Loading...
Change Order - Torres Sanitation - Project 351COSTA MESA SANITARY DISTRICT Adams Avenue Urgent Sewer Repair Project No. 351 REQUEST FOR CHANGE ORDER (Payment or Time) RCO No. 1 DATE: 3/27/24 NOTICE: Conditions arising that would support a request for payment for additional work or time extension must be brought to the District's attention within ten (10) days, and a Request for Change Order for additional work/time extensions must be filed within fifteen (15) days. THIS FORM MUST BE USED. (See Contract Section 5.) Circumstances supporting payment for additional work/time: 1) Describe why payment should be granted. Attach any more detailed discussion, with backup documents as an exhibit. (Remember: damages have been contractually limited on this job. See Section 28 of the Contract.) Torres to backfill sewer repair trench with 1Sk Cement Slurry due to large void under asphalt. Additional Cost $5,183.03 2) Describe the delay and why a time extension is appropriate. Provide any backup documents as may be necessary to support the request. You must demonstrate how the critical path was impacted. No time extension Contractor:Torres Sanitation Systems Construction Submitted by: Owner Name: Alexandro Torres District: Construction Manager's Approval: Engineer's Approval: By: Michael Benesh By: Mark Esquer NOTE: Approval of this request for change order is only effective upon District approval of the change order. Change Order approved/denied by: 9617 OTIS ST SOUTH GATE CA. 90280 (323)518-9012 LIC# 1052723 DIR# 1000669233 Proposal Re: Project Title: Project Location: Proposal Completed By: Description of Work: Includes: Backfill sewer trench including large void beneath asphalt adjacent to trench with 1 Sk cement slurry. . Bid Item #Description Estimated QTY Unit Unit Price Total price Co1 1.0 Sk cement slurry 10 CY LS $4,506.98 Change order Mark up +15%$676 $5,183.03 Created By:Alexandro Torres Name and Title:Owner Date :3/26/2024 Signature:Alex Approved By: Name and Title: Date: Signature: TORRES SANITATION SYSTEMS CONSTRUCTION . SUB TOTAL 32624 Michael Benesh Slurry Backfill Alexandro Torres Adams Ave Urgent Sewer Repair Project No. 351 Costa Mesa Sanitation District Costa Mesa, CA 1