Proposal - Project 342 Headquarters Sewer Water - 2023-05-18May 2, 2023
P342 HQ Sewer and Water Modifications ReBid
BID FORM
Company Name: ______________________________
Address: ______________________________
Phone #: ______________________________
Base Bid (And basis of Award): Provide HQ Property Serwer and Water modifications per Plans,
Specifications, and Standard Drawings that generally consist of installing a new 4” private sewer lateral
with cleanout(s), installation of new cleanout on existing sewer lateral, install a new 2” copper waterline,
install new 2” RP Backflow device, and new 1” copper waterline with appurtenance.
Task Description Cost Basis
1. Move-on and overhead Lump Sum
2. Install new 4” sewer lateral with Single
and Double Cleanout(s)Lump Sum
3. Install new CMSD S-107A Double
Cleanout on existing sewer Lump Sum
4. Install new 2” copper potable water line
with RP Backflow Device Lump Sum
5. Install new 1” copper potable water line
with hose bibbs Lump Sum
6. Move-off and close-out Lump Sum
PROJECT Base Bid TOTAL (Numbers):$
_____________________________Total Base Bid Price (in Words):
The Base Bid will be used to award a contract and the basis of award to the lowest responsive and
responsible bidder. Price(s) given above are consultant for 60 days after date of bid opening.
May2, 2023
Page | 2
Alternate Bid Price (District may consider a substitution for Bid Line #5): Not Bases for Award
A1 Lump Sum
Install new 1” HDPE potable water line with copper hose
bibbs risers instead of 1” copper (alternate for Bid Item #5,
above).
Lump
Sum $
A2 Not Used Lump
Sum $ 0.00
TOTAL AMOUNT OF
ITEMS A1 THROUGH A2 $________________
Addendum(s) No(s). ____,____,____, and ____ has/have been received and is/are included in this bid.
Contractor License: _________________________________
Bidder Signature: _________________________________
Print Name & Title: _________________________________
Date: _________________________________
Email: _________________________________