YARD OFFICE ELECTRICAL IMPROVEMENTS PLAN 250822 MAE SignedCOSTA MESA SANITARY DISTRICT CONSTRUCTION PLANS FOR YARD OFFICE ELECTRICAL IMPROVEMENTS AUGUST 2025 COSTA MESA SANITARY DISTRICT BOARD OF DIRECTORS: MICHAEL SCHEAFER , PRESIDENT ARLENE SCHAFER, VICE PRESIDENT ARTHUR PERRY, SECRETARY ROBERT OOTEN, VICE SECRETARY NICOLE WILTSHIRE, DIRECTOR PREPARED BY: 8/22/25 MARK ESQUER, RCE 45174 DATE PROJECT ENGINEER COSTA MESA SANITARY DISTRICT REV.DATE BY DESCRIPTION 1 YARD OFFICE ELECTRICAL IMPROVEMENTS TITLE SHEET COSTA MESA SANITARY DISTRICT ORIGINAL SCALE:APPROVED FOR BIDDING: MARK ESQUER, DISTRICT ENGINEER DATE DRAFT DRAWN BY: DESIGN BY: CHECKED BY: T.B. M.E. M.E. SHEET 1 OF 3 SHEETS SHEET INDEX NUMBER TITLE 1 TITLE SHEET 2 NOTES 3 ELECTRICAL PLAN S S S S S S S S S S W W W W W W W W W W W W SSSSSSSSSSWWWWWWWWWWSSSSSSSSSSSSSSSSSS Scale: 1"=50' Project Location Map N S W E GENERAL NOTES 1.ALL CONSTRUCTION SHALL CONFORM TO THE COSTA MESA SANITARY DISTRICT'S "STANDARD PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION OF SANITARY SEWERS" AS LAST REVISED, UNLESS OTHERWISE INDICATED ON THE PLANS OR BY PROJECT SPECIFICATIONS. 2.THE CONTRACTOR SHALL SUBMIT TO THE DISTRICT A DETAILED CONSTRUCTION SCHEDULE WITHIN FIVE DAYS AFTER AWARD OF CONTRACT AND NOTICE TO PROCEED BY THE DISTRICT. THE CONTRACTOR WILL NOT BE ALLOWED TO BEGIN CONSTRUCTION UNTIL AFTER A PRE-CONSTRUCTION MEETING AND THE CONSTRUCTION SCHEDULE IS APPROVED BY THE DISTRICT. 3.THE CONTRACTOR SHALL HAVE A COPY OF THE APPROVED CONTRACT DOCUMENTS AND THE CMSD STANDARD PLANS AND SPECIFICATIONS ON THE JOB SITE AT ALL TIMES. 4.THE CONTRACTOR SHALL REQUEST INSPECTION FROM OFFICE OF THE DISTRICT ENGINEER AT (949)548-1192 AT LEAST TWO WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION. NO FACILITIES SHALL BE BACKFILLED UNTIL OBSERVED BY THE DISTRICT INSPECTOR. ANY WORK PERFORMED WITHOUT INSPECTION FROM THE DISTRICT SHALL BE CONSIDERED UNACCEPTABLE. 5.THE CONTRACTOR SHALL OBTAIN A CMSD SEWER PERMIT PRIOR TO COMMENCEMENT OF WORK FROM THE CMSD OFFICE AT 290 PAULARINO AVENUE, COSTA MESA, CA 92627 (949) 645-8400 EXTENSION 229. 6.THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS REQUIRED BY THE CITY OF COSTA MESA, CITY OF NEWPORT BEACH AND OTHER LOCAL GOVERNING AGENCIES. 7.THE CONTRACTOR SHALL IMPLEMENT A TRAFFIC CONTROL PLAN FOR CONSTRUCTION AREAS IN CONFORMANCE WITH THE WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH) AND APPROVED CITY OF COSTA MESA AND/OR CITY OF NEWPORT BEACH ENCROACHMENT PERMITS. 8.THE CONTRACTOR SHALL COMPLY TO CONSTRUCTION WORK HOURS AS DEFINED ON THE CITY OF COAPPROVED ENCROACHMENT PERMIT. 