSD- monthly
—LAIF- monthly
-- ^OC Pool-monthly
10
• 0 •
• COSTA MESA SANITARY DISTRICT
Warrant Resolution No. CMSD 2011 -3
0
Meeting Date Iteffi NumF
rOB/23J10 VI. D: 3:
A RESOLUTION OF THE COSTA MESA SANITARY DISTRICT
RATIFYING THE PAYMENT OF CERTAIN CLAIMS AND DEMANDS, AND
SPECIFYING THE FUNDS OUT OF WHICH THE SAME WERE PAID.
THE BOARD OF DIRECTORS OF THE COSTA MESA SANITARY DISTRICT
DOES HEREBY ORDER AND RESOLVE AS FOLLOWS:
Section 1. That the attached claims and demands totaling $602,008.54 have
been audited as required by law and that the same were paid out of respective funds as
hereinafter set forth.
Section 2. That the Clerk of the District shall certify to the adoption of this
Resolution and shall retain a certified copy thereof in her own records.
PASSED AND ADOPTED this 23rd day of September 2010.
ATTEST:
Secretary President
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss
COSTA MESA SANITARY DISTRICT )
I, JOAN REVAK, Clerk of the Costa Mesa Sanitary District, hereby certify that
the foregoing Warrant Resolution No. CMSD 2011 -3 was duly adopted by the Costa
Mesa Sanitary District at a regular meeting held on the 23rd day of September 2010.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the Seal of
the Costa Mesa Sanitary District on this 23rd day of September 2010.
40 Clerk of the Costa Mesa Sanitary District
A c , Payable
c o is ay
Checks for Approval
i •
COSTA 9YESA S ITA RT 1�ISTRIG''I'
--- an Independent Special oisb*t
User: tgonzalez
Liquid Waste Fund
Federal Withholding Taxes
Internal Revenue Service
Printed: 09/10/2010 - 1:52 PM
0 08/11/2010
Liquid Waste Fund
FICA - Employee
Internal Revenue Service
Check Number Check Date
Fund Name
Account Name
Vendor Name
Amount
Internal Revenue Service
53.86
0 08/11/2010
Liquid Waste Fund
0 08/05/2010
Liquid Waste Fund
PERS Medical
Cal PERS
5,817.17
0 08/05/2010
Solid Waste Fund
Benefits Admin Costs
Cal PERS
2.50
0 08/05/2010
Liquid Waste Fund
Benefits Admin Costs
Cal PERS
22.51
6,645.10
0 08/11/2010
Liquid Waste Fund
Check Total:
5,842.18
0 08/11/2010
Liquid Waste Fund
Federal Withholding Taxes
Internal Revenue Service
5,367.98
0 08/11/2010
Liquid Waste Fund
FICA - Employee
Internal Revenue Service
53.86
0 08/11/2010
Liquid Waste Fund
FICA - Employee
Internal Revenue Service
53.86
0 08/11/2010
Liquid Waste Fund
Medicare - Employee
Internal Revenue Service
584.70
0 08/11/2010
Liquid Waste Fund
Medicare - Employee
Internal Revenue Service-
584.70
Check Total:
6,645.10
0 08/11/2010
Liquid Waste Fund
State Withholding Taxes
State of Cal Emp Dev Dept
1,921.21
Check Total:
1,921.21
f
0 08/11/2010
Liquid Waste Fund
PERS Retirement
Cal Pers Employee Ret System.
173.39
0 08/11/2010
Liquid Waste Fund
PERS Retirement
Cal Pers Employee Ret System
294.51
0 08/11/2010
Liquid Waste Fund
PERS Retirement
Cal Pers Employee Ret System
2,477.16
0 08/11/2010
Liquid Waste Fund
PERS Retirement
Cal Pers Employee Ret System
4,207.29
0 08/11/2010
Liquid Waste Fund
PERS Survivor Benefit
Cal Pers Employee Ret System
11.16
0 .08/11/2010
Liquid Waste Fund
PERS - Employer
Cal Pers Employee Ret System
-0.02
Check Total:
7,163.49
0 08/15/2010
Solid Waste Fund
Investment Earnings
Bank of America
302.14
Check Total:
302.14
0 08/25/2010
Liquid Waste Fund
Federal Withholding Taxes
Internal Revenue Service
5,239.73
AP - Checks for Approval ( 09/10/2010 - 1:52 PM) Page I
1,
Check Nuer Check Date Fund Name
Account Name Vendor Name
0 08/25/2010
Liquid Waste Fund
FICA - Employee
Internal Revenue Service
0 08/25/2010
Liquid Waste Fund
FICA - Employee
Internal Revenue Service
0 08/25/2010
Liquid Waste Fund
Medicare - Employee
Internal Revenue Service
0 08/25/2010
Liquid Waste Fund
Medicare - Employee
Internal Revenue Service
0 08/25/2010 Liquid Waste Fund State Withholding Taxes State of Cal Emp Dev Dept
0 08/25/2010
Liquid Waste Fund
PERS Retirement
0 08/25/2010
Liquid Waste Fund
PERS Retirement
0 08/25/2010
Liquid Waste Fund
PERS Retirement
0 08/25/2010
Liquid Waste Fund
PERS Retirement
0 08/25/2010
Liquid Waste Fund
PERS Survivor Benefit
0
08/27/2010
Solid Waste Fund
0
08/27/2010
Liquid Waste Fund
7647
08/13/2010
Solid Waste Fund
7647
08/13/2010
Liquid Waste Fund
7648
08/13/2010
Liquid Waste Fund
7648
08/13/2010
Liquid Waste Fund
7649
08/13/2010
Facilities Revolving Fund
7649
08/13/2010
Facilities Revolving Fund
7649
08/13/2010
Facilities Revolving Fund
7649
08/13/2010
Facilities Revolving Fund
7650
08/13/2010
Liquid Waste Fund
7650
08/13/2010
Liquid Waste Fund
Cal Pers Employee Ret System
Cal Pets Employee Ret System
Cal Pers Employee Ret System
Cal Pers Employee Ret System
Cal Pers Employee Ret System
Check Total:
Check Total:
Check Total:
Equipment Maintenance
Automatic Data Processing, Inc
Equipment Maintenance
Automatic Data Processing, Inc
Check Total:
Fiscal Services
CBIZ ATA Orange County LLC
Fiscal Services
CBIZ ATA Orange County LLC
Check Total:
Sewer Maint -FOG Prog Contract
Environmental Engr & Cont, Inc
GIS System #188 Contr Svc
Environmental Engr & Cont, Inc
Check Total:
District Yard
The Greater Alarm Company Inc
District Yard
The Greater Alarm Company Inc
District Yard
The Greater Alarm Company Inc
District Yard
The Greater Alarm Company Inc
Check Total:
Sewer Maint - Equipment Maint Haaker Equipment Company
Sewer Maint- Equipment Maint Haaker Equipment Company
• Amount
52.60
52.60
573.94
573.94
6,492.81
1,920.80
1,920.80
168.26
285.79
2,403.84
4,082.74
11.16
6,951.79
5.65
50.80
56.45
975.52
1,811.68
2,787.20
6,494.00
18,637.50
25,131.50
2,347.50
3,747.50
5,247.50
1,325.00
12,667.50
1,756.22
60.35
AP - Checks for Approval ( 09/10/2010 - 1:52 PM) Page 2
Check bier Check Date Fund Name Account Name Vendor Name , Amount
7650
08/13/2010
Liquid Waste Fund
Sewer Maint- Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint- Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint- Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint- Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint- Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint- Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint- Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint- Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint- Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint- Equipment Maint
7650
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
Haaker Equipment Company
129.41
1,143.31.
