Change Order - T&M Associates Consulting Engineers - 2023-04-05REQUEST FOR CHANGE ORDER NO. 1 (Payment or Time) NOTICE: Conditions arising that would support a request for payment for additional work or time extension must be brought to the District’s attention within ten (10) days, and a Request for Change Order for additional work/time extensions must be filed within fifteen (15) days. THIS FORM MUST BE USED. (See Contract Section 5.) Circumstances supporting payment for additional work/time: 1. Describe why payment should be granted. Attach any more detailed discussion, with backup documents as an exhibit. (Remember: damages have been contractually limited on this job. See Section 28 of the Contract.) The District completed the arc-flash review and study work that identified urgent work that must be conducted because the electrical deficiencies create a hazard to the station and District staff. The added work includes design for: A. Irvine Station: Installation of a main electrical breaker, local disconnect for the generator set, and replacement interlock for the generator set and portable generator plug. B. Harbor Station: Replacement of the portable pump transfer switch and replacement of the undersize main wire/conductors between the main breaker and buss bar/pump breakers. Summary The total requested change order cost is $7,422. This change order request amounts to an 18.7% increase, based on the $39,710 contract amount. The proposed change order price is reasonable, based on District staff soliciting bids from two other firms, Linkture Electrical, at $9,830, and a “No Bid” from Spec Services Electrical Engineering Services. The District Engineer also called Carollo Engineers and Black and Veatch, neither would respond to this small engineering service and declined to provide an email. DocuSign Envelope ID: 6DC5340D-3F78-4886-83D2-EF47A6EB1D6B 2. Describe the delay and why a time extension is appropriate. Provide any backup documents as may be necessary to support the request. You must demonstrate how the critical path was impacted. A hundred (100) workday extension is being granted to account for delays caused by the District and to provide time for the Consultant to prepare the project design. Submitted by: M. Esquer Contractor’s Representative Approval: District Engineer’s Approval: See attached Proposal signed by T&M __________________________ By: John Dean By: Mark Esquer NOTE: Approval of this request for change order is only effective upon District approval of the change order. Change Order approved/denied by: _________________________________ Scott Carroll, General Manager Digitally signed by Mark Esquer, P.E. DN: C=US, E=mesquer@cmsdca.gov, O=Costa Mesa, OU=District Engineer, CN="Mark Esquer, P.E." Reason: I am the author of this document Date: 2023.04.05 15:04:29-07'00' DocuSign Envelope ID: 6DC5340D-3F78-4886-83D2-EF47A6EB1D6B 4/5/2023