9.AT THE END OF EACH WORKING DAY AND AT THE TIMES WHEN CONSTRUCTION OPERATIONS ARE SUSPENDED FOR ANY REASON, THE CONTRACTOR SHALL REMOVE ALL EQUIPMENT, VEHICLES, MATERIAL, TRAFFIC CONTROL, STOCKPILE OR ANY OTHER FORM OF OBSTRUCTION FROM THE STREET RIGHT-OF-WAY. 10.THE CONTRACTOR SHALL MAINTAIN THE WORK AREAS IN A NEAT, SAFE, CLEAN, AND SANITARY CONDITION AT ALL TIMES AND TO THE SATISFACTION OF THE DISTRICT. STREETS SHALL BE KEPT CLEAN OF DEBRIS, DUST, AND OTHER NUISANCE AT ALL TIMES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CLEAN-UP OF ADJACENT STREETS AFFECTED BY CONSTRUCTION. THE CONTRACTOR SHALL HAVE A VACUUM/BRUSH TYPE SWEEPER ON THE JOB SITE AT ALL TIMES DURING CONSTRUCTION. 11.ALL PAVEMENT REMOVAL NECESSARY FOR THE CONSTRUCTION OF THIS PROJECT SHALL BE SAW CUT PRIOR TO REMOVAL AND REPLACED IN CONFORMANCE WITH THE PLANS AND SPECIFICATIONS AND TO THE SATISFACTION OF THE DISTRICT. DISPOSAL OF REMOVED PAVEMENT SHALL BE AT AN APPROVED DUMP SITE. 12.ALL CONCRETE DRIVEWAYS, SIDEWALKS OR CURBS TO BE REMOVED AND REPLACED SHALL BE SAWCUT TO THE NEAREST TRANSVERSE SCORE MARK OR ADJUSTABLE CONTROL JOINT OR WEAKENED PLANE JOINT AND REPLACED IN CONFORMANCE WITH THE PLANS AND SPECIFICATIONS AND TO THE SATISFACTION OF THE DISTRICT. 13.THE CONTRACTOR SHALL REPAIR AND RESTORE EXISTING LANDSCAPE AND SURFACE IMPROVEMENTS TO ORIGINAL CONDITION TO THE SATISFATION OF THE DISTRICT. 14.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISPOSAL OF EXCESS MATERIAL NOT USED 14. DURING CONSTRUCTION AT AN APPROVED DUMP SITE. 15.ALL TRENCHING AND/OR SHORING SHALL MEET REQUIREMENTS OF CAL-OSHA. GROUNDWATER MAY BE PRESENT DURING CONSTRUCTION OF THE PROPOSED FACILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARATION OF A DEWATERING PLAN IN CONFORMANCE WITH ALL REGIONAL WATER QUALITY CONTROL BOARD REQUIREMENTS. 16.AT THE END OF EACH WORK DAY, THE CONTRACTOR SHALL EITHER BACKFILL USING TEMPORARY PAVEMENT OR 16. STEEL PLATE ALL EXCAVATIONS WITHIN STREET RIGHT-OF-WAY SO ALL LANES OF TRAFFIC CAN BE OPENED. STEEL PLATES SHALL HAVE NON-SKID SURFACE. THE CONTRACTOR SHALL RECESS STEEL PLATES ON TOP OF MILLED SURFACE SO PLATES ARE FLUSH WITH EXISTING SURFACE. STEEL PLATES SHALL BE INSTALLED TO THE SATISFACTION OF THE DISTRICT AND CITY INSPECTORS. 17.THE CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT AT LEAST 48 HOURS BEFORE BEGINNING ANY CONSTRUCTION WORK. THE CONTRACTOR SHALL PROVIDE THE DISTRICT A COPY OF THE USA TICKET. 18.EXISTING BENCHMARK/MONUMENT: ANY BENCHMARK OR MONUMENT WHICH IS DISTURBED OR DESTROYED DURING CONSTRUCTION SHALL BE REESTABLISHED AND REPLACED BY A STATE OF CALIFORNIA CIVIL ENGINEER REGISTERED PRIOR TO DECEMBER 31, 1981 OR A LICENSED LAND SURVEYOR. 19.EXISTING UTILITIES AND STRUCTURES VERIFICATION: THE EXISTENCE AND LOCATION OF ANY EXISTING UTILITIES AND STRUCTURES SHOWN ON THESE PLANS ARE APPROXIMATE. THE CONTRACTOR SHALL FIELD VERIFY THE LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES AND STRUCTURES. THE CONTRACTOR SHALL TAKE ALL CARE AND PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN, AND ANY OTHER LINES AND STRUCTURES NOT SHOWN ON THESE PLANS, AND IS RESPONSIBLE FOR THE PROTECTION OF, AND ANY DAMAGE TO THOSE LINES AND STRUCTURES. ALL COST OF POTHOLING AND EXPOSING SHALL BE BORNE BY THE CONTRACTOR. 