146.38
101.35
83.05
468.03
599.01
437.53
237.46
12.49
173.87
64.73
7.57
151.82
58.55
135.00
88.14
89.76
184.08
456.49
828.38
67.49
109.62
10.69
21.91
58.89
35.22
140.78
19.82
1,643.71
24.67
5,767.11
167.36
Check Total:
15,480.25
7651
08/13/2010
Liquid Waste Fund
Sewer Maint -FOG Prog Contract
Orange County Sanitation Distr
1,193.08
Check Total:
1,193.08
7652
08/13/2010
Liquid Waste Fund
Sewer Maint - Electric Pumps
Utility Cost Management LLC
142.40 .
7652
08/13/2010
Liquid Waste Fund
Sewer Maint- Electric Pumps
Utility Cost Management LLC
342.78
7652 „
08/13/2010
Liquid Waste Fund
Sewer Maint - Electric Pumps
Utility Cost Management LLC .
566.82
7652
08/13/2010
Solid Waste Fund
Electric - Building
Utility Cost Management LLC
5.79
7652
08/13/2010
Liquid Waste Fund
Electric - Building
Utility Cost Management LLC
52.11
AP - Checks for Approval ( 09/10/2010 - 1:52 PM)
Page 3
09
Check NW* Check Date Fund Name Account Name • Vendor Name • Amount
Check Total: 1,109.90
7653
08/13/2010
Liquid Waste Fund
Employee Insurance
AFLAC
706.78
Check Total:
706.78
7654
08/13/2010
Liquid Waste Fund
Sewer Maint -Swr Lateral Prog
Arthur Brooks
1,800.00
Check Total:
1,800.00
7655
08/13/2010
Solid Waste Fund
Investment Earnings
Bank of America
15.00
7655
08/13/2010
Solid Waste Fund
Travel/Meals /Lodging
Bank of America
2.65
7655
08/13/2010
Liquid Waste Fund
Travel /Meals /Lodging
Bank of America
23.84
7655
08/13/2010
Solid Waste Fund
Travel/Meals/Lodging
Bank of America ,
10.23
7655
08/13/2010
Liquid Waste Fund
Travel/Meals/Lodging
Bank of America
92.02
7655
08/13/2010
Solid Waste Fund
Travel/Meals/Lodging
Bank of America
3.00
7655
08/13/2010
Liquid Waste Fund
Travel/Meals /Lodging
Bank of America
27.00
7655
08/13/2010
Liquid Waste Fund
Staff Development
Bank of America
13.50
7655
08/13/2010
Solid Waste Fund
Staff Development
Bank of America
1.50
7655
08/13/2010
Solid Waste Fund
Building Maintenance
Bank of America
4.30
7655
08/13/2010
Liquid Waste Fund
Building Maintenance
Bank of America
38.70
7655
08/13/2010
Solid Waste Fund
Travel/Meals /Lodging
Bank of America
10.44
7655
08/13/2010
Liquid Waste Fund
Travel/Meals/Lodging
Bank of America
93.96
7655
08/13/2010
Solid Waste Fund
Postage
Bank of America
1.69
7655
08/13/2010
Liquid Waste Fund
Postage
Bank of America
15.16
7655
08/13/2010
Solid Waste Fund
Travel/MeaWLodging
Bank of America
19.74
7655
08/13/2010
Liquid Waste Fund
Travel/Meals /Lodging
Bank of America
177.66
7655
08/13/2010
Liquid Waste Fund
Travel/Meals/Lodging
Bank of America
165.15
7655
08/13/2010
Solid Waste Fund
Travel/Meals /Lodging
Bank of America
18.34
7655
08/13/2010
Solid Waste Fund
Travel/Meals /Lodging
Bank of America
21.64
7655
08/13/2010
Liquid Waste Fund
Travel/Meals /Lodging
Bank of America
194.76
7655
08/13/2010
Solid Waste Fund
Office Supplies
Bank of America
7.61
7655
08/13/2010
Liquid Waste Fund
Office Supplies
Bank of America
68.49
7655
08/13/2010
Liquid Waste Fund
Sewer Maint- Material/Supplies
Bank of America
173.99
7655
08/13/2010
Liquid Waste Fund
Sewer Maint- Material/Supplies
Bank of America
346.83
7655
08/13/2010
Liquid Waste Fund
Sewer Maint- Material/Supplies
Bank of America
- 113.43
7655
08/13/2010
Liquid Waste Fund
Building Maintenance
Bank of America
6.48
7655
08/13/2010
Liquid Waste Fund
Sewer Maint -Small Tools /Eq
Bank of America
82.43
7655
08/13/2010
Liquid Waste Fund
Sewer Maint - Material /Supplies
Bank of America
130.03
7655
08/13/2010
Liquid Waste Fund
Sewer Maint -Small Tools/Eq
Bank of America
419.48
7655
08/13/2010
Liquid Waste Fund
Sewer Maint- Material/Supplies
Bank of America
258.39
7655
08/13/2010
Liquid Waste Fund
Sewer Maint- Equipment Maint
Bank of America
1.56
7655
08/13/2010
Liquid Waste Fund
Sewer Maint- Equipment Maint
Bank of America
71.39
AP - Checks for Approval ( 09/10/2010 - 1:52 PM ) Page 4
Check NOer Check Date Fund Name Account Name 0 Vendor Name • Amount
7655
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
Bank of America
103.22
7655
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
Bank of America
79.91
7655
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
Bank of America
.702.03
7655
08/13/2010
Liquid Waste Fund
Sewer Maint - Material /Supplies
Bank of America
76.20
7655
08/13/2010
Liquid Waste Fund
Sewer Maint - Material /Supplies
Bank of America
-7.66
7655
08/13/2010
Liquid Waste Fund
Sewer Maint - Material /Supplies
Bank of America
25.45
7655
08/13/2010
Solid Waste Fund
Building Maintenance
Bank of America
2.28
7655
08/13/2010
Liquid Waste Fund
Building Maintenance
Bank of America
20.52
7655
08/13/2010
Solid Waste Fund
Public Info /Ed/Community Promo
Bank of America
2.75
7655
08/13/2010
Liquid Waste Fund
Public Info/Ed/Community Promo
Bank of America
24.71
7655
08/13/2010
Solid Waste Fund
Public Info/Ed/Community Promo
Bank of America
30.00
7655
08/13/2010
Liquid Waste Fund
Public Info/Ed/Community Promo
Bank of America
270.00
7655
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
Bank of America
4,163.28
7655
08/13/2010
.
Solid Waste Fund
Staff Development
Bank of America
13.94
7655
08/13/2010
Liquid Waste Fund
Staff Development
Bank of America
125.46
7655
08/13/2010
Solid Waste Fund
Staff Development
Bank of America
7.90
7655
08/13/2010
Liquid Waste Fund
Staff Development
Bank of America
71.10
7655
08/13/2010
Liquid Waste Fund
Staff Development
Bank of America
13.50
7655
08/13/2010
Solid Waste Fund
Staff Development
Bank of America
1.50
Check Total: 8,129.62
7656
08/13/2010
Solid Waste Fund
Legal Services
Alan R. Burns
2,495.99
7656
08/13/2010
Liquid Waste Fund
Legal Services
Alan R. Burns
4,635.41
7656
08/13/2010
Liquid Waste Fund
Legal Services
Alan R. Burns
1,122.20
7656
08/13/2010
Solid Waste Fund
Legal Services
Alan R. Burns
199.10
7656
08/13/2010
Solid Waste Fund
Legal Services
Alan R. Burns
202.72
7656
08/13/2010
Liquid Waste Fund
Legal Services
Alan R Burns
376.48
7656
08/13/2010
Solid Waste Fund
Legal Services
Alan R. Burns
30.80
7656
08/13/2010
Liquid Waste Fund
Legal Services
Alan R. Burns
57.20
Check Total:
9,119.90
7657
08/13/2010
Solid Waste Fund
Professional Services
Computer Masters
420.85
7657
08/13/2010
Liquid Waste Fund
Professional Services
Computer Masters
3,787.67
Check Total:
41208.52
7658
08/13/2010
Solid Waste Fund
Container Collection Costs
CR &R Incorporated
3,875.81
Check Total:
3,875.81
7659 08/13/2010 Liquid Waste Fund Sewer Maint -Pump Stn Contract C&R Drains Inc.
