Loading...
project349a__addendum_1 COSTA MESA SANITARY DISTRICT ADDENDUM NO. 01 Mendoza Drive Gravity Main Extension PROJECT No. 349A June 16, 2025 Costa Mesa Sanitary District Addendum #01 CIP349A – Mendoza Drive Gravity Seewer Extension Page 1 of 2 This Addendum is hereby made a part of the contract documents which consists of answers to the contractor’s questions and corrections to the Bid Documents. Receipt of this Addendum shall be noted on the Bid Proposal Form. The following questions were received from bidders at the pre-bid meeting and by email: 1. Will contractor spend their budget for traffic control? Answer: CMSD has had a traffic control plan prepared and has submitted it to the City for use with the encroachment permit. A copy of the traffic control plan is attached. The contractor will be responsible for implementing the traffic control measures at the site. The contractor shall furnish all labor and materials necessary to implement the plan. 2. Backfill condition? Answer: Contractor is responsible for backfilling the excavation per City of Costa Mesa requirements. Contractor shall install permanent pavement to the satisfaction of the City Inspector to match existing pavement grade. Manhole shall be plated and left 6” below top of pavement grade. City pavement contractor shall raise to grade. 3. Where should contractor put their staging area? Answer: The contractor can store pipe and manhole shaft in the pump station yard at the end of the alley. It is the contractor’s responsibility to arrange for any other staging or storage areas needed. 4. After bypassing and hooking the newer force main to the new manhole, what should we do with the force main portion between the new manhole to the existing manhole on Mendoza Dr? Answer: The contractor shall plug the ends of the abandoned force main with brick and mortar and fill it with 1-sack sand cement slurry. 5. How much time does contractor need for Encroachment permit? Answer: CMSD has started the encroachment permit application but the City will not approve it until the Contractor’s license and insurance information has been submitted and approved. It is up to the contractor to provide the required information as expeditiously as possible. 6. Our understanding is the work must be completed by July 25, 2025 or we will need to pay $1,000 in liquidated damages each day of work that goes over. It is not clear how much time we will have to complete this contract. When can we anticipate receiving NTP? Is there a minimum number of working days we can expect to have to complete the work? COSTA MESA SANITARY DISTRICT ADDENDUM NO. 01 Mendoza Drive Gravity Main Extension PROJECT No. 349A June 16, 2025 Costa Mesa Sanitary District Addendum #01 CIP349A – Mendoza Drive Gravity Seewer Extension Page 2 of 2 Answer: Per the Bid Documents, the Contractor acknowledges and agrees to return the signed and executed contract to the district, together with the contract bonds and required proof of insurance within 5 WORKING days after receipt of written notice of award of contract. The notice to proceed will be issued after the bonds and insurance as been reviewed and accepted. The review usually takes two or three working days. The July 25th date has been set by the City. If the project is not completed by then, the District will incur expenses for delaying the City pavement project. The following changes, additions, clarifications or modifications shall be made to the contract documents and all other conditions remain the same. Bid Items 3 and 5 have been revised. CMSD will be providing the PVC pipe and precast 60” manhole shaft and cone. The revised Bid Proposal Form is attached and shall be used by the bidders. There are no other changes to the bid documents at this time. Thank you, and good luck. Michael L. Benesh, PE Project Engineer mlbenesh@robhamers.com CMSD Project No. 349A Bid Proposal Form – 1 of 7 CMSD SEWER PROJECT NO. 349A REVISED SCHEDULE OF WORK ITEMS MENDOZA DRIVE GRAVITY MAIN EXTENSION BID ITEM APPROX. QUANTITY DESCRIPTION UNIT PRICE TOTAL AMOUNT 1 Lump Sum Bonds, Insurance, and Permits: Work under this item includes any costs incurred for securing bonds, insurance permits and financing for construction work. $__________ $ 2 Lump Sum Mobilization, Demobilization and Cleanup: AMOUNT BID FOR MOBILIZATION / DEMOBILIZATION SHALL NOT EXCEED 4.0% OF CONTRACTORS BID TOTAL. Work under this item shall include preparatory and cleanup operations including, but not limited to, those necessary for the movement of personnel, equipment, materials, and incidentals to and from the project site, securing a temporary construction yard, securing all necessary permits from the City of Costa Mesa, securing the work site during all work activities, and maintaining the project site in a safe and orderly manner during construction. The district shall pay 50 % of this item for mobilization activities, and 50 % for demobilization activities at the end of the project. $__________ $ 3 120 L.F. Remove existing force main and construct new 18” PVC gravity sewer main per construction plan. CMSD will furnish 18” PVC pipe. Contractor shall pick up and move the furnished materials from the District Yard, located at 174 W.Wilson Street, Costa Mesa, and move to job site. Furnish all other labor, materials, and equipment necessary for construction. $__________ per Foot $ 4 1 EACH Re-Channel existing manhole base per plan. Furnish all labor, materials, and equipment necessary for construction. $__________ Each $ 5 1 EACH Construct standard 60” I.D. manholes per construction plan. CMSD will furnish precast concrete manhole shaft and cone. Contractor shall pick up and move the furnished materials from the District Yard, located at 174 W.Wilson Street, Costa Mesa, and move to job site. Furnish all labor, materials, and equipment necessary for construction. $__________ Each $ 6 1 EACH Core-Drill and join 18" sewer to existing manhole per plan. Furnish all labor, materials, and equipment necessary for construction. $__________ Each $ CMSD Project No. 349A Bid Proposal Form – 2 of 7 7 397 S.F. Trench Repair and backfill. Remove and replace A.C. pavement on Mendoza Drive per plan and City Standards. Furnish all labor, materials, and equipment necessary for construction. $__________ Per Square Foot $ 8 81 S.F. Trench Repair and backfill. Remove and replace concrete pavement in driveway apron per City Standards. Furnish all labor, materials, and equipment necessary for construction. $__________ Per Square Foot $ TOTAL AMOUNT OF ITEMS 1 THROUGH 8 $ ____________________ WRITE TOTAL AMOUNT OF BID IN WORDS: NOTE: IN THE EVENT OF A DISCREPANCY BETWEEN THE FIGURES AND THE WORDS, THE AMOUNT IN WORDS SHALL PREVAIL. Bidder’s Initials________ If the Contractor should be the lowest responsible bidder, the Contractor acknowledges and agrees to return the signed and executed contract to the district, together with the contract bonds and required proof of insurance within 5 WORKING days after receipt of written notice of award of contract. If the bidder fails or refuses to enter into a contract to do the work within the time limit, the bid security shall be forfeited to the District and shall be collected and paid to the General Fund of the District, and the contract will be awarded to the next lowest bidder. Bidder’s Initials________ The Contractor agrees that the District will not be held responsible if any of the approximate quantities shown in the foregoing proposal shall be found incorrect, and he shall not make any claim for damages or for loss of profits because of a difference between the quantities of the various classes of work as estimated and the work actually done. If any error, omission or mis-statements shall be discovered in the estimated quantities, it shall not invalidate this contract or release the Contractor from the execution and completion of the whole or part of the work herein specified, in accordance with the specifications and the plans herein mentioned and the prices herein agreed upon and fixed therefor, or excuse him from any of the obligations or liabilities hereunder, or entitle him to any damages or compensation otherwise than as provided for in this contract. Bidder’s Initials________ The Contractor agrees that the District shall have the right to increase or decrease the quantity of any bid item or portion of the work or to omit portions of the work as may be deemed necessary or expedient, and that the payment for incidental items of work, not separately provided in the proposal shall be considered included in the price bid for other various items of work. Bidder’s Initials________ CMSD Project No. 349A Bid Proposal Form – 3 of 7 Accompanying this proposal is ____________________________________________ _______________________________ ($________________). NOTICE: Insert the words "Cash", "Certified Check", or "Bidder`s Bond", as the case may be in an amount equal to at least 10% of the total bid price, payable to the Costa Mesa Sanitary District. The undersigned deposits the above named security as a proposal guaranty and agrees that it shall be forfeited to the Costa Mesa Sanitary District as liquidated damages in case this proposal is accepted by the District and the undersigned shall fail to execute a contract for doing said work and to furnish good and sufficient bonds in the form set forth in the specifications and contract documents of the District with surety satisfactory to the District within 10 Days after the bidder has received written notice of the award of the contract; otherwise, said security shall be returned to the undersigned. Respectfully submitted, _________________________________ _________________________________ Contractor's Business Name Contractor Title _________________________________ _________________________________ Business Address: Street By: Title _________________________________ _________________________________ City State Zip Contractor's License, Expiration Date & Classification __________________________________ Business Phone Number __________________________________ Name Title __________________________________ Residence Phone Number __________________________________ Bidder’s Residence: Street __________________________________ City State Zip I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Dated at ____________________, this________ day of________________ 201 ____. ________________________________ (Signed) CMSD Project No. 349A Bid Proposal Form – 4 of 7 The full names and residences of all persons and parties interested in the foregoing proposal, as principals, are as follows: NOTICE: Give first and last names in full; in case of corporation, give names of President, Secretary, Treasurer and Manager, and affix corporate seal; in all cases of partnerships and joint ventures give names of all the individual members. CONSTRUCTION PROJECT REFERENCES In order to more fully evaluate your background and experience for the project herein proposed, it is requested that you submit