20.UTILITIES CONFLICT: IF THE EXISTING UTILITIES OR STRUCTURES DIFFER FROM THOSE SHOWN ON THE PLANS AND THERE IS A CONFLICT WITH THE PROPOSED FACILITIES, THE CONTRACTOR SHALL NOTIFY THE DISTRICT IN WRITING IMMEDIATELY TO DETERMINE THE DESIGN CHANGES OR RELOCATIONS REQUIRED TO ELIMINATE THE CONFLICT. 21.OVERHEAD ELECTRIC/UTILITY LINES: THE CONTRACTOR SHALL COMPLY WITH REQUIREMENTS OF CAL-OSHA, PUBLIC UTILITIES, AND OTHER LOCAL GOVERNMENT AGENCIES FOR ALL WORK NEAR OVERHEAD ELECTRIC AND UTILITY LINES. 22.ALL PROPOSED IMPROVEMENTS HAVE BEEN DESIGNED AROUND THE ASSUMPTION THAT THE LOCATION OF 22. ALL EXISTING UTILITIES AS WELL AS THE EXISTING SEWER FACILITIES ARE AS SHOWN ON THESE PLANS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO EXPOSE ALL PIPELINES INVOLVED IN CONSTRUCTION TO VERIFY THE LOCATION, ELEVATION, AND PIPE MATERIALS PRIOR TO CONSTRUCTION. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAKE ADJUSTMENTS IN THE FIELD BASED UPON ACTUAL FIELD CONDITIONS IN A MANNER ACCEPTABLE TO THE DISTRICT. EXISTING UNDERGROUND UTILITIES NOTE: EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN ARE PER RECORD DRAWINGS. PRIOR TO TRENCHING FOR FORCE MAIN, CONTRACTOR SHALL POTHOLE UTILITIES AT CROSSINGS AND REPORT TO THE ENGINEER ANY DISCREPANCIES IN LOCATION AND/OR ELEVATION PREPARED BY: 8/22/25 MARK ESQUER, RCE 45174 DATE PROJECT ENGINEER NOTE: THE CENTERLINE AND RIGHT OF WAY SHOWN HEREON ARE BASED ON RECORD MAPS ON FILE WITH ORANGE COUNTY AND ARE FOR INFORMATIONAL PURPOSES ONLY. NO TITLE REPORT OR EASEMENT INFORMATION WAS PROVIDED BY CLIENT. G G G G SD SD SD CATV CATV CATV CATV GAS METER RISER VALVE VAULT UNKNOWN UTILITY ETS MANHOLE PULLBOX RISER UTILITY POLE VAULT VEGETATION TREE CABLE TV PULLBOX SITE AREA LIGHT GUARD POST MAILBOX MONITORING WELL BUILDING COLUMN PILLAR ELECTRICAL GUY ANCHOR MANHOLE METER POWER POLE POWER POLE WITH LIGHT PULLBOX RISER BARRIERS/FENCES/WALLS GATE POST SINGLE GATE DOUBLE GATE CONTROL BENCHMARK HORIZ AND VERT CONTROL FOUND MONUMENT IRRIGATION CONTROL VALVE SEWER CLEANOUT MANHOLE STORM DRAIN AREA DRAIN DROP INLET MANHOLE TELEPHONE MANHOLE POLE PULLBOX RISER VAULT RECLAIMED WATER HYDRANT METER VALVE VAULT WATER FIRE DEPARTMENT CONNECTION FIRE HYDRANT FIRE HYDRANT VALVE MANHOLE METER POST INDICATOR VALVE VAULT TRAFFIC DETECTION LOOP PEDESTRIAN SIGNAL STREET LIGHT NO ARM STREET LIGHT WITH ARM STREET LIGHT PULLBOX TRAFFIC SIGNAL NO ARM TRAFFIC SIGNAL WITH ARM TRAFFIC SIGNAL PULLBOX TRAFFIC SIGN SIGN DRAIN GRATE CLEANOUT ELECTRIC VAULT VENT TV T MBX ST TRAFFIC SIGNAL WITH ARM-MULTI TS U U U DRAFT YARD OFFICE ELECTRICAL IMPROVEMENTS SHEET 2 OF 3 SHEETS PUBLIC