7659 08/13/2010 Liquid Waste Fund Sewer Maint -Pump Stn Contract C &R Drains Inc.
AP -Cheeks for Approval ( 09/10/2010 - 1:52 PM) Page 5
1,036.00
949.00
Check Nu *r
Date
Fund
•
Check
Name
Account Name
Vendor Name
Amount
Check Total:
1,985.00
7660
08/13/2010
Solid Waste Fund
Public Info /Ed/Community Promo
Cross Media Resources
5,802.93
Check Total:
5,802.93
7661
08/13/2010
Solid Waste Fund
Recycling/Disposal
CR Transfer, Inc.
177,818.52
7661
08/13/2010
Solid Waste Fund
Recycling/Disposal
CR Transfer, Inc.
10,874.81
Check Total:
188,693.33
7662
08/13/2010
Liquid Waste Fund
Sewer Maint -Swr Lateral Prog
Edward Glinka
851.00
-Check Total:
851.00
7663
08/13/2010
Solid Waste Fund
Travel /MeaWLodging
Jim Ferryman
0.75
7663
08/13/2010
Liquid Waste Fund
Travel /Meals /Lodging
Jim Ferryman
6.75
Check Total:
7.50
7664
08/13/2010
Liquid Waste Fund
Sewer Maint -Swr Lateral Prog
George Berg
145.68
Check Total:
145.68
7665
08/13/2010
Liquid Waste Fund
Sewer Maint- Material/Supplies
Golden Bell Products, Inc.
1,555.13
Check Total:
1,555.13
7666
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
Haaker Equipment Company
52835
Check Total:
528.35
7667
08/13/2010
Liquid Waste Fund
Sewer Maint - Equipment Maint
Interstate Batteries
1,254.87
Check Total:
1,254.87
7668
08/13/2010
Liquid Waste Fund
Sewer Maint -Swr Lateral Prog
James Delving
1,800.00
Check Total:
1,800.00
7669
08/13/2010
Liquid Waste Fund
Sewer Maint -Pump Stn Contract
Jimni Systems, Inc
1,810.00
AP - Checks for Approval ( 09/10/2010 - 1:52 PM)
Page 6
Check *er Check Date Fund Name
Account Name
Vendor Name
Amount
Check Total: 84.00
7677 08/13/2010' Liquid Waste Fund Professional Services Norman A. Traub 1,829.75 .
Check Total: 1,829.75
7678 08/1.3/2010 Liquid Waste Fund Due to OCSD Orange County Sanitation Distr 1,807.85
AP -Cheeks for Approval ( 09/10/2010 - 1:52 PM) Page 7
Check Total:
1,810.00
7670
08/13/2010
Liquid Waste Fund
Sewer Maint- Equipment Maint
Lifecom
65.00
Check Total:
65.00
7671
08/13/2010
Solid Waste Fund
Building Maintenance
The Lloyd Pest Control Co. Inc
7.00
7671
08/13/2010
Liquid Waste Fund
Building Maintenance
The Lloyd Pest Control Co. Inc
63.00
Check Total:
70.00
7672
08/13/2010
Solid Waste Fund
Staff Development
Macias, Gini, & O'Connell LLP
15.00
7672
08/13/2010
Liquid Waste Fund
Staff Development
Macias, Gini, & O'Connell LLP
135.00
Check Total:
150.00
7673
08/13/2010
Liquid Waste Fund
Sewer Maint - .Water Pumps
Mesa Consolidated Water Dist
16.42
7673
08/13/2010
Liquid Waste Fund
Sewer Maint- Water Pumps
Mesa Consolidated Water Dist
16.42
7673
08/13/2010
Liquid Waste Fund
Sewer Maint- Water Pumps
Mesa Consolidated Water Dist
16.43
Check Total:
49.27
7674
08/13/2010
Liquid Waste Fund
Prof Membership/Dues
Municipal Equiqment Maintenanc
75.00
Check Total:
75.00
7675
08/13/2010
Liquid Waste Fund
Sewer Maint -Small Tools/Eq
Morgan Company
2,556.15
Check Total:
2,556.15
7676
08/13/2010
Solid Waste Fund
Prof Membership/Dues
National Notary Associati
42.00
7676
08/13/2010
Liquid Waste Fund
Prof Membership/Dues
National Notary Associati
42.00
Check Total: 84.00
7677 08/13/2010' Liquid Waste Fund Professional Services Norman A. Traub 1,829.75 .
Check Total: 1,829.75
7678 08/1.3/2010 Liquid Waste Fund Due to OCSD Orange County Sanitation Distr 1,807.85
AP -Cheeks for Approval ( 09/10/2010 - 1:52 PM) Page 7
AP - Checks for Approval ( 09/10/2010 - 1:52 PM } Page 8
Check Nue
Check Date
Fund Name
Account Name •
Vendor Name
Amount
Check Total:
1,807.85
7679
08/13/2010
Liquid Waste Fund
Travel/Meals/Lodging
Bob Ooten
211.00
7679
08/13/2010
Liquid Waste Fund
Travel/Meals/Lodging
Bob Ooten
60.00
7679
08/13/2010
Liquid Waste Fund
Travel/Meals/Lodging
Bob Ooten
221.88
7679
08/13/2010
Liquid Waste Fund
Travel/Meals/Lodging
Bob Ooten
82.12
Check Total:
575.00
7680
08/13/2010
Liquid Waste Fund
Sewer Maint -Swr Lateral Prog
Peter Barnett
1,600.00
Check Total:
1,600.00
7681
08/13/2010
Liquid Waste Fund
Sewer Maint -Swr Lateral Prog
Robert Bolin
.