a list of Public Works and/or similar construction projects completed, or in progress, within the last 24 months. Your cooperation in this matter is greatly appreciated. DATE PROJECT AGENCY'S CONTRACT AWARDED AWARDING AGENCY ADMINISTRATOR CMSD Project No. 349A Bid Proposal Form – 5 of 7 PROJECT ADDENDA Bidder shall signify receipt of all Addenda here, if any: ADDENDUM NO. DATE RECEIVED BIDDER’S SIGNATURE DESIGNATION OF SUBCONTRACTORS In compliance with the "Subletting and Subcontracting Fair Practices Act" being Sections 4100-4113 of the Government Code of the State of California, and any amendments thereto, each bidder shall set forth below the name and location of the place of business of each Subcontractor who will perform work or labor or render service to the prime Contractor in or about the construction of the work or improvement in an amount in excess of 1/2 of 1% of the prime Contractor's total bid and shall further set forth the portion of the work which will be done by each such Subcontractor. Only one Subcontractor for each such portion shall be listed. If the Contractor fails to specify a Subcontractor for any portion of the work to be performed under the contract, he shall be deemed to have agreed to perform such work himself, and he shall not be permitted to subcontract that portion of the work except under the conditions hereinafter set forth. Subletting or subcontracting of any portion of the work to which no Subcontractor was designated in the original bid, shall only be permitted in cases of public emergency or necessity, and then only after a finding reduced to writing as a public record of the Legislative Body of the owner. Portion State License Of Work Subcontractor's Name and Address Number Class CMSD Project No. 349A Bid Proposal Form – 6 of 7 10% BIDDER'S BOND TO ACCOMPANY PROPOSAL (Required if the bidder desires to submit bond instead of a certified or cashier's check). KNOW ALL PEOPLE BY THESE PRESENTS: That we, _____________________________________________as principals, and _________________________________________as surety, are held and firmly bound unto the Costa Mesa Sanitary District, a special district, organized under the laws of the State of California and situated in Orange County in the sum of _______________________________________________ ($_____________________) to be paid to the District, its successors and assigns, for which payment well and truly to be made, we bind ourselves, our heirs, executors, and administrators, successors or assigns, joint and severally firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, That if the certain proposal of the above bounden ________________________________________________________, is accepted by the Costa Mesa Sanitary District, and if the above bounden, _________________________ __________________ his heirs, executors, administrators, successors and assigns, shall duly enter into and execute a contract for such construction, and shall execute and deliver the LABOR AND MATERIAL and the FAITHFUL PERFORMANCE BONDS described within 10 days (not including Sunday) from the date of the mailing of a notice of the above bounden, __________________, by and from District, that said contract is ready for execution, then this obligation shall become null and void; otherwise it shall be and remain in full force and virtue. IN WITNESS WHEREOF: We hereunto set our hands and seals this ______________________ day of ____________________, 20__. __________________________________ __________________________________ __________________________________ CMSD Project No. 349A Bid Proposal Form – 7 of 7 NON-COLLUSION AFFIDAVIT The bidders, by its officers and agents or representatives present at the time of filing this bid, being duly sworn on their oaths say, that neither they nor any of them have in any way, directly or indirectly, entered into any arrangement or agreement with any other bidder, or with any public officer of Costa Mesa Sanitary District whereby such affiant or affiants or either of them has paid or is to pay to such bidder or public officer any sum of money, or has given or is to give to such other bidder or public officer anything of value whatever, or such affiant or affiants or either of them has not directly or indirectly, entered into any arrangement or agreement with any other bidder or bidder, which tends to or does lessen or destroy free competition in the letting of the contract sought for on the attached bids; that no bid has been accepted from any Subcontractor or supplier through any bid depository, the By-Laws, Rules, or Regulation of which prohibit or prevent the Contractor from considering any bid from any Subcontractor or supplier which is not processed through said bid depository, or which prevent any Subcontractor or supplier from bidding to any Contractor who does not use the facilities of or accept bids from or through such bid depository; that no inducement of any form or character other than that which appears upon the face of the bid will be suggested, offered, paid or delivered to any person of the contract, nor has this bidder any agreement or understanding of any kind whatsoever, with any person whomsoever to pay, deliver to, or share with any other person in any way or manner, any of the proceeds of the contracts sought by this bid. Subscribed and sworn to before me by: _____________________________________ This _______ day of ___________ 20__. My Commission expires: _____________________________________ Notary Public