AGENCIES & UTILITIES AGENCY PHONE NO. AT&T - DISTRIBUTION 714-666-5503 CLEAR CHANNEL OUTDOOR 213-305-0045 COSTA MESA SANITARY DISTRICT 949-645-8400 EXT. 229 MESA CONSOLIDATED WATER DISTRICT 949-207-5518 SC EDISON 714-796-9932 SC GAS- SANTA ANA 714-634-5067 SUNESYS CROWN CASTLE 951-278-0400 TIME WARNER CABLE 714-903-8446 CITY OF COSTA MESA 714-750-5000 LEGAL DESCRIPTION: THE WEST 165.23 FEET OF THE SOUTH 160.00 FEET LOT 1 OF TRACT NO. 156, IN THE CITY OF COSTA MESA, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 11, PAGES 47 OF MISCELLANEOUS MAPS IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. BASIS OF BEARINGS: THE BEARINGS SHOWN HEREON ARE BASED ON THE BEARING BETWEEN O.C.S. HORIZONTAL STATION GPS NO. 6195 AND STATION GPS NO. 6155R1 BEING NORTH 00°28'44" EAST, PER RECORDS ON FILE IN THE OFFICE OF THE ORANGE COUNTY SURVEYOR. BENCHMARK: THE ELEVATIONS SHOWN HEREON ARE BASED ON COUNTY OF ORANGE BENCHMARK NUMBER "CM-32-81", ELEVATION 80.679'. COSTA MESA SANITARY DISTRICT ORIGINAL SCALE: S S S S S S S S S S S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SSSSSSSSSSSSSSSSSWWWWWWWWWWWWWWWWWSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSWNEW BUILDING WAS BUILT EXISTING FUEL TANK S S S S CAP THE SEWER LATERAL AT THE PROPERTY LINE EXISTING TRASH ENCLOSURE EXISTING TRASH ENCLOSURE 2252 FAIRVIEW RD EXISTING BLOCK WALLEXISTING BLOCK WALL TO REMAIN EXISTING GATE PROPERTY LINE PROPERTY LINE EXISTING FENCE PROPERTY LINE PROPERTY LINE ULTIMATE ROW 12" ACP WATER 8" VCP SEWER21" VCP SEWER27" VCP SEWER8" VCP SEWEREXISTING WATER METER IN SERVICE FOR IRRIGATION ONLY EXISTING DRAIN INLET EXISTING BLOCK WALL E D F J M C A BN K C A BOFFICE (10' x 32'-2")4.0'32.2'10.0'6.0'KG H 2.8' 60" x 40" STEP OUT 2.1'C K PLAN VIEW SCALE: 1"=20' N S W E CONSTRUCTION NOTES DESCRIPTION CORE DRILL FOR TWO (2) CONDUITS. J-BOX WITH COVER 1" ELECTRIC CONDUIT WITH 2 - CAT 6 CABLE. 1-1 14" ELECTRIC CONDUIT WITH 1 # 2 THHN BLACK, 1 # 2 THHN RED, 1 # 2 THHN WHITE, 1 # 4 GROUND. TWO(2) CAT 6 CABLE (HOME RUN) APPROX. ±100 FT. INSTALL 4 x 4 BOX WITH COVER IN SERVER OFFICE, TERMINATE CABLE(S) WITH 10 FEET EXCESS. TERMINATE 1 14" CONDUIT IN BREAKER BOX. TERMINATE 1 14" CONDUIT IN TRAILER ELECTRICAL PANEL, CONNECT CONDUCTOR TO PANEL. TERMINATE 1" CONDUIT IN S.E CORNER OF OFFICE, PROVIDE 10 FEET OF CAT 6 (EXCESS). NOT USED. INSTALL 80 AMP DOUBLE-POLE BREAKER (WITH LOCK-OUT CAPABILITY). INSTALL CONDULET. NOT USED. INSTALL 4 x 4 BOX WITH COVER FOR CAT 6 CABLE. APPROX. 200' RM FROM BREAKER TO SUB-PANEL. # A B C D E F G H I J K L M N GENERAL NOTES 1.INSTALL WORK PER LATEST EDITION OF CALIFORNIA ELECTRICAL CODE. 2.PROVIDE TWO (2) 300-FOOT, CAT 6 CABLE (NO SPLICES). COSTA MESA SANITARY DISTRICT ORIGINAL SCALE:PREPARED BY: 8/22/25 MARK ESQUER, RCE 45174 DATE PROJECT ENGINEER DRAFT YARD OFFICE ELECTRICAL IMPROVEMENTS SHEET 3 OF 3 SHEETS