1,800.00
Check Total:
1,800.00
7682
08/13/2010
Liquid Waste Fund
Sewer Maint -Misc Swer Wk
Santa Ana Blue Print
41.97
Check Total:
41.97
7683
08/13/2010
Solid Waste Fund
Electric - Building
Southern California Edison
74.25
7683
08/13/2010
Liquid Waste Fund
Electric - Building
Southern California Edison
668.20 '
Check Total:
742.45
7684
08/13/2010
Solid Waste Fund
TraveUMeals /Lodging
Arlene Schafer
1.50
7684
08/13/2010
Liquid Waste Fund
Travel/Meals/Lodging
Arlene Schafer
13.50
Check Total:
15.00
7685
08/13/2010
Solid Waste Fund
Sharps Program
Stericycle
267.53
Check Total:
267.53
7686
08/13/2010
Liquid Waste Fund
Rehab of (6)Swrs Transfrd #189
Traffic Control Engineering, I
6,000.00
Check Total:
6,000.00
7687
08/13/2010
Solid Waste Fund
Building Maintenance
Trimco Landscape
11.40
7687
08/13/2010
Liquid Waste Fund
Building Maintenance
Trimco Landscape
102.60
AP - Checks for Approval ( 09/10/2010 - 1:52 PM } Page 8
Check Aer
Check Date
Fund Name
Account Name •
Vendor Name
• Amount
Check Total:
114.00
7688
08/13/2010
Liquid Waste Fund
Contract Services
Underground Service Alert/SC
116.50
Check Total:
• 116.50
7.689
08/13/2010
Liquid Waste Fund
Deferred Compensation - 457
VantagePoint Transfer Agents
1,030.00
Check Total:
1,030.00
7690
08/13/2010
Liquid Waste Fund
Deferred Medical -RHS- Employee
VantagePoint Transfer Agents
345.95
7690
08/13/2010
Liquid Waste Fund
Deferred Medical -RHS- Employee
VantagePoint Transfer Agents
345.95
Check Total:
691.90
7691
08/13/2010
Liquid Waste Fund
Sewer Maint -Swr Lateral Prog
William Leedom
425.00
Check Total:
425.00
7697 -
08/27/2010
Solid Waste Fund
Building Maintenance
949 Storage
11.00
7697
08/27/2010
Liquid Waste Fund
Building Maintenance
949 Storage
99.00
Check Total:
110.00
7698
08/27/2010
Solid Waste Fund
Office Supplies
Ariel Supply
82.61
7698
08/27/2010
Liquid Waste Fund
Office Supplies
Ariel Supply
743.46
Check Total:
826.07
7699
08/27/2010
Solid Waste Fund
Telephone
AT &T
52.30
7699
08/27/2010
Liquid Waste Fund
Telephone
AT &T
470.65
Check.Total:
522.95
7700
08/27/2010
Solid Waste Fund
Building Maintenance
Bay Alarm
14.70
7700
08/27/2010
Liquid Waste Fund
Building Maintenance
Bay Alarm
132.30
Check Total:
147.00
7701
08/27/2010
Liquid Waste Fund
Capital Outlay
Bearcom
4,262.91
7701
08/27/2010
Liquid Waste Fund
Capital Outlay
Bearcom
43.50
AP - Checks for Approval ( 09/10/2010 - 1:52 PM)
Page 9
Check Nuor
Check Date
Fund Name
Account Name •
Vendor Name
Amount
365.23
7707
08/27/2010
Liquid Waste Fund
Check Total:
4,306.41
7702
08/27/2010
Solid Waste Fund
Fiscal Services
CBIZ ATA Orange County LLC
616.00
7702
08/27/2010
Liquid Waste Fund
Fiscal Services
CBIZ ATA Orange County LLC
1,144.00
Sewer Maint -Swr Lateral Prog
Edward Glinka
349.50
Check Total:
1,760.00
7703
08/27/2010
Liquid Waste Fund
Sewer Maint- Water Pumps
City of Newport Beach
17.41
7704 08/27/2010 Solid Waste Fund
7705 08/27/2010 Solid Waste Fund
7705 08/27/2010 Liquid Waste Fund
7706 08/27/2010 Liquid Waste Fund
Trash Hauler
Professional Services
Professional Services
Costa Mesa Disposal
Computer Masters
Computer Masters
Sewer Maint- Material/Supplies Cross Media Resources
Check Total:
Check Total:
Check Total:
17.41
196,914.34
196,914.34
35.00
315.00
350.00
365.23
AP - Checks for Approval ( 09/10/2010 - 1:52 PM) Page 10
Check Total:
365.23
7707
08/27/2010
Liquid Waste Fund
Sewer Maint -Swr Lateral Prog
Edwin Butcher
1,737.50
Check Total:
1,737.50
7708
08/27/2010
Liquid Waste Fund
Sewer Maint -Swr Lateral Prog
Edward Glinka
349.50
Check Total:
349.50
7709
08/27/2010
Liquid Waste Fund
Sewer Maint -Swr Lateral Prog
Elden Dwelling LLC
1,800.00
Check Total:
1,800.00
7710
08/27/2010
Facilities Revolving Fund
District Yard
Enovity, Inc.
3,630.00
Check Total:
3,630.00
7711
08/27/2010
Liquid Waste Fund
Travel/Meals /Lodging
Jim Ferryman
416.00
AP - Checks for Approval ( 09/10/2010 - 1:52 PM) Page 10
Check Nor Check Date Fund Name
7711
08/27/2010
Liquid Waste Fund
7712
08/27/2010
Solid Waste Fund
7712
08/27/2010
Liquid Waste Fund
7712
08/27/2010
Solid Waste Fund
7712
08/27/2010
Liquid Waste Fund
7713
08/27/2010
Facilities Revolving Fund
7713
08/27/2010
Facilities Revolving Fund
7713
08/27/2010
Facilities Revolving Fund
7713
08/27/2010
Facilities Revolving Fund
7714 08/27/2010 Solid Waste Fund
7714 08/27/2010 Liquid Waste Fund
7715 08/27/2010 Liquid Waste Fund
7715 08/27/2010 Liquid Waste Fund
7716 08/27/2010 Liquid Waste Fund
7717
08/27/2010
Solid Waste Fund
7717
08/27/2010
Liquid Waste Fund
7717
08/27/2010
Solid Waste Fund
7717
08/27/2010
Liquid Waste Fund
7718
08/27/2010
Solid Waste Fund
7718
08/27/2010
Liquid Waste Fund
Account Name
Vendor Name
Travel/MealsfLodging Jim Ferryman
Amount
144.65
AP - Checks for Approval ( 09/10/2010 - 1:52 PM) Page 11
Check Total:
560.65
Staff Development
Fred Pryor Seminars
19.90
Staff Development
Fred Pryor Seminars
179.10
Staff Development
Fred Pryor Seminars
8.40
Staff Development
Fred Pryor Seminars
75.60
Check Total:
283.00
District Yard
The Greater Alarm Company Inc
2,112.75
District Yard.
The Greater Alarm Company Inc
4,722.75
District Yard
The Greater Alarm Company Inc
3,372.75
District Yard
The Greater Alarm Company Inc
1,192.50
Check Total:
11,400.75
Postage
MailFinance Inc.
8.22
Postage
MailFinance Inc.
73.99
Check Total:
82.21
Sewer Maint- Water Pumps
Irvine Ranch Water District
8.00
Sewer Maint- Water Pumps
Irvine Ranch Water District
8.00
Check Total:
16.00
Sewer Maint -Misc Swer Wk
Mike Kilbride, LTD
3,500.00
Check Total:
3,500.00
Equipment Maintenance
Konica Minolta Bus Sol U.S.A.,
31.50
Equipment Maintenance
Konica Minolta Bus Sol U.S.A.,
283.48
Equipment Maintenance
Konica Minolta Bus Sol U.S.A.,
8.71
Equipment Maintenance
Konica Minolta Bus Sol U.S.A.,
78.42
Check Total:
402.11
Legal Services
Liebert Cassidy Whitmore
36.10
Legal Services
Liebert Cassidy Whitmore
324.90
AP - Checks for Approval ( 09/10/2010 - 1:52 PM) Page 11
Check Nular
Check
•
•
Date
Fund Name
Account Name
Vendor Name
Amount
Check Total:
361.00
7719
08/27/2010
Solid Waste Fund
Water - Building
Mesa Consolidated Water Dist
21.27
7719
08/27/2010
Liquid Waste Fund
Water - Building
Mesa Consolidated Water Dist
191.38
7719
08/27/2010
Liquid Waste Fund
Sewer Maint- Water Pumps
Mesa Consolidated Water Dist
16.65
Check Total:
229.30
7720
08/27/2010
Liquid Waste Fund
Sewer Maint -Swr Lateral Prog
Michael Warner
1,800.00
7720
08/27/2010
Liquid Waste Fund
Permits/Inspection Fees
Michael Warner
120.00
Check Total:
1,920.00
7721
08/27/2010
Solid Waste Fund
Office Supplies
Office Depot
,
3.42
7721
08/27/2010
Liquid Waste Fund
Office Supplies
Office Depot
30.76
7721
08/27/2010
Solid Waste Fund
Office Supplies
Office Depot
19.85
7721
08/27/2010
Liquid Waste Fund
Office Supplies
Office Depot
178.61
7721
08/27/2010
Solid Waste Fund
Office Supplies
Office Depot
3.36
7721
08/27/2010
Liquid Waste Fund
Office Supplies
Office Depot
30.25
Check Total:
266.25
7722
08/27/2010
Solid Waste Fund
Recycling Grant AB 939
ORBIS Corporation
13,209.86
7722
08/27/2010
Solid Waste Fund
Recycling Grant AB 939
ORBIS Corporation
2,972.27
Check Total:
16,182.13
7723
08/27/2010
Solid Waste Fund
Building Maintenance
Pacific Building Care, Inc.
45.37
7723
08/27/2010
Liquid Waste Fund
Building Maintenance
Pacific Building Care, Inc.
408.38
Check Total:
453.75
7724
08/27/2010
Liquid Waste Fund
Sewer Maint -Swr Lateral Prog
Penelope Venola
244.00
Check Total:
244.00
7725
08/27/2010
Solid Waste Fund
Office Supplies
Priority Mailing System
4.15
7725
08/27/2010
Liquid Waste Fund
Office Supplies
Priority Mailing System
37.33
Check Total:
41.48
7726
08/27/2010
Liquid Waste Fund
Sewer Maint -Swr Lateral Prog
Ray Aguirre
624.77
AP - Checks for Approval ( 09/10/2010 - 1:52 PM ) Page 12
Check Neer
Check Date
Fund Name
Account Name •
Vendor Name
Amount
Check Total:
624.77
7727
08/27/2010
Liquid Waste Fund
Sewer Maint -Swr Lateral Prog
Robert Reeder
428.05
7727
08/27/2010
Liquid Waste Fund
Sewer Maint -Swr Lateral Prog
Robert Reeder
325.50
Check Total:
753.55
7728
08/27/2010
Liquid Waste Fund
Sewer Maint -Elec Bldg
Southern California Edison
773.83.
7728
08/27/2010
Liquid Waste Fund
Sewer Maint - Electric Pumps
Southern California Edison
788.86
Check Total:
1,562.69
7729
08/27/2010
Liquid Waste Fund
Travel/Meals/Lodging
Arlene Schafer
410.00
7729
08/27/2010
Liquid Waste Fund
Travel/Meals/Lodging
Arlene Schafer
105.74
Check Total:
515.74
7730
08/27/2010
Solid Waste Fund
Other Reimbursements
Tola Korsunski
20.00
Check Total:
20.00
7731
08/27/2010
Liquid Waste Fund
Deferred Compensation - 457
VantagePoint Transfer Agents
1,030.00
Check Total:
1,030.00
7732
08/27/2010
Liquid Waste Fund
Deferred Medical -RHS- Employee
VantagePoint Transfer Agents
338.28
7732
08/27/2010
Liquid Waste Fund
Deferred Medical- RHS - Employee
VantagePoint Transfer Agents
338.28
Check Total:
676.56
Report Total:
602,008.54
AP - Checks for Approval ( 09%10/2010 - 1:52 PM) Page 13
-Costa M Sanitary District
Expense Reimbument Form for Directors
Name: ARLENE SCHAFER ' #2201
I. Attach all receipts.
Pay
this meeting. L-4i IN ' – `y �1-0 .(U
c
Calculation
1. _ miles at 48.5 cents per mile
(current Rate)
2. �— _ Total meals
3. (p days attendance at $_221.00 per day
(per Board Policy) ,
4. Meeting
5. Other
Calculated by: Joan Revak Date:
Approved by: Tom Fauth Date:
`6 — .af lb & Cp it �beds ej( for Pate o as well as taxi, limo and air fare.
Total= $ 0
Ill. Must be submitted to District Office by the 28th of each month. Director Signature
2026.68 ONLINE (rev. 2/04) While - Finance; Yellow - District Office; Pink - Directors Copy
PURPOSE OR OCCASION
(�//
1
no
RIM A MIJ141FIRR
�.
i
err
I ✓� w Ala
Pay
this meeting. L-4i IN ' – `y �1-0 .(U
c
Calculation
1. _ miles at 48.5 cents per mile
(current Rate)
2. �— _ Total meals
3. (p days attendance at $_221.00 per day
(per Board Policy) ,
4. Meeting
5. Other
Calculated by: Joan Revak Date:
Approved by: Tom Fauth Date:
`6 — .af lb & Cp it �beds ej( for Pate o as well as taxi, limo and air fare.
Total= $ 0
Ill. Must be submitted to District Office by the 28th of each month. Director Signature
2026.68 ONLINE (rev. 2/04) While - Finance; Yellow - District Office; Pink - Directors Copy
• Costa Mesa Sanitary District
Expense Reimbursement Form for Directors
Name: ARLENE SCHAFER #2201
1. Attach all receipts.
.•
PURPOSE OR OCCASION
•
•
. r w L +l Y ?ice
___m = -,0
.,Pay
II.
this meeting. c__;l 15 P, `� �_O _(U
Calculation
1. — miles at --�cents per mile 414°v o0 'I" /a- 00
(current Rate)
2. 05.E Total meals
3. days attendance at $_Z21.00 per day
(per Board policy)
4. Meeting
5. Other _
Calculated by: Joan Revak . Date:
Approved by: Tom Fauth Date:
III. Must be submitted to District Office by the 28th of each month.
2026 - INE (rev. 2/04) White - Rnance; Yellow - District Office; Pink - Director's Copy
•
`6 b (Yiabedse�(br vats o as well as ta)i, limo and air fare.
�Za 416
z�� !T
Total = $ 51 S 74
Director Signature
•
I_
r
Costa Mesa Witary District
Expense, Reimbursernnt Form for Directors
Name: Robert I Ooten
I. Attach, all receipts.
is
DATE OF EVENT
PURPOSE OR OCCASION
LOCATION
TRAVEL*
MEAL EXPENSE
OTHER
I 1-Lolo
to fke-o
Oc. W
a 119 J2aI �
� p-S A
C
—
L+
-
�
5/2,S17010
C5
C)
a I-VA 2o10
S%Ak L/
'Can be used for private auto as well as taxi, limo and air fare.
11. Calculation
1. o r4 miles at 50 cents per mile
(Current Rate)
2. Total meals
3. (_ days attendance at $ 221.00 per day
(per Board Policy)
4. Meeting
5. Other
Conference /Event: C $I' S A
Location:
Per Ordinance No. 55, "Board membJ shall provide brief
reports on meetings attended at public expense at the next
regular Board meeting." (Operations Code, Section 3.61.035)
(rev. 2106)
t32- (o.00
Total = $ 111(a , P 2-
Significant points learned of benefit to the District and its
ratepayers: n r
to t\CO -, v.9 LILL Pdl Ut
w�( o 4J !-�- a� rov. Cs� -o,�wc k)OIC A\ 1 ro
Director Signature: Cl 1
Costa Mesa nitary District
Expense Reimbursnt- Form for Directors
Name:Gary Monahan
I. Attach all receipts.
DATE OF EVENT
PURPOSE OR OCCASION
LOCATION
TRAVEL"
MEAL EXPENSE
OTHER
8/17/10
CMSD Sewer System Committee Meeting
CMSD
8/26/10
CMSD Regular Board of Directors Meeting
CMSD
-uan De used for private auto as well as taxi, limo and air tare.
ll. Calculation
1. miles at 50.0 cents per mile
(Current Rate)
2. Total meals
3. 2 days attendance at $ 221.00 per day
(per Board policy)
1
4. Meeting
5. Other
Conference/Event:
Location:
Per Ordinance No. 55, "Board members shall provide brief
reports on meetings attended at public expense at the next
regular Board meeting." (Operations Code, Section 3.01.035)
442.00
Total = $442.00
Significant points learned of benefit to the District and its
ratepayers:
Director Signature:
(rev. 1/1/09) .
LJ
Costa Mesenitary district !� ' � (.� (� LI
Expense Reimbursement Form for Directors
Name:
1. Attach all receipts.
DATE OF EVENT
PURPOSE OR OCCASION
LOCATION
TRAVEL'
MEAL EXPENSE
OTHER
-a
140b,rY
ci
z
70
'Can be used for private auto as wail as taxi, ilmo and air fare.
U.- Calculation
1. miles at 50.0 cents per mile
(cu"ent Pats)
2. Total meals
3. days attendance at $ 221.00 per day
t"faaROPWICA 2 /,
4. Meeting V
5, other
Conference/Event:
Location: CA
Per Ordinance No. 55, "Board members shall provide brief
-4 reports on meetings attended at public expense at the next
S regular Board meeting." (Operations Code, Section 3.01.035)
r-
v
m
.r
eb
Total
Significant points learned of benelit to the District and its
ratepayers.
C
Rl
in
.m
�m
�Ij
r
M
7
V
S
E
�I
2
n
V
V
�= I
I
O
M
r-
Costa Mesa Sanitary District
Expense Reimbursement Form for Directors
Name: J/M L'' i`-
I_ Attach all receipts. '
qy� -bp:)(i G L� -
DATE OF EVENT
PURPOSE OR OCCASION
LOCATION
TRAVEL'
MEAL EXPENSE
-
OTHER
-- -
y .�
a
�u
r
'Can be used for prlvate auto as well aft taxl, ilmo and air fare.
il. Calculation
1. miles at 50.0 tents per mile
(Cunent Rafe)
2. Total meals
3. , days attendance at $ 221.00 per day
(tit eaa d POWY)
4. Meeting
f
U
5. Other
ConferenWEvent:
Location: "t V-V k
Per Ordinance No. 55, "Board members shall provide brief
reports on meetings attended at public expense at the next
regular Board meeting." (Operations Code, Section 3.01.035)
(rer, IIIhIq)
0
r
LJ
AI
1
Total = $ S�CU• 6S
Significant points learned of benefit to the District and its
ratepayers: I .
911//1 /0 - k�it&/I
Director Signatures
0
7-
� s
rti
Q a
u
Y
D
M
M
M
rn
z
z
n
co
-A
I
I
ai
ti
r
r
r'
Costa Mesa nitary District
Expense Reimburse Ont Form for Directors
Blame:
I. Attach all receipts.
•
.-o: _
DATE OF EVENT
PURPOSE OR OCCASION
LOCATION
TRAVEL*
MEAL EXPENSE
OTHER
I'O
CC)
0 C UAT AI- 14 si
z�
�A--I) pj-4 11� c ,mac.
-t,an oe usea Tor private auto as wen as taxi, ino ana air tare.
II. Calculation
1. miles at w ts per mile
(Current Rate)
2. Total meals
3. _ days attendance at $ 221.00 per day
(per Board policy) f
4. Meeting
5. Other
Conference /Event:
Location..
Per Ordinance No. 55, "Board members shall provide brief
reports on meetings attended at public expense at the next
regular Board meeting." (Operations Code, Section 3.01.035)
Total = $ Od
Significant points learned of benefit to the District and its
ratepayers:
C
(rev. 2106)
Costa Mesa Sanitary District
Expense Reimbursement Form for Directors
(dame: �`►/L { �" '
I. Attach all receipts.
DATE OF EVENT.
PURPOSE OR OCCASION
LOCATION
TRAVEL*
MEAL EXPENSE
OTHER
ra
c
C, 7",t el Y
1
tc ��.�( s j 4 C�-IA4"
o Al-10 DZ C2 411-�
�a�FERC-['cE
&V
S,qB
" -.NCB
11\-c,, -Tz, %Z rl-
�� 1 ct, ,,- X-, R ( �
q
i
cil 31
9 0 7 n
a
/� \vim \•�`,L\' 11 •»��T i
V
i
Clj
SEC k-Ii S
_i
SEA' 17 2010
COST a .. SMITARY Vt `
Q.-fl, �,-
`r: . _ I�tlrtrrlrl I�ttrr�Yi�rtttr!it frt�tlt ,i!�
Meeting Date Item NumtsF
109/23H 0 IX, A.
COST.9 WES
.A SA.NI7Ak7q)rsT4UC1'
Memorandum
... an Independent Specia(District
To: Board of Directors
Via: Scott Carroll, General Manager
From: Sherry Kallab, Administration Manager
Date: September 23, 2010
Subject: Budget Appropriation Engineering Phase Proj #189 OCSD 6 Lines
Summary
A budget appropriation in the amount of $27,065 is needed to complete the design
® phase of this project. Staff will be providing a report for the construction phase of the
project once designs are complete and costs are finalized.
Staff Recommendation
That the Board of Directors approves appropriating $27,065 to complete the design
phase of Project No. 189.
Analvsis
In October 2009 the Board approved a proposal in the amount of $66,865 from RBH,
Inc. for engineering design service to mitigate deficiencies in the six OCSD sewer lines
transferred to the District. The approval was followed up with a budget appropriation
in the amount of $48,700 for estimated work to be completed in the 09 -10 fiscal year
knowing this project will be carried forward in FY2010 -11. A budget appropriation in
the amount of $18,165 is needed to complete the design phase of this project. An
additional appropriation of $2,900 for soils engineering and $6,000 for traffic control is
also needed, bringing the total appropriation to $27,065.
Strategic Plan Element & Goal
This item supports achieving Strategic Element No. 1.0, Sewer Infrastructure, through
"the careful management of the collection infrastructure ".
Protecting our community's health 6y providing solid waste and sewer coQection services
crosdca.gov
Board of Directors
September 23, 2010
Page 2 of 2
Leg-all Review
Not applicable
Financial Review
There are adequate funds to appropriate from the Fund Balance. Approximately
$1,300,000 was transferred from OCSD for upgrading the six sewer lines.
Committee Recommendation
Not applicable
Public Notice Process
Copies of this report are on file with the entire agenda packet at District Headquarters
and on the District's website.
Alternative Actions
1. Deny the appropriation and refer the matter back to staff
�1
Meeting Date I Item Number
09/23/10 IX. B.
�UX
To: Board of Directors
... an Independent Speeia[Distikt
Via: Scott Carroll, General Manager`s
Date: September 23, 2010
Subject: Annexation Fee
Summary
On September 15, 2010, staff went before the OC LAFCO Commission to request
waiving the annexation fee for the property at 789 Paularino Avenue. The Commission
tentatively approved staff's request on the condition the District agrees to the following
terms.
1. Annex all four islands within the District service area
2. Remit the annexation fee to LAFCO and once all four islands are
officially annexed LAFCO will return the fee to the District.
Staff Recommendation
That the Board of Directors approves annexing the last four islands within the District
service area and approves appropriating $3,200 for OC LAFCO annexation fees.
Analysis
Earlier this year, LAFCO brought to our attention four islands exist within the District
service area. After further investigation by staff, we learned one of the four islands
consists of a single - family residence, which is located at 789 Paularino Avenue. We
also learned that this property is illegally connected` to the private school property
located adjacent to 789 Paularino at 795 Paularino Avenue. The private school
property is owned by the same owner as 789 Paularino Avenue.
The person who performed the illegal connection is now deceased and we believe his
widow had no knowledge of the illegal connection. After meeting with the property
owner, she has agreed to allow her property to be annexed into our service area and
she has agreed to pay for construction costs to connect her sewer system to our
sewer main.
Protecting our community;s health and the environment by providing solid waste and sewer co&tivn services.
wuW.crosdcnBov
Board of Directors
September 23, 2010
Page 2 of 3
• The remaining three islands are located below:
Harbor Island
APN# 140- 041 -63
Harbor /Baker Island
APN# 418- 101 -03
McCormick Island
APN# 427 - 190 -01
These islands consist of parking lots, vacant land, and in one case, a portion of a
building, so they do not require new sewer and /or new refuse collection services.
Attached are aerial maps depicting the island properties. However, staff believes it is
good business to clean up our records by annexing the remaining islands within our
service area.
If you approve annexing these islands, staff will contact the property owners and
attempt to obtain their approval to allow for annexation. There is a chance a property
owner may be uncooperative and will not agree to annexation and in which case OC
LAFCO may not return the $3,200 annexation fee to the District. However, staff will
inform the property owners that it will be in their best financial interest to annex now in
order to receive annexation fee waivers, otherwise they will have to pay all annexation
fees at a later date when they perform any level of work on the property. The property
owners will be required to pay an annexation fee to the State Board of Equalization,
but that fee is minimal at approximately $300 per parcel.
Strategic Element & Goal
Not applicable
Legal Review
Not applicable.
Financial Review
The fee to annex all four islands is $3,200. OC LAFCO has agreed to return this
money to the District after all four islands are officially annexed into the CMSD service
area.
Committee Recommendation
• Not applicable
Board of Directors
September 23, 2010
Page 3 of 3
Public Notice Process
Copies of this report are on file and will be included with the entire agenda packet for
the September 23, 2010 Board of Directors regular meeting at District Headquarters
and on the District's website.
Alternative Actions
1. Deny staff's recommendation and refer the matter back to staff for
additional information.
Reviewed by:
Sherry Kallab
Administrative Manager
r1
LJ
•
Law
is
A
- A
�L�Outh Coam Df
Costa Mesa Sanitary District
Harbor Island
SOI Originally Adopted: 5/19/76
Last Reviewed: 11/12/08
0 110 220 440
Feet
3/3/10
-- Costa Mesa Sanitary District
Harbor /Baker Island
501 Originally Adopted: 5/19/76
' Last Reviewed: 11/12/08
�l 0 55 110 220
Feet 3/3/10
•� r
•� J
Costa Mesa Sanitary District
McCormick Island
i_ SOI Originally Adopted: 5/19/76
Last Reviewed: 11/12/08
0 75 150 300
F%8/10
i
•� r
Costa Mesa Sanitary District
Paularino /Randolph Island
' SO[ Originally Adopted: 5/19/76
Last Reviewed: 11/12/08
45 90 180
Feet 3/3/10
•
Meeting Date Item Number
09/23/10 X. A.
COSTA MESA SANITARY DISTRICT
RECYCLING COMMITTEE
AGENDA
Monday, September 20, 2010
10:30 a.m.
Costa Mesa Sanitary District
628 W. 191h Street
Costa Mesa, California
(Directors Ooten and Perry)
• I. Orange County Waste & Recycling Sub - Regional Meetings, Funding & Grant Program
II. Strategic Goals for Recycling Committee
III. CR &R Report on Other Agencies Recycling Programs
IV. Integrated Waste Management Department Household Hazardous Waste Collection
Program
V. Composting Bins
VI. Residential FOG Recycling Program
VII. Report on Other CMSD Recycling Programs
VIII. Public Comments
IX. Next Meeting Date — October 25, 2010
•
Dated: September 16, 2010
Clerk of the District
Meeting Date I Item Number
09/23/10 1 XI. A.
F};��9AN1 Qr�
COST-A 9WES.A SA9qT.ARY(DISMCT
� F
... an Independent Specia( District
Memorandum
To: Board of Directors
Via: Scott Carroll, General Manag
From: Robin B. Harriers, District Engineer
i
Date: September 23, 2010
Subject: #168 Irvine Pumping Station Relocation — Acceptance
Summary
Construction of the improvements was completed on June 5, 2008, including minor
repairs made September 12 -13, 2010, and the lawsuit between Back Bay, the District,
and Vadnais Corporation is complete, therefore, it is appropriate for the District to final
the project and file a Notice of Completion.,
Staff Recommendation
That the Board of Directors approves the following action:
Accept improvements as completed and file a Notice of
Completion.
2. Authorize payment of 5% retention 35 days after Notice of
Completion is recorded.
3. Exonerate Labor and Material Bond after Notice of Completion is
recorded and exonerate Faithful Performance Bond one year after
Notice of Completion is recorded.
Analysis
Construction of the pumping station was completed on June 5, .2008, however, the
shoring method used by the contractor Vadnais Corporation. caused the private
property slope to fail. The contractor braced the slope and retaining wall to protect the
District's new pumping station while a lawsuit ensued for the Back Bay property owner
to recover damages. The lawsuit was recently settled and reconstruction of the
retaining wall, slope, and parking lot is presently occurring. The slope, wall, and
ftotecting our community's health and the environment by providing solid waste and sewer collection services.
www.cmsdca.gov
Board of Directors
September 23, 2010
Page 2 of 2
parking lot is being supported by 30" diameter caissons at 5' on center with a grade
beam across the top of all the caissons.
Strategic Element & Goal
This item supports achieving Strategic Element No. 1.0, Sewer Infrastructure, through
"the careful management of the collection infrastructure"
Legal Review
Not applicable.
Financial Review
The 5% retention amounts to $88,705.47. Funding is available in the C.I.P. budget to
pay for the retention.
Committee Recommendation
Not applicable
Public Notice Process 0
Copies of this report are on file and will be included with the entire agenda packet for
the September 23, 2010 Board of Directors regular meeting at District Headquarters
and on the District's website.
Alternative Actions
1. Refer the matter back to staff for additional information.
Reviewed by:
Sherry Kallab
Administrative Manager
•
Wk
Meeting Date I Item Number
09/23/10 XI. B.
C osT.9
9YES.A SANYTA(D(V l�ls2UCT
. an Independent Specid D4aiict
Memorandum
To: Board of Directors
Via: Scott Carroll, General Manag
From: Robin B. Hamers, District Engineer
Date: September 23, 2010
Subject: #183 -2 Bristol Street Sewer North of Randolph - Bid Opening
Summary
The project will replace 175 linear ..feet of 8" sewer in Bristol Street that contains three
sags and is an enhanced maintenance area (hot spot) requiring continued cleaning
and attention 'by the field crew. Bid opening was held September 7, 2010 for the
replacement of the sewer and the results are shown below.
• Staff Recommendation
That the Board of Directors accepts and files this report
Analysis
The District created a Hot Spot Abatement Program in order to structurally correct
problems in the sewer system that need constant cleaning and attention. The sewer in
Bristol Street north of Randolph Avenue . serves restaurants on both sides of Bristol
Street and combined with the three sags in the line requires constant cleaning.
A public bid opening was held on September 7, 2010. Nine contractors submitted bids
for this project. The lowest responsive bidder is Nikola Corporation for $63,909. The
low bid is well below the Engineer's estimate, which is $99,875. Below is a listing of all
the bids submitted for this project.
1 Nikola Corporation
$ 63,909.00
2 Mike Prlich
$ 75,839.00
3 GCI
$ 78,550.00
4 John T. Malloy
$ 97,500.00
5 Atlas Allied
$ 99,000.00
6 Vasily
$102,000.00
S(Protecting our community's heartk an -the environment 6y provid ng sorurwaste andsewer coffection services.
u ww. crosdca gov
Board of Directors
September 23, 2010 •
Page 2 of 3
7 E &R
$106,250.00
8 TTS
$124,117.50
9 Savala
$162,449.20
Staff checked Nikola Corporation's references and the two agencies queried gave
Nikola high marks. Additionally, Nikola constructed #181 Newport Blvd. Sewer North
of 19th Street for the Costa Mesa Sanitary District and performed exceptionally well.
Nikola Corporation's license with the Contractors State License Board is current.
The General Manager is authorized to sign a contract for this Project because the cost
is less than $125,000. Staff is preparing the agreement and will be signed and fully
executed in the very near future.
Strategic Element & Goal
This item supports achieving Strategic Element No. 1.0, Sewer Infrastructure, and
Strategic Goals No. 1.3, Hot Spot Abatement Program and Goal No 1.4, System wide
Sewer Replacement and Repair Program.
Legal Review
Not applicable at this time; however, district counsel will review the agreement before it •
is signed by both parties.
Financial Review
The lowest qualified bid is $63,909 plus a ten percent contingency will bring the
potential total cost for this project at $70,300. The budget amount for this project is
$108,437, so there are adequate funds available.
Committee Recommendation
Not applicable
Public Notice Process
Copies of this report are on file and will be included with the entire agenda packet for
the September 23, 2010 Board of Directors regular meeting at District Headquarters
and on the District's website.
•
Board of Directors
• September 23, 2010
Page 3 of 3
Alternative Actions
1. Refer the matter back to staff for additional information.
2. Reject all bids and direct staff to re- solicit bids
Reviewed by:
Sherry Kallab
Administrative Manager
•
•
•
s
SEWER SYSTEM COMMITTEE AGENDA
September 14, 2010,10:30 a.m.
Costa Mesa Sanitary District
628 W. 19th Street
Costa Mesa, California
Directors Monahan, Ooten and Ferryman
Meeting Date Item Numb
08/23110 - — 1 XII. A:
1. Monthly Spill Statistics
II. Oversight.of Private Pumping Stations Update
A. Brochure and Site Visit Information Form
B. List of discharge points if stations fail
C. Flyer for meeting with owners to present program
111. I/I Reduction Program — Minutes of meeting held 913/10
IV. CMSD Pumping Stations
A. Quarterly staff meetings
B. List of discharge points if stations fail
V. Root Control Status
VI. Plumber's Seminar Follow -Up — Select Trenchless Pipelines Brochure
VII. WDR Compliance Library
VIII. Grease Recovery Device Options — CHEMSEARCH BIOAMP — SCP & Elden Pump Stations
IX. Proposed Senior Housing —1545 Adams Avenue
X. OC WDR Steering Committee 'Emergency Response Communications' Seminar- 10 -21 -10
XI. Pump Stations Earthquake Evaluation
XII. CMSD Sewer Cleaning Program Year 1; Preparing Bid Documents
XIII. Triennial WDR Review
A. First Draft Review in November 2010
B. Agency Statistics — google groups; sso; Example: http: / /_qroups.ggogle.com/group /sso- data- review-
committee/browse thread/thread /1 bac50e3eb0c12df
XIV. Network Piping Monitoring Systems Scam
XV. Articles of Interest
XVI. CMSD Projects:
A. Project #101 — Westside Pumping Station Abandonment
B. Project #129 — Bristol Street Sewer
C. Project #164 — Miscellaneous Sewer Work
D. Project #171 — Irvine Pumping Station Force Main Rehabilitation
E. Project #183 — System -Wide Sewer Reconstruction
F. Project #183 -2 — Bristol Street North of Randolph
G. Project #186 — Sewer Lateral Assistance Program
H. Project #187 — District Yard
I. Project #189 — Rehabilitation of Six Sewers Transferred to CMSD
XVII. Next Meeting: October 19, 2010,10:30 a.m.
XVIII. Public Comments
Dated: September 7, 2010
Clerk of the District
is
•
•
COSTA MESA SANITARY DISTRICT
INVESTMENT OVERSIGHT COMMITTEE
LOCATION:
DATE AND TIME:
CONTACT:
1. Call to Order
2. Roll Call
Conference Room
M�Btin Date Iterl Numb @F
1 09/23/10
Thursday, September 23, 2010 at 5:00 p.m.
Marc Davis, Treasurer
AGENDA
A. President Schafer (rotating Committee member)
B. Director Perry (rotating Committee member)
C. Scott Carroll, General Manager
3. New Business
A. Review of Investment Report as of August 31, 2010
B. Update on Annual Charge for FY2010 -11
4. Public Comments
5. Adjournment
It is the intention of the Costa Mesa Sanitary District to comply with California Government Code Section
54961 and the Americans with Disabilities Act ( "ADA ") in all respects. If as an attendee or participant at
this meeting, you will need special assistance beyond what is normally provided, the Costa Mesa Sanitary
District will attempt to accommodate you in every reasonable manner. Please contact Joan Revak; Clerk
of the Sanitary District, (949) 645 -8400 ext. 223; at least forty -eight (48) hours prior to the meeting to
inform us of your particular needs and to determine if accommodation is feasible. Please advise us at the
time you will need accommodations to attend or participate in meetings on a regular basis."
is
Meefift Date Iterh _Numb6F
1 09/23/10 I XV. A.
COSTA.U�ESA SANITANY DISqRICT
Memorandum
... an Independent Special District
To: Board of Directors
Via: Scott Carroll, General Man
From: Joan Revak, Office Manager /Clerk of the District 9rr� avo�
Date: September 23, 2010
Subject: Joint Meeting with Midway City Sanitary District
Summary
Staff received a call from Ken Robbins of Midway City'Sanitary District to set up a date
for a joint meeting at Midway City Sanitary District headquarters in the month of
November. Their Board and Staff are available any day in the month with the
exception of November 5 or 12, 2010.
Staff Recommendations
It is recommended the Board of Directors consider a date for the joint meeting at the
CMSD regular Board meeting on September 23, 2010.
Analysis
Not applicable
Legal Review
Not applicable
Financial Review
Not applicable
Public Notice Process
Copies of this report are on file with the entire agenda packet at District Headquarters .
and on the District's website.
Protecting our community's Health and the environment by providing solid waste and sewer coffection services.
www.crosdcagov
•
OFFICE OF THE TREASURER -TAX COLLECTOR
HALL OF FINANCE & RECORDS
R E C E I V E D 11 CIVIC CENTER PLAZA, SUITE G58
POST OFFICE BOX 4005
SEP 0 2 2010 SANTA ANA, CA 92702
www.ttc.ocgov.com
COSTA MESA SANITARY DISTRICT
COSTA MESA SANITARY DISTRI 540207
PO BOX 1200
COSTA MESA CA 92628 -1200
Meeting Date Item Num�9F
09123/10 XVIII-A.
TREASURER-TAX COLLECTOR
PAUL C. GORMAN, C.P.A., CFP
CHIEF ASSISTANT TREASURER -TAx COLLECTOR
JENNIFER BURKHART, CFA
ASSISTANT TREASURER-TAX COLLECTOR
ROBIN RUSSELL
ASSISTANT TREASURER -TAX COLLECTOR
ADMINISTRATION
LAFCO COST SEC. 56381
2010 -2011
Invoice # GA00112
BALANCE: $18880.76
SECOND NOTICE
* * * * * * * * * * * * * * * * * **
The above referenced invoice remains due and payable. It is
essential that you contact our office if there is a delay for
payment or, that payment is received in the next 10 days.
Your payment should be mailed to:
County Of Orange Treasurer -Tax Collector
11 Civic Center Plaza Suite G58
P O Box 4005
SANTA ANA CA. 92702
Thank you.
JORGE VELASQUEZ
DEPUTY REVENUE RECOVERY OFFICER
714 - 834 -7550 3GL
08 -30 -10
Approved Ry
Approved 8y late
GL Acct
GL Acct
1 °/aa - 0200 00 